EAST CORRIDOR DESIGN BOOKLET KEY PLAN DRAFT ENVIRONMENTAL PROJECT REPORT: APRIL 2018 RICHMOND OXFORD STREET EAST STREET HIGHBURY AVENUE CLARENCE

Similar documents
Appendix A-K Public Information Centre 2 Materials

Appendix K: Traffic Analysis July 2017

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Frequently Asked Questions (FAQ)

Appendix E-1: Traffic Analysis

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

LONDON s. system TRANSFORMING THE WAY LONDON MOVES

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

CHAIR AND MEMBERS STRATEGIC PRIORITIES AND POLICY COMMITTEE MEETING ON MARCH 20, 2019

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

See Figure 38, Existing Nonmotorized Connections.

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

DRAFT ENVIRONMENTAL PROJECT REPORT. April 23, 2018

Richmond-Adelaide Cycle Tracks

Welcome to the Quebec Alternatives Analysis Public Meeting

Seattle Bicycle Advisory Board August 3, 2011

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

4.7 Best Route to School Maps and Mapping

Park City, Utah s Access Management for the Olympic Transit Center/Roundabout in Old Town

Decision on North Waterloo Routing

Agenda Item # Page # RECOMMENDATION

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Columbia Pike Implementation Team (CPIT) Meeting

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

STREETSCAPE CONCEPTS

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

KEARNY MESA COMMUNITY PLAN UPDATE

Existing Transportation System

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

CHIEF PEGUIS TRAIL EXTENSION WEST

Bus rapid transit network

RZC Appendix 8A Marymoor Subarea Street Requirements

September 20, 2016 L Taraval Rapid Project SFMTA Board of Directors Meeting

Sixth Line Development - Transit Facilities Plan

Completing the Street: Denning Drive

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Why invest in the 1 Street S.W. Corridor?

Community Task Force July 25, 2017

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Item B1 November 19, 2009

122 Avenue: 107 Street to Fort Road

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Scope of the Transit Priority Project

Appendix A-2: Screen 1 Alternatives Report

LTAC: Katie Mencarini, Central & Hampton Roads streets and a fifteen minute debrief to discuss the findings. Participants walked along Mill Road

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Active Transportation Audit

Non-Motorized Transportation 7-1

City of Richmond Bicycle Master Plan

Welcome to the Sellwood Bridge Project Open House!

Welcome and Purpose of Meeting

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Functional, Preliminary Design and Detailed Design

DART Bus Crash Analysis. typical scenarios associated with selected crash types

including shade trees; Recommend minimum 13 ft total sidewalk

What Is a Complete Street?

APPENDIX L. Design Criteria

Tonight is for you. Learn everything you can. Share all your ideas.

Existing Transportation System

Maywood Town Hall Meeting. May 4, 2016

Appendix E-2: Microsimulation Report

N. Frederick Street to N. Manchester Street

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

2012 PRIORITY TRANSPORTATION PROJECTS

Station Plan: Penn & 43rd Avenue

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

San Fernando School Route Improvement Program Phase 3 Cycle 2 Federal Grant Application Project List

Board of Supervisors February 27, 2017

PROJECT KEY TYPICAL SECTION 1 =60

Arterial Transitway Corridors Study. Ave

Hospital Link Project Project Update September 2017

Crystal City Citizen Review Council Meeting. July 10, 2013

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

McLEAN CITIZENS ASSOCIATION

North Turnaround. Option 3: Best facilitates transfers from local to rapid transit services. High cost

NEWMARKET UPHAM S CORNER

Comprehensive Collection of Stakeholder Alternatives by Mode

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arterial Transitway Corridors Study. Sept. 26, 2011

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

3000 Event Village closes

Creating the Future Bruce B Downs Blvd

Transcription:

EAST CORRIDOR DESIGN BOOKLET NE10 NE11 NE12 CLARENCE RICHMOND STREET STREET ONTARIO STREET NE09 NE08 EAST NE04 NE05 NE06 NE07 NE01 NE02 NE03 KEY PLAN DRAFT ENVIRONMENTAL PROJECT REPORT: APRIL 2018

WATERLOO STREET WATERLOO STREET COLBORNE STREET COLBORNE STREET BURWELL STREET BURWELL STREET SEE WEST CORRIDOR SW29 SEE WEST CORRIDOR SW29 DESIGN AND OPERATION OF PARKING/ LOADING ZONE TO BE DEVELOPED COLBORNE ST CYCLING FACILITY TO BE REVIEWED SIGNALIZED PEDESTRIAN CROSSWALK MATCH LINE NE02 MATCH LINE NE02

MAITLAND STREET MAITLAND STREET ADELAIDE STREET ADELAIDE STREET WILLIAM STREET WILLIAM STREET MATCHLINE NE01 MATCHLINE NE01 KING / ADELAIDE CYCLING FACILITY TO BE REVIEWED MATCH LINE NE03 MATCH LINE NE03

GLEBE STREET GLEBE STREET RECTORY STREET RECTORY STREET HEWITT STREET LYLE STREET LYLE STREET HEWITT STREET LYLE STREET LYLE STREET MATCHLINE NE02 MATCHLINE NE02 MATCH LINE NE04 MATCH LINE NE04

MATCH LINE NE05 MATCHLINE NE03 MATCH LINE NE05 MATCHLINE NE03 KING STREET ONTARIO STREET ONTARIO STREET ONTARIO STREET DUNDAS STREET

QUEBEC STREET EGERTON STREET EGERTON STREET KELLOGG LANE KELLOGG LANE MATCHLINE NE04 QUEBEC STREET CHARLOTTE STREET CHARLOTTE STREET WOODMAN AVENUE WOODMAN AVENUE DORINDA STREET DORINDA STREET MATCHLINE NE04 CYCLING FACILITY BETWEEN QUEBEC ST AND EGERTON ST TO BE REVIEWED LEFT-TURN ACCESS UNDER REVIEW MATCH LINE NE06 MATCH LINE NE06

ELEANOR STREET ELEANOR STREET ASHLAND AVENUE ASHLAND AVENUE ASHLAND AVENUE ASHLAND AVENUE MATCHLINE NE05 NIGHTINGALE AVENUE NIGHTINGALE AVENUE BURBROOK PI 5.00 5.00 5.00 MCCORMICK BLVD MCCORMICK BLVD MATCHLINE NE05 TO REMAIN EXISTING RAIL CROSSING UNDER REVIEW LANE CONFIGURATION REFINED IN DETAIL DESIGN LEFT-TURN ACCESS UNDER REVIEW BURBROOK PI POTENTIAL REALIGNMENT TO BE MATCH LINE NE07 MATCH LINE NE07

OAKLAND AVENUE OAKLAND AVENUE MATCHLINE NE06 5.00 MATCHLINE NE06 LEFT-TURN ACCESS UNDER REVIEW MATCH LINE NE08 HIGHBURY AVENUE MATCH LINE NE08

MATCHLINE NE07 MATCHLINE NE07 REFER TO NE-GA-01. STRUCTURE OUTLINE. CONCEPTUAL MATCH LINE NE09 MATCH LINE NE09

PSYCHIATRIC HOSPITAL ENTRY PSYCHIATRIC HOSPITAL ENTRY LONDON LONDON MATCHLINE NE08 MATCHLINE NE08 LANDS TO BE DEVELOPED (BY OTHERS) ACCESS TO REDEVELOPMENT LANE CONFIGURATION UNDER REVIEW MATCH LINE NE10 MATCH LINE NE10

MATCHLINE NE09 MATCHLINE NE09 OXFORD STREET MULTI-USE TRAIL MATCH LINE NE11 MATCH LINE NE11

BY OTHERS FUTURE DEVELOPMENT MATCHLINE NE10 MULTI-USE TRAIL MULTI-USE TRAIL ROEHAMPTON AVENUE ROEHAMPTON AVENUE MULTI-USE TRAIL MATCHLINE NE10 ROEHAMPTON AVENUE MULTI-USE TRAIL ROEHAMPTON AVENUE AVENUE AYRESWOOD AVENUE AYRESWOOD MULTI-USE TRAIL FIRST STREET FIRST STREET DESIGN ALONG OXFORD ST TO BE REVIEWED MULTI-USE PATH MATCH LINE NE12 MATCH LINE NE12

JIM ASHTON STREET JIM ASHTON STREET MATCHLINE NE11 BUS SHELTER BUS SHELTER BUS SHELTER BUS SHELTER FUTURE PLATFORMS PROTECTED FOR MATCHLINE NE11 ENTERING BUS BAYS TURNING CIRCLE BEFORE TURN AROUND AT THE ALL LOCAL BUSES WILL SHELTER BUS SHELTER BUS PARKING LOT TURNING OUT INTO BUS BAY (BY OTHERS) CAMPUS DRIVE LINE PAINTED CORNER TO PREVENT VEHICLES FROM REALIGNED TIE-IN TO TRAFFIC TO TURN LEFT INDICATE TO OTHER SEMI-RAISED CURB TO