Intermediate Angle, 0-25, Drilling detail. Angle 26-50, Baulk Plates, Pole Details. Termination Poles, ABC Details

Similar documents
Installation and Training Manual

Airwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Security and confidence at height.

CS10 # Network Safety Performance Objectives (2016)

3/8" Safety Cable Systems

Page 1 of 1 04/19/13 SBR

Tripod Setup Guide (M-TPx)

Anchors that can be used for a lifeline in a grain bin. or Ladder do not make good anchors!

TVPPA Lineman Apprenticeship Program

TRAVSMART permanent single-cable horizontal lifeline system

Troyer s Gourd Rack 8 unit F R H O P

RAI-M series RUDDER ANGLE INDICATOR SYSTEM

VDOT 2016 Road and Bridge Standards Section Traffic Control Devices

Spring steel fasteners KWHS-14R. KwikWire. Hanging system

B-LINE SERIES. Spring steel fasteners KWHS-15. KwikWire. Hanging system

Installation Guide Wall Mounted Angled Flagpole

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

Instructions. Follow All Instructions Before Assembling Or Using This Product

S.R.A. Fully Engineered Product Range

HARD COPY UNCONTROLLED Ergon Energy Corporation Ltd ABN

Lessons from (Transmission Line) Failures

Gel Drop Seal for FOSC 450 Fiber Optic Splice Enclosure Installation Instructions

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

Uses, Certifications, and Standards FASTENERS,KWIK WIRE,Lighting, Ductwork, Cable Tray

Sideshift SS230 Installation on a 2006 Bayliner 265SB

Methods of installation of ADSS fiber optic cables

Boat Boat Loader Fitting Instructions

Tower Accessories & Hardware

Printview: End and intermediate plate; 1 mm thick - Item No.:

ABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR U SERIAL No

Copper Bonded Ground Rod / Grounding Rods / Copper Bonded Earth Rod / Earthing rods

A Basic Guide to Europe Dinghy Rigging

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Infrared Linescanners

I.H.S INSTALLATION INSTRUCTIONS

Data sheet Pressure switch type CS December 2001 DKACT.PD.P10.A B1119

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

COMPFIRE CCFT-FP_550_55_ September 2010 Fin Plate Connection to Circular Concrete-Filled Tube Test Result

2010 International Snow Science Workshop

44 CE RANGE WATERTIGHT SURFACE-MOUNTING JUNCTION BOXES

TOWER INSPECTION REPORT

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Loopie Sling SP-18(0718)

Vibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual

Cable Grip Fitting Procedure General

MSA Latchways Ladder System

Soma Wind Generators

References, characteristics. References (1) Complementary characteristics not shown under general characteristics (page 30395/3)

WALL BRACKETS WALL BRACKETS PDI-179C. PDI-179 Bunting. see diagram next page PDI B-1

Sconce INSTALLATION INSTRUCTIONS P34022

HALYARD EXITS, CLEATS, CLUTCHES, WINCH PADS, HANDLE POCKET

Step 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the seam joint is.

VERSA BIKE RACK INSTRUCTIONS


Electromechanical pressure switches

Draw-wire system SZG165

Safety System Installation Guide for ARE Wind Poles

Channel Nuts & Hardware

BKC100 SPRG Clamp For Wire Rope. Dimensions and Weight. Long Description. Manufacturer Information. Taxonomies, Classifications, and Categories

MSA Confined Space Entry Equipment

Masthead Sensor Installation Guide

S110 Steel Level Panel Installation Instructions

B104ZN BLTD 4H 90 L Bracket. Features. Material, Color, and Finish. Dimensions and Weight. Long Description

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

Mast Inspection. Client: Location: Date: Inspected by: Verified by:

Instructions. Follow All Instructions Before Assembling Or Using This Product

rondo aluminium components

XTS-Impact. XTS-Terminal (hold)

Thumb Shifter Plus Thumb Shifter

PAGE INDEX PAGE # CATALOG NUMBER BUS SUPPORTS B 1 AWSTFR BUS SUPPORTS B 2 AWTTFR BUS SUPPORTS B 3 AWTESR BUS SUPPORTS B 4 AWLI BUS SUPPORTS B 6 AACB

Applications and Considerations Section 11

Anchor Component Material Standard Mechanical Properties

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

A variety of other devices can be used with the front dee ring, but please check for suitability.

Sub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171

Backboard and Rim Owners Manual

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

We put it all on the line, so you don t have to.

Shifting Lever. Dealer's Manual. RAPIDFIRE Plus SL-M2000 SL-M3010 SL-M4010. Thumb Shifter SL-TZ500. ROAD MTB Trekking. City Touring/ Comfort Bike

steel wire cable tray system accessories

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

MSA Confined Space Entry Equipment

Installation, Compensation and Maintenance Instructions for. RITCHIE Compasses. Made In U.S.A

Check with local zoning official for property line distance requirements.

Residential Garage Door WARNING

Journeyman Team Events

Grounding reel VDV & VDV-3416

TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall

Limit switches OsiSense XC Special For material handling applications, type XC1 AC

JET SWIM ELEGANCE 70 INSTALLATION AND USER GUIDE

BALL STOP INSTALLTION GUIDE

Fewer parts. Fast installs. ANSI Compliant. 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems

Fewer parts. Fast installs. ANSI Compliant. 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems

Heavy Equipment & Rigging Specialist Training

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

The accuracy and safety of the connected measuring devices are directly regulated. of the introduced current transformers.

Transcription:

Part 7 LVABC Overhead Drawing Register Number A1 A2 A3 A4 A5 A6 A8 A9 Description Intermediate Angle, 0-25, Drilling detail Angle 26-50, Baulk Plates, Pole Details Termination Poles, ABC Details Inline Strain, with or without Fusing / Isolation Tee Off Cables Circuit Breaker and Mounting Bracket Standard Fuse and Mounting Bracket Horizon Power Corporation

INTERMEDIATE ANGLE 0^ - 25^ DRILLING DETAIL A1

STAY 100 4 BOLTED BAULK BOLTED BAULK 1500 NOTE 2 POLE STRENGTH (kn) SELECTION FOR WIND CATEGORIES A & B (NOTE 8) CATEGORY A POLE HEIGHT 9.5m 11.0m 12.5m LOCATION POLE HEIGHT LOCATION TOWN RURAL TOWN RURAL 5 10 10 15 15 20 CATEGORY B 9.5m 11.0m 12.5m 20 35 40 45 50 50 STAY REQUIRMENTS FOR ANGLE DEVIATION FOR 4 x 95mm CABLE ANGLE OF DEVIATION (DEG) ANGLE OF DEVIATION (DEG) 0-25 26-38 39-50 TERM 0-19 20-28 29-44 45-50 0-19 20-28 29-44 0-14 15-20 21-32 TERM MEDIUM TENSION MEDIUM TENSION BOLTED BAULKS BOLTED BAULKS STAYED STAYED TIGHT TENSION TIGHT TENSION BOLTED BAULKS STAY REQUIRMENTS FOR ANGLE DEVIATION FOR 4 x 150mm CABLE BOLTED BAULKS 45-50 TERM STAYED 33-50 TERM STAYED 2. REFER TO TABLE TO DETERMINE IF BAULK REQUIRED (STOCK No. CZ0388) BAULKS TO BE INSTALLED IN PARALLEL WITH THE HORIZON POWER ALIGNMENT USING U-BOLTS. 3. POLE TOP ARRANGEMENTS (0^ - 25^) ABC 300 AND (26^ - 50^) ABC 301 ARE TO BE USED WITH THE POLE SELECTION. 4. POLE STRENGTH IS FOR A CONDUCTOR WIND LOADING OF 500pa AT 15^. 5. IN CYCLONIC AREAS POLES MUST BE STAYED FOR ANGLES GREATER THAN 10^. 6. FOR POOR SOIL CONDITIONS POLES MUST BE STAYED FOR DEVIATIONS GREATER THAN 5^ 7. ALL STAYS SHOULD BE 19/2.0 SC/GZ G 1320 STRENGTH. 8. POLE STRENGTH REQUIREMENTS FOR A STEEL POLE IN MEDIUM/GOOD SOIL CONDITIONS. ANGLE 26^- 50^ BAULK PLATES POLE DETAILS A2

SEE NOTE 2 & 3 ABC EYEBOLT HOLE 50 150 STAY 4 SEE NOTE 2 2. ABC TAILS TO BE CAPPED/SEALED. 3. WHEN LOOPED BACK ALONG THE LINE THE CABLE TO BE HELD IN PLACE BY SUITABLE CABLE TIES WITH TAPE OVER TERMINATION POLE ABC DETAILS A3

5000 1100 1250 510 100 4 () 14 DIAMETER HOLE () 14 DIAMETER HOLES INLINE STRAIN WITH OR WITHOUT FUSING / ISOLATION A4

R8 NEUTRAL ABC CLAMP 150 150 4 TEE OFF A5

SEE NOTE 6 380 TOP OF POLE R W R3 B ROADSIDE N R4 4 70 5000 1200 1350 () 14 DIAMETER HOLE () 14 DIAMETER HOLES 2. ALWAYS MAKE ALL ABC CONNECTIONS FIRST. 3. CONNECTIONS TO OPEN AERIALS ARE TO BE THE LAST PROCEDURE CARRIED OUT. 4. PHASING OUT BETWEEN THE ABC CONDUCTORS AND THE OPEN AERIALS MUST BE CARRIED OUT BEFORE CONNECTION IS MADE. 5. SPLICE AND PG CLAMP ARE TO BE USED FOR ABC TO BARE AERIAL CONNECTION. 6. DASHED ABC CABLE SHOWS ALTERNATIVE CONNECTIONS FOR AN DIRECT TAP WITHOUT FUSES. TEE OFF LV BARE TO ABC A6

FIX TO ABC UNIVERSAL BRACKET CIRCUIT BREAKER COVER C.B. FIXING HOLES CIRCUIT BREAKER MOUNTING BRACKET THREE PHASE CIRCUIT BREAKER SINGLE PHASE CIRCUIT BREAKER 1. IN CYCLONIC AREAS FUSING IS REQUIRED TO CIRCUIT BREAKER, REFER A9 CIRCUIT BREAKER AND MOUNTING BRACKET A8

"T" BRACKET SEE NOTE 1 SEE NOTE 1 SEE NOTE 2 1. MOUNTING PLATE CAN BE FITTED IN EITHER POSITION TO SUIT INSTALLATION. 2. A MINIMUM OF 2 BOLTS FITTED DIAGONALLY MUST BE USED STANDARD FUSE AND MOUNTING BRACKET A9