TRANSIT CENTER DISTRICT. Public Realm

Similar documents
TRANSBAY JOINT POWERS AUTHORITY

San Francisco Planning Department IPIC Report 2016

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

FOLSOM-HOWARD STREETSCAPE OVERVIEW

The Bay Bridge Corridor Congestion Study

Freeway ramp intersection study

FALL 2014 WORKSHOPS TAKEAWAYS

WATERFRONT TRANSPORTATION ASSESSMENT

Better Market Street Project. Project Update January 15, 2015

PUBLIC REALM CENTRAL CORRIDOR EXISTING CONDITIONS ASSESSMENT PLANNING PROJECT

ABOUT THIS OPEN HOUSE

WATERFRONT TRANSPORTATION ASSESSMENT T R A N S P O T A T I O N A U T H O R I T Y B O A R D SAN FRANCISCO, CALIFORNIA

Ann Arbor Downtown Street Plan

Better Market Street Project Update. Urban Forestry Council September 17, 2014

FINAL REPORT DECEMBER 2011

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Citizens Advisory Committee March 26, 2014

Pedestrian Safety Workshop SAN FRANCISCO, CALIFORNIA

District 6 & Citywide Non-Transit Project Delivery Status Report

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

ORDER NUMBER SPECIAL EVENTS REMEMBER: SERVICE IS OUR ONLY BUSINESS

Office Development Annual Limitation ("Annual Limit") Program

Office Development Annual Limitation ("Annual Limit") Program

AUTOMATED SPEED ENFORCEMENT: REDUCING SPEED TO SAVE LIVES

CHAPTER 7.0 IMPLEMENTATION

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS AND PARKING AUTHORITY COMMISSION NOTICE OF MEETING AND CALENDAR

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

integrated action plan

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

FIRST AMENDMENT TO METRO NORTH CROSSING TAX INCREMENT FINANCING PLAN

Options. Agenda. Program

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

Transit Center District Plan A Sub-Area Plan of the Downtown Plan

Ordinance amending Ordinance No. 1061, entitled "Regulating the Width of Sidewalks,"

Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee

BICYCLE STRATEGY UPDATE

Active TFCA Projects to Date - TFCA Allocations and Total Project Costs San Francisco County Transportation Authority

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

WHAT S NEXT? SAN FRANCISCO S MAJOR DEVELOPMENT AND INFRASTRUCTURE PROJECTS

New Planning Code Summary: Better Streets Plan and Curb Cut Restrictions

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS AND PARKING AUTHORITY COMMISSION NOTICE OF MEETING AND CALENDAR

IMPLEMENTATION STRATEGIES

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

First Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017

Vision Zero Priority Projects (March 2017)

TASK FORCE UPDATE MARCH 29, 2016

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

WELCOME Mission-Geneva Transportation Study

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

Environment and Public Works Committee Presentation

VISION ZERO: ELIMINATING TRAFFIC DEATHS BY 2024 MARCH 2015

Northside Livable Centers Study

Miami Health District

City of San Francisco 2009 Pedestrian Count Report. April 2010

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Addendum to Mitigated Negative Declaration

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

COMMUNITY PARTICIPATION CHAPTER 8

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

ABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

2/25/2015. The Best of Pro Walk Pro Bike Pro Place Continuing Education. Today s presenters

Managed Lanes in California:

Methodology for Determining Pedestrian Activity Factors

I-105 ExpressLanes Project

Upper Market Street Bike Lane Project

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SPRINGFIELD REVITALIZATION REPORT

BALBOA PARK STATION COMMUNITY ADVISORY COMMITTEE (BPSCAC) Meeting Minutes

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Community Task Force July 25, 2017

Bicycle Master Plan Goals, Strategies, and Policies

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St.

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

2019 Prop K 5-Year Prioritization Program Update Prop K Project Ideas - Public Survey Results

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Building Target Field

VTA Development Review Program Annual Report for 2015

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Project Status Update

VISION ZERO UPDATE JUNE 2, 2016

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

OneBayArea Grant Application

THIS PRINT COVERS CALENDAR ITEM NO. : 12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY. DIVISION: Sustainable Streets BRIEF DESCRIPTION:

SAFE STREETS FOR ALL. A Report to Land Use Committee on Street widths in Hunters Point Shipyard and Candlestick Point Developments

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2.0 CHAPTER CONTEXT. 2.1 Existing Conditions 2.2 Regulatory Context 2.3 Existing City Efforts CONTEXT

Transcription:

TRANSIT CENTER DISTRICT Public Realm TJPA CAC December 13, 2016

Today s Presentation Public Realm Projects for opening of TTC + SF Public Works + TTC Public Realm improvements in Rincon/Transit District + Previous planning, outreach and environmental analysis + Ongoing District-wide planning and outreach

1 Signalized 1 After Dec. 2017 1 Unsignalized 1 2 3 6 4 5 7 8 9 Priority Areas for Implementation Prior to December 2017

1 Signalized TJPA 1 Unsignalized CCSF 1 After Dec. 2017 Others 1 2 3 4 5 6 7 9 Priority Areas for Implementation Prior to December 2017 8

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! t!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! EMBARCADERO MARKET ST TRANSIT CENTER DISTRICT PLAN BOUNDARY!!!!!!!!!! MISSION ST!!!!!!! HOWARD ST 2ND ST 1ST ST FREMONT ST BEALE ST MAIN ST SPEAR ST STEUART ST!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! CENTRAL SOMA PLAN AREA TRANSIT CENTER ZONE 2 FOLSOM ST ZONE 1 HARRISON ST RINCON HILL AREA PLAN BRYANT ST TR BO TR ZO ZO RI 3RD ST Plan Areas

The format of this document will be modi ed to conform to the standardized format of the General Plan. D E PA R T M E N T August 2015 San Francisco Planning Department STREETSCAPE MASTER PLAN Rincon Hill SAN FRANCISCO PL ANNING NOVEMBER 2009 Transbay Streetscape & Open Space Concept Plan 1 San Francisco Redevelopment Agency DRAFT FOR PUBLIC REVIEW TRANSIT CENTER DISTRICT PLAN NOTE: SAN FRANCISCO PLANNING DEPARTMENT AN AREA PLAN OF THE GENERAL PLAN OF THE CITY AND COUNTY OF SAN FRANCISCO RINCON HILL 2017 Rincon/Transit Center Public Realm Strategy 2015 Rincon Hill Streetscape Plan Adopted by Planning Commission and Board of Supervisors 2012 Transit Center District Plan 2006 SFMTA Board Approves Rincon Circulation and Sidewalk Changes 2006 Transbay Redevelopment Streetscape Open Space Concept Plan 2005 Transbay Redevelopment Plan 2005 Rincon Hill Plan 2004 TJPA FEIS/EIR

Outreach Extensive outreach throughout the process 12+ years of public process From this process we created the plans and generated list of critical streetscape projects Most recent public process in Transbay was via the TCDP Process in 2012 Large Public Workshops Presentations to CACs Ongoing Project-Level Outreach (TJPA, OCII, Public Works) Public Realm Planning Process in 2017 (more later)

STEVENSON ST STEVENSON ST JESSIE ST AMBROSE BIERCE ST JESSIE ST MISSION ST HOWARD ST FOLSOM ST HARRISON ST ELIM ALY NATOMA ST TEHAMA ST GUY PL LANSING ST SANSOME ST BATTERY ST DAVIS ST FRONT ST STEUART ST SPEAR ST MAIN ST BEALE ST FREMONT ST 1ST ST 2ND ST NEW MONTGOMERY ST ANNIE ST ECKER ST Golden Gate University 50 1st Street 350 Mission ANTHONY ST MINNA ST SFMOMA 2nd and Howard Plaza Parcel F Shaw Plaza City Park 524 Howard Transit Tower Mission Square 181 Fremont Parcel M OCII Block 5 BUILDINGS Under Construction Entitled Preliminary Project Assessment Submitted (1st step in the entitlement process) Soft Site (Anticipated Development) Completed Project/Inactive Parcel 555 Howard MALDEN ALY HAWTHORNE ST OCII Block 7 OSCAR ALY KAPLAN LN CLEMENTINA ST CLEMENTINA ST OCII Block 9 OCII Block 8 OCII Block 6 OCII Block 1 ECKER ST 95 Hawthrone Under Ramp Park 41 Tehama THE EMBARCADERO ZENO PL OCII Block 11 OCII Block 4 OCII Block 3 (Transbay Park) OCII Block 2 75 Howard OPEN SPACE OCII TJPA POPOS STREETSCAPE Completed projects Improvement Required Through Entitlements (developer required) Improvement funded by CCSF (Non TDCP Revenue) Improvemnt funded by OCII Improvement funded by TJPA No Change in sidewalk needed (to be identified) Mid-block crossing GROTE PL ESSEX ST Hawthorne BOUNDARY Transbay Zone 1 Transbay Zone 2 Transit Center District Plan Rincon Hill Central SoMa SAINT FRANCIS PL DOW PL OCII Block 12 Transbay Pipeline Map Project Coorination + Plan implementation 3RD ST MARKET ST

Managing and Responding to Complexity To coordinate who is doing what, where, biweekly meetings are held with these City agencies SF Public Works (Project Management, Permitting, Design/Engineering) SFMTA (Transit Engineering & Traffic Routing, SFMTA Planning) SF Planning TJPA OCII Additional coordination as needed with Public Works disciplines, PUC staff, Private utility owners, Individual building owners and engineers

Future Public Realm Strategy Apply previously adopted goals and policies to future decisions Partnership between City and CBD Programming Open Spaces Improving Building Facades Materials and Planting Palettes Surgical Transport Improvements Prioritizing Next Waive of Public Investments

Thank You Shannon Cairns, Project Manager San Francisco Public Works shannon.cairns@sfdpw.org 415-581-2576 Paul Chasan, Urban Designer San Francisco Planning Department paul.chasan@sfgov.org 415-575-9065