Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Similar documents
Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Polk Streetscape Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Vision Zero Priority Projects (March 2017)

ABOUT THIS OPEN HOUSE

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Bicycle Network. Vision Zero San Francisco The City and County of San

Geary Corridor Bus Rapid Transit

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Central Freeway and Octavia Circulation Study

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Welcome! San Jose Avenue Open House August 25, 2015

Project Goals and Objectives

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Upper Market Street Bike Lane Project

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Chapter 2: Standards for Access, Non-Motorized, and Transit

Cycle Track Design Best Practices Cycle Track Sections

Geary Bus Rapid Transit Project

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Freeway ramp intersection study

3.5 Pedestrian and Bicycle Transportation

Bay to Bay Boulevard Complete Streets Project

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Broadway Complete Streets Project

Mission Bay Loop (MBL) Public Meeting

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Tonight is for you. Learn everything you can. Share all your ideas.

Multi-Modal Traffic Analysis. Parisi and Associates

Military Road Safety Improvements

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

District 6 & Citywide Non-Transit Project Delivery Status Report

Pedestrian and Bicycle Conditions

Geary Bus Rapid Transit Project

Road Diets FDOT Process

CITY OF LOMITA CITY COUNCIL REPORT

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

43 rd Avenue, Skillman Avenue Protected Bike Lanes

Hidden Oaks Elementary School

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

122 Avenue: 107 Street to Fort Road

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING

6.4 RECOMMENDED IMPROVEMENTS

Frequently Asked Questions

LAUREL HEIGHTS/JORDAN PARK TRAFFIC CALMING PROJECT DECEMBER 2012

Dewey Area Traffic Calming Project

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

ROADWORK AND INFRASTRUCTURE OVERSIGHT

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

The Wiggle Route in Context

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

SFMTA PROJECT TIMELINE

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Pedestrian & Bicycle Safety Innovations & Applications

GEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

WELCOME WIGGLE NEIGHBORHOOD GREEN CORRIDOR COMMUNITY OPEN HOUSE

CURBSIDE ACTIVITY DESIGN

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Geary Corridor Bus Rapid Transit: Staff-Recommended Alternative

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Bicycle Boulevards and Neighborhood Greenways

STANLEY STREET December 19, 2017

Lawrence Avenue Streetscape Concepts August 30, 2011

Public Information Centre

Fifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018

1 st and 2 nd Street Couplet FAQ s

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Governance and Priorities Committee Report For the July 2, 2015 Meeting

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

RED COLORED TRANSIT-ONLY LANES REQUEST TO EXPERIMENT

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

SAFE ROUTES TO SCHOOL

CONTENTS EXECUTIVE SUMMARY 1

Transcription:

PROJECT OVERVIEW Project Goal and Description The goal of the Broadway Safety Improvement d St Van Ness Ave Project is to improve safety and comfort for all who Franklin St Hyde St Octavia St Gough St Polk St use Broadway between Steiner and Polk streets. Fillmore St Laguna St Additionally, the project aims to: Steiner St Reorient the design of Broadway from a four-lane arterial road into a neighborhood street, west of Franklin Street Facilitate more predictable turn movements at Buchanan St Webster St Broadway Project corridor SFPW Paving Segment intersections Maintain or improve existing loading operations at the four schools along the corridor Alta Plaza Park Why Broadway? Lafayette Park SF Public Works will be reconstructing sewers and repaving the street on Broadway between Polk and Octavia streets, to be completed in early 2019. This was the impetus behind considering possible changes to the street layout. After analyzing collision and traffic volume data, it became clear that Broadway experiences preventable injuries and has excess capacity that leads to speeding. The project proposals you see today are meant to address those issues. PROJECT OVERVIEW

VISION ZERO AND SAFETY West of Van Ness Street, Broadway has seen a number VISION ZERO HIGH INJURY NETWORK MAP of collisions on what should be a 25 mph, neighborhood street. Nearly all of the pedestrian-related collisions involved motorists violating pedestrians right-of-way. Of the injuries to motorists, nearly half involved speeding. Traffic calming through a lane reduction is a way to address both these types of collisions. Collisions at Van Ness and Polk are being addressed by their respective projects. PROJECT AREA ON THE HIGH INJURY NETWORK Between 2011 and 2016, there were 20 collisions and PROJECT AREA 25 injuries in the 7 block stretch between Van Ness and Fillmore (where the bulk of safety improvements are proposed). This includes injuries to: 19 motorists 5 pedestrians 1 bicyclist Two blocks of Broadway, between Polk and Franklin streets, are on the city s High-Injury Network, which are the 13 percent of streets that account for 75 percent of traffic related injuries and fatalities. Not included in the above collisions statistics, in March of this year, a 52-year-old woman was seriously injured after she was hit by a motorist while crossing Broadway in the crosswalk at Laguna Street. This collision highlights the need to bring safety improvements to Broadway to prevent more of these collisions from happening in the future. VISION ZERO

PROJECT ELEMENTS TRAFFIC LANE REDUCTION West of Franklin, where traffic volumes drop, removing a lane of traffic would provide room for other project elements, like dedicated turn lanes, median islands, TURN LANES Where turn volumes are high, turn lanes are proposed to get turning vehicles out of the through lane of traffic, and allow motorists to make turns when they feel comfortable. and bike lanes. PEDESTRIAN VISIBILITY ZONES (DAYLIGHTING) Daylighting improves sight lines between drivers and pedestrians by ensuring that pedestrians are not hidden from drivers by parked cars, and that pedestrians do not have to step into the street to see oncoming traffic. PEDESTRIAN HEAD STARTS At the intersections of Franklin and Gough streets, pedestrian head starts could give pedestrians the walk sign several seconds in advance of vehicles, allowing pedestrians to establish themselves in the crosswalk before turning vehicles. MEDIAN ISLANDS Median islands provide additional comfort for pedestrians while crossing the street, and present an opportunity for landscaping. Based on community input, these spaces could also be dedicated left turn lanes. BIKE LANES Broadway is already part of the San Francisco Bike Network, but has no existing bicycle facilities. Bike lanes would provide a space for bicyclists who do not feel comfortable sharing the lane with motorists. PROJECT ELEMENTS

CREATING A NEIGHBORHOOD STREET (WEST OF FRANKLIN) With its four lane, wide arterial design, the look of Broadway remains the same from the tunnel all the way to Fillmore Street, even as traffic volumes drop by more than 70% between Polk Street and Fillmore Street. Where traffic volumes are lower, Broadway s multi-lane layout encourages speeding, which can lead to collisions and a higher likelihood of injuries. A major goal of the project is to make Broadway feel like a residential, neighborhood Street west of Franklin, to match the surrounding land uses and volumes of traffic on the street. Reconfiguring a street from four lanes to three is proven to reduce vehicle collisions by 19 to 47 percent (FHWA, 2014) while improving safety and increasing comfort for those who walk and bike. D A C E F B Note: this diagram is for illustrative purposes only; proposed design will vary by block based on traffic operations, volumes, and community feedback A B Improved pedestrian safety and comfort when crossing at intersections. Thumbnail islands, where traffic volumes allow and supported by the community, can further reduce pedestrian exposure. Bike lanes create a dedicated space for bicyclists using Broadway and provide connectivity to the bicycle network D E Improved visibility and fewer conflicts with on-coming traffic for vehicles entering or crossing the roadway Fewer rear-end and left-turn crashes as a result of the two-way left turn lane, which facilitates left turns into driveways without blocking through traffic C Reduced speeding F Increased queuing space for turning vehicles at intersections by providing leftand/or right-turn only lanes where turn volumes are higher CREATING A NEIGHBORHOOD STREET

CONCEPTUAL CROSS SECTIONS Conceptual Design Option Steiner Street to Fillmore Street Conceptual Design Option - Fillmore Street to Laguna Street *No lane reduction proposed on this segment POLK VAN NESS LAGUNA BUCHANAN FRANKLIN WEBSTER GOUGH OCTAVIA LAGUNA STEINER FILLMORE Broadway Street from Steiner to Laguna streets Broadway Street from Laguna to Polk streets Conceptual Design Option - Laguna Street to Franklin Street Conceptual Design Option - Franklin Street to Van Ness Ave *No lane reduction proposed on this segment Conceptual Design Option - Van Ness Ave to Polk Street *No lane reduction proposed on this segment CONCEPTUAL CROSS SECTIONS

ONLY GGT MUNI PARKING AND COLOR CURB CHANGES STEINER ST FILLMORE ST WEBSTER ST BUCHANAN ST LAGUNA ST OCTAVIA ST GOUGH ST FRANKLIN ST -3 VAN NESS AVE ONLY GGT MUNI ONLY GGT MUNI ONLY GGT MUNI Parking loss from red visibility zone or right turn pocket Shifted or shortened white passenger loading zone to accommodate red visibility zone Parking reduction has been minimized wherever possible, however some reduction is necessary to accommodate pedestrian visibility zones at intersections. These zones are one of the most basic safety improvements in our toolbox. In all the project proposes removing 14 parking spaces through the corridor, or about 1.5 spaces per block. PARKING AND COLOR CURB CHANGES

SCHOOL LOADING Between Fillmore and Laguna streets (Hamlin School; Convent & Stuart Hall), and between Franklin Street and Van Ness (St. Brigid School), the conceptual design ensures that existing loading operations can be maintained and accommodate future increases in pickup and drop-off activities. The below diagram details the existing loading operations between Fillmore and Laguna streets, and shows how the exact same operation would be maintained under the proposed design. Convent & Stuart Hall WEBSTER ST Hamlin School FILLMORE Convent & Stuart Hall pick-ups and drop-offs exit queue lane and enter loading lane Hamlin pick-ups and drop-offs must turn right at Webster Hamlin pick-ups and drop-offs exit queue lane and enter loading lane BUCHANAN SCHOOLS QUEUE Existing Street Layout Convent & Stuart Hall WEBSTER ST Hamlin School FILLMORE Convent & Stuart Hall pick-ups and drop-offs exit queue lane and enter loading lane Hamlin pick-ups and drop-offs must turn right at Webster Hamlin pick-ups and drop-offs exit queue lane and enter loading lane BUCHANAN SCHOOLS QUEUE Proposed Street Layout SCHOOL LOADING

NEARBY PROJECTS Van Ness Improvement Project The Van Ness Improvement Project is bringing San Francisco its first Bus Rapid Transit system, a much-needed and globally-proven solution to improve transit service and address traffic congestion on Van Ness Avenue, a major north-south arterial. To avoid future construction impacts, the project also includes extensive utility maintenance, civic improvements and transportation upgrades. sfmta.com/vannness Enter map title here And the sub-title here May 2018 Include a description of this map and policy/projects it pertains to along with a list of data sources. LEGEND MTA.parks_modified MTA.sfblocks_modified 12 Folsom-Pacific Proposed Route and Stop Adjustments Polk Streetscape Project ss Vall Service Change (Route and Stop Changes) The Polk Streetscape Project aims to increase safety for people walking and biking on Polk Street, as well acific ackson Gough Polk Washington New Routing New Stop in Discontinued Routing Discontinued Stop as improve the efficiency of transit on the corridor. The project is currently under construction, with expected completion in late 2018. sfmta.com/polk Clay Terminal move necessitated by Van Ness Improvement Project New terminal proposed on eastbound Broadway at Van Ness Curb Changes Proposed new terminal (removes 8 parking spaces) New Westbound Stop (shared with 10 Townsend stop) Discontinued Eastbound Stop (bus zone to remain to serve the 10 Townsend) Broadway Van Pacific Jackson Polk Washington [ Scale 1:13,591 Date Saved: 5/4/2018 0.25 Miles miles For reference contact: <insert SFMTA staff email> NEARBY PROJECTS By downloading this map, you are agreeing to the following disclaimer: The City and County of San Francisco ( City ) provides the following data as a public record and no rights of any kind are granted to any person by the City s provision of this data. The City and County of San Francisco ( City ) makes no representation regarding and does not guarantee or otherwise warrant the accuracy or completeness of this data. Anyone who uses this data for any purpose whatsoever does so entirely at their own risk. The City shall not be liable or otherwise responsible for any loss, harm, claim or action of any kind from any person arising from the use of this data. By accessing this data, the person accessing it acknowledges that she or he has read and does so under the

PROPOSED ROADWAY RESTRIPING PHASING Phase 1 - Summer 2018 Phase 2 - Early 2019 The eastern segment of the project is proposed to be implemented in early 2019, as SFPW wraps up roadway repaving. This would allow the new proposed striping to be laid down immediately after the roadway is freshly repaved. POLK VAN NESS LAGUNA BUCHANAN FRANKLIN WEBSTER GOUGH OCTAVIA LAGUNA STEINER FILLMORE Restriping of the roadway is proposed to begin on the western segment of the project, between Steiner Street and Octavia Street. Implementing this segment in the summer would minimize disruptions to the schools between Fillmore and Buchanan Streets. This section is not included in the scheduled SFPW paving work. Work would involve removing the existing roadway striping and laying down the new striping. Phase 3 - Mid-2019 A potential third phase could convert the proposed painted roadway median islands to concrete, to provide additional comfort and protection to pedestrians crossing the road. Alternatively, based on feedback, the islands at Octavia could instead be left turn lanes. PROPOSED ROADWAY RESTRIPING PHASING

TIMELINE Data Collection and Conceptual Design Work SFMTA staff collected data, including turning vehicle volumes, speed surveys, and existing conditions, and began initial conceptual design work. Legislation and Detailed Design The project elements would be presented to the public at a Public Hearing and ultimately go before the SFMTA Board for consideration, which provide additional opportunities for community input. At the same time, SFMTA staff would begin detailed design work. Phase 2 Implementation (Octavia Street to Polk Street) In coordination with a Department of Public Works sewer upgrade and paving project, the east segment of the project would be implemented as the street is repaved. Summer - Winter 2017 Spring - Summer 2018 Early 2019 Winter 2017 - Spring 2018 July/August 2018 Mid-2019 Today Project Outreach and Conceptual Design Refinement Staff began project outreach, including meeting with all four schools along the corridor, to ensure any conceptual design worked for existing operations. The conceptual design was refined based on the feedback received. Open House (Today) The feedback received today will be used to gauge the community s response to the project, further refine the design, and determine next steps. Phase 1 Implementation (Steiner to Octavia) Assuming the project is approved by the SFMTA Board, the project segment between Steiner and Octavia Streets would be implemented in August, before the start of the school year. Phase 3 (Median Island Construction) If the idea of median islands at Octavia and Fillmore is supported by the community (rather than dedicated left turn lanes), the initial painted islands would be converted to raised concrete islands, with the potential for landscaping. Interested in project updates? Use the sign-in sheet, or visit sfmta.com/broadway TIMELINE