WARRINGTON TOWNSHIP BOARD OF SUPERVISORS April 14, 2015 Regular Meeting
CALL TO ORDER MOMENT OF SILENCE PLEDGE OF ALLEGIANCE
SPECIAL RECOGNITION PRESENTATION ELBOW LANE DAY CAMP
GENERAL BUSINESS EXECUTIVE SESSION REPORT
GENERAL BUSINESS APPROVAL OF BILL LIST 1. March 24, 2015 April 14, 2015: $ 1,089,411.72 2. APPROVAL OF MINUTES March 10, 2015 POSTING OF MINUTES 3. March 24, 2015 4. March 31, 2015
PUBLIC COMMENT The Board will hear from any interested resident or taxpayer who would like to comment on an item not on this evening s agenda. Respondents are asked to keep their comments to 3 minutes.
None PUBLIC HEARING
OLD BUSINESS 5. Consider adoption of Resolution approving final land development agreement for Highgrove Manor, as recommended by the Planning Department.
High Grove Manor
RESIDENT S CONCERNS HOW THE PROPOSED LOOP ROAD AND THE PROPOSED TRAFFIC SIGNAL IS BETTER FOR THE SURROUNDING NEIGHBORHOOD AND THE COMMUNITY IN GENERAL HOW THE PROPOSED LOOP ROAD AND THE PROPOSED TRAFFIC WILL NOT SIGNIFICANTLY IMPACT THE RESIDENTS ON PARK ROAD AND SCHOOL LANE
PENNDOT PROCESS PENNDOT SCOPING FORM DETERMINES NEED FOR A TRAFFIC IMPACT ASSESSMENT OR TRAFFIC IMPACT STUDY AND GENERAL PROJECT REQUIREMENTS TRANSPORTATION TRAFFIC STUDY MANUAL/AUTOMATED TRAFFIC COUNTS LEVEL OF SERVICE ANALYSIS QUEUING ANALYSIS SIGHT DISTANCE EVALUATION
IMPROVEMENTS EASTON ROAD (SR 0661) AND LOOP ROAD/PARK ROAD INSTALLATION OF A NEW TRAFFIC SIGNAL 150 WESTBOUND LEFT TURN LANE RE-STRIPE SOUTHBOUND SR 0611 TO PROVIDE A 125 LONG LEFT TURN LANE WIDEN SR 0611 NORTHBOUND FOR A SEPARATE 150 LONG RIGHT TURN LANE PROVIDE GORE MARKINGS TO DELINATE LANES ON PARK ROAD BRISTOL ROAD (SR 2025) AND LOOP ROAD/COOPER ROAD RE-STRIPE/WIDEN SR 2025 TO PROVIDE A LEFT TURN LANES IN THE EASTBOUND AND WESTBOUND DIRECTIONS. THE LANES WILL BE 175 LONG AND 75 LONG, RESPECTIVELY. PROVIDE A STOP SIGN ON NORTHBOUND LOOP ROAD CHANNELIZED RIGHT TURN LANE NORTHBOUND LOOP ROAD THAT IS 175 LONG
IMPROVEMENTS
IMPROVEMENTS
TRIP GENERATION
TRIP DISTRIBUTION - TOWNHOUSES
TRIP DISTRIBUTION CONVENIENCE MARKET
TRIP DISTRIBUTION - OFFICE
TRIP DISTRIBUTION - PARK
2020 LOS w/o DEVELOPMENT
2020 LOS w/ DEVELOPMENT
HIGHWAY OCCUPANCY PERMIT PROCESS (HOP) STEP 1: CONCEPT PLAN STEP 2: HOP PREPARATION AND SUBMISSION STEP 3: SIGNAL PLAN STEP 4: RIGHT-OF-WAY PLAN STEP 5: CONSTRUCTION
IMPROVEMENTS TO LOCAL AREA ROADWAY NETWORK THE CONSTRUCTION OF LOOP ROAD ADAPTIVE SIGNALS INSTALLED FROM NAVAL AIR STATION DRIVE TO BRISTOL ROAD ALONG SR 611 (EASTON ROAD)
IMPROVEMENTS TO LOCAL AREA ROADWAY NETWORK PROPOSED WIDENING TO ALLOW FOR A DEDICATED EASTBOUND LEFT TURN LANE AT BRISTOL ROAD AND SR 611 (EASTON ROAD) PENNDOT INTENDS TO BE PAVING SR 611 (EASTON ROAD) FROM COUNTY LINE ROAD AT THE BORDER OF WARRINGTON TOWNSHIP AND WARMINSTER TOWNSHIP TO MAIN STREET IN DOYLESTOWN TOWNSHIP
PROPOSED WIDENING
WARRINGTON COMMUNITY AMBULANCE CORP. SQUAD 129 BENEFIT WITH CONSTRUCTION OF LOOP ROAD/EASTON ROAD SIGNAL, WARRINGTON COMMUNITY AMBULANCE WILL HAVE IMMEDIATE ACCESS TO PARK ROAD COMMUNITY NEW SIGNAL PROVIDES 45 SECONDS OF GREEN TIME FOR MOVEMENT INTO PARK ROAD COMMUNITY
PROACTIVE MEASURES BY WARRINGTON TOWNSHIP INTERSECTION OF PARK ROAD AND SCHOOL LANE IS AN ALL WAY STOP ROAD WIDENING AT BRISTOL ROAD AND EASTON ROAD PROPOSED SIGNAL PROVIDES IMMEDIATE ACCESS OF WARRINGTON COMMUNITY AMBULANCE CORP. SQUAD 129 TO PARK ROAD
SHOULD THERE BE CONCERNS AFTER CONSTRUCTION OF LOOP ROAD BELOW IS A TABLE OF OPTIONS FROM PENNSYLVANIA S TRAFFIC CALMING HANDBOOK
QUESTIONS? BEI
OLD BUSINESS 6. Disposition of bids for Carriage Way Sewer Rehabilitation Project. 7. Consider amendment to Warrington Springs Phases I-II Developers Agreement.
NEW BUSINESS 8. Discuss proposed concept plan for Warrington Run and developer s request to amend the comprehensive plan and Zoning Code.
NEW BUSINESS 9. Disposition of bids for Tradesville Wastewater Treatment Plant SBR Equipment Replacement.
10. Manager s Report MANAGER S REPORT a. Resolution approving temporary noparking restriction in Willow Knoll (Cambridge Drive, Oxford Drive and Suzanne Drive).
MANAGER S REPORT 10. Manager s Report b. County Line Road WD-2 Cost Sharing Agreement. c. Concurrence on Consortium Fuel Bid. d. 2015-2016 Life Insurance Renewal
10. Managers Report MANAGER S REPORT e. DPW Facility Change Order(s). Contractor Orig. Contract C.O. Adj. Contract Craftsource $896,600 $10,928 $907,528 AJM Electrical Stan-Roch Plumbing $169,890 $1,200 $171,090 $279,500 ($14,832) $264,668 B&E Boiler $204,000 ($5,000) $199,000 Guy Cooper $18,000 $0 $18,000 AJM Fire Alarm $31,700 $0 $31,000 Grand Total $1,599,690 ($7,704) $1,591,986
10. Manager s Report MANAGER S REPORT f. Bid Authorization Water Tank Painting
CHAIRPERSON S REPORT 11. Chairman s Report a. Body Cameras b. Zoning Officer Appointment
ENGINEER S REPORT 12. Engineer s Report a. Neshaminy Glen b. MM Storage (formerly Malcolm s) c. Palomino Farms Streambank Stabilization Project
SOLICITOR S REPORT 13. Solicitor s Report a. Site Development Agreement Wal-Mart Real Estate Trust b. Sanitary Sewer Deed of Easement across TMP 50-004- 085 (Eureka Stone Quarry)
ESCROW AND MAINTENANCE 14. None BOND RELEASES
15. None EXTENSION REQUESTS
None DEDICATION REQUESTS
SUPERVISOR COMMENTS
ADJOURNMENT