COMMUNITY MEETING #1 Summary

Similar documents
Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Application of a Complete Street

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Frequently Asked Questions

SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

122 Avenue: 107 Street to Fort Road

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

City of Davis East Covell Corridor Plan

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

CSAH 101 Preliminary Design

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Report. Typical Sections. City of Middleton, WI

Water Street Promenade Engineering and Design Services

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

FONTAINE AVENUE STUDY Final Report

Designing for Pedestrian Safety

PUBLIC HEARING QUESTIONS AND COMMENTS

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

NORTH HIGHLAND LAKE ROAD PROJECT

MASTER BICYCLE AND PEDESTRIAN PLAN

Active Transportation Facility Glossary

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

RE: Natomas Landing (P99-091)

Military Road Safety Improvements

Washington DC Section of ITE Project Briefing

PUBLIC REALM MASTER PLAN

Transportation Planning Division

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

Commercial-Vista Corridor Plan Project Management Team. Judith Johnduff, AICP, Associate Transportation Planner Public Works Department

TRANSPORTATION COMMISSION Agenda Staff Report

Tonight is for you. Learn everything you can. Share all your ideas.

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

TRANSPORTATION STANDARDS

Sherwood Drive Traffic Circle

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Route 29 Solutions Projects

APPENDIX D. May 22, 2002 Open House Summary and Materials

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Broad Street Bicycle Boulevard Design Guidelines

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Bay to Bay Boulevard Complete Streets Project

Chapter 3.3 Horizon Elementary School. Volusia County MPO. June 2009

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

CURBSIDE ACTIVITY DESIGN

Completing the Vision

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Chapter 5 Future Transportation

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Lincoln Highway Streetscape Plan Concept Plan

NEWMARKET UPHAM S CORNER

City of Seattle Edward B. Murray, Mayor

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Owl Canyon Corridor Project Overview and Summary

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Introduction. North 12 th Complete Street Project Overview

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

C C C

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Designing Complete Streets: What you need to know

Public Information Centre

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Orange Center Elementary School

City of Novi Non-Motorized Master Plan 2011 Executive Summary

to the Public Information Centre for the Downtown Traffic Study

Multimodal Through Corridors and Placemaking Corridors

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Hidden Oaks Elementary School

Open House #1 Summary

Thank you for attending

PAT Meeting #2 Future Alternatives Meeting Agenda

DEPARTMENT OF COMMUNITY PLANNING & BUILDING INTEROFFICE MEMORANDUM

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Appendix B - Street Sections

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Omaha s Complete Streets Policy

Technical Report & Design Concepts. January 2018

City of Vallejo Traffic Calming Toolbox

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Windy Ridge Elementary School

Maywood Town Hall Meeting. May 4, 2016

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Community Transportation Plan

WELCOME Public Information Centre

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

RIVERSIDE DRIVE: 21st to 41st

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Transcription:

COMMUNITY MEETING #1 Summary October 26, 2016 LOCATION: TIME: ATTENDEES: Dr. Phillips High School Cafeteria 6500 Turkey Lake Road, Orlando, FL 32819 6:00 pm to 8:00 pm 79 citizens Commissioner Scott Boyd, Orange County Commission District 1 Renzo Nastasi, Orange County Transportation Planning Brian Sanders, Orange County Transportation Planning Anoch Whitfield, Orange County Transportation Planning Ian Phyars, Orange County Transportation Planning Beata Stys-Palasz, FDOT D5 Jeff Arms, HDR Matt Wiesenfeld, HDR Andrew Ritter, HDR Howard Newman, HDR Laura Turner, Laura Turner Planning Services Orange County has begun a transportation study that is focusing on the future of Sand Lake Road, from Apopka Vineland Road to Turkey Lake Road. The purpose of the study is to assess current and future travel demand in the area and to identify operational enhancements to keep people and vehicles moving along this corridor. Alternative improvements have been developed and the study team wanted to share this information with the public, so they could review the information and to provide input. This summary provides the highlights of the notification process, information shared at Community Meeting #1, the discussion, and comments shared. Meeting Notification Here is a summary of the notification techniques were used to publicize Community Meeting #1. October 7, 2016 October 8, 2016 October 9, 2016 October 10, 2016 October 10, 2016 Posted Community Meeting #1 information on www.sandlakeroadstudy.com Newspaper ad published (in Spanish) in El Sentinel Newspaper ad published (in English) in Orlando Sentinel Newsletter #1 emailed to 33 Elected Officials, 63 Study Advisory Group Members, 18 agencies, and 97 interested parties Commissioner Scott Boyd (District 1) sent an email to 1,157 in the Dr. Phillips area with a link to Newsletter #1 Page 1 of 6

October 11, 2016 October 12, 2016 October 12, 2016 October 13, 2016 Newsletter #1 mailed to 235 property owners and 54 others without email addresses Posted Community Meeting #1 information on Orange County Calendar and Orange County Bulletin Board Hand Delivered copies of Newsletter #1 to Dr. Phillips YMCA and Southwest Orange Public Library News release sent to local media Study Information at the Meeting As individuals signed in, they could identify how they learned about Community Meeting #1. Individuals learned about this meeting by: email (49); mail (12); other (8); and website (1). Also at the sign in table were copies of Newsletter #1 and a comment form. Individuals could share their input by submitting a completed comment form at the meeting or send it to the Orange County Project Manager by November 2, 2016. From 6:00 p.m. to 8:00 p.m. the following study displays were available for review: Alternative 1, Alternative 2, and Alternative 3 along with videos animating the VISSIM simulated traffic operations for each scenario. In addition, study team members were available to answer questions and to hold one-on-one conversations with individuals. At 6:30 p.m., a presentation was given followed by a question and answer forum. The meeting displays and presentation are posted on the study website (www.sandlakeroadstudy.com) on the Study Documents page. Question and Answer Forum Following the presentation, meeting participants had the opportunity to ask the study team questions. Questions are provided here along with responses. Design Features Q. Can the right turn lanes be connected while also preventing this from becoming continuous through lanes? Expressed concern about Sand Lake Road being more than four through lanes. o A. There are several design elements that can be used to accomplish this such as striping and signage. This is a detail that will be addressed during design. Q. Expressed the need to slow down cars and buffer pedestrians. o A. This will be examined during design. Q. The oak trees in the median are a part of the area s character and part of the marketability of the area s restaurants. Need to emphasize the project s aesthetics. o A. Alternative 2 has a couple of options. If the median is wider (and the oak trees are preserved), then there is not as much space for landscaping along the sidewalks. If the median is narrower (and the oak trees are removed), there is more space for the landscaping to be along the sidewalks. Q. Why are there different median widths? o A. There is a difference in median widths in order to provide two design approaches. With the wider median, the existing oak trees will remain with fewer landscaping options available along the sidewalks. The narrower median provides more opportunities for landscaping along the sidewalks. Page 2 of 6

Q. Will the shared use path be off the street? o A. Yes, it will be located where the existing sidewalk is and a bit wider. Q. Will there be dedicated deceleration lanes? o A. No, due to limited existing right-of-way. Q. Why will there be a 12-foot travel lane on one side and an 11-foot travel lane on the other side? o A. This relates to connecting the existing turn lanes on the north side and provides continuous lane widths, while the south side being 11 feet allows for a wider landscape buffer between the travel lanes and the sidewalk or shared use path. Q. Has the location of new drainage ponds been identified? o A. No, they have not yet been determined for Alternative 3. It is unlikely that Alternative 2 will require new drainage ponds. Q. As an alternative to the new traffic signal at The Fountains, could there be a directional access? o A. Yes Traffic Q. The signals at Turkey Lake Road and Apopka Vineland Road are not synchronized. Usually, left turns have to be made on the yellow phase. o A. Orange County Traffic Engineering will look at the existing signal timing. Q. If I am eastbound on Sand Lake Road and want to turn left on Turkey Lake Road, I often have to wait for several phases. o A. All signals on Sand Lake Road will be synchronized in the future with the system now found on International Drive. With construction on Sand Lake Road, east of I-4, beginning in a few weeks, it will take about two years for the area signals to be optimally coordinated due to construction. Q. Can transit or buses be considered to move people along Sand Lake Road? o A. Today, there is no bus service along Sand Lake Road. Orange County has been in contact with LYNX about this service. Q. What is happening along Wallace Road? o A. Operational improvements to Wallace Road are being reviewed since it is the closest parallel road to Sand Lake Road. Q. Are there traffic projections? o A. Yes for years 2020 and 2040. Costs Q. What parts of this project have been funded? o A. The completion of this study is funded. Future project phases design, right-of-way acquisition, and construction are not funded. Staff is anticipating that design will be funded by the end of the study. Q. How will this project be funded and when? o A. There is a significant cost difference between Alternative 2 and Alternative 3. Orange County staff anticipates that Alternative 2 can happen sooner than Alternative 3 since it has a much lower project cost, and therefore easier to fund. Other Area Projects Q. It seems the biggest problem is getting traffic (particularly DOT traffic) off of Sand Lake Road; a solution 10-12 years from now will be too late. o A. There are two projects that will happen sooner that should help. I-4 Beyond the Ultimate includes reworking the Sand Land Road/I-4 interchange. The other project is the Daryl Carter Parkway interchange. Page 3 of 6

Q. Need to have infrastructure in place before rezoning properties and stop future development until infrastructure catches up. o A. Many of those projects had previously approved land uses. Q. What is the status of I-4 Ultimate and will there be toll roads? o A. It should be completed in 4-5 years. The center lanes will be tolled. Alternatives A show of hands at the end of the meeting showed support for Alternative 2. Alternative 2 makes sense and should include beautification. Alternative 2 works within existing right-of-way and is a lesser cost than Alternative 3. It is foolish to do the full construction as proposed under Alternative 3. With either alternative, there is support for more landscaping. Shared Comments and Statements During the Questions and Answer session, some comments and statements about the project were made. A summary of these is as follows: There is a need to coordinate and synchronize all the traffic signals in the area. At Turkey Lake Road and Sand Lake Road, the opposing left turns are not timed at the same time. The new Rialto light is not in sync with the other signals. More No Turn on Red signs are needed in this area. Signage consistency is needed, especially at the I-4 ramps. The traffic signals at I-4 are difficult to see with the sun and need to be replaced. For the Restaurant Row area, there are not a lot of pedestrians. This aspect of the project needs to be minimized with a focus more on accommodating vehicles and buses. Along Wallace Road, there is a need to consider that there are lots of pedestrians, especially children and parents with Dr. Phillips Elementary School. When school lets out, parents tend to park in the neighborhoods south of Wallace Road so there is a lot of crossing of the street. The study team needs to look at the speed limit along Wallace Road since some portions are 45 mph. Many visiting drivers do not know that you can turn right on red. Additional signs letting them know that they may turn right are needed. Large green signs, like those found on Toll Road 429, should not be used on Sand Lake Road. A recommendation should not be based just on the savings of three minutes. The community needs to consider what the Sand Lake Road corridor will look like in the future -- a drive-through area or a Town Center (destination). The Turkey Lake Road/Sand Lake Road intersection is the worst intersection and is not likely to change any time soon. Bicycling and walking should be encouraged along with lower speeds, and more green spaces. We love our Dr. Phillips community and amenities. If additional pavement is not added, we can preserve the area s lakes and environment. Page 4 of 6

Written Comments Received Thirty individuals submitted written comments (either emails or completed comment forms) from October 10, 2016 through November 2, 2016. Here is a summary of the written comments that were shared during this time. The number in parenthesis indicates how often the same comment was made. Potential Project Impacts New development should be put on hold until the roadway improvements are in place. (2) Concerns were expressed about additional traffic and safety on Wallace Road. (1) If traffic is increased along Wallace Road (as a result of this project), there will be a need for a higher wall to reduce noise at Spring Lake Villas. Turn lanes for both east and west movements on Wallace Road should be added. (1) Project Elements The northbound movement along Apopka Vineland Road needs two right turn lanes onto eastbound Sand Lake Road. (2) The continuous right turn lanes are terrible for bicyclists and pedestrians. The study team should consider separating them by using higher curbing, reflector pipes, or other physical means. (1) A separate traffic signal phase for all pedestrians and bicyclists to cross an intersection at the same time, with no vehicles moving, should be considered. (1) The current setting is pedestrian unfriendly and unsafe, which is why pedestrian counts may be low. (1) The right lane at Della Drive and Sand Lake Road should become right turn only. The left lane should be a shared straight and left. (1) The shared use path (south side of Sand Lake Road) should be at least 13 feet wide. (1) The sidewalk on north side of Sand Lake Road should be at least 6 feet wide. (1) The shared use path needs to accommodate wheelchairs and strollers. (1) Walkability encourages commerce. (1) Permeable pavers or concrete for sidewalks and shared use path should be used. (1) Sand Lake Road serves more than local traffic due to the limited number of east-west options in the area. (1) Traffic Solutions and Signage The traffic signals, especially at Turkey Lake Road, need to be synchronized. (3) Another traffic signal should not be added. (3) Additional signs are needed, indicating right turn on red is allowed. (1) The road design needs to make it difficult to drive through along Sand Lake Road. (1) Put a no u-turn sign in front of McDonald s. (1) The traffic signals need to be synchronized. (1) Traffic studies should have been completed in the summer and winter, the peak tourist season, and not in the spring and fall. (1) Study Alternatives Alternative 1 o There is support for Alternative 1. (2) o The benefits of improvements do not outweighing the inconveniences. (1) Alternative 2 o There is support for Alternative 2. (15) o There is support for Alternative 2 since it provides more green spaces and trees. (5) o There is support for Alternative 2 plus synchronized lights. (1) Page 5 of 6

o There is support for the option with the wider median. (1) o Money and time should not be wasted on wider sidewalks since there are few pedestrians. (2) Alternative 3 o Individuals are against Alternative 3. (2) o There is support for Alternative 3. (2) o Alternative 3 is not viable. (1) o The cost of Alternative 3 is not worth saving three minutes. (1) o There is support for Alternative 3 plus transit (especially from International Drive.) (1) o Alternative 3 will address the traffic issues; Alternative 2 is just a band aid. (1) o Alternative 3 plus Darryl Carter Parkway would have the potential to create an enormous bypass of I-4. (1) There is support to keep landscaping in the medians. (1) The team shared lots of information but no real solutions. (1) Requests Requests were made to be added to study contact list. (21) Study information was requested. (3) Traffic accident data at the Sand Lake Road/Della Drive/Esplanade intersection was requested. (1) There was a request for pedestrian counts by each study segment. (1) Funding sources for the Sand Lake Road Study and future phases was requested. (1) Interest in Other Projects Better coordination among agencies is needed in dealing with development and infrastructure. (2) Information about Sand Lake Road, from Turkey Lake Road to Universal Boulevard was requested. (1) Need to extend the Turkey Lake Road flyover to the existing traffic signal at Wal-Mart, if not all the way to Dr. Phillips Hospital instead of having it exit at Whole Foods. (1) Adding a traffic signal between Wal-Mart entrance and the road south of Whole Foods will create more traffic jams. (1) Approval of Rialto 2 will add to the traffic problems in the area. (1) Next Steps This input will be considered as a Recommended Alternative is further refined. Study updates will be posted on the study website (www.sandlakeroadstudy.com). The Orange County Project Manager will continue to be available to respond to questions and information requests. Community Meeting #2 is expected to be held in February 2017. Page 6 of 6