National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

Similar documents
Bulwell Cycling Consultation

Devonport City Cycling Network Strategy

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Transportation Master Plan Advisory Task Force

MILTON ROAD LLF PROJECT UPDATE

Copenhagen Cycling Map. Red Lines Cycling facilities

Strategy for Walking & Cycling Action Plan

TRANSPORT AND MOVEMENT

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Chelmsford City Growth Package

Ballybrack Valley Pedestrian and Cycle Route, Phase 4

Nottingham Cycle City Frequently Asked Questions

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Frome Street Bicycle Route

Chapter 3 DESIGN SPECIFICATIONS

CUERDEN TRANSPORT PROPOSALS

Sandwell General Hospital Travel Plan 2014

CPC Parking Lot Riverside Drive. Transportation Rationale

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

6.1 Infrastructure and Safety

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

Appendix A-K Public Information Centre 2 Materials

NCN 78 Benderloch to Ledaig Summary

North West Non-Technical Summary of the Transport Assessment September 2011

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

Launceston's Transport Futures. Greater travel options for the people of Launceston

Highway 56 Traffic Study Rymal Road to Cemetery Road

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

Appendix 11 Barton Greenway Review

RICHMOND BICYCLE AND PEDESTRIAN PLAN. September 2014 Prepared by the Midcoast Council of Governments

connectivity through walking and cycling

Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit

Community engagement guide May 2018

Appendix N(b): Portishead Station Outline Travel Plan

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Tonight is for you. Learn everything you can. Share all your ideas.

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Re: N71 Muckross Road Traffic Calming Scheme Part 8 and Section 38

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Making Dublin More Accessible: The dublinbikes Scheme. Martin Rogers Colm Keenan 13th November 2012

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Delivering the. Strategy 7.0

Review of Guidelines for Cycleway Safety Fencing

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Evaluating a Cycling Strategy

Bicycle Master Plan Goals, Strategies, and Policies

West Tamar Highway Priority Upgrades

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Transportation Assessment

a CYCLING ACTION PROGRESS MEETING

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

C.A.R.S. Project Design Report.

BIKESydney s response to Sydney Airport s Preliminary Draft Major Development Plan. Introduction. To:

2. Context. Existing framework. The context. The challenge. Transport Strategy

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Nottingham, the great cycle city

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Groningen. welcome to the cycling paradise

CHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Transit boulevard: A new road type for Sydney s Growth Centres

Your views are important. Please fill in a form before you leave. Or alternatively

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

SCHEME DESIGN AND ENGINEERING

Regional Cycle Programme Update

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

TASRAIL STANDARD - FENCING

Perne Rd / Radegund Rd Roundabout Cambridge

York Region Population and Employment Growth

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY

Christchurch 3 years on: - growing resilience

THE TWO BANKS OF THE TAGUS RIVER BY INTEGRATING THE BYCICLE INTO A MULTIMODAL SYSTEM

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

Phone: Ref No: 06/2018/0884

TIP Scheme List Huntingdonshire

Active Travel Strategy Dumfries and Galloway

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Project Description Form 6V

Active Travel Birr. Tullamore Road Gateway, Traffic Calming and cycle lanes. After with Gateway Sculpture

Land at Chesterton, Cirencester

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

CLOSED. Highlights of the Final Concept Design:

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Final Plan 20 December 2016

Maynooth Cycling Submission on North South Corridor

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Great Bentley Parish Level Crossing Closure Proposal E45 Great Bentley Station

Transcription:

National Cycle Network Funding Scheme 2012/2012 Application Form Section 1:Project Outline Name and Address of Local Authority Contact person/proposed project manager Waterford City Council Paul Cleary, Executive Engineer Telephone 051 849508 e-mail Planned route start and end points (e.g. Newport to Mulranny). Detailed map to be included as appendix. Proposed route distance (km) Estimated total project delivery costs ( ) Total grant funding being sought ( ) Planned duration of project/works (months) Planned start date and completion date Brief outline of planned project pcleary@waterfordcity.ie Tramore Road R675, Waterford City; from Junction of R675 (Tramore Road) with R709 (Inner Ring Road) to Tramore Road (R675) at City Boundary 3.2km 289,000 289,000 3 Months Mid August 2012 Mid November 2012 The proposal is to upgrade and widen the existing amenity walkway along the route of the abandoned Waterford / Tramore Railway as far as Sheep s Bridge on the R675. Then widen existing path from Sheeps Bridge to Outer Ring Road (R710) cycle path and finally extend along to join proposed Waterford to Tramore Cycle path being planned by Waterford County Cycle

Section 2: Project Detail Briefly outline how this route aligns with the corridors identified in the National Cycle Network scoping study, or links into or between the identified corridors Is this project proposal for a standalone route, or is it a single phase of a longer proposed route (outline details). What type of route will be delivered (i.e. on road or off road, usage of existing infrastructure such as abandoned rail lines, canal tow paths, state lands etc.) Is the land necessary to develop the proposed route currently in public ownership? Are there any land ownership issues along any section of the proposed route, and if yes how is it planned to address them? Are there any other outstanding issues which could impact on deliverability of the proposed route (e.g. statutory requirements)? What is the proposed width of the route? (metres) What is the proposed surfacing type for the route? This route forms part of Corridor 3 Wexford- Tralee of the National Cycle Network Scoping This is a section of a route that, when combined with the proposed Waterford County Council proposal will connect Tramore (population 9,700) with Waterford City (population 46,700). Approximately 85% of the route will be off-road, using a combination of abandoned rail and existing footpath. The remainder shall be on road (hard shoulder) to match Waterford County Council proposal. All land is in public ownership, with no ownership issues. None 3.0m Due to the route passing through a pnha, the route will primarily be finished in blinded hardcore. This is to reduce the amount of runoff generated from the surfacing. A section of where the available width is reduced a timber decking board walk will be provided over the pnha.

Section 3: Project Costs Key costs/works (e.g. land purchasing, clearance works, compacting and placing of surface material, bridges, crossing barriers, fencing) Estimated cost ( ) Requested contribution ( ) Planned drawdown date (e.g. Sept 2012) Preliminaries November 2012 Excavate along existing amenity walkway on abandoned railway for 1,700 x 3m wide with a 6mm gravel finished cycleway including provision of land drain Replace existing 1.2m wide wooden footbridges over drainage ditches with 3m wide combined footbridge Clear 900m of existing overgrown abandoned rail track Provision of on road cycle lane in existing hard shoulder including lining, logos, signs and coloured surfacing at conflict points Provide new Toucan Crossing + power supply 170,000 170,000 November 2012 15,000 15,000 November 2012 65,000 65,000 November 2012 10,000 10,000 November 2012 26,000 26,000 Total 289,000 289,000 November 2012 Section 4: Demand and benefit assessment: Provide an evidence based assessment of potential demand in terms of local users and potential visitor and tourist user numbers. Assessment should include evidence based estimate of annual user number, and impacts on local economy, including in terms of job creation Tramore Town is a seaside town and popular tourist destination. It also serves as a commuter satellite to Waterford City. The City, has large employers (Waterford Institute of Technology, Regional Hospital, Bausch & Lomb, Genzyme, Canada Life, Honeywell etc) is a large source of employment to Tramore Town; therefore it is foreseen that there will be usage by both commuters and leisure/tourist cyclists alike. The current vehicular traffic on the Waterford Tramore route is 10,500 vehicles per

day, and is within the optimum 30minute cycle range for commuting With Waterford City and Tramore Town situated close to Rosslare Europort, a noticeable amount of continental touring cyclists are regularly spotted in both locations. The addition of a top quality cycle track along this route would further enhance the attractiveness of visiting both locations. Section 5: Outline (i) alignment with other transport, tourism and sport programmes/locations (e.g. other infrastructure, greenschools, work place travel plans, tourism visitor centres etc.) (ii) route management and promotion plans and (iii) planned route user monitoring The proposed route ties into both the 8.5km long off road cycle path along the R710 Outer Ring Road, from the Regional Hospital and the large residential area to the East of the City to the Waterford.I.T. Carriganore Sports & Research Campus. The proposed route also connects to the existing cycle lanes on the R680 Cork Road and R709 Inner Ring Road connecting Waterford City Centre to the Regional Sports Centre, IDA Industrial Estates as well as the main WIT Campus A number of local organisations participate in the Work Place Travel Plans such as the City & County Councils, the Institute of Technology and Genzyme, Both Waterford City and County Councils are very active in promoting cycling, and work with the local cycling clubs to achieve the highest level of awareness of cycling including participation in the Green Schools, Bike Week (joint hosting of National Opening Event 2012) and the ever popular Sean Kelly Tour, which in 2011 has over 4000 cyclists take part in various length cycles in the county, from 10km and 30km family cycles to 90km and 160km cyclist for committed sports cyclists.