SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Similar documents
Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Financial Project ID No(s).: and ETDM No(s).: and 14181

Pinellas County Safety Initiatives

Transportation Planning Division

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Transportation Planning Division

Road Diets FDOT Process

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

City of Wilsonville 5 th Street to Kinsman Road Extension Project

LANE ELIMINATION PROJECTS

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

54 th Avenue North Complete Streets Concept Plan

Diamond Springs Parkway Project

Freeway ramp intersection study

Plant City Bicycle and Pedestrian Master Plan. Project Update March 2, 2017

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

City of Jacksonville Mobility Fee Update

Orange County s Transportation Planning and Multimodal Corridor Plan

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Tampa Bay. Pedestrian Safety Skills

Route 79/Davol Street Corridor Study

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

VT15 / Allen Martin Drive Intersection Scoping Study

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

PROJECT FACT SHEET May 25, 2018

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

North Shore Transportation Improvement Strategy

Omaha s Complete Streets Policy

San Jose Transportation Policy

Bicycle Friendly Niagara Falls

MASTER BICYCLE AND PEDESTRIAN PLAN

PROJECT FACT SHEET March 21, 2018

MASTER BICYCLE AND PEDESTRIAN PLAN

Moving Towards Complete Streets MMLOS Applications

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Citizen Advocacy. VISION ZERO IN HILLSBOROUGH COUNTY TODAY

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets

US 19 PEDESTRIAN AND BICYCLE SAFE ACCESS

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Snelling Bus Rapid Transit June 17, 2013 Technical Advisory Committee Meeting #2 & VISSIM Traffic / TSP Evaluation Wrap-Up

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Reams Road RCA Study. Board of County Commissioners Public Hearing

Environment and Public Works Committee Presentation

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Closing Plenary Session

Route 7 Corridor Study

Arterial Transitway Corridors Study. Ave

Central Avenue Corridor Study FPID Number:

Northside Livable Centers Study

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

122 Avenue: 107 Street to Fort Road

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Regional Bicycle System Master Study. Preliminary Results Update

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Hillsborough Pedestrian Safety Action Plan 2015 Update. Hillsborough MPO BPAC May 2015

West LRT Workshop Session Welcome Stony Plain Road from 149 Street to 124 Street May 12, 2010

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Bicycle RSAs: How to Conduct Road Safety Audits and How to Use Them to Promote Bicyclist Safety. Dan Nabors, PE, VHB Bill DeSantis, PE, VHB

Agenda. Citizen Advisory Committee. CSAH 101 (CSAH 62 to Hutchins Drive) City of Minnetonka May 29, :00 pm

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

MnPASS System Today and the Future

Durham Region Long Term Transit Strategy

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Wilshire Boulevard Bus Rapid Transit Project

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Transcription:

Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout study duration AGENDA 1. Welcome & Introductions 2. Project Description and Scope of Work 3. Complete Streets Overview 4. Planning Process 5. Project Overview 6. Agency Planning Efforts & Corridor Concerns 7. Project Schedule & Next Steps 8. Wrap-up & Adjourn

Project Description and Scope of Work Corridor study limits Shore Drive South/Mathews Road to 66th Street Project length is 1.659 miles Scope Collaborate with community, stakeholders and a Project Advisory Group (PAG) to: Develop a multi-modal vision for the corridor that establishes a more walkable, bike-friendly, urban environment Improve safety, mobility and operations/efficiency along the corridor for all users 3

Study Purpose and Need Two main objectives Enhance multi-modal mobility and connectivity along the corridor Develop short and long term strategies to address corridor needs Stakeholder Outreach Goals & Objectives / Policy PAG Visioning Meeting Vision Workshop Vison Plan Alternatives Strategies Alternatives Workshop 4

Approach to Project Process Corridor Visioning Data Collection & Alternatives Development Analyze, Compare & Select Recommended Alternative Draft Documentation/ Plans Finalize Documentation/ Plans Kickoff Meeting Base Mapping Input on Preliminary Purpose and Need Goals & Objectives Visioning Workshop Vision Plan Engineering & Environmental Data Collection Engineering & Environmental Analysis Design Traffic and Traffic Operational Analysis Alternatives Development Draft Engineering/Environmental Documentation Final Purpose and Need Comparative Evaluation Alternatives Public Meeting Select Recommended Alternative Draft Corridor Alternatives and Strategies Report Draft Conceptual Roadway Design Prepare Cost Estimates Prioritization of Alternative Improvements Final Corridor Alternatives and Strategies Report Coordinate with FDOT for funding for CIP and Work Program Present Findings to MPO Committees Preliminary Purpose and Need 5

Project Schedule Study began: January 2017 15-month schedule TASK 2017 2018 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR Study Begins PAG Meeting PAG Meeting PAG Meeting Public Involvement Data Collection / Analysis (Environmental, Traffic, Etc.) Kick-Off Meeting Visioning Workshop Alternatives Public Workshop Analysis / Alternatives Development Corridor Alternatives & Strategies Report 6

Complete Streets New Manuals Draft Florida Design Manual Replaces FDOT Plans Preparation Manual (PPM) Uses complete streets design principles Effective January 2018 Draft Complete Streets Handbook Context based planning and design 7

Complete Streets New Context Based Design Highway functional classification Design speed Context Classification - (New) 8

Complete Streets Complete streets shall serve the needs all of users: Motorists Pedestrians Cyclists Transit Freight 9

Planning Process PHASE 1: Define the Problem 1.1 Initial Stakeholder Outreach PHASE 2: Define Guiding Principles 2.1 Define Guiding Principles PHASE 3: Define & Select Alternatives 3.1 Define Alternatives 1.2 Collect Data 2.2 Define Purpose & Need 3.2 Compare Alternatives 1.3 Synthesize Issues and Opportunities 2.3 Define Measures of Success 3.3 Select Alternatives & Determine Next Phase 10

Planning Process: PHASE 1.1 PHASE 1.1 Initial Stakeholder Outreach Project Kick-off Meeting Establishment of Project Advisory Group (PAG) Follow-up PAG Meeting Corridor Vision Workshop Create Vision Plan Visualize the Corridor 11

Planning Process: PHASE 1.2 PHASE 1.2 Collect Data Working concurrently with PHASE 1.1 Understand the Transportation Context Safety Physical constraints Existing/future traffic Bike/pedestrian/transit needs Land use context What type of area is being served? Who are the predominant Users? Land use special consideration? Policy and financial context Regional priorities Local goals and priorities 12

Planning Process: PHASE 1.3 PHASE 1.3 Synthesize Issues and Opportunities Provide information that can be synthesized in ways that can be easily communicated to and understood by community members and decision makers.. Maps, traffic and crash data, photos, aerial boards, etc. 13

Project Background Project length is 1.659 miles Shore Drive South to 66th Street Urban arterial Evacuation route Mostly 6 lanes with a short segment that is 4 lanes Constrained corridor CITY OF SOUTH PASADENA CITY OF ST. PETERSBURG Gulfport Blvd S Park St S SECTION 1 SECTION 2A SECTION 2B 14

Existing Roadway Section Section 1 Shore Drive South to Park Street South Total length of 0.766 miles Urban minor arterial Located in the City of South Pasadena Prior corridor study by the City proposed lane diet 15

Existing Roadway Section Section 2A Park Street South to Central Avenue Total length of 0.606 miles Urban minor arterial and urban principal arterial Wider median, more restrictive from Segment 1 No Bike Lanes!! Intersects Pinellas Trial and Bikes to Beaches Project Located in the City of Saint Petersburg Last RRR project completed in 2004 16

Existing Roadway Section Section 2B Central Avenue to 66th Street North Total length of 0.287 miles Urban principal arterial Changes from 6 lanes to 4 lanes Outside lanes become right-turn drop lanes No Bike Lanes!! Located in the City of Saint Petersburg Last RRR project completed in 2004 17

Crash Data Signalized Intersections Crash Data from 2010 to 2015 XX Number of Crashes 40 Pasadena Ave 25 53 118 21 56 109 55 18

Crash Data Top 10 Locations By Number of Crashes 1. Gulfport Boulevard (118) 2. Central Avenue (109) 3. 1 st Avenue South (56) 4. 66 th Street (55) 5. Majestic Way (53) 6. Shore Drive (40) 7. 1st Avenue North (30) not signalized 8. Hibiscus Avenue (27) not signalized 9. Huffman Way South (25) 10. Park Street (21) By Injury Crashes 1. Central Avenue (51) 2. Gulfport Boulevard (47) 3. 66 th Street (30, 1 fatal) 4. 1 st Avenue South (25) 5. Park Street (20) 6. Majestic Way (18, 1 fatal) 7. Shore Drive (18) 8. 1 st Avenue North (18) 9. Hibiscus Avenue (10) 10. Bougainvillea Avenue (10) 19

Safety Review - Hibiscus Avenue 27 Total Crashes 10 Injury Crashes 18 Angle Crashes Side street is striped Right-Turn Only 20

Safety Review 66 th Street 55 Total Crashes 30 Injury Crashes 26 Roadway Departure Crashes Sharp Curve at 66 th Street 66 th St 21

Motorist - Existing and Future Traffic Preliminary Average Annual Daily Traffic (AADT) Pasadena Ave Existing (2017) 28,000 32,000 34,500 37,000 33,500 29,500 28,500 35,900 38,700 41,500 37,600 33,100 32,000 31,400 Future (2040) 22

Pedestrian Users Older population Disabled users SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66th Street 23

Pedestrian Volumes XX 2017 Existing Year Peak 4-hour Pedestrian Volume from Preliminary Counts 28 Pasadena Ave 18 76 93 40 41 45 5 24

Pedestrian Accessibility Crossing Locations Crosswalk Locations No Crosswalk Provided at 66 th Street Pasadena Ave ¼ Mile ¼ Mile ½ Mile 25

Pedestrian Accessibility Shore Drive/Matthews Road Excessive crossing distance (Approximately 200 feet) Requires two-stage crossing 2 min, 45 seconds to cross 26

Bike Users No bike lanes Riding on sidewalk 27

Bike Volumes XX 2017 Existing Year Peak 4-hour Bike Volume from preliminary counts 31 Pasadena Ave 43 71 53 33 28 24 3 28

Bike Connectivity Planned on-street 4-foot bike lanes Future bike gap Pinellas trail Pasadena Ave 29

Transit Connections Existing PSTA Corridor Routes Route 79 Route 90 Central Avenue Trolley Planned PSTA Routes Central Avenue Bus Rapid Transit (BRT) from Downtown St. Petersburg to St. Pete Beach 30

Freight Considerations Types of facilities Limited access roadway Regional freight mobility corridor Freight Distribution Route Fright activity Freight activity & land use compatibility analysis Low activity area Freight oriented area Community oriented area Diverse activity area 31

Agency Planning Efforts & Corridor Concerns Current/Proposed Transportation Plans Previously identified transportation improvements Anticipated land use changes Transportation policy changes Local Perspective of Corridor Issues Safety Mobility Multi-Modal Needs Land Use Stakeholder Input Open Discussion 32

Project Schedule & Next Steps TASK 2017 2018 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR Study Begins PAG Meeting PAG Meeting PAG Meeting Public Involvement Data Collection / Analysis (Environmental, Traffic, Etc.) Kick-Off Meeting Visioning Workshop Alternatives Public Workshop Analysis / Alternatives Development Corridor Alternatives & Strategies Report 33

Thank You! Brian Shroyer, CPM Multimodal Project Manager 813-975-6449 Brian.Shroyer@dot.state.fl.us Remember to be Alert Today, Alive Tomorrow. Safety doesn t happen by accident. 34