Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Similar documents
Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

IL Route 71 Construction Update

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Taylor Road Resurfacing Project

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

I-25 South Gap Project Monument to Castle Rock

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact

PROJECT FACT SHEET May 25, 2018

Traffic Control Inspection Checklist Segment:

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

TRAFFIC SIGNAL WARRANT STUDY

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Lincoln Avenue Road Diet Trial

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

SECTION TRAFFIC REGULATIONS

50 Year Roads: Don't Accept Anything Less

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Hospital Link Project Project Update September 2017

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Challenges of Tack Coat

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

Cincinnati Dayton Rd Widening

Introduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Legislative Update Williamsburg Residency

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

ADA on Construction. Guidance for Section C Plan Preparers

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Accommodating Pedestrians in the Work Zone

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Welcome! Urban Work Zone Design. Training Course 0-1

Project Update May 2018

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

PUBLIC INFORMATION MEETING

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Charlottesville Regional Chamber of Commerce. October 28, 2014

1-295 Southbound Project Area and Detours ()~ , A ---- This map shows the project area, as well as the detour Turnpike) and Route 201.

Rio Intersection Traffic Restrictions Begin Monday

PROJECT FACT SHEET March 21, 2018

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

Hospital Link Project Project Update November 2017

Chapter 4 Traffic Analysis

Township of Springwater

Project Application. Project Location: Salem Drive (Federal Route 1101)

Design Criteria. Design Criteria

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Gerald P. Oliveto, P.E. George Franz NJDOT

General References Definitions. (1) Design Guidance. (2) Supporting Information

Fleur Drive Reconstruction

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

91

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

Frequently Asked Questions

Access Management Standards

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Downloaded from Downloaded from /1

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

3.0 PROJECT DESCRIPTION

An Easier Commute. Learn how to use I-77 Express to save you time.

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Welcome! San Jose Avenue Open House August 25, 2015

IH 20 RANGER HILL PUBLIC MEETING

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

US 69 RELIEF ROUTE STUDY

Mark Malone, P.E. SD DOT

Harrah s Station Square Casino

FDOT Treasure Coast Traffic Impact Report

Appendix B Existing ADOT Data Parameters

Why invest in the 1 Street S.W. Corridor?

QUEEN ELIZABETH WAY / MARTINDALE ROAD BRIDGE DEMOLITION DETOUR ANALYSIS

Parks Highway: MP Lucus Road to Big Lake Road

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Driveway Design Criteria

SC 41/Joe Rouse Intersection Improvements

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

July 9 Mom's the Bomb at Waseca Waterpark th Ave NE (Mom's get in free with a paid child's admission.)

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Project Description Form 8EE

This memo summarizes the traffic observations around the 2016 WayHome event and offers recommendations for improvements for future events.

Table of Contents. Guidelines on Rolling Roadblocks for Work Zone Applications

Low Volume Roads: Rural and Urban

Transcription:

CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas where traffic becomes concentrated, such as urban intersection, flexible pavement may be prone to rutting over time. In areas with seasonal extremes of both hot and cold weather, the ruts can quickly become severe. Several of the flexible pavement intersections in eastern region of Washington state had been suffering from severe rutting caused by slow moving heavy vehicles, exasperated by high temperatures during the summer months.

Portland Cement Concrete Pavements The frequent maintenance required on some asphalt concrete (AC) pavement sections has made reconstruction with Portland Cement Concrete Pavement (PCCP) a more feasible alternative. In Eastern Washington, three major AC intersections with severe rutting problems were reconstructed with PCCP. The entire reconstruction of each intersection, including demolition of the AC pavement and its replacement with PCCP, took place over a period of three days - starting on Thursday evening and opening the intersection to the traffic on Sunday afternoon. Map of the project area Sites 1, 2 &3

The Problem 25,000-30,000 ADT (Average Daily Traffic) with 20 percent trucks Rutting in Asphalt Concrete Pavements

Intersection Construction Replace the existing pavement with 12 inches PCCP over the existing crushed stone base Thursday evening to Monday morning closures to construct the intersection square area Detour traffic over surrounding surface streets and state/interstate highway Intersection Construction

Planning Prior to Design of this Project, Washington State Department of Transportation (WSDOT) communicated with contractors, and the city about strategies for avoiding some of the inconvenience caused by the previous Contracts. The contractor proposed completing the entire intersection including the radii, if a three day closure was Possible. City allowed full weekend closure, Friday evening to Monday morning, of one intersection at a time. Contractors felt that the entire intersection with the exception of the radii could be completed in this timeframe. Traffic Detours Truck traffic detoured approximately 13 miles on interstate and state highways. Car traffic detoured on local streets. Flaggers placed at all key locations.

Traffic Detour Map Public Relations Numerous public meeting were held during the design phase for public input and agreement WSDOT contacted business owners prior to the construction One week before the closure Day before the closure Provided flyers

Public Relations Weekly meeting were held by the project engineer to update the local media WSDOT tried to make the closures as painless as possible: Fully signed the detour routes On site changes/refinements to allow traffic flow Aggressive scheduling to ensure a minimum timeline for the closure Variable message signs, flyers, and media notices Construction Staging

Staging Concerns Traffic Flow and Traffic Control Access to Adjacent Business Access for Construction & Material Delivery Construction Time Safe Construction Area for Employees and Public Mix Designs Time to Cure and Opening to Traffic Traffic Control Requirements SR-395 & Yelm, Clearwater, Kennewick Avenue: Close one Intersection at a Time Temporary Lane Closures Stages 1,2,3 Complete Closure Stage 4, Thursday at 7:00 PM to Monday 6:00 AM. Late opening penalty of up to $2,400.00 per hour. 2,500 psi for opening to traffic.

Modification to Traffic Control Plan Place Traffic in NB or SB lanes for several days. Once the traffic flow is modified leave them in the same configuration. Set up Temporary Signals Worked on Two Intersections at Once (Clearwater & Kennewick) No Left Turns to Facilitate Construction Kennewick Intersection Staging Monday AM to Thursday 7:00 PM Complete Approach & Departure Legs on Southbound Legs as Shown in Stage 1 & Stage 2 at both Kennewick & Clearwater Set up Traffic Control for Closure at Clearwater Move materials, (Tie Bars, Dowel Baskets, Forms, etc), into position for easy access

Stage 1 Work Zone Traffic Flow Stage 2 Work Zone Traffic Flow

Kennewick Intersection Staging Complete Interior Portion of Clearwater Avenue over the weekend Monday through Friday Completed Northbound Approach and Departure Legs at Kennewick & Clearwater Avenue Stage 3 Work Zone Traffic Flow

Kennewick Intersection Staging 7:00 PM Thursday to 6:00 AM Monday Close Kennewick Intersection 7:00 PM Thursday Begin Milling at 8:00 PM Start Finish Grading at 2:00 AM Friday Morning. Set Forms 7:00 AM Start Concrete Placement 11:00 AM Complete Daily placement 11:00 PM Friday Evening. Begin Green Sawing 4 to 6 hours after start of placement Kennewick Intersection Staging Saturday Check Maturity Meter 7:00 AM Remove & Reset Forms, Place Baskets 8:00 AM Begin Placing Concrete Complete Concrete placement 4:00 PM Start Cleanup.

Stage 4a Stage 4b Stage 4a Stage 4b Work Zone Road Closure

Kennewick Intersection Staging Sunday Check Maturity Meter for Required Strength Clean and Seal Joints 7:00 AM to 2:00 PM Set Up Traffic Control for opening Place Traffic on Pavement 6:00 PM Sunday Intersection Complete

Time for Completion In 15 days approximately 3384 cubic yards of concrete were placed at Kennewick Avenue and Cleawater. Kennewick Avenue and Clearwater were built concurrently. The concurrent construction saved a considerable amount of time. Crews were able to place concrete daily. Time Comparison to Other Projects Location Days Cubic Yards Francis & Division 35 3050 Broadway & Pines 19 1681 Kennewick, Clearwater 15 3384

Time Components Construction Activity 3% 1% 5% (Joint Seal) 2% 5% (Clean Joints) Closing Roadway Grading 17% (No Activity) 14% (Cure) Form and Place Concrete Cure Joint Seal Prep Roadway for Opening to Traffic No Activity 1% 11% (Sawcutting) 8% (Excavation) Excavation Conduit Repair Sawcutting Clean Joints Clean Roadway Delay 5% (Grading) 1% 27% (Form & Place Concrete) Components of typical turn-around time for a PCCP intersection reconstruction Keys to this Projects Success Good Communication between WSDOT project office and Acme. Key decision makers on site or available at all times. Involvement in the scheduling from subcontractors and suppliers. Hourly schedule for Weekend closures with clear milestones for daily production. Quality Control personnel onsite during all placements.

Mix Design Bonus/Penalty for Air Content & Strength evaluated statistically Mix design required 650 flex in 14 days with 28 day cylinders for pay Ultimate 28 day field strengths required to exceed, 28 day lab cured compressive strength less 1000 psi, evaluated statistically. 2500 psi for opening to traffic in 12 to 16 hours Maturity Meter curves for early opening. Mix Design WSDOT One Day Mix 705 # Type III Cement 940 # 1 1/2 Rock 799 # 3/4 Rock 140 # 3/8 Pea Gravel 590 # Coarse Sand 481# Fine Sand 254 # Water 11 oz/cy AEA 30.3 oz/cy WRA 17.6 oz/cy Delvo (Set Retarder)

Maturity Meter Maturity vs. Compressive Strength Maturity vs. Flexural Strength Flexural & Compressive vs. Time Maturity Meter

Closing There are many different ways an agency can stage an intersection. The method presented is only one method that worked very well on this project. None of the techniques used to place the concrete are highly specialized. The mix design is very simple and easy to use. High penalties for late openings will increase the initial cost of the intersections to cover contractor risk. Rapid Intersection Reconstruction Kennewick, Washington