Standard Operating Procedure

Similar documents
Equipment Operating Procedure Glove Box

School of Chemistry SOP For Operation Of Glove Boxes

University of Minnesota Nano Center Standard Operating Procedure

Glove Box Installation Manual

Preparation of Nerve Agent Simulant Aerosol

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

OPERATION MANUAL NTF-15

Glove Box with Gas Purification System and Digital Control VGB-6. MTI Corporation

OPERATION MANUAL NTF-60 Plus

THERMAL EVAPORATION UNIT (for Al evaporation)

Solvent System Walkthrough

MB-SP Series Solvent Purification System

AX5000 Operational Manual

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

Operating Instructions

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Revised: June 7, 2017

AKTA MC SOP Page 1 9/27/04 AKTA METAL CHELATING SOP

The primary purpose of laboratory fume hoods is to keep toxic or irritating vapors out of the general laboratory working area.

MODEL NUMBER: P-A AUTOMATIC PORTABLE COMPRESSOR

Pressure Regulators. Operating Instructions. Instrumentation

Inert Air (N2) Systems Manual

NTF-515. Operation Manual

Burner Management System DEMO Operating instructions

STANDARD OPERATING PROCEDURES

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

ZUERCHER TANK REGULATORS PRINCIPLES OF TANK VENTILATION

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Discovery HP-TGA 75/750. Site Preparation Guide

ARC Unofficial Manual to the Solvent Dispensing System. Designed by J. C. Meyer

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

XpressFill XF2500 Counter Pressure Filler. Operating Instructions

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

STANDARD OPERATING PROCEDURE

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

STANDARD OPERATING PROCEDURES

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

Nordiko Metal Sputtering System Standard Operating Procedure

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Armfield Distillation Column Operation Guidelines

Operating Procedures for Metal Evaporator I

AKTA 3D SOP. Click on the System Control tab. This screen has 4 windows.

PURPOSE OF THE POLICY

Optimizing Gas Supply for Industrial Lasers

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

SERIES 30. Spring Operated Tank Blanketing Valve PROTECTOSEAL.

Standard Operating Manual

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

Chromat Calibration Updated October 27th, 2017

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

MODEL NUMBER: P PORTABLE COMPRESSOR

CHEMISTRY FACULTY LABORATORY SAFETY CONTRACT CENTRAL CAMPUS

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

CP10 Sensor Installation and Maintenance Instructions

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

CONGRATULATIONS ON YOUR PURCHASE OF YOUR THUNDER COMPRESSOR For your personal safety please read, understand and follow the information provided in

STANDARD OPERATING PROCEDURE (SOP): URETHANE

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Basic & Controlled Atmosphere Glove Boxes

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Standard Operating Procedure

SOP: Buck Scientific BLC-20P HPLC Operation

OPERATING MANUAL LO-CROSS-FLOW CF M

Use of Biosafety II cabinets

TEMPLE UNIVERSITY A Commonwealth University Environmental Health & Radiation Safety (EHRS)

March CS-1701F Reactive Ion Etcher

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

1. Study the performance of a binary distillation column operated in batch mode.

Basic ICP Operating Procedures

Instruction Manual Dräger MSI P7 and MSI P7 plus

Instruction Manual VCG-6


Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Eaton Filtration, LLC

Arizona State University NanoFab XACTIX ETCHER. Rev A

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

STANDARD OPERATING PROCEDURES (SOP) FOR REPRODUCTIVE HAZARDS

Section 1. Contact Information. Procedure Title: Procedure Author: Date of SOP Creation/Revision: Name of Responsible Person: Location of Procedure:

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Standard Operating Manual

Focus on VOC Emissions Reduction Using an Oxygen Based Inerting Control System For Inert Gas Blanketing of Chemical Process Vessels

Chemical Class Standard Operating Procedures. Pyrophoric Chemicals (PYR) & Water Reactive Chemicats (WRC) Diethylzinc

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

XpressFill XF4500C Counter Pressure Can Filler. Operating Instructions

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

Chapter 4: Implementing Effective Exposure Controls

NTF-230 OPERATION MANUAL

STANDARD OPERATING PROCEDURE TEMPLATE

AUTOVENT 4000 VENTILATOR

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

Tire Inflation Cage Kit For servicing only single piece automotive, and most light truck tire/wheel assemblies

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Transcription:

Page 1 of 10 Vigor Glove Box Standard Operating Procedure Lab: ESB 154 Department: Materials Science and Engineering PI: Paul V. Braun Written By: Subing (Alan) Qu Section 1: Overview Type of SOP: Process Hazardous Material Hazardous Class of Materials Equipment Synopsis: This SOP is written to standardize the operating procedure of the Vigor glove box, protect the equipment from being used improperly and protect the users from potential hazards. Section 2: Risk Assessment Summary (Hazards and control measures) Materials: Material (name, CAS #, other ID) Argon, 7440-37-1 Hazards High pressure, suffocation when leakage happens Equipment Hazards: Bodily Injury: the glove box is connected to a continuous supply of argon gas from a high-pressure liquid argon tank. In the event that the tank is in need of replacement, DO NOT attempt to do this yourself. The tank is heavy and can cause severe physical harm if moved improperly. Please notify Alan Qu and/or Sanghyeon Kim of the need and certain measures will be taken. Hazardous Conditions: Reduced/Shut-down of gas supply: circulation will be shut down and materials enclosed are subjected to contamination. Overpressure of gas supply: equipment is subject to damage and can cause physical harm to human body. Technique Hazards: Overtighten big antechamber door: door can be damaged during refilling and can cause physical harm to human body. Improper use of sharp: can cause glove damage, inhalation of toxic gas, contamination of enclosed materials.

Title: Click here to enter text. Page 2 of 10 Personal Protective Equipment Nitrile gloves, Safety glasses, Lab coat, Close-toe shoes Engineering Controls The glove box is connected to a protector with an ON/OFF switch at all times (on the sidewall of the control box, right-down side), in case an emergency shut-down is required. The argon tank has two safety valves in case flow of gas into glove box must be cut off. The argon tank has a built-in over pressure outlet that prevents tank from being over-pressurized. Section 3: Procedures Sign in the logbook hung right by the glovebox before and after your experiment. Pay extra attention to the oxygen level, if it is above 5ppm, please notify Alan Qu or Sanghyeon Kim. We have a multifunctional touchscreen for this new glovebox: There are several accessible functions on the main menu page.

Title: Click here to enter text. Page 3 of 10 Glovebox Pressure: The pressure limits set for the glovebox interior are relative pressures, referenced to the surrounding atmospheric pressure. A positive pressure indicates the pressure inside the box is greater than the outside atmospheric pressure while a negative pressure indicates a lower pressure than outside the glovebox. The unit of the pressure used here is the mbar, or one thousandth of a bar. Generally, operating pressures limits between 0 and a few mbar are good for most users. It is also suggested to read the oxygen level from the GE oxygen sensor placed on top of the glovebox.

Page 4 of 10 Functions operation: When you click the Task button on the touch screen there are several operations that you can do to maintain the good working conditions of the glove box. Important ones listed below. Please remember that Purging and Regeneration should ONLY be done by Sanghyeon Kim, Junjie Wang or Alan Qu. Circulation can be done by any trained user. 1) Purge: When impurities are introduced into glovebox, we recommend turning off circulation system and purging the impurities out of the box (5-10 minutes). Doing so will avoid introducing the impurities into the gas purification column and prematurely consuming the purification capacity. Caution! 1. Set the Box Pressure upper limit to 8 mbar and lower limit to 5 mbar before activating the purge function. 2. Be sure that working gas is being delivered at a minimum 60 psi (~4bar). If not, the glovebox will be unable to open the pneumatic valve when vents purge gas. Warning! To activate the purge function, the Circulation and Regeneration need to be completely turned off. Circulation should be set to manual and then turned off.

Page 5 of 10 Enter a value in the Purging Time box and press Start Purge to activate the purge function. Purging will stop after the specified time period. It can be stopped at any time by pressing the Stop Purge button. 2) Circulation: After a pure or regeneration cycle completes, the circulation function removes residual impurities to < 1ppm. Note: The very first circulation, performed during set up, may only bring impurities to single digits before regeneration is needed. Thereafter, it will achieve an impurity level of < 1ppm until it is time to regenerate it again. Warning! Before starting the circulation, please check to assure that: 1. The purge function is not running. 2. Any running regeneration cycle has fully completed and that the purifier(s) is/ are completely cooled down to room temperature. Please DO NOT restart circulation before the regeneration fully completes (20 hours) as this may damage the glovebox permanently. 3. At least 70 psi (~5bar) of working gas pressure is available to allow circulation to start. If the pressure is too low, circulation will not start. 4. The oxygen level is < 100ppm (or from 100 200 ppm during initial startup). Press Circ. On the main menu page to enter the circulation page. There you will specify whether you want the purifier to circulate in manual or automatic (on demand) mode. On Demand Circulation Mode is the default mode for all Vigor gloveboxes. Under On Demand mode, circulation will start when the oxygen or moisture level exceeds the upper limit (which you have previously selected as suitable for your work, see settings window shown below). Circulation will continue until the impurity level reaches the lower limit that you set.

Title: Click here to enter text. Page 6 of 10 Manual Circulation: To control the circulation function manually, press the On Demand button once to transfer into the Manual control mode. A new button, Start Circulation, will appear. Press this once to start manual circulation. It will continue to run until you press the button again (it now appears as Stop Circulation). For a new installation, Vigor recommends setting the circulation mode to Manual, and running the circulation continuously for at least one week, or setting it to On Demand mode with the upper limits for O2 and H2O set to 1ppm and the lower limits for O2 and H2O to 0.2 ppm. During this startup period moisture slowly (over days) desorbs from interior surfaces and moisture gradually drops. Oxygen will drop much faster than water in low ppm ranges. 3) Regneration: When running the circulation process becomes unable to remove impurities from the glovebox to reach the selected levels, or when this process greatly slows, regeneration is indicated. To enter the regeneration page, press the Regen button on the main menu.

Warning! Title: Click here to enter text. Page 7 of 10 Do not use pure hydrogen gas or regeneration gas with a hydrogen level exceeding 10% for regeneration due to the possibility of ignition or explosion. Vigor suggests using an ultra-high purity grade mixture of 5% Hydrogen in 95% inert gas (to match your working gas), supplied at 15 psi, for regeneration. After adjusting regeneration gas flow, please click Start Regeneration icon to start regeneration. Regeneration will proceed for the next 20 to 24 hours. To manually turn off the regeneration process, please click Stop Regeneration (Scram button on some models) to stop the process. Although, unless there is a compelling reason why this is necessary, we suggest you not interrupt the process. Caution! 1. After regeneration, impurities levels might have risen by a few ppm which is normal and mostly due to diffusion through the gloves. Starting the circulation will quickly bring the levels of impurities back down again. 2. After regeneration when starting circulation, the gloves might suck into glovebox or deflate all the sudden due to the vacuum state of the purifier, which is normal. Before-experiment inspection: Check the H 2 O level on the panel, DO NOT use if it is higher than 10ppm. Check the gauges on the argon tank, make sure there is enough gas and the pressure on the left gauge is right above 80psi (a little bit higher than 80psi). Loading samples: Make sure the insides doors are closed before loading samples. i) if using the small antechamber, the chamber should be pumped and refilled three times before loading samples into the glove box. ii) if using the big antechamber, the chamber should be pumped ONLY once for at least 30 mins and refilled with argon before loading samples into the glove box. Use two fingers to close the big antechamber doors. DO NOT overtighten the big antechamber doors.

Page 8 of 10 Restart circulation and analyzer: In some cases, e.g. the gloves are pushed too fast, the circulation and/or analyzer will be shut down. When this happens, press Task on the panel and select circulation in the slab, type in the upper and lower limit of desired H 2 O and O 2, the circulation will be turned on. Equipment error information: In some cases, the panel will show inlet/outlet valves purifier not opened, first check the gauge of tank, normally it is due to the argon gas is running out. Replace the gas tank and restart circulation and analyzer if necessary (refer to above). If there is still gas inside the tank and the error info is not gone, try to increase the pressure above 80psi a little and when the valves are back on, REMEMBER to reduce the pressure back to 80psi. If this still doesn t work, contact the safety person. Section 4: Waste Disposal/Cleanup The waste are to be disposed of according to Division of Research Safety (DRS) ChemTrek requirements. Clean up after experiment. Dispose of any wasted labwares (gloves, pipettes, kimwipes, weighing papers, etc.) OUT of the glove box. Section 5: Spill/ Other Emergency 1. Please make sure a piece of aluminum foil is spread out on the bottom inside the glovebox when you are handling powders, and please wrap up and dispose of it properly according to DRS requirements. 2. When there will be volatile chemicals involved in your experiments, please make sure you seal the containers once finished so as to prevent potential damage to the catalyst and regenerator. 3. If some liquid chemical (inflammable) is spilled, please use kimwipes to clean it up and take the kimwipes out of the glovebox after operation. 4. According to DRS spill control stipulations, please take certain measures on corresponding chemicals and notify Alan Qu and/or Sanghyeon Kim. If it is something immediate out of your control by your sensible judgement, call the DRS or 911. Section 6: Additional Information Advice: 1. Usage of water or any aqueous materials is NEVER allowed inside glovebox. 2. Squeeze bottles with liquid inside are NEVER allowed inside the antechamber during pumping down. 3. Degassing of porous materials (e.g. kimwipes) is necessary for at least 30 mins before opening antechamber from inside (overnight for a whole box of kimwipes and gloves, too!). 4. While refilling the big antechamber, DO NOT refill argon too fast, open the refill valve to the half at first, once the pressure reaches to -0.4, the refill valve can be fully opened. Checklist:

Page 9 of 10 A checklist can be written in the SOP as a reminder for the steps needed to take in order to perform the procedure. Potential checklist items include: Read (Material) Safety Data Sheets. Proper fire extinguisher is nearby. Another researcher is nearby and knows the hazards present. All calculations are done prior to beginning the procedure. The required glassware is of the proper size to accommodate all steps of the procedure. Received necessary immunizations.

Page 10 of 10 Training Documentation Signing this document means that you have read and understand all aspects of this Standard Operating Procedure. The supervisor is the person that acknowledges you took the training and understand the procedure. They can be a lab manager or researcher assigned by the PI to oversee this particular SOP. Name (Printed) Name (Signed) Supervisor Date