State Road (S.R.) 61 (U.S. 319) FPID s and

Similar documents
Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

APPENDIX L: COST ESTIMATING TOOLS

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Florida Department of Transportation

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

Performance Criteria for 2035 Long Range Transportation Plan

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

LANE ELIMINATION PROJECTS

Application of a Complete Street

Financial Project ID No(s).: and ETDM No(s).: and 14181

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Road Diets FDOT Process

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

DOT Policy and Procedure Integrity Excellence Respect

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017

Reams Road RCA Study. Board of County Commissioners Public Hearing

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

FM #: ETDM #: 11241

CHAPTER 5 TRANSPORTATION GOAL

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

Roundabout Feasibility Memorandum

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

South Carolina Department of Transportation. Engineering Directive

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Route 47 (North Main Street) Reconstruction

CTH M HIGHWAY PROJECT CTH Q to STH 113

LOUISIANA COMPLETE STREETS POLICY. Ellen W. Soll, AICP Principal Soll Planning

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

CTDOT Pedestrian and Bicycle Safety Initiatives

CTH M Reconstruction

FDOT Treasure Coast Traffic Impact Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

US 301 Resurfacing, Restoration, and Rehabilitation

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Complete Streets Training. Georgia Municipal Association June 27, 2016

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Complete Streets and Context Classification

Public Information Meeting #1. Pā ia Community Center 5:30 PM 8:00 PM

Public Information Meeting

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

Joshua Jester, E.I., Florida Department of Transportation, District One

Technical Advisory Committee (TAC)

Safety of U-turns at Unsignalized Median Openings

Bicycle and Pedestrian Level of Service Evaluation

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023

Chapter 5. Financial Analysis

HIGHWAY 11 CORRIDOR STUDY

Central Avenue Corridor Study FPID Number:

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Geometric Design Tables

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

TRAFFIC IMPACT ANALYSIS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Frequently Asked Questions

FDOT Treasure Coast Traffic Impact Report

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

Southcote Road Improvements Class Environmental Assessment Study

FDOT Treasure Coast Traffic Impact Report

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Appendix 3 Roadway and Bike/Ped Design Standards

2725 Judge Fran Jamieson Way, Bldg. B Viera, Florida Telephone: (321) Fax: (321)

Austell Road Access Management Plan Public Meeting February 17, 2009

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

FUNDING SOURCES CHAPTER 6

Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

I-10 AT SCENIC LOOP RD. Open House

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Chapter 5 Future Transportation

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Transcription:

State Road (S.R.) 61 (U.S. 319) FPID s 220496 2 22 01 and 219747 2 22 01 Crawfordville Highway Conceptual Design and Environmental Reevaluation May 6, 2014

END PROJECT PROJECT LOCATION/LIMITS Project Limits: S.R. 61 (U.S. 319) from S.R. 30 (U.S. 98) in Wakulla County to South of the Four Points Intersection in Leon County (23.5 miles) Segments North of Rivers Road to the Four Points Intersection (End Project) have been constructed Type 2 Categorical Exclusion was approved on August 1996 BEGIN PROJECT N Hurricane Evacuation Route Presently not on Strategic Intermodal System (SIS)

END PROJECT PROJECT LOCATION/LIMITS 3 Focus Areas: 1. S.R. 30 (U.S. 98) to the intersection of C.R. 61 in Wakulla County (6.7 miles) 2. From the intersection of C.R. 61 to Leon County line in Wakulla County (9 miles) 3. From the Wakulla County line to beginning of the four lane South of Rivers Road in Leon County ( 4.25 miles) BEGIN PROJECT N 4. Focus Project Length is approx. 20 miles

PURPOSE The proposed improvements to Crawfordville Highway are needed to: improve mobility relieve traffic congestion improve traffic circulation improve pedestrian and bicycle connectivity provide for and ensure public safety while protecting the environment Purpose for performing the Study: Evaluate/Update Studies conducted during the earlier PD&E Study to determine the preferred alternative

PROJECT CORRIDOR SEGMENT 7 FPID 219881 1 SEGMENT 6 FPID 219881 2 Focus Areas: 1. 7 Segments 2. Two Alternate Alignments SEGMENT 4 FPID 220495 7 SEGMENT 5 FPID 220495 8 ALTERNATE 1 Alternate 1 follows the existing alignment with shifts to the left and right to accommodate the typical section. SEGMENT 3 FPID 220495 3 Alternate 2 is similar to Alternate 1 except it includes the one way pair within Segment 3 ALTERNATE 2 SEGMENT 2 FPID 220495 6 SEGMENT 1 FPID 220495 5

PROJECT SEGMENTS Segment 1: From SR 30 (US 98) to North of Alaska Way Segment is Being Advanced, R/W Funded for 2014/15/16 Design Plans Being Updated, Currently at 90% Segment 2: From North of Alaska Way to Lost Creek Bridge 30% Design Plans Completed in 2007 SEGMENT 2 FPID 220495 6 SEGMENT 1 FPID 220495 5 Urban Typical Section Design Speed is 45 MPH Provides Two 12 lanes in each direction Provides 4 Bike Lane and 6 sidewalk in each direction

PROJECT SEGMENTS Segment 3: From Lost Creek Bridge to South of East Ivan Road 100% Design Plans Completed in 2006 SEGMENT 3 FPID 220495 3 Alternate 1: Urban Typical Section SEGMENT 2 FPID 220495 6 ALTERNATE 1 Limits From Lost Creek Bridge to South of East Ivan Road Design Speed = 45 MPH Provides two 12 lanes in each direction Provides 4 Bike Lane and 6 Sidewalk in each direction SEGMENT 1 FPID 220495 5

PROJECT SEGMENTS Segment 3: From Lost Creek Bridge to South of East Ivan Road SEGMENT 3 FPID 220495 3 ALTERNATE 1 Alternate 1, Option 1: Crawfordville Town Plan Urban Typical Section SEGMENT 2 FPID 220495 6 ALTERNATE 1, Option 1 ALTERNATE 1 Limits From Harvey Mill Road to Wakulla Arran Road Design Speed = 45 MPH Provides two 11 lanes and 5 bike lanes in each direction Provides 6 Sidewalk in each direction Provides 8 Parking in each direction 14 Median Width* SEGMENT 1 FPID 220495 5 * Does not meet current FDOT criteria

PROJECT SEGMENTS Segment 3: From Lost Creek Bridge to South of East Ivan Road SEGMENT 3 FPID 220495 3 ALTERNATE 1 Alternate 1, Option 2: Urban Typical Section SEGMENT 2 FPID 220495 6 ALTERNATE 1, Option 2 ALTERNATE 1 Limits From Harvey Mill Road to Wakulla Arran Road Design Speed = 45 MPH Provides two 11 lanes in each direction Provides 4 bike lane and 6 sidewalk in each direction 19.5 Median Width SEGMENT 1 FPID 220495 5

PROJECT SEGMENTS Typical Section Options From Harvey Mill Road to Wakulla Arran Road Alternate 1, Option 1: Crawfordville Town Plan Urban Typical Section Alternate 1, Option 2: Urban Typical Section On going Coordination with Agencies

PROJECT SEGMENTS Segment 3: From Lost Creek Bridge to South of East Ivan Road ALTERNATE 2 Alternate 2: One Way Pair Typical Section From North of Harvey Mill Road to North of Azalea Drive Urban Typical Section From North of Azalea Drive to South of East Ivan Road From Lost Creek Bridge to North of Harvey Mill Road

HARVEY MILL ROAD END 4 LANE URBAN SECTION BEGIN ONE WAY PAIR PROJECT SEGMENTS OCHLOCKNEE STREET END ONE WAY PAIR BEGIN 4 LANE URBAN SECTION AZALEA DRIVE CRAWFORDVILLE HIGHWAY

PROJECT SEGMENTS Ochlocknee Street Crawfordville Hwy. Alternate 2: One Way Pair Typical Section From North of Harvey Mill Road to North of Azalea Drive Design Speed 45 MPH Provides two 12 lanes in each direction Provides 4 bike lane and 6 sidewalk in each direction

SEGMENT 3 FPID 220495 3 SEGMENT 2 FPID 220495 6 SEGMENT 1 FPID 220495 5 SEGMENT 4 FPID 220495 7 SEGMENT 7 FPID 219881 1 SEGMENT 6 FPID 219881 2 SEGMENT 5 FPID 220495 8 PROJECT SEGMENTS Segment 4: From South of East Ivan Road to North of SR 267 100% Design Plans Completed in 2010 Segment to be Advanced, R/W Funded for 2017/18/19 Binding Wetland Jurisdictional Determination Segment 5: From North of SR 267 to South of Leon County Line 100% Design Plans Completed in 2010 Segment to be Advanced, R/W Funded for 2016/17/18 Binding Wetland Jurisdictional Determination Segment 6: From Leon County Line to LL Wallace Road 45% Design Plans Completed in 2011 Ponds are designed to Meet Current Permitting Regulations Segment 7: From LL Wallace Road to beginning of the four lane South of Rivers Road 45 60% Design Plans Completed 2006 Drainage Design will not Meet Current Permitting Regulations

PROJECT SEGMENTS SEGMENT 7 FPID 219881 1 SEGMENT 6 FPID 219881 2 SEGMENT 5 FPID 220495 8 SEGMENT 3 FPID 220495 3 SEGMENT 4 FPID 220495 7 Rural Typical Section for Segments 4, 5, 6 & 7 Design Speed 70 MPH Provide two 12 lanes and 5 paved shoulder in each direction SEGMENT 2 FPID 220495 6 SEGMENT 1 FPID 220495 5

SCHEDULE Component Schedule Original PD&E 1996 Conceptual Design and Environmental Reevaluation Now underway Complete in 2015 Right of Way Construction Funded for only Segments 1, 4 & 5 Not funded

SCHEDULE Task Schedule Traffic Analysis Now May 2014 Engineering Analysis Now Oct. 2014 Environmental Analysis Now June 2015 Alternatives Public Meeting June 2014 Public Hearing March 2015 Final Conceptual Plans September 2014 Location Design Concept Acceptance June 2015

SCHEDULE Public Meeting Tuesday, June 17 5:30 p.m. 6:30 p.m. (EDT) Crawfordville United Methodist Church

CONTACT INFORMATION April Williams, P.E. Project Manager FDOT District Three Environmental Management Office 1074 Highway 90 East Chipley, FL 32428 April.Williams@dot.state.fl.us Ph: (850) 330 1625 Ian Satter Public Information Director FDOT District Three 1074 Highway 90 East Chipley, FL 32428 Ian.Satter@dot.state.fl.us Ph: (850) 330 1205