INTERSECTION SAFETY STUDY State Route 57 / Seville Road

Similar documents
TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Glenn Avenue Corridor Traffic Operational Evaluation

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Truck Climbing Lane Traffic Justification Report

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Donahue Drive Corridor Traffic Operational Evaluation

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

TRAFFIC SIGNAL WARRANT STUDY

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

Troutbeck Farm Development

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

Chapter 4 Traffic Analysis

Transportation Impact Study for Abington Terrace

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

THIS PAGE LEFT BLANK INTENTIONALLY

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

ALLEY 24 TRAFFIC STUDY

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

Design Traffic Technical Memorandum

Henderson Avenue Mixed-Use Development

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Shockoe Bottom Preliminary Traffic and Parking Analysis

Intersection Traffic Control Feasibility Study

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC IMPACT ANALYSIS

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Roundabout Feasibility Memorandum

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Highway 111 Corridor Study

DUNBOW ROAD FUNCTIONAL PLANNING

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Capital Region Council of Governments

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

CITY OF SASKATOON COUNCIL POLICY

TRAFFIC ACCIDENT ANALYSIS

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

TRAFFIC IMPACT STUDY

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Road Conversion Study Plumas Street

DRAFT Old Worthington Mobility Study Phase 2 High Street Pedestrian Crossings City of Worthington, Ohio

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

EXECUTIVE SUMMARY. Page 1 of 6

Realignment & Intersection Improvement Alternatives for the Intersection of Lorain Road & Brookpark Road

Operational Ranking of Intersections: A Novel Prioritization Methodology

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Figure 1: Vicinity Map of the Study Area

MEMORANDUM. Layout Of Study Intersections And Traffic Control

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Queensgate Drive Corridor Traffic Study

NO BUILD TRAFFIC OPERATIONS

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

Simons Run Corridor Study

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

TRAFFIC IMPACT STUDY CRITERIA

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Traffic Impact Statement

1 2 I N T R O D U C T I O 6 G E N E R A L I N F O R M A T I O N. Across. 6. Knowledge communicated in a brief overview

Delaware Avenue Corridor Study

Signal Warrant Studies

Access Location, Spacing, Turn Lanes, and Medians

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Traffic Signal Warrant Analysis Report

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

Transcription:

INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD Group 520 South Main Street Suite 2531 Akron, OH 44311 September 2017

INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, Ohio 44281 September 2017 Engineer s Seal Prepared By: Prepared Under The Responsible Charge of: Curtis J. Deibel, P.E. Registration No. 81305 Michael A. Hobbs, P.E., PTOE Registration No. 68713 Certification No. 1346 Date

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio TABLE OF CONTENTS I. Study Area:... 1 II. Executive Summary... 2 Purpose & Need:... 2 Background:... 2 Brief Overview of Possible Causes:... 2 Recommended Countermeasures and Related Costs:... 3 III. Purpose and Need:... 4 IV. Existing Conditions:... 4 V. Project Traffic Volumes:... 6 Planning Level Traffic Volumes... 6 Historic Growth Trends... 6 Future Traffic Volumes... 6 VI. Safety Analysis:... 7 Crash Statistics... 9 VII. Benefit to Cost Analysis:... 10 Proposed Improvements... 10 Benefit to Cost Analysis... 11 VIII. Traffic Analyses:... 12 Signal Warrant Analysis... 12 Intersection Capacity Analysis... 13 IX. Pavement Condition Ratings:... 18 X. Conclusions and Recommendations:... 19 LIST OF APPENDICES Appendix A: Appendix B: Appendix C: Appendix D: Appendix E: Appendix F: Appendix G: Appendix H: Appendix I: Appendix J: Appendix K: Appendix L: Site Photo Log Existing HCS Intersection Capacity Analysis Manual Turning Movement Counts Growth Rate Calculations Collision Diagrams Collision Data Summary & Charts Safety Application Cost Estimate Benefit / Cost Worksheets Traffic Signal Warrant Analysis HCS Intersection Capacity Analysis SIDRA Roundabout Capacity Analysis Page - i September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio LIST OF TABLES Table 1: HCS Intersection Capacity Analysis Summary Existing Year 2017 Conditions Table 2: Travel Speed Summary Table 3: Crash Data Analysis Summary Chart Table 4: Benefit to Cost Summary Chart Table 5: Traffic Signal Warrant Analysis Summary Existing Year 2017 Conditions Table 6: HCS Intersection Capacity Analysis Summary Opening Year 2023 No- Build vs. Build Conditions - Signalized Intersections Table 7: HCS Intersection Capacity Analysis Summary Design Year 2043 No- Build vs. Build Conditions - Signalized Intersections Table 8: SIDRA Roundabout Capacity Analysis Summary Opening Year 2023 Build Conditions Table 9: SIDRA Roundabout Capacity Analysis Summary Design Year 2043 Build Conditions Table 10: Pavement Condition Ratings (2016) LIST OF FIGURES Figure 1: Figure 2: Figure 3: Figure 4: Figure 5: Figure 6: Aerial Photograph Existing Conditions Diagram Existing Year 2017 Peak Hour Traffic Volumes Opening Year 2023 Peak Hour Traffic Volumes Design Year 2043 Peak Hour Traffic Volumes Proposed Improvement Rendering Page - ii September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio I. Study Area: Traffic Safety Study ODOT District 3, City of Wadsworth Safety Study Intersection SAFETY STUDY INTERSECTION Completed by: GPD Group Completion Date: September 2017 LEGEND Study Intersection Page - 1 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio II. Executive Summary Purpose & Need: At the request of the City of Wadsworth, GPD Group was tasked with completing an Intersection Safety Study for the State Route 57 / Seville Road intersection. The intersection which is the subject of this Safety Study is located in the southwest quadrant of the City of Wadsworth. This study will determine if any operational or safety deficiencies exist within the study area and what improvements are necessary to correct any deficiencies that are identified. The City of Wadsworth actively pursues projects that identify crash patterns in the attempt to construct roadway improvements that provide the greatest potential to benefit safety. Currently, the City of Wadsworth is in the processes of constructing safety improvements along State Route 94 in the area of the I.R. 76 interchange ramps and this project is anticipated to be completed in 2018. In the attempt to continue future safety planning efforts following the completion of the State Route 94 project, the City of Wadsworth has actively been looking for locations that identify crash patterns. The City of Wadsworth considers improving the safety of this intersection to be their highest safety improvement priority at this time. Background: Historically, the subject intersection has been a troublesome location for the City of Wadsworth. Numerous complaints of dangerous operations and conditions have been made to the city. In 2017, GPD Group completed a comprehensive tabulation of the crashes for the three (3) most recent years of crash data (2014 2016) at the State Route 57 / Seville Road intersection in the City of Wadsworth, Ohio. A total of 20 crashes were reported at the study intersection and were analyzed as part of this study. These crashes include 13 rear-end, 3 left turn, 2 fixed object, 1 sideswipe passing and 1 angle crash. This crash data showed an elevated number of crashes within the study area, suggesting that there were safety issues and a more detailed analysis was needed to determine the extent of the problem(s) and what could be done to address them. Brief Overview of Possible Causes: A review of the crash patterns indicate that safety and operational issues exist within the study area. The crash diagrams indicate an increased number of rear-end crashes are occurring at this intersection and this suggests that as the traffic signal turns red, a higher opportunity for rear-end crashes occurs. Additionally, left turning vehicles in the single thru lane impede following traffic, resulting in rear-end crashes. Field observations suggest that when these left turning movements occur, the following vehicles illegally pass on the right shoulder which creates unsafe conditions at the intersection and increases left turn or sideswipe passing conflict points. Page - 2 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Recommended Countermeasures and Related Costs: This study has identified long-term improvement recommendations that would reduce the number of crashes occurring within the study area. The following list outlines these improvements: Long Term Improvements: 1. Remove the traffic signal at the State Route 57 / Seville Road intersection and convert the intersection into a single lane roundabout. The existing traffic signal at the State Route 57 / Seville Road intersection is proposed to be removed and the intersection converted into a single lane roundabout. Currently, as vehicles at the study intersection wait for a safe gap in traffic to perform a left turn movement, the following thru traffic in the single travel lane cannot legally go around. This contributes to traffic queuing which subsequently causes rear-end collisions (recall that the posted speed limit on State Route 57 is 50 mph and when vehicles traveling at this speed are forced to make a hard stop, due to congestion, queueing or when the light turns red, a higher potential for rear-end collisions occur. The proposed improvements will convert the left turn movement into a yield condition. This will improve the traffic queue caused by left turn movements and help mitigate rear-end collisions. Additionally, the proposed roundabout will provide a traffic calming effect that reduces approach speeds and will help alleviate rear-end collisions caused by an inability to stop due to a sudden or unexpected object in the roadway. Converting the State Route 57 / Seville Road intersection into a single lane roundabout eliminates the possibility for impatient drivers to illegally pass on the shoulder. The proposed roadway geometry and curbing will physically block this type of vehicular movement and will help mitigate the unsafe conditions and additional conflict points created by illegally passing on the right. Moreover, traffic is anticipated to flow more efficiently into the intersection which will reduce the delay experienced at the intersection when a motorist attempts to complete a left turn. An elevated number of left turn crashes were observed at this intersection. When converting the signalized intersection into a single lane roundabout, it will eliminate the possibility of a direct, left turn conflict movement. At a four (4) approach intersection, a roundabout has a total of 8 conflict points while a traditional intersection contains a total of 32 conflict points. In addition to the reduced number of conflict points, a roundabout only contains same-direction conflict points, which reduces the severity of the crashes that occur and lowers the likelihood of injury if a crash were to occur. The project will propose to install intersection lighting. The proposed intersection lighting will improve the intersection visibility of the roundabout during hours of low light. With intersection lighting, the center of the roundabout will become more noticeable and the intersection lighting will help focus a motorist s attention on key conflict areas. This improvement is anticipated to help mitigate the frequency and severity of nighttime and early morning collisions. The estimated cost for this project is approximately 1.7 million dollars (not including construction inspection or inflation). Page - 3 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio III. Purpose and Need: At the request of the City of Wadsworth, GPD Group was tasked with completing an Intersection Safety Study for the State Route 57 / Seville Road intersection. The intersection which is the subject of this Safety Study is located in the southwest quadrant of the City of Wadsworth. This study will determine if any operational or safety deficiencies exist within the study area and what improvements are necessary to correct any deficiencies that are identified. The City of Wadsworth actively pursues projects that identify crash patterns in the attempt to construct roadway improvements that provide the greatest potential to benefit safety. Currently, the City of Wadsworth is in the processes of constructing safety improvements along State Route 94 in the area of the I.R. 76 interchange ramps and this project is anticipated to be completed in 2018. In the attempt to continue future safety planning efforts following the completion of the State Route 94 project, the City of Wadsworth has actively been looking for locations that identify crash patterns. The City of Wadsworth considers improving the safety of this intersection to be their highest safety improvement priority at this time. IV. Existing Conditions: Development along both State Route 57 and Seville Road is comprised of a mix of both commercial and residential properties near the study intersection. This intersection is located in the southwest quadrant of the City of Wadsworth s corporation limit and is adjacent to Wadsworth Municipal Airport. See Figure 1 for an aerial photograph of the study area. State Route 57 is a two (2) lane asphalt roadway in the vicinity of the study intersection. The current posted speed limit for State Route 57 is 50 miles per hour (mph). According to data obtained from the Ohio Department of Transportation s (ODOT s) website, State Route 57 is classified as an Urban Minor Arterial. State Route 57 within the study area is both a Federal Aid Primary Route and a National Highway System route. State Route 57 is an uncurbed roadway without on street lighting, open ditch and no sidewalks. Seville Road is a two (2) lane asphalt roadway in the vicinity of the study intersection. The current posted speed limit on Seville Road is 35 mph. According to data obtained from ODOT s website, Seville Road is classified as an Urban Major Collector. Seville Road is an uncurbed roadway without on street lighting, open ditch and no sidewalks. The existing roadway geometry for the study intersection is detailed on the following page. Refer to Figure 2 for the existing condition diagram of the study area and see Appendix A for a site photo log. Page - 4 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio State Route 57 / Seville Road Intersection: This intersection is currently signalized using a typical span wire configuration with strain poles on the northeast and southwest corners of the intersection. The intersection consist of four (4) approaches with the following lane configurations: EB Seville Road one (1) lane (left-thru-right), WB Seville Road one (1) lane (left-thruright), NB State Route 57 one (1) lane (left-thru-right) and SB State Route 57 one (1) lane (left-thru-right). It should be noted that all four (4) approaches operate under permissive signal operation. Right turns on red are currently prohibited for the northbound and southbound State Route 57 approaches. A single luminaire exists on the southwest corner of the intersection, this is the only luminaire that exists at the intersection or on the approaches leading up to the intersection. The traffic count at the study intersection did not count a single pedestrian utilizing the intersection during the thirteen (13) hour count. The existing traffic signal itself has 12 LED traffic signal heads, two signal heads for each approach, no backplates and the traffic signal heads are tethered. The signal operates with two (2) phases, one for northbound and southbound traffic and the second for eastbound and westbound traffic. No protected left turn phasing exists. Table 1 summarizes the results of the capacity analysis for the signalized intersections within the study area using Existing Year 2017 traffic. The analysis is performed utilizing the computer program HCS7 which is developed by McTrans Corporation and based on the Highway Capacity Manual, Sixth Edition and the 2009 Manual of Uniform Traffic Control Devices (MUTCD). Based on criteria established by ODOT, Highway Capacity Software (HCS) is used to determine the required number of lanes and the lane assignments at intersections (i.e. the needed intersection capacity). The analysis was performed for the intersection during the AM and PM peak hours. See Appendix B for the HCS Intersection Capacity Analysis printouts. Table 1: HCS Intersection Capacity Analysis Summary Existing Year 2017 Conditions Intersection / Movement AM Peak Delay LOS (sec) PM Peak Delay LOS (sec) State Route 57 / Seville Road Eastbound Left-Thru-Right C 20.3 C 23.0 Eastbound Approach C 20.3 C 23.0 Westbound Left-Thru-Right C 23.2 C 21.2 Westbound Approach C 23.2 C 21.2 Northbound Left-Thru-Right B 17.1 B 19.2 Northbound Approach B 17.1 B 19.2 Southbound Left-Thru-Right C 20.7 D 36.3 Southbound Approach C 20.7 D 36.3 Intersection Total B 20.0 C 26.4 Note: Orange highlighted cells indicate a Level of Service E. Red highlighted cells indicate a Level of Service F. Page - 5 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio As shown in Table 1, the study intersection is currently operating at LOS B during the AM peak hour and LOS C during the PM peak hour under the Existing Year 2017 traffic volumes and traffic signal operations. The southbound approach to the intersection is currently operating at LOS D during the PM peak hour. Although in an urban setting a LOS D isn t considered a failing movement, an entire approach operating at LOS D can cause excessive queuing, frequent starts and stops by traffic, leading to rear-end crashes occurring on the approach. The statistical analysis does not account for the dangerous conditions that exist at this intersection due to the lack of left turn lanes. V. Project Traffic Volumes: Planning Level Traffic Volumes For this study, GPD Group obtained a turning movement traffic count performed by Cummins Consulting Services for the study intersection on Tuesday, March 21 th, 2017. The turning movement counts were performed for thirteen (13) hours from 7:00 AM 8:00 PM. The raw traffic count data is contained in Appendix C. Planning level traffic volumes were created from the 2017 manual turning movement traffic count. The Average Daily Traffic (ADT) volumes were seasonally adjusted, while the peak hour data had design hour factors applied to them to create the design hourly volumes (DHV) for each peak hour. See Figure 3 for the Existing Year 2017 planning level peak hour traffic volumes. Historic Growth Trends Developing the future traffic volumes involves calculating a proposed growth rate based on historic traffic counts collected along the roadway. ODOT has been collecting traffic volumes on State Route 57 since 1980 and the ADT volumes on these roads during this time frame are available on the ODOT website. According to these counts, traffic volumes along State Route 57 has been steadily increasing since 1999. Based on these historic traffic volumes, GPD Group developed a growth trend-line equation for State Route 57. As shown in Appendix D, the traffic counts on State Route 57 show an annual increase in traffic volumes of 0.09% (linearly). Based on this growth of traffic in the study area, a 0.50% growth rate has been applied to the traffic volumes to develop the Opening Year 2023 and Design Year 2043 ADT and peak hour volumes. Future Traffic Volumes The proposed safety improvements are anticipated to be completed in 2023 which will serve as the Opening Year for the study while the Design Year will be 2043 (twenty (20) year design criteria). In order to develop the projected future traffic volumes, the annual growth rate of 0.50% was applied linearly to the existing traffic volumes to compute the Opening Year 2023 as well as the Design Year 2043 traffic conditions. This increase in traffic accounts for background growth which consists of additional traffic from nonspecific development and general regional growth that could be expected to occur in the future. The Opening Year 2023 traffic incorporates a 3.00% increase in existing traffic (6 years of growth) while the Design Year 2043 traffic incorporates an 13.00% increase in Page - 6 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio existing traffic (26 years of growth). See Figure 4 for the Opening Year 2023 planning level peak hour traffic volumes and Figure 5 for the Design Year 2043 planning level peak hour traffic volumes. VI. Safety Analysis: Crash data was obtained from ODOT s GCAT for the calendar years of 2014 to 2016 for the entire study area. A total of 20 crashes were reported at the study intersection and were analyzed as part of this study. These crashes include 13 rear-end, 3 left turn, 2 fixed object, 1 sideswipe passing and 1 angle crash. 70% of all crashes occurred in daylight and 70% occurred on dry pavement. 100% of the crashes were property damage only and no fatal crashes reported during the last three (3) years. See Appendix E for collision diagrams of the study area and Appendix F for crash data summary and charts. The leading crash type within the study area is thirteen (13) rear-end related crashes. These rear-end crashes are mainly a result of two (2) issues. First, a traffic signal forces vehicles to stop as the light turns red and creates the opportunity for a rear-end crash to occur. Because the posted speed limit on State Route 57 is 50 mph, the chance for a rear-end collision greatly increases as vehicles traveling at this speed have less time and space to stop short of an object following the unexpected and immediate need to apply the brakes. The second factor that is contributing to the rear-end crashes is congestion due to left turning movements. As vehicles wait for a safe gap in traffic to perform a permitted left turn movement at the study intersection, the following thru traffic in the single travel lane cannot legally go around. This congestion and queueing leads to hard stops and rear-end collisions. The proposed improvements will convert the signalized intersection to a single lane roundabout, which will provide a traffic calming effect, improve congestion, traffic queueing, and traffic flow which will help mitigate rear-end collisions. A total of three (3) left turning crashes occurred within the study area. Because the signal operates with permitted phasing, left turning vehicles may become impatient (due to the high opposing thru traffic volume) and attempt to turn in front of oncoming traffic, instead of waiting for a safe gap in traffic. Because opposing vehicles are traveling at speeds of 50 mph, the number of safe gaps in traffic become harder to gauge which increases left turn related collisions. The proposed improvements will eliminate the possibility of a direct, left turn conflict movement which reduces the severity of the crashes that occur and lowers the likelihood of injury if a crash were to occur. Field observations suggest that when a vehicle wishes to make a left turn at this intersection, the following thru traffic in the single travel lane illegally passes on the right shoulder. This illegal passing on the right shoulder raises safety concerns and additional left turn conflict points at the study intersection. When two (2) opposing vehicles initiate legal concurrent left turn movements and passing on the shoulder occurs, the left turning motorist (who has the right-of-way) must abruptly stop short of a potential collision and yield the right-of-way to the vehicle who has passed on the right shoulder in an attempt to make a thru movement. Additionally, GPD Group personnel have experience an unsafe situation at this intersection where a GPD Group motorist legally waits behind a left turning vehicle at the intersection. After the leading left turning vehicle completes the turning movement, the GPD Group motorist legally enters the intersection. As the legal thru movement occurs, a Page - 7 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio vehicle that has concurrently passed on the right shoulder creates a sideswipe passing conflict point as both motorists are vying for a position in the downstream thru lane. Photos 1 and 2 depict vehicles passing on the right shoulder for both the northboundsouthbound approaches, while Photos 3 and 4 depict vehicles passing on the right shoulder for both the eastbound-westbound approaches. Photos 5 and 6 depict the unsafe condition in which an opposing concurrent left turning vehicle must yield the right-of-way to the vehicle that has illegally passed on the right. It should be noted that the unsafe scenario which creates a potential sideswipe passing conflict point was never recorded. This is primarily due to the low compliance of the law, as most vehicles were not observed waiting in the queue of traffic that follows a left turning movement. Photo 1: A semi-truck passes on the right shoulder in the southbound direction Photo 2: A white car passes on the right shoulder in the northbound direction. Photo 3: An eastbound vehicle passes on the right shoulder. Photo 4: A westbound vehicle passes on the right shoulder. Page - 8 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Photo 5: A northbound vehicle passes on the right shoulder while a southbound vehicle attempts to make a left turn. Photo 6: The northbound vehicle causes a near miss accident by passing on the right shoulder. Again, the illegal passing on the right shoulder creates several unsafe conditions that increase conflict points and potential collisions at the State Route 57 / Seville Road intersection. The proposed roadway geometry and curbing will physically block this type of vehicular movement and will help mitigate the unsafe conditions and additional conflict points created by illegally passing on the right. Crash Statistics Using the 2014 to 2016 crash data and the existing traffic volumes, the Crash Frequency, Crash Rate, Relative Severity Index (RSI), Equivalent Property Damage Only (EPDO), and EPDO Rate, were calculated for the crashes occurring in the study area. See Table 3 for the results of these calculations and Appendix G for the safety application which performs the necessary calculations. It should be noted that all crash data shown on Table 3 is calculated using methodology from the Highway Safety Manual Study Corridor Table 3: Crash Data Analysis Summary Chart Number of Crashes Expected Crash Frequency Ratio Fatal and Serious Injuries to Total Crashes RSI EPDO Index Volume to Capacity Ratio Total Crashes 20 7.79 0.00 $24,819 2.68 0.89 The expected crash frequency is calculated by the Economic Crash Analyst Tool (ECAT), which is calculated based upon the geometric conditions, traffic volumes (ADT) and observed crash frequency. See Table 3 for the expected crash frequency and Appendix G for the safety application. The Ratio of Observed Fatal and Serious Injuries to Observed Total Crashes is calculated by dividing the total number of fatal crashes and serious injury crashes by the total number of observed crashes. See Table 3 for the ratio of fatal and serious injuries to total crashes and Appendix G for the safety application. Page - 9 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio The Relative Severity Index (RSI) is a measure of the relative cost to society due to a particular type of crash. Each crash type is given a cost. The RSI is determined by multiplying the number of each type of crash with its associated cost to society. The RSI is the summation of the total cost for all crashes at an intersection or segment divided by the total number of crashes which occurred at the intersection or segment. The RSI reflects the severity of crashes at a location. See Table 3 for the Relative Severity Index values and Appendix G for the safety application. The Equivalent Property Damage Only (EPDO) index converts all the crashes at a location to an equivalent property damage value. The summation of the type of crash and multiplier results in the EPDO Value. The EPDO Value is divided by the Average Daily Traffic to determine the EPDO rate. See Table 3 for the EPDO Index and Appendix G for the safety application. VII. Benefit to Cost Analysis: Proposed Improvements This study has identified long-term improvement recommendations that would reduce the number of crashes occurring within the study area. The following list outlines these improvements: Long Term Improvements: 1. Remove the traffic signal at the State Route 57 / Seville Road intersection and convert the intersection into a single lane roundabout. The existing traffic signal at the State Route 57 / Seville Road intersection is proposed to be removed and the intersection converted into a single lane roundabout. Currently, as vehicles at the study intersection wait for a safe gap in traffic to perform a left turn movement, the following thru traffic in the single travel lane cannot legally go around. This contributes to traffic queuing which subsequently causes rear-end collisions (recall that the posted speed limit on State Route 57 is 50 mph and when vehicles traveling at this speed are forced to make a hard stop, due to congestion, queueing or when the light turns red, a higher potential for rear-end collisions occur. The proposed improvements will convert the left turn movement into a yield condition. This will improve the traffic queue caused by left turn movements and help mitigate rear-end collisions. Additionally, the proposed roundabout will provide a traffic calming effect that reduces approach speeds and will help alleviate rear-end collisions caused by an inability to stop due to a sudden or unexpected object in the roadway. Converting the State Route 57 / Seville Road intersection into a single lane roundabout eliminates the possibility for impatient drivers to illegally pass on the shoulder. The proposed roadway geometry and curbing will physically block this type of vehicular movement and will help mitigate the unsafe conditions and additional conflict points created by illegally passing on the right. Moreover, traffic is anticipated to flow more efficiently into the intersection which will reduce the delay experienced at the intersection when a motorist attempts to complete a left turn. Page - 10 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio An elevated number of left turn crashes were observed at this intersection. When converting the signalized intersection into a single lane roundabout, it will eliminate the possibility of a direct, left turn conflict movement. At a four (4) approach intersection, a roundabout has a total of 8 conflict points while a traditional intersection contains a total of 32 conflict points. In addition to the reduced number of conflict points, a roundabout only contains same-direction conflict points, which reduces the severity of the crashes that occur and lowers the likelihood of injury if a crash were to occur. The project will propose to install intersection lighting. The proposed intersection lighting will improve the intersection visibility of the roundabout during hours of low light. With intersection lighting, the center of the roundabout will become more noticeable and the intersection lighting will help focus a motorist s attention on key conflict areas. This improvement is anticipated to help mitigate the frequency and severity of nighttime and early morning collisions. See Figure 6 for the proposed improvement exhibits for the study area. These exhibits present the proposed future geometry at the study intersection. The estimated cost for this project is approximately 1.7 million dollars. See Appendix H for a cost estimate of the above listed improvements. Benefit to Cost Analysis The reduction of crashes within the State of Ohio is the top priority of ODOT s Highway Safety Program (HSP). In order to maximize the impacts of their limited funding allocations, a complex spreadsheet was developed which calculates the anticipated Benefit / Cost ratio for all safety improvement projects. This spreadsheet compares the anticipated construction cost of an improvement to the anticipated reduction in crashes of this improvement. The Benefit / Cost ratio for a safety improvement can then be compared to the anticipated Benefit / Cost ratio for all other safety improvement projects throughout the State. The benefit / cost ratio spreadsheet and all necessary rates and typical crash cost were obtained from the ODOT Highway Safety Program s website. Table 4 provides a summary of the Cost / Benefit Ratio for the recommended corridor improvements. In order to adhere to ODOT s current procedures, the ECAT was used to calculate the estimated reduction in excess crashes and Benefit / Cost ratio for the improvements. The Benefit / Cost Analysis and Crash Modification Summary worksheets are contained in Appendix I. Table 4: Benefit to Cost Summary Chart Full Project Safety Request Benefit to Cost Results 0.87 1.01 The Benefit / Cost Ratio analyses was performed based upon a cost of $1,742,764 (which is the total cost of the State Route 57 / Seville Road safety improvement project, not including construction inspection and inflation). This results in a 0.87 Benefit / Cost ratio. The Benefit / Cost Ratio was then computed based upon the $1,500,000 being requested from the HSP Safety committee and the Benefit / Cost Ratio is 1.01. Page - 11 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio VIII. Traffic Analyses: Signal Warrant Analysis Utilizing the existing and proposed traffic volumes, as specified in Section 402-2 of the ODOT Traffic Engineering Manual (TEM), traffic signal warrant analyses were performed for the study intersection. The nine (9) traffic signal warrants provided in the 2012 Ohio Manual of Uniform Traffic Control Devices (OMUTCD) define the minimum conditions under which installing traffic control signals is justified. Due to the availability of thirteen (13) hour turning movement traffic count data, OMUTCD Warrant # s 1-3 and 9 were deemed applicable for the Existing Year 2017 warrant analyses. The warrants are described as follows: Warrant #1 Eight Hour Vehicular Volume The Eight Hour Vehicular Volume warrant is intended for application where the volume of intersection traffic is the principal reason for consideration of the signal installation. Three (3) conditions are possible to satisfy this particular warrant. Condition A applies to specifically minimum vehicular volume requirements. Condition B deals with the interruption of continuous traffic flow. Condition C represents a combination of Conditions A and B being met at reduced volume requirements. When the 85 th percentile speed of the major street traffic exceeds 40 mph in either an urban or rural area, or when the intersection lies within a built-up area of an isolated community having a population less than 10,000, the Eight Hour Vehicular Volume Warrant is seventy percent (70%) of the base requirements. Warrant #2 Four Hour Vehicular Volume The Four Hour Vehicular Volume warrant is satisfied when for four (4) hours of an average day, minimum volumes are reached on both the major street (total of both approaches) and the highest volume minor street approach (one direction only). When the 85 th percentile speed of the major street traffic exceeds 40 mph or when the intersection lies within a built-up area of an isolated community having a population less than 10,000, the Four Hour Vehicular Volume requirements are reduced to seventy percent (70%) of the base values. Warrant #3 Peak Hour Vehicular Volume The Peak Hour Vehicular Volume warrant is intended for application when traffic conditions are such that for one hour of the day, minor street traffic suffers undue delay in entering or crossing the major street. The Peak Hour Vehicular Volume warrant is satisfied when the minimum required volumes on the major and highest volume minor approach are met for any one hour period (any four consecutive 15- minute periods) on an average day. When the 85 th percentile speed of the major street traffic exceeds 40 mph or when the intersection lies within a built up area of an isolated community having a population less than 10,000, the Peak Hour Vehicular Volume warrants are reduced. Page - 12 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio In order to determine whether the existing intersection meets any warrants based on the current traffic conditions, the existing traffic data was compared to the volume thresholds for warrants #1, #2, #3 and #9. The results of the Existing Year 2017 signal warrant analyses are shown in Table 5. See Appendix J for the traffic signal warrant analyses. Table 5: Traffic Signal Warrant Analysis Summary Existing Year 2017 Conditions Intersection Warrant #1 (Eight Hour Vehicular Volume) Signal Warrants Warrant #2 (Four Hour Vehicular Volume) Warrant #3 (Peak Hour Vehicular Volume) State Route 57 / Seville Road Satisfied Satisfied Satisfied As shown in Table 5, the study intersection satisfies all three (3) volume based traffic signal warrants under the Existing Year 2017 conditions. Because the traffic volumes are anticipated to increase linearly and no traffic is being redistributed away from the intersection under future conditions, the traffic signal is anticipated to remain warranted under future conditions. Therefore, no Opening Year signal warrants have been performed. Intersection Capacity Analysis Intersection capacity analyses were performed for the No-Build and Build conditions in order to determine the operating conditions experienced at the intersection. The quality of the operating condition experienced at an intersection is measured in terms of Level-of- Service (LOS). Levels-of-Service can range from LOS A to LOS F. Level-of-Service ratings of A, B, and C are considered to be in the acceptable range. LOS D is typically considered acceptable in urban areas (which the study area has been determined to be within). Levelsof-Service E and F are considered unacceptable with significant levels of delay experienced by vehicles. The analysis is performed utilizing the computer program HCS7 which is developed by McTrans Corporation and based on the Highway Capacity Manual, Sixth Edition and the 2009 Manual of Uniform Traffic Control Devices (MUTCD). Based on criteria established by ODOT, Highway Capacity Software (HCS) is used to determine the required number of lanes and the lane assignments at intersections (i.e. the needed intersection capacity). The analysis was performed for the intersection during the AM and PM peak hours.. The ODOT preferred balanced approach delay methodology was used when performing this analysis, which was not used in the Existing Year 2017 analysis, which could show an improvement in overall delay due to the timing changes. Page - 13 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Opening Year 2023 Capacity Analyses Table 6 summarizes the HCS Intersection Capacity Analysis and details the Levels-of- Service and delay experienced under the Opening Year 2023 No-Build and Build traffic conditions at the study intersection. The Build scenario incorporates all of the transportation improvements listed in Section VII. See Appendix K for the HCS Intersection Capacity Analysis printouts. Table 6: HCS Intersection Capacity Analysis Summary Opening Year 2023 No-Build vs. Build Conditions Signalized Intersection Intersection / Movement LOS No-Build Conditions Build Conditions AM Peak PM Peak AM Peak PM Peak Delay (sec) LOS Delay (sec) LOS Delay (sec) LOS Delay (sec) State Route 57 / Seville Road Eastbound Left-Thru-Right B 19.7 C 26.1 Eastbound Approach B 19.7 C 26.1 Westbound Left-Thru-Right C 22.5 C 23.6 Westbound Approach C 22.5 C 23.6 Northbound Left-Thru-Right B 18.0 B 16.5 Northbound Approach B 18.0 B 16.5 Southbound Left-Thru-Right C 22.6 C 26.0 Southbound Approach C 22.6 C 26.0 Intersection Total C 20.8 C 22.4 Note: Orange highlighted cells indicate a Level of Service E. Red highlighted cells indicate a Level of Service F As shown in Table 6, similar to the Existing Year 2017 conditions, the Opening Year 2023 No-Build results are anticipated to operate at an acceptable LOS C or better for all approaches and movements. The State Route 57 / Seville Road intersection will further be discussed later in this report, once the Build conditions are analyzed. Design Year 2043 Capacity Analyses Table 7 summarizes the HCS Intersection Capacity Analysis and details the Levels-of- Service and delay experienced under the Design Year 2043 No-Build and Build traffic conditions at the study intersection. Again, the Build scenario incorporates all of the transportation improvements listed in Section VII. See Appendix K for the HCS Intersection Capacity Analysis printouts. Page - 14 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Table 7: HCS Intersection Capacity Analysis Summary Design Year 2043 No-Build vs. Build Conditions - Unsignalized Intersections Intersection / Movement LOS No-Build Conditions Build Conditions AM Peak PM Peak AM Peak PM Peak Delay (sec) LOS Delay (sec) LOS Delay (sec) LOS Delay (sec) State Route 57 / Seville Road Eastbound Left-Thru-Right C 21.2 C 34.7 Eastbound Approach C 21.2 C 34.7 Westbound Left-Thru-Right C 25.2 C 26.7 Westbound Approach C 25.2 C 26.7 Northbound Left-Thru-Right B 17.6 B 15.1 Northbound Approach B 17.6 B 15.1 Southbound Left-Thru-Right C 25.4 C 34.7 Southbound Approach C 25.4 C 34.7 Intersection Total C 22.4 C 26.9 Note: Orange highlighted cells indicate a Level of Service E. Red highlighted cells indicate a Level of Service F. As shown in Table 7, the Design Year 2043 No-Build traffic conditions are anticipated to maintain an acceptable LOS C or better for all movements and approaches, similar to that of the Existing Year 2017 and Opening Year 2023 No-Build conditions. Again, the State Route 57 / Seville Road intersection will further be discussed later in this report, once the Build conditions are analyzed. Roundabout Capacity Analyses In order to size the roundabout proposed in the Build conditions, it was necessary to perform capacity analysis of the roundabout under the Opening Year and Design Year traffic conditions. The roundabout analysis was performed utilizing the computer program SIDRA Intersection 7.0 which is developed by SIDRA Solutions and based on the 2010 Highway Capacity Manual. The roundabout capacity analysis has identified that the following geometric layout would be recommended for the State Route 57 / Seville Road intersection if a roundabout were to be constructed: State Route 57 / Seville Road Intersection: - Construct a single lane roundabout with the following lane configurations: Northbound approach one (1) lane (left-thru-right). Southbound approach one (1) lane (left-thru-right). Eastbound approach one (1) lane (left-thru-right). Westbound approach one (1) lane (left-thru-right). Page - 15 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Table 8 summarizes the SIDRA Intersection Capacity Analysis and details the Levels-of- Service and delay experienced under the Opening Year 2023 Build traffic conditions at the study intersection. See Appendix L for the SIDRA roundabout capacity analysis printouts and see Figure 6 for the conceptual roundabout layout. It should be noted that the SIDRA analysis was performed using the ODOT recommended settings, including an Environment Factor of 1.20 for the Opening Year analysis. Table 8: SIDRA Roundabout Capacity Analysis Summary Opening Year 2023 Build Conditions Intersection / Movement AM Peak Delay LOS (sec) PM Peak Delay LOS (sec) State Route 57 / Seville Road Eastbound Left B 14.6 C 17.2 Eastbound Thru A 8.6 B 11.2 Eastbound Right A 8.7 B 11.2 Eastbound Approach B 11.1 B 14.4 Westbound Left C 16.6 C 16.5 Westbound Thru B 10.6 B 10.6 Westbound Right B 10.7 B 10.6 Westbound Approach B 12.1 B 11.6 Northbound Left B 12.3 C 20.7 Northbound Thru A 6.4 B 14.8 Northbound Right A 6.4 B 14.8 Northbound Approach A 6.6 B 14.9 Southbound Left B 12.2 B 11.4 Southbound Thru A 6.3 A 5.5 Southbound Right A 6.3 A 5.5 Southbound Approach A 7.3 A 6.7 Intersection Total A 8.4 B 11.4 Note: Orange highlighted cells indicate a Level of Service E. Red highlighted cells indicate a Level of Service F. As shown in Table 8, all movements, approaches and the overall roundabout is anticipated to operate at an LOS C or better during both peak hours under the Opening Year 2023 Build traffic conditions when incorporating the recommended roundabout geometry detailed above. The AM peak hour under the Opening Year Build conditions is anticipated to operate with a total intersection delay of 8.4 seconds (an improvement of delay of approximately 60% when comparing to the Opening Year No-Build conditions) while the PM peak hour intersection total delay is anticipated to operate with 11.4 seconds of delay (an improvement of delay of approximately 49% when comparing to the Opening Year No- Build conditions). This indicates traffic will flow more efficiently thru the intersection under the Build conditions. Table 9 summarizes the SIDRA Intersection Capacity Analysis and details the Levels-of- Service and delay experienced under the Design Year 2043 Build traffic conditions at the Page - 16 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio study intersection. See Appendix L for the SIDRA roundabout capacity analysis printouts and see Figure 6 for the conceptual roundabout layout. It should be noted that the SIDRA analysis was performed using the ODOT recommended settings, including an Environment Factor of 1.10 for the Design Year analysis. Table 9: SIDRA Roundabout Capacity Analysis Summary Design Year 2043 Build Conditions Intersection / Movement AM Peak Delay LOS (sec) PM Peak Delay LOS (sec) State Route 57 / Seville Road Eastbound Left C 15.4 C 21.0 Eastbound Thru A 9.4 C 15.1 Eastbound Right A 9.4 C 15.1 Eastbound Approach B 12.0 C 18.4 Westbound Left C 19.9 C 19.6 Westbound Thru B 13.9 B 13.7 Westbound Right B 14.0 B 13.7 Westbound Approach C 15.4 B 14.6 Northbound Left B 13.9 D 33.9 Northbound Thru A 8.0 D 28.0 Northbound Right A 8.0 D 28.0 Northbound Approach A 8.2 D 28.1 Southbound Left B 14.1 B 11.9 Southbound Thru A 8.1 A 6.0 Southbound Right A 8.2 A 6.0 Southbound Approach A 9.2 A 7.2 Intersection Total B 10.4 C 17.2 Note: Orange highlighted cells indicate a Level of Service E. Red highlighted cells indicate a Level of Service F. As shown in Table 9, all movements, approaches and the overall roundabout is anticipated to operate at an LOS D or better during both peak hours under the Design Year 2043 Build traffic conditions when incorporating the recommended roundabout geometry detailed above. The AM peak hour under the Design Year Build conditions is anticipated to operate with a total intersection delay of 10.4 seconds (an improvement of delay of approximately 54% when comparing to the Design Year No-Build conditions) while the PM peak hour intersection total delay is anticipated to operate with 17.2 seconds of delay (an improvement of delay of approximately 36% when comparing to the Design Year No- Build conditions). This indicates traffic will flow more efficiently thru the intersection under the Design Year Build conditions. Page - 17 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio IX. Pavement Condition Ratings: Pavement Condition Ratings (PCR) are based on a visual inspection of pavement distress. The ability of pavement to carry traffic loads in a safe and smooth manner is adversely affected by observable distress in the pavement. When computing PCR, points are deducted for each type of observable distress. Perfect pavement is considered to have a PCR of 100. Overlaying and rehabilitation of roadways should be considered when the PCR drops below a score of 65. As with any physical infrastructure, the pavement of a roadway continues to degrade over time. The rate at which the pavement degrades is accepted as one (1) to three (3) points per year dependent on the number of vehicles and trucks traveling on the roadway. The PCR for State Route 57 and Seville Road was reviewed in 2016 by ODOT, and their findings are summarized in Table 10. Table 10: Pavement Condition Ratings (2016) Roadway Name Beginning Log Point End Log Point Description PCR State Route 57 1.00 1.58 South of Seville Road 60 State Route 57 1.58 2.13 North of Seville Road 60 Seville Road 5.15 5.69 East of State Route 57 52 Seville Road 5.69 5.94 West of State Route 57 53 State Route 57 north and south of Seville Road has a recorded PCR of 60, while Seville Road west of State Route 57 has a recorded PCR of 52 and east of State Route 57 has a recorded PCR of 53. These recorded values are below the threshold for resurfacing (which is 65). However, a resurfacing project (PID #92920) on State Route 57 from the Wayne County line to I.R. 76 is planned to begin construction in 2018. The PCRs in this segment of roadway will be improved by the resurfacing project. Due to the types of improvements being recommended with this project, the PCR on the Seville Road approaches will also be improved. Page - 18 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio X. Conclusions and Recommendations: At the request of the City of Wadsworth, GPD Group was tasked with completing an Intersection Safety Study for the State Route 57 / Seville Road intersection. The intersection which is the subject of this Safety Study is located in the southwest quadrant of the City of Wadsworth. This study will determine if any operational or safety deficiencies exist within the study area and what improvements are necessary to correct any deficiencies that are identified. The following conclusions and recommendations have resulted from this study. 1. A review of the crash patterns indicate that safety and operational issues exist within the study area. The crash diagrams indicate an increased number of rear-end crashes are occurring at this intersection and this suggests that as the traffic signal turns red, a higher opportunity for rear-end crashes occurs. Additionally, left turning vehicles in the single thru lane impede following traffic, resulting in rear-end crashes. Field observations suggest that when these left turning movements occur, the following vehicles illegally pass on the right shoulder which creates unsafe conditions at the intersection and increases left turn or sideswipe passing conflict points. 2. The study intersection is currently operating at LOS B during the AM peak hour and LOS C during the PM peak hour under the Existing Year 2017 traffic volumes and traffic signal operations. 3. Crash data was obtained from ODOT s GCAT for the calendar years of 2014 to 2016 for the entire study area. A total of 20 crashes were reported within the study area and were analyzed as part of this study. These crashes include 13 rear-end, 3 left turn, 2 fixed object, 1 sideswipe passing and 1 angle crash. 70% of all crashes occurred in daylight and 70% occurred on dry pavement. 100% of the crashes were property damage only and no fatal crashes reported during the last three (3) years. 4. The leading crash type within the study area is thirteen (13) rear-end related crashes. These rear-end crashes are mainly a result of two (2) issues. First, a traffic signal forces vehicles to stop as the light turns red and creates the opportunity for a rear-end crash to occur. Because the posted speed limit on State Route 57 is 50 mph, the chance for a rear-end collision greatly increases as vehicles traveling at this speed have less time and space to stop short of an object following the unexpected and immediate need to apply the brakes. The second factor that is contributing to the rear-end crashes is congestion due to left turning movements. As vehicles wait for a safe gap in traffic to perform a permitted left turn movement at the study intersection, the following thru traffic in the single travel lane cannot legally go around. This congestion and queueing leads to hard stops and rear-end collisions. The proposed improvements will convert the signalized intersection to a single lane roundabout, which will provide a traffic calming effect, improve congestion, traffic queueing, and traffic flow which will help mitigate rear-end collisions. Page - 19 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio 5. A total of three (3) left turning crashes occurred within the study area. Because the signal operates with permitted phasing, left turning vehicles may become impatient (due to the high opposing thru traffic volume) and attempt to turn in front of oncoming traffic, instead of waiting for a safe gap in traffic. Because opposing vehicles are traveling at speeds of 50 mph, the number of safe gaps in traffic become harder to gauge which increases left turn related collisions. The proposed improvements will eliminate the possibility of a direct, left turn conflict movement which reduces the severity of the crashes that occur and lowers the likelihood of injury if a crash were to occur. 6. Field observations suggest that when a vehicle wishes to make a left turn at this intersection, the following thru traffic in the single travel lane illegally passes on the right shoulder. This illegal passing on the right shoulder raises safety concerns and additional left turn conflict points at the study intersection. When two (2) opposing vehicles initiate legal concurrent left turn movements and passing on the shoulder occurs, the left turning motorist (who has the right-of-way) must abruptly stop short of a potential collision and yield the right-of-way to the vehicle who has passed on the right shoulder in an attempt to make a thru movement. Additionally, GPD Group personnel have experience an unsafe situation at this intersection where a GPD Group motorist legally waits behind a left turning vehicle at the intersection. After the leading left turning vehicle completes the turning movement, the GPD Group motorist legally enters the intersection. As the legal thru movement occurs, a vehicle that has concurrently passed on the right shoulder creates a sideswipe passing conflict point as both motorists are vying for a position in the downstream thru lane. 7. The existing traffic signal at the State Route 57 / Seville Road intersection is proposed to be removed and converted into a single lane roundabout. As vehicles at the study intersection wait for a safe gap in traffic to perform a left turn movement, the following thru traffic in the single travel lane cannot legally go around. This contributes to traffic queuing which subsequently causes rear-end collisions (recall that the posted speed limit on State Route 57 is 50 mph and when vehicles traveling at this speed are forced to make a hard stop, due to congestion, queueing or when the light turns red, a higher potential for rear-end collisions occur. The proposed improvements will convert the left turn movement into a yield condition. This will improve the traffic queue caused by left turn movements and help mitigate rear-end collisions. Additionally, the proposed roundabout will provide a traffic calming effect that reduces approach speeds and will help alleviate rear-end collisions caused by an inability to stop due to a sudden or unexpected object in the roadway. 8. Converting the State Route 57 / Seville Road intersection into a single lane roundabout eliminates the possibility for impatient drivers to illegally pass on the shoulder. The proposed roadway geometry and curbing will physically block this type of vehicular movement and will help mitigate the unsafe conditions and additional conflict points created by illegally passing on the right. Moreover, traffic is anticipated to flow more efficiently into the intersection which will reduce the delay experienced at the intersection when a motorist attempts to complete a left turn. Page - 20 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio 9. An elevated number of left turn crashes were observed at this intersection. When converting the signalized intersection into a single lane roundabout, it will eliminate the possibility of a direct, left turn conflict movement. At a four (4) approach intersection, a roundabout has a total of 8 conflict points while a traditional intersection contains a total of 32 conflict points. In addition to the reduced number of conflict points, a roundabout only contains same-direction conflict points, which reduces the severity of the crashes that occur and lowers the likelihood of injury if a crash were to occur. 10. The project will propose to install intersection lighting. The proposed intersection lighting will improve the intersection visibility of the roundabout during hours of low light. With intersection lighting, the center of the roundabout will become more noticeable and the intersection lighting will help focus a motorist s attention on key conflict areas. This improvement is anticipated to help mitigate the frequency and severity of nighttime and early morning collisions. 11. The State Route 57 / Seville Road intersection satisfies all three (3) volume based traffic signal warrants under the Existing Year 2017 conditions. Because the traffic volumes are anticipated to increase linearly and no traffic is being redistributed away from the intersection under future conditions, the traffic signal is anticipated to remain warranted under future conditions. Therefore, no Opening Year signal warrants have been performed. 12. The Design Year 2043 No-Build results are similar to the Existing Year 2017 conditions which shows the intersection is anticipated to operate at LOS C or better for all approaches and movements. The Design Year 2043 Build results for the State Route 57 / Seville Road intersection indicate that the all movements, approaches and the overall roundabout is anticipated to operate at an LOS D or better during both peak hours under the Design Year 2043 Build traffic conditions when incorporating the recommended single lane roundabout geometry. 13. The PCR for State Route 57 is 60, while the PCR for Seville Road within the study are varies between 52 and 53. These recorded values are below the threshold for resurfacing (which is 65). However, a resurfacing project (PID #92920) on State Route 57 from the Wayne County line to I.R. 76 is planned to begin construction in 2018. The PCRs in this segment of roadway will be improved by the resurfacing project. Due to the types of improvements being recommended with this project, the PCR on the Seville Road approaches will also be improved. 14. The Benefit / Cost Ratio analyses was performed based upon a cost of $1,742,764 (which is the total cost of the State Route 57 / Seville Road safety improvement project, not including construction inspection and inflation). This results in a 0.87 Benefit / Cost ratio. The Benefit / Cost Ratio was then computed based upon the $1,500,000 being requested from the HSP Safety committee and the Benefit / Cost Ratio is 1.01. Page - 21 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Based on the results of the analysis contained in this report, GPD Group recommends the following: 1. The City of Wadsworth should pursue the safety improvement project as outlined in this study. 2. The City of Wadsworth should create a financial plan and apply for safety funding to secure funds for the construction of the proposed improvements. The funding plan should address the funding of the entire project. Page - 22 September 2017

FIGURES

STATE ROUTE 57 SEVILLE RD. N Glaus, Pyle, Schomer, Burns & DeHaven, Inc. Copyright; Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 2015

Ohio Western Reserve National Cemetery STATE ROUTE 57 SEVILLE RD. LEGEND EXISTING SIGNAL Glaus, Pyle, Schomer, Burns & DeHaven, Inc. Copyright; Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 2015 FIGURE 2 EXISTING SIGN EXISTING SPAN WIRE EXISTING CONDITIONS DIAGRAM SEPTEMBER 2017

Glaus, Pyle, Schomer, Burns & DeHaven, Inc. Copyright; Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 2015

Glaus, Pyle, Schomer, Burns & DeHaven, Inc. Copyright; Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 2015

Glaus, Pyle, Schomer, Burns & DeHaven, Inc. Copyright; Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 2015

SEVILLE RD. STATE ROUTE 57 LEGEND NEW/RECONSTRUCTED PAVEMENT PROPOSED CURB FIGURE 6 PROPOSED IMPROVEMENT RENDERING SEPTEMBER 2017

APPENDIX A SITE PHOTO LOG

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Looking west on Seville Road toward the State Route 57 intersection. Looking east on Seville Road toward the State Route 57 intersection. Photo Page - 1 September 2017

Intersection Safety Study State Route 57 / Seville Road City of Wadsworth, Ohio Looking north on Seville Road toward the State Route 57 intersection. Looking south on Seville Road toward the State Route 57 intersection. Photo Page - 2 September 2017

APPENDIX B EXISTING HCS INTERSECTION CAPACITY ANALYSIS

EXISTING YEAR 2017 CONDITIONS

HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency GPD Group Duration, h 0.25 Analyst Curtis J. Deibel, P.E. Analysis Date 6/21/2017 Area Type Other Jurisdiction City of Wadsworth Time Period AM Peak Hour PHF 0.92 Urban Street State Route 57 Analysis Year Existing Year 2017 Analysis Period 1> 7:00 Intersection State Route 57 / Seville File Name State Route 57 and Seville AM Peak Hour.xus Project Description Intersection Safety Study Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 50 50 20 70 70 150 20 420 20 90 330 100 Signal Information Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated Yes Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Green Yellow Red 43.0 32.0 0.0 0.0 0.0 0.0 6.0 3.0 0.0 0.0 0.0 0.0 3.0 3.0 0.0 0.0 0.0 0.0 1 3 4 5 6 7 8 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 8 2 6 Case Number 8.0 8.0 8.0 8.0 Phase Duration, s 38.0 38.0 52.0 52.0 Change Period, ( Y+R c ), s 6.0 6.0 9.0 9.0 Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 Queue Clearance Time ( g s ), s 7.3 15.6 19.0 27.2 Green Extension Time ( g e ), s 0.8 0.8 2.2 2.1 Phase Call Probability 1.00 1.00 1.00 1.00 Max Out Probability 0.00 0.00 0.00 0.02 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 130 315 500 565 Adjusted Saturation Flow Rate ( s ), veh/h/ln 1416 1621 1847 1598 Queue Service Time ( g s ), s 0.0 7.4 0.0 8.2 Cycle Queue Clearance Time ( g c ), s 5.3 13.6 17.0 25.2 Green Ratio ( g/c ) 0.36 0.36 0.48 0.48 Capacity ( c ), veh/h 560 626 924 810 Volume-to-Capacity Ratio ( X ) 0.233 0.504 0.541 0.698 Back of Queue ( Q ), ft/ln ( 50 th percentile) 43.8 120.6 160.3 212.8 Back of Queue ( Q ), veh/ln ( 50 th percentile) 1.8 4.8 6.4 8.5 Queue Storage Ratio ( RQ ) ( 50 th percentile) 0.00 0.00 0.00 0.00 Uniform Delay ( d 1 ), s/veh 20.2 23.0 16.7 18.5 Incremental Delay ( d 2 ), s/veh 0.1 0.3 0.4 2.2 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 20.3 23.2 17.1 20.7 Level of Service (LOS) C C B C Approach Delay, s/veh / LOS 20.3 C 23.2 C 17.1 B 20.7 C Intersection Delay, s/veh / LOS 20.0 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.1 B 2.1 B 2.1 B 2.1 B Bicycle LOS Score / LOS 0.7 A 1.0 A 1.3 A 1.4 A Copyright 2017 University of Florida, All Rights Reserved. HCS7 Streets Version 7.2.1 Generated: 6/21/2017 2:34:25 PM

HCS7 Signalized Intersection Results Summary General Information Intersection Information Agency GPD Group Duration, h 0.25 Analyst Curtis J. Deibel, P.E. Analysis Date 6/21/2017 Area Type Other Jurisdiction City of Wadsworth Time Period PM Peak Hour PHF 0.92 Urban Street State Route 57 Analysis Year Existing Year 2017 Analysis Period 1> 7:00 Intersection State Route 57 / Seville File Name State Route 57 and Seville PM Peak Hour.xus Project Description Intersection Safety Study Demand Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 140 90 30 30 60 90 10 490 50 120 410 50 Signal Information Cycle, s 90.0 Reference Phase 2 Offset, s 0 Reference Point End Uncoordinated Yes Simult. Gap E/W On Force Mode Fixed Simult. Gap N/S On Green Yellow Red 43.0 32.0 0.0 0.0 0.0 0.0 6.0 3.0 0.0 0.0 0.0 0.0 3.0 3.0 0.0 0.0 0.0 0.0 1 3 4 5 6 7 8 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 8 2 6 Case Number 8.0 8.0 8.0 8.0 Phase Duration, s 38.0 38.0 52.0 52.0 Change Period, ( Y+R c ), s 6.0 6.0 9.0 9.0 Max Allow Headway ( MAH ), s 3.1 3.1 3.1 3.1 Queue Clearance Time ( g s ), s 15.3 9.3 24.1 42.2 Green Extension Time ( g e ), s 0.8 0.9 2.7 0.4 Phase Call Probability 1.00 1.00 1.00 1.00 Max Out Probability 0.00 0.00 0.02 1.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 283 196 598 630 Adjusted Saturation Flow Rate ( s ), veh/h/ln 1481 1674 1859 1376 Queue Service Time ( g s ), s 5.9 0.0 0.0 18.1 Cycle Queue Clearance Time ( g c ), s 13.3 7.3 22.1 40.2 Green Ratio ( g/c ) 0.36 0.36 0.48 0.48 Capacity ( c ), veh/h 588 642 929 706 Volume-to-Capacity Ratio ( X ) 0.481 0.305 0.643 0.893 Back of Queue ( Q ), ft/ln ( 50 th percentile) 107.5 68.5 211.1 343.6 Back of Queue ( Q ), veh/ln ( 50 th percentile) 4.3 2.7 8.4 13.7 Queue Storage Ratio ( RQ ) ( 50 th percentile) 0.00 0.00 0.00 0.00 Uniform Delay ( d 1 ), s/veh 22.8 21.1 18.0 22.9 Incremental Delay ( d 2 ), s/veh 0.2 0.1 1.2 13.4 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 23.0 21.2 19.2 36.3 Level of Service (LOS) C C B D Approach Delay, s/veh / LOS 23.0 C 21.2 C 19.2 B 36.3 D Intersection Delay, s/veh / LOS 26.4 C Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.1 B 2.1 B 2.1 B 2.1 B Bicycle LOS Score / LOS 1.0 A 0.8 A 1.5 A 1.5 B Copyright 2017 University of Florida, All Rights Reserved. HCS7 Streets Version 7.2.1 Generated: 6/21/2017 2:35:47 PM

APPENDIX C EXISTING TRAFFIC DATA

Cummins Consulting Services 4661 Marlberry Place, Lexington, KY 40509 swcummins@windstream.net 859.361.2589 "simplifying Data Collection since 2004" Cloudy - 40 Degrees Schools in Session File Name : OH57_at_Seville_392786_03-21-2017 Site Code : Tuesday Start Date : 3/21/2017 Page No : 1 OH57 From North Groups Printed- Cars - Buses - Trucks CR16 - Seville Road From East OH57 From South CR16 - Seville Road From West Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 13 65 7 85 12 8 39 59 1 97 3 101 19 14 4 37 282 07:15 AM 12 83 13 108 21 12 45 78 3 110 5 118 10 9 3 22 326 07:30 AM 16 93 26 135 26 13 35 74 5 122 6 133 12 7 4 23 365 07:45 AM 36 93 33 162 14 28 35 77 7 91 9 107 10 16 4 30 376 Total 77 334 79 490 73 61 154 288 16 420 23 459 51 46 15 112 1349 08:00 AM 29 55 27 111 11 17 32 60 8 91 4 103 10 9 2 21 295 08:15 AM 15 61 17 93 10 11 23 44 4 93 6 103 10 7 0 17 257 08:30 AM 13 78 20 111 9 13 32 54 8 71 3 82 7 12 3 22 269 08:45 AM 12 76 20 108 8 11 22 41 5 63 5 73 4 11 1 16 238 Total 69 270 84 423 38 52 109 199 25 318 18 361 31 39 6 76 1059 09:00 AM 9 53 18 80 2 13 24 39 2 63 2 67 8 7 3 18 204 09:15 AM 13 57 22 92 7 15 15 37 1 56 5 62 4 5 1 10 201 09:30 AM 9 44 19 72 3 3 16 22 2 66 8 76 10 5 3 18 188 09:45 AM 8 50 12 70 6 12 10 28 3 70 8 81 3 8 1 12 191 Total 39 204 71 314 18 43 65 126 8 255 23 286 25 25 8 58 784 10:00 AM 8 59 13 80 2 5 13 20 0 54 1 55 12 9 0 21 176 10:15 AM 3 43 13 59 6 14 9 29 5 56 10 71 4 8 4 16 175 10:30 AM 9 47 12 68 6 13 9 28 4 53 5 62 13 9 2 24 182 10:45 AM 9 52 11 72 9 9 10 28 2 65 1 68 8 5 4 17 185 Total 29 201 49 279 23 41 41 105 11 228 17 256 37 31 10 78 718 11:00 AM 11 51 13 75 4 12 7 23 1 73 5 79 9 7 15 31 208 11:15 AM 10 54 7 71 3 8 11 22 1 53 9 63 15 4 2 21 177 11:30 AM 5 66 8 79 2 10 20 32 5 70 1 76 12 11 5 28 215 11:45 AM 18 75 13 106 10 18 19 47 5 69 5 79 18 10 3 31 263 Total 44 246 41 331 19 48 57 124 12 265 20 297 54 32 25 111 863 12:00 PM 18 54 18 90 6 41 21 68 2 68 3 73 15 22 7 44 275 12:15 PM 16 55 13 84 3 22 12 37 1 52 4 57 21 5 4 30 208 12:30 PM 9 53 21 83 7 15 17 39 5 42 1 48 19 20 1 40 210 12:45 PM 13 56 29 98 1 16 20 37 2 73 10 85 9 17 2 28 248 Total 56 218 81 355 17 94 70 181 10 235 18 263 64 64 14 142 941 01:00 PM 11 40 16 67 3 12 18 33 3 52 2 57 12 13 6 31 188 01:15 PM 12 72 17 101 7 13 16 36 1 62 2 65 16 5 4 25 227 01:30 PM 20 52 17 89 3 10 9 22 1 62 7 70 16 15 2 33 214 01:45 PM 14 70 85 169 6 10 8 24 4 61 4 69 8 12 0 20 282 Total 57 234 135 426 19 45 51 115 9 237 15 261 52 45 12 109 911 02:00 PM 10 70 14 94 3 11 16 30 4 65 7 76 26 14 5 45 245 02:15 PM 16 85 9 110 8 10 9 27 5 57 7 69 16 9 6 31 237 02:30 PM 17 76 20 113 6 20 10 36 7 67 15 89 13 17 6 36 274 02:45 PM 11 75 23 109 2 14 11 27 4 74 7 85 36 16 3 55 276 Total 54 306 66 426 19 55 46 120 20 263 36 319 91 56 20 167 1032 03:00 PM 18 66 12 96 11 13 30 54 2 78 3 83 27 42 16 85 318 03:15 PM 27 88 9 124 1 14 6 21 4 90 12 106 15 24 3 42 293 03:30 PM 18 97 17 132 10 10 21 41 4 106 8 118 25 21 5 51 342 03:45 PM 27 95 11 133 4 15 24 43 0 86 18 104 12 13 2 27 307 Total 90 346 49 485 26 52 81 159 10 360 41 411 79 100 26 205 1260

Cummins Consulting Services 4661 Marlberry Place, Lexington, KY 40509 swcummins@windstream.net 859.361.2589 "simplifying Data Collection since 2004" OH57 From North Groups Printed- Cars - Buses - Trucks CR16 - Seville Road From East File Name : OH57_at_Seville_392786_03-21-2017 Site Code : Tuesday Start Date : 3/21/2017 Page No : 2 OH57 From South CR16 - Seville Road From West Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 04:00 PM 23 94 16 133 5 7 14 26 4 117 6 127 26 19 7 52 338 04:15 PM 23 78 11 112 4 8 26 38 3 113 11 127 14 10 4 28 305 04:30 PM 37 107 11 155 10 19 26 55 1 86 12 99 41 29 12 82 391 04:45 PM 28 101 11 140 9 19 18 46 3 104 7 114 9 16 2 27 327 Total 111 380 49 540 28 53 84 165 11 420 36 467 90 74 25 189 1361 05:00 PM 30 85 6 121 5 27 35 67 1 129 12 142 29 22 10 61 391 05:15 PM 32 104 17 153 11 11 18 40 1 130 13 144 19 17 3 39 376 05:30 PM 22 118 12 152 12 15 20 47 1 118 14 133 39 22 6 67 399 05:45 PM 34 97 13 144 2 9 19 30 0 107 8 115 29 10 2 41 330 Total 118 404 48 570 30 62 92 184 3 484 47 534 116 71 21 208 1496 06:00 PM 25 73 10 108 4 9 21 34 2 94 10 106 29 14 3 46 294 06:15 PM 19 68 17 104 3 7 20 30 1 72 6 79 17 14 1 32 245 06:30 PM 23 66 9 98 2 8 11 21 1 58 7 66 11 8 5 24 209 06:45 PM 22 56 13 91 4 10 12 26 2 40 6 48 15 9 3 27 192 Total 89 263 49 401 13 34 64 111 6 264 29 299 72 45 12 129 940 07:00 PM 13 53 6 72 9 5 18 32 0 36 2 38 17 15 3 35 177 07:15 PM 15 54 7 76 3 6 11 20 4 40 2 46 9 12 3 24 166 07:30 PM 6 46 11 63 2 6 12 20 0 29 6 35 3 2 5 10 128 07:45 PM 10 39 10 59 0 6 3 9 1 17 3 21 1 10 0 11 100 Total 44 192 34 270 14 23 44 81 5 122 13 140 30 39 11 80 571 Grand Total 877 3598 835 5310 337 663 958 1958 146 3871 336 4353 792 667 205 1664 13285 Apprch % 16.5 67.8 15.7 17.2 33.9 48.9 3.4 88.9 7.7 47.6 40.1 12.3 Total % 6.6 27.1 6.3 40 2.5 5 7.2 14.7 1.1 29.1 2.5 32.8 6 5 1.5 12.5 Cars 776 3287 743 4806 320 618 858 1796 128 3565 315 4008 724 628 184 1536 12146 % Cars 88.5 91.4 89 90.5 95 93.2 89.6 91.7 87.7 92.1 93.8 92.1 91.4 94.2 89.8 92.3 91.4 Buses 5 7 1 13 0 2 1 3 1 5 0 6 0 0 0 0 22 % Buses 0.6 0.2 0.1 0.2 0 0.3 0.1 0.2 0.7 0.1 0 0.1 0 0 0 0 0.2 Trucks 96 304 91 491 17 43 99 159 17 301 21 339 68 39 21 128 1117 % Trucks 10.9 8.4 10.9 9.2 5 6.5 10.3 8.1 11.6 7.8 6.2 7.8 8.6 5.8 10.2 7.7 8.4

Cummins Consulting Services 4661 Marlberry Place, Lexington, KY 40509 swcummins@windstream.net 859.361.2589 "simplifying Data Collection since 2004" OH57 Out In Total 5147 4806 9953 6 13 19 468 491 959 5621 5310 10931 File Name : OH57_at_Seville_392786_03-21-2017 Site Code : Tuesday Start Date : 3/21/2017 Page No : 3 743 1 91 835 Right 3287 7 304 3598 Thru 776 5 96 877 Left CR16 - Seville Road Out In Total 1489 1536 3025 4 0 4 151 128 279 1644 1664 3308 724 628 184 0 68 0 39 0 21 792 Left 667 Thru 205 Right North 3/21/2017 07:00 AM 3/21/2017 07:45 PM Cars Buses Trucks Right Thru Left 858 1 99 958 618 2 43 663 320 0 17 337 Out In Total 1719 1796 3515 5 3 8 156 159 315 1880 1958 3838 CR16 - Seville Road Left 128 1 17 146 Thru 3565 5 301 3871 Right 315 0 21 336 3791 4008 7799 7 6 13 342 339 681 4140 4353 8493 Out In Total OH57

Cummins Consulting Services 4661 Marlberry Place, Lexington, KY 40509 swcummins@windstream.net 859.361.2589 "simplifying Data Collection since 2004" File Name : OH57_at_Seville_392786_03-21-2017 Site Code : Tuesday Start Date : 3/21/2017 Page No : 4 OH57 From North CR16 - Seville Road From East OH57 From South CR16 - Seville Road From West Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 12 83 13 108 21 12 45 78 3 110 5 118 10 9 3 22 326 07:30 AM 16 93 26 135 26 13 35 74 5 122 6 133 12 7 4 23 365 07:45 AM 36 93 33 162 14 28 35 77 7 91 9 107 10 16 4 30 376 08:00 AM 29 55 27 111 11 17 32 60 8 91 4 103 10 9 2 21 295 Total Volume 93 324 99 516 72 70 147 289 23 414 24 461 42 41 13 96 1362 % App. Total 18 62.8 19.2 24.9 24.2 50.9 5 89.8 5.2 43.8 42.7 13.5 PHF.646.871.750.796.692.625.817.926.719.848.667.867.875.641.813.800.906 OH57 Out In Total 603 516 1119 99 Right 324 Thru 93 Left Peak Hour Data CR16 - Seville Road Out In Total 192 96 288 42 Left 41 Thru 13 Right Peak Hour Begins at 07:15 AM Cars Buses Trucks North 147 70 72 Right Thru Left Out In Total 158 289 447 CR16 - Seville Road Left 23 Thru 414 Right 24 409 461 870 Out In Total OH57

Cummins Consulting Services 4661 Marlberry Place, Lexington, KY 40509 swcummins@windstream.net 859.361.2589 "simplifying Data Collection since 2004" File Name : OH57_at_Seville_392786_03-21-2017 Site Code : Tuesday Start Date : 3/21/2017 Page No : 5 OH57 From North CR16 - Seville Road From East OH57 From South CR16 - Seville Road From West Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 10:00 AM to 01:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:30 AM 11:30 AM 5 66 8 79 2 10 20 32 5 70 1 76 12 11 5 28 215 11:45 AM 18 75 13 106 10 18 19 47 5 69 5 79 18 10 3 31 263 12:00 PM 18 54 18 90 6 41 21 68 2 68 3 73 15 22 7 44 275 12:15 PM 16 55 13 84 3 22 12 37 1 52 4 57 21 5 4 30 208 Total Volume 57 250 52 359 21 91 72 184 13 259 13 285 66 48 19 133 961 % App. Total 15.9 69.6 14.5 11.4 49.5 39.1 4.6 90.9 4.6 49.6 36.1 14.3 PHF.792.833.722.847.525.555.857.676.650.925.650.902.786.545.679.756.874 OH57 Out In Total 397 359 756 52 Right 250 Thru 57 Left Peak Hour Data CR16 - Seville Road Out In Total 156 133 289 66 Left 48 Thru 19 Right Peak Hour Begins at 11:30 AM Cars Buses Trucks North 72 91 21 Right Thru Left Out In Total 118 184 302 CR16 - Seville Road Left 13 Thru 259 Right 13 290 285 575 Out In Total OH57

Cummins Consulting Services 4661 Marlberry Place, Lexington, KY 40509 swcummins@windstream.net 859.361.2589 "simplifying Data Collection since 2004" File Name : OH57_at_Seville_392786_03-21-2017 Site Code : Tuesday Start Date : 3/21/2017 Page No : 6 OH57 From North CR16 - Seville Road From East OH57 From South CR16 - Seville Road From West Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 02:00 PM to 07:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 30 85 6 121 5 27 35 67 1 129 12 142 29 22 10 61 391 05:15 PM 32 104 17 153 11 11 18 40 1 130 13 144 19 17 3 39 376 05:30 PM 22 118 12 152 12 15 20 47 1 118 14 133 39 22 6 67 399 05:45 PM 34 97 13 144 2 9 19 30 0 107 8 115 29 10 2 41 330 Total Volume 118 404 48 570 30 62 92 184 3 484 47 534 116 71 21 208 1496 % App. Total 20.7 70.9 8.4 16.3 33.7 50 0.6 90.6 8.8 55.8 34.1 10.1 PHF.868.856.706.931.625.574.657.687.750.931.839.927.744.807.525.776.937 OH57 Out In Total 692 570 1262 48 Right 404 Thru 118 Left Peak Hour Data CR16 - Seville Road Out In Total 113 208 321 116 Left 71 Thru 21 Right Peak Hour Begins at 05:00 PM Cars Buses Trucks North 92 62 30 Right Thru Left Out In Total 236 184 420 CR16 - Seville Road Left 3 Thru 484 Right 47 455 534 989 Out In Total OH57

APPENDIX D GROWTH RATE CALCULATIONS

Roadway Section State Route 57 Historical Traffic Volumes Growth 1999 2002 2004 2007 2010 2016 Rate State Route 57 at Seville Road 12400 12590 12960 13350 12530 12730 Trendline 12674 12709 12733 12768 12803 12873 0.09% 15000 13000 11000 9000 7000 5000 1996 2000 2004 2008 2012 2016

Traffic Survey Report Page 3 of 7 1999 MEDINA CO 3 AVERAGE 24-HR TRAFFIC VOLUME SECT. SECT. PASS & B & C TOTAL BEGINS TRAFFIC SECTION LENGTH A COM'L COM'L VEH. ------------------------------------------------------------------------------- US-42 (Cont'd) 25.12 LEAVE BRUNSWICK.27 15250 560 15810 U 25.39 RE-ENTER BRUNSWICK.03 15250 560 15810 25.42 N. CORP. BRUNSWICK 1.52 15250 560 15810 26.94 EQUALS STA. 0.00 IN CUYAHOGA CO..00 SR-57 00.00 WAYNE CO. HAMETOWN RD..56 8900 990 9890 U 00.56 S. CORP. WADSWORTH 1.02 8900 990 9890 U 01.58 WADSWORTH-SEVILLE RD..55 11120 1280 12400 02.13 LEAVE WADSWORTH.52 11120 1280 12400 02.65 COLLEGE ST. EXT. WADSWORTH.57 13390 1310 14700 U 03.22 REENTER WADSWORTH.02 13390 1310 14700 03.24 IR 76 5.76 5120 310 5430 09.00 IR 71 1.02 5120 310 5430 10.02 SR 162.87 6400 740 7140 U 10.89 S. CORP. MEDINA 1.73 11130 270 11400 12.62 SR 18 (WASHINGTON ST.) 4.12 SEE PREFERRED ROUTE 16.74 SR 18.93 4110 530 4640 17.67 SR 252.67 2460 250 2710 18.34 C-56 (LESTER LIVERPOOL RD.) 2.33 1070 40 1110 20.67 EQUALS STA. 0.00 IN LORAIN CO..00 IR-71 00.00 WAYNE CO. LINE 1.88 26740 13600 40340 01.88 SR 83 5.62 30250 13940 44190 07.50 IR 76.44 29110 9950 39060 07.94 IR 76 1.99 29110 9950 39060 09.93 SR 3 3.61 29110 9950 39060 13.54 SR 57.96 29110 9950 39060 14.50 SR 162 2.35 29110 9950 39060 16.85 SR 18 1.65 43530 11600 55130 18.50 IR 271 2.40 32270 4630 36900 20.90 SR 3 2.32 39570 5460 45030 U 23.22 S. CORP. BRUNSWICK.80 39570 5460 45030 U 24.02 SR 303 (CENTER RD.).76 54780 6690 61470 24.78 LEAVE BRUNSWICK 1.78 54780 6690 61470 U 26.56 RE-ENTER BRUNSWICK.12 54780 6690 61470 26.68 EQUALS STA. 0.00 IN CUYAHOGA CO..00 IR-76 00.00 IR 71.61 16100 7950 24050 00.61 US 224.30 18990 9560 28550 00.91 IR 71 1.41 18990 9560 28550 file://x:\tc\traffic Survey Report\TRAFFIC\TSR Archive\Med1999.htm 1/5/2007

Traffic Survey Report Page 3 of 7 2002 MEDINA CO 3 AVERAGE 24-HR TRAFFIC VOLUME SECT. SECT. PASS & B & C TOTAL BEGINS TRAFFIC SECTION LENGTH A COM'L COM'L VEH. ------------------------------------------------------------------------------- US-42 (Cont'd) 25.12 LEAVE BRUNSWICK.27 15950 460 16410 U 25.39 RE-ENTER BRUNSWICK.03 15950 460 16410 25.42 N. CORP. BRUNSWICK 1.52 15950 460 16410 26.94 EQUALS STA. 0.00 IN CUYAHOGA CO..00 SR-57 00.00 WAYNE CO. HAMETOWN RD..56 8750 970 9720 U 00.56 S. CORP. WADSWORTH 1.02 8750 970 9720 U 01.58 WADSWORTH-SEVILLE RD..55 11290 1300 12590 02.13 LEAVE WADSWORTH.52 11290 1300 12590 02.65 COLLEGE ST. EXT. WADSWORTH.57 13510 1160 14670 U 03.22 REENTER WADSWORTH.02 13510 1160 14670 03.24 IR 76 5.76 6710 420 7130 09.00 IR 71 1.02 6710 420 7130 10.02 SR 162.87 7760 540 8300 U 10.89 S. CORP. MEDINA 1.73 10520 260 10780 12.62 SR 18 (WASHINGTON ST.) 4.12 SEE PREFERRED ROUTE 16.74 SR 18.93 5640 600 6240 17.67 SR 252.67 2450 220 2670 18.34 C-56 (LESTER LIVERPOOL RD.) 2.33 1330 50 1380 20.67 EQUALS STA. 0.00 IN LORAIN CO..00 SR-57 DIRECTIONAL ALTERNATE 00.00 SR 18 (LIBERTY ST.) IN MEDINA.25 SEE PREFERRED ROUTE 00.25 ROUTE ENDS AT SR 57 IN MEDINA.00 IR-71 00.00 WAYNE CO. LINE 1.88 30110 11070 41180 01.88 SR 83 5.62 33390 11500 44890 07.50 IR 76.44 31610 7150 38760 07.94 IR 76 1.99 31610 7150 38760 09.93 SR 3 3.61 31610 7150 38760 13.54 SR 57.96 31610 7150 38760 14.50 SR 162 2.35 31610 7150 38760 16.85 SR 18 1.65 46940 8600 55540 18.50 IR 271 2.40 30750 3040 33790 20.90 SR 3 2.32 40130 3510 43640 U 23.22 S. CORP. BRUNSWICK.80 40130 3510 43640 U 24.02 SR 303 (CENTER RD.).76 51710 4270 55980 24.78 LEAVE BRUNSWICK 1.78 51710 4270 55980 U 26.56 RE-ENTER BRUNSWICK.12 51710 4270 55980 26.68 EQUALS STA. 0.00 IN CUYAHOGA CO..00 file://x:\tc\traffic Survey Report\TRAFFIC\TSR Archive\Med2002.htm 1/5/2007

Traffic Survey Report Page 3 of 7 2004 MEDINA CO 3 AVERAGE 24-HR TRAFFIC VOLUME SECT. SECT. PASS & B & C TOTAL BEGINS TRAFFIC SECTION LENGTH A COM'L COM'L VEH. ------------------------------------------------------------------------------- US-42 (Cont'd) U 25.10 RE-ENTER BRUNSWICK.02 16420 410 16830 25.12 LEAVE BRUNSWICK.27 16420 410 16830 U 25.39 RE-ENTER BRUNSWICK.29 16420 410 16830 25.68 N. CORP. BRUNSWICK 1.26 16420 410 16830 26.94 EQUALS STA. 0.00 IN CUYAHOGA CO..00 SR-57 00.00 WAYNE CO. C-150 (EASTERN RD.).56 9380 1040 10420 U 00.56 S. CORP. WADSWORTH 1.02 9380 1040 10420 U 01.58 SEVILLE RD..55 11870 1090 12960 02.13 LEAVE WADSWORTH.52 11870 1090 12960 02.65 C-97 (GREENWICH RD.).57 13320 1190 14510 U 03.22 RE-ENTER WADSWORTH.02 13320 1190 14510 03.24 IR 76 5.76 6980 630 7610 09.00 IR 71 1.02 6980 630 7610 10.02 SR 162.87 7980 510 8490 U 10.89 S. CORP. MEDINA 1.73 9030 220 9250 12.62 SR 18 (WASHINGTON ST.) 4.12 SEE PREFERRED ROUTE 16.74 SR 18.93 5360 440 5800 17.67 SR 252.67 2410 100 2510 18.34 C-56 (LESTER RD.) 2.33 1060 40 1100 20.67 EQUALS STA. 0.00 IN LORAIN CO..00 SR-57 DIRECTIONAL ALTERNATE 00.00 SR 18 (LIBERTY ST.) IN MEDINA.25 SEE PREFERRED ROUTE 00.25 ROUTE ENDS AT SR 57 IN MEDINA.00 IR-71 00.00 WAYNE CO. LINE (CONSTRUCTION) 1.88 29860 14180 44040 01.88 SR 83 (CONSTRUCTION) 5.62 32870 14470 47340 07.50 IR 76 (CONSTRUCTION).44 31670 10070 41740 07.94 IR 76 (CONSTRUCTION) 1.99 31670 10070 41740 09.93 SR 3 (CONSTRUCTION) 3.61 31670 10070 41740 13.54 SR 57 (CONSTRUCTION).96 31670 10070 41740 14.50 SR 162 (CONSTRUCTION) 2.35 31670 10070 41740 16.85 SR 18 (CONSTRUCTION) 1.65 46470 9670 56140 18.50 IR 271 (CONSTRUCTION) 2.40 31000 4310 35310 20.90 SR 3 2.32 43490 4960 48450 U 23.22 S. CORP. BRUNSWICK.80 43490 4960 48450 U 24.02 SR 303 (CENTER RD.).76 56490 5940 62430 24.78 LEAVE BRUNSWICK 1.78 56490 5940 62430 U 26.56 RE-ENTER BRUNSWICK.12 56490 5940 62430 26.68 EQUALS STA. 0.00 IN CUYAHOGA CO..00 file://x:\tc\traffic Survey Report\Med2004.htm 12/29/2006

Traffic Survey Report file://x:\tc\traffic Survey Report\Med2007.new Page 3 of 7 2/11/2008 2007 MEDINA CO 3 AVERAGE 24-HR TRAFFIC VOLUME SECT. SECT. PASS & B & C TOTAL BEGINS TRAFFIC SECTION LENGTH A COM'L COM'L VEH. ------------------------------------------------------------------------------- US-42 (Cont'd) U 25.10 RE-ENTER BRUNSWICK.02 13110 540 13650 25.12 LEAVE BRUNSWICK.27 13110 540 13650 U 25.39 RE-ENTER BRUNSWICK.29 13110 540 13650 25.68 N. CORP. BRUNSWICK 1.26 13110 540 13650 26.94 EQUALS STA. 0.00 IN CUYAHOGA CO..00 SR-57 00.00 WAYNE CO. C-150 (EASTERN RD.).56 9540 1060 10600 U 00.56 S. CORP. WADSWORTH 1.02 9540 1060 10600 U 01.58 SEVILLE RD..55 12310 1040 13350 02.13 LEAVE WADSWORTH.52 12310 1040 13350 02.65 C-97 (GREENWICH RD.).57 13150 1180 14330 U 03.22 RE-ENTER WADSWORTH.02 13150 1180 14330 03.24 IR 76 5.76 7210 620 7830 09.00 IR 71 1.03 7210 620 7830 10.03 SR 162.86 8410 470 8880 U 10.89 S. CORP. MEDINA 1.73 13150 320 13470 12.62 SR 18 (WASHINGTON ST.) 4.12 SEE PREFERRED ROUTE 16.74 SR 18.93 5530 430 5960 17.67 SR 252.67 2600 150 2750 18.34 C-56 (LESTER RD.) 2.33 1050 40 1090 20.67 EQUALS STA. 0.00 IN LORAIN CO..00 SR-57 DIRECTIONAL ALTERNATE 00.00 SR 18 (LIBERTY ST.) IN MEDINA.25 SEE PREFERRED ROUTE 00.25 ROUTE ENDS AT SR 57 IN MEDINA.00 IR-71 00.00 WAYNE CO. LINE (CONSTRUCTION) 1.88 29510 12440 41950 01.88 SR 83 (CONSTRUCTION) 5.62 32730 13060 45790 07.50 IR 76 (CONSTRUCTION).44 30680 8460 39140 07.94 IR 76 (CONSTRUCTION) 1.99 30680 8460 39140 09.93 SR 3 (CONSTRUCTION) 3.61 30680 8460 39140 13.54 SR 57 (CONSTRUCTION).96 30680 8460 39140 14.50 SR 162 (CONSTRUCTION) 2.35 30680 8460 39140 16.85 SR 18 (CONSTRUCTION) 1.65 47730 9470 57200 18.50 IR 271 (ATR #609 AT 18.51) (CONST.) 2.40 31590 3760 35350 20.90 SR 3 1.21 42380 4540 46920 22.11 ATR #610 1.11 42380 4540 46920 U 23.22 S. CORP. BRUNSWICK.80 42380 4540 46920 U 24.02 SR 303 (CENTER RD.).76 56770 5580 62350 24.78 LEAVE BRUNSWICK.83 56770 5580 62350 25.61 ATR #611.95 56770 5580 62350

Traffic Survey Report Page 3 2010 MEDINA COUNTY 3 AVERAGE 24-HR TRAFFIC VOLUME SECT. SECT. PASS & B & C TOTAL BEGINS TRAFFIC SECTION LENGTH A COM'L COM'L VEH. ------------------------------------------------------------------------------- US-42 (Cont'd) 25.03 LEAVE BRUNSWICK.07 11900 640 12540 U 25.10 RE-ENTER BRUNSWICK.02 11900 640 12540 25.12 LEAVE BRUNSWICK.27 11900 640 12540 U 25.39 RE-ENTER BRUNSWICK.29 11900 640 12540 25.68 N. CORP. BRUNSWICK 1.26 11900 640 12540 26.94 EQUALS STA. 0.00 IN CUYAHOGA CO..00 SR-57 00.00 WAYNE CO. C-150 (EASTERN RD.).56 9260 800 10060 U 00.56 S. CORP. WADSWORTH 1.02 9260 800 10060 U 01.58 SEVILLE RD..55 11530 1000 12530 02.13 LEAVE WADSWORTH.52 11530 1000 12530 02.65 C-97 (GREENWICH RD.).57 14020 1050 15070 U 03.22 RE-ENTER WADSWORTH.02 14020 1050 15070 03.24 IR 76 5.76 7900 410 8310 09.00 IR 71 1.03 7900 410 8310 10.03 SR 162.86 7730 310 8040 U 10.89 S. CORP. MEDINA 1.73 9830 390 10220 U 12.62 SR 18 (WASHINGTON ST.) 4.12 SEE PREFERRED ROUTE 16.74 SR 18.93 5380 330 5710 17.67 SR 252.67 2730 150 2880 18.34 C-56 (LESTER RD.) 2.33 1070 70 1140 20.67 EQUALS STA. 0.00 IN LORAIN CO..00 SR-57 DIRECTIONAL ALTERNATE U 00.00 SR 18 (LIBERTY ST.) IN MEDINA.25 SEE PREFERRED ROUTE 00.25 ROUTE ENDS AT SR 57 IN MEDINA.00 IR-71 00.00 WAYNE CO. LINE 1.88 28620 12380 41000 01.88 SR 83 (CONSTRUCTION) 5.47 31410 12660 44070 07.35 IR 76 (CONSTRUCTION).59 27990 7360 35350 07.94 US 224 (CONSTRUCTION) 1.99 27990 7360 35350 09.93 SR 3 (CONSTRUCTION) 3.61 27990 7360 35350 13.54 SR 57 (CONSTRUCTION).96 27990 7360 35350 14.50 SR 162 (CONSTRUCTION) 2.35 27990 7360 35350 16.85 SR 18 1.65 47350 8540 55890 18.50 IR 271 (ATR #609 AT 18.51) 2.40 31590 3430 35020 20.90 SR 3 1.20 43630 4080 47710 22.10 ATR #610 1.12 43630 4080 47710 U 23.22 S. CORP. BRUNSWICK.80 43630 4080 47710 U 24.02 SR 303 (CENTER RD.).76 56040 5070 61110 24.78 LEAVE BRUNSWICK.83 56040 5070 61110

Traffic Survey Report Page 2 2013 MEDINA COUNTY 2 AVERAGE 24-HR TRAFFIC VOLUME SECT. SECT. PASS & B & C TOTAL BEGINS TRAFFIC SECTION LENGTH A COM'L COM'L VEH. ------------------------------------------------------------------------------- SR-18 (Cont'd) U 12.22 HARMONY ST. 1.03 11490 990 12480 13.25 E. CORP. MEDINA 1.36 15920 1000 16920 14.61 C-49 (RIVER STYX RD.).88 24880 1800 26680 15.49 IR 71.25 30760 2230 32990 15.74 T-272 (GATEWAY DR.) 2.87 19300 1180 20480 18.61 SR 94 / ATR #760 AT 20.40 2.52 22530 1380 23910 21.13 EQUALS STA. 0.00 IN SUMMIT CO..00 SR-18 DIRECTIONAL ALTERNATE 00.00 SR 18.04 3210 380 3590 00.04 SR 83.04 3330 390 3720 00.08 ROUTE ENDS AT SR 18.00 SR-18 DIRECTIONAL ALTERNATE 1 00.00 ROUTE BEGINS AT SR 18 IN MEDINA.25 SEE PREFERRED ROUTE U 00.25 US 42 (COURT ST.) IN MEDINA.11 5210 470 5680 00.36 ROUTE ENDS AT SR 18 IN MEDINA.00 US-42 00.00 WAYNE CO. LINE 2.25 2980 300 3280 02.25 C-139 (LODI RD.).85 2390 300 2690 03.10 US 224 2.64 4640 1100 5740 05.74 SR 83 1.17 9150 1410 10560 06.91 US 224 ENTER RAMP.21 1310 150 1460 07.12 SR 421 LEAVE RAMP 3.36 3710 330 4040 10.48 C-35 (FRIENDSVILLE RD.) 1.57 5830 440 6270 12.05 SR 162.47 6550 530 7080 12.52 SR 162 2.50 6220 400 6620 U 15.02 S. CORP. MEDINA (LAKE RD. AT 15.03) 1.77 12240 890 13130 U 16.79 SR 3 (LAFAYETTE ST.) ENTER COURT ST..26 12950 940 13890 U 17.05 SR 18 (WASHINGTON ST.).08 13130 950 14080 U 17.13 SR 3 (LIBERTY ST.) 2.20 13320 960 14280 19.33 C-70 (FENN RD.) 4.58 9100 1030 10130 U 23.91 OXFORD DR.IN BRUNSWICK.38 11680 850 12530 U 24.29 SR 303 (CENTER RD.) 2.65 13330 970 14300 26.94 EQUALS STA. 0.00 IN CUYAHOGA CO..00 SR-57 00.00 WAYNE CO. C-150 (EASTERN RD.) 1.58 8630 960 9590 U 01.58 SEVILLE RD.IN WADSWORTH 1.07 10020 1160 11180 02.65 C-97 (GREENWICH RD.).59 11650 890 12540 03.24 IR 76 6.79 6630 500 7130

APPENDIX E COLLISION DIAGRAMS

05/15/15 13:18 DRY 08/20/16 23:33 DRY SEVILLE RD. 01/26/15 12:30 WET 09/16/16 17:11 DRY 10/09/15 08:45 WET 09/09/15 13:55 DRY 07/27/15 13:44 DRY 11/15/16 17:54 DRY 03/27/15 16:11 WET STATE ROUTE 57 02/02/15 06:57 SNOW 06/10/14 15:52 WET 11/09/15 17:52 DRY 12/07/15 11:23 DRY 03/31/16 07:48 DRY 11/18/16 06:38 DRY 11/19/14 17:11 DRY 01/18/15 12:59 WET 11/17/15 18:18 DRY 12/03/15 16:27 DRY 0 11/21/14 10:40 DRY 25 50 1" =50' SCALE IN FEET 100 MOVING VEHICLE BACKING VEHICLE NON CONTACT VEHICLE PEDESTRIANS PARKED VEHICLE FIXED OBJECT FATAL CRASH INJURY CRASH LEGEND REAR END HEAD ON OUT OF CONTROL LEFT TURN SIDESWIPE ANGLE NO FAULT CRASHES Glaus, Pyle, Schomer, Burns & DeHaven, Inc. Copyright; Glaus, Pyle, Schomer, Burns & DeHaven, Inc. 2015 APPENDIX E STATE ROUTE 57 / SEVILLE ROAD CRASH DIAGRAM FIGURE 1 OF 1 SEPTEMBER 2017

APPENDIX F COLLISION DATA SUMMARY & CHARTS

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number Frequency of Crashes by Severity CRASH_SEVERITY Property Damage Crash 20, 100% SEVERITY Frequency of Crashes by Year and Severity 14 12 10 8 6 4 2 0 2014 2015 2016 CRASH_SEVERITY Property Damage Crash TRAFFIC_CRASH_YEAR

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number Frequency of Crashes by Year 5, 25% 3, 15% TRAFFIC_CRASH_YEAR 2014 2015 2016 12, 60% Number Frequency of Crashes by Day of the Week 0 1 2 3 4 5 6 7 Friday Monday DAY_OF_WEEK Tuesday Wednesday Thursday Saturday Sunday

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number 4.5 Frequency of Crashes by Hour 4 3.5 3 2.5 2 1.5 1 0.5 0 6 7 8 10 11 12 13 15 16 17 18 23 HOUR_OF_DAY Number 7 Frequency of Crashes by Month 6 5 4 3 2 1 0 1 2 3 5 6 7 8 9 10 11 12 CRASH_MONTH_NBR

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number 14 12 10 8 6 4 2 Frequency of Crashes by Type of Crash 0 Angle Sideswipe Passing Fixed Object Left Turn Rear End TYPE_OF_CRASH Number Frequency of Crashes by Light Condition 1, 5% 5, 25% LIGHT_CONDITION Daylight Dark No Lights Dark Lighted 14, 70%

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number 12 Frequency of Crashes by Location 10 8 6 4 2 0 Not An Intersection Four Way Intersection LOCATION Number Frequency of Crashes by Road Condition 1, 5% 5, 25% ROAD_CONDITION Road Dry Road Wet Road Snow 14, 70%

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number Frequency of Animal Crashes Number Frequency of Work Zone Crashes 25 20 20, 100% 15 10 5 0 ANIMAL_TYPE Animal Not Stated SPECIAL_AREA Unknown or Not in Work Zone Number Frequency of Crashes by Road Contour 1, 5% ROAD_CONTOUR Straight Level Straight Grade 19, 95%

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number 14 Frequency of Crashes by Contributing Factor 1 12 10 8 6 4 2 0 Ran Red Light Failure To Control Failure To Yield Followed Too Closely/ACDA CONTRIBUTING_FACTOR1 Number 18 Frequency of Crashes by Contributing Factor 2 16 14 12 10 8 6 4 2 0 (blank) None CONTRIBUTING_FACTOR2

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number Frequency of Crashes by Action 1 Overtaking/Passing Making Left Turn ACTION1 Slowing Or Stopped In Traffic Straight Ahead 0 2 4 6 8 10 12 Number Frequency of Crashes by Action 2 ACTION2 Straight Ahead Slowing Or Stopped In Traffic 0 2 4 6 8 10 12 14

MED-SR57 - (1.58-) From 01/01/2014 to 12/31/2016 Number 25 Frequency of Crashes by Object Struck 1 20 15 10 5 0 Total Number 1, 5% 1, 5% Driver 1 Alcohol 18, 90% DRIVER_ALCOHOL1 None Yes Drugs Suspected Yes Alcohol Suspected Number Driver 2 Alcohol 2, 10% 18, 90% DRIVER_ALCOHOL2 None

APPENDIX G SAFETY APPLICATION

Safety Funding Application General Project Information Project Sponsoring Agency Project Name PID Project Manager Contact Phone Contact Email City of Wadsworth State Route 57 / Seville Road Intersection Safety Study Not Assigned Mr. Larry D. Jenkins, P.E., P.S., CPSWQ 330-335-2740 ljenkins@wadsworthcity.org Location Information ODOT District Route Number Begin Logpoint Begin Latitude End Latitude 3 SR-57R 1.590 41.010 County MED Road Name Wadsworth Road End Logpoint 0.000 Begin Longitude -81.753 End Longitude Project Description Summary of Crash Patterns Historically, the subject intersection has been a troublesome location for the City of Wadsworth. Numerous complaints of dangerous operations and conditions have been made to the city. In 2017, GPD Group completed a comprehensive tabulation of the crashes for the three (3) most recent years of crash data (2014 2016) at the State Route 57 / Seville Road intersection in the City of Wadsworth, Ohio. This crash data showed an elevated number of crashes within the study area, suggesting that there were safety issues and a more detailed analysis was needed to determine the extent of the problem(s) and what could be done to address them. A review of the crash patterns indicate that safety and operational issues exist within the study area. The crash diagrams indicate an increased number of rear-end crashes are occurring at this intersection and this suggests that as the traffic signal turns red, a higher opportunity for rear-end crashes occurs. Additionally, left turning vehicles in the single thru lane impede following traffic, resulting in rear-end crashes. Field observations suggest that when these left turning movements occur, the following vehicles illegally pass on the right shoulder which creates unsafe conditions at the intersection and increases left turn or sideswipe passing conflict points. Summary of Recommended Countermeasures 1. Remove the traffic signal at the State Route 57 / Seville Road intersection and convert the intersection into a single lane roundabout. It is assumed that this intersection project will be completed under a complete closure of the intersection. Project Priority Information The City of Wadsworth actively pursues projects that identify crash patterns in the attempt to construct roadway improvements that provide the greatest potential to benefit safety. Currently, the City of Wadsworth is in the processes of constructing safety improvements along State Route 94 in the area of the I.R. 76 interchange ramps and this project is anticipated to be completed in 2018. In the attempt to continue future safety planning efforts following the completion of the State Route 94 project, the City of Wadsworth has actively been looking for locations that identify crash patterns. The City of Wadsworth considers improving the safety of this intersection to be their highest safety improvement priority at this time. Office of Systems Planning and Program Management Page 1 of 3

Safety Funding Application Crash Data Crash Totals Existing Conditions: Predicted Crash Frequency Existing Conditions: Expected Crash Frequency Potential for Safety Improvement Proposed Conditions: Expected Crash Frequency Observed Crashes Observed People Injury Totals Observed People Injury Totals Fatal & Serious Injury (KA) Visible Injury (B) Non-Visible (C) Property Damage Only (O) Total 0.1606 0.7348 1.0260 5.2677 7.19 0.1585 0.6921 0.9260 6.0170 7.79-0.0021-0.0427-0.1000 0.7493 0.60 0.0460 0.2007 0.2685 4.4526 4.97 0.0000 0.0000 0.0000 6.6667 6.67 Fatal Injury (K) Serious Injury (A) Visible Injury (B) Non-Visible (C) Total 0.0000 0.0000 0.0000 0.0000 0.00 Application Scoring Category Expected Crash Frequency Ratio of Observed Fatal and Serious Injuries to Observed Total Crashes % of the Potential for Safety Improvement to Total Expected Crashes Relative Severity Index Equivalent Property Damage Only Index Volume to Capacity Ratio Benefit Cost Ratio Safety Funding Request Percentage Scoring Value Points Awarded Points Possible 7.79 4 10 0.00 0 5 7.70% 14 20 $24,819 2 10 2.68 2 5 0.89 8 10 0.87 0 30 66.31% 10 10 Total 40 100 Strategic Highway Safety Plan Functional Class Major Route AADT Ohio Emphasis Area Ohio Emphasis Area Subcategory FHWA Emphasis Area FHWA Improvement Category FHWA Improvement Subcategory Other Principal Arterial Roadway 13,800 Emphasis Area V - Incident and Congestion Related Crashes Rear End Crashes Improving the design and operation of highway intersections Intersection traffic control Modify control - traffic signal to roundabout Work Locations NLFID SMEDSR00057**C Begin Logpoint End Logpoint Begin Latitude Begin Longitude Location Termini (i.e. from Street 1 to Street 2) 1.590 0.000 41.010-81.7533 State Route 57 / Seville Road Office of Systems Planning and Program Management Page 2 of 3

Safety Funding Application Project Funding Project Phase Fiscal Year Project Phase Completed Previous Safety New Safety Sponsor Funding Safety Study Interchange Mod. Study PE - Environmental PE - Detailed Design Right of Way /Utilities Construction 2018 2018 2019 2021 2023 Total N/A $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $167,916.00 $83,958.00 $0.00 $1,248,126.00 $1,500,000.00 $0.00 $0.00 $18,657.00 $9,329.00 $41,000.00 $693,122.00 $762,108.00 Total $0.00 $0.00 $186,573.00 $93,287.00 $41,000.00 $1,941,248.00 $2,262,108.00 Additional Funding Detail Local funding will be allocated from the City of Wadsworth's funds. A future Issue 1 request will be made by the City of Wadsworth. A funding request may be made to NOACA for the STBG or CMAQ funding program as well. The next funding cycle for STBG will be in the Fall of 2018 and the next CMAQ funding cycle is believed to be in the Summer of 2019. Project Development Project Phase Completed by Safety Study GPD Group 9/13/2017 Completion Date Applicant Information Name Mr. Larry Jenkins, P.E., P.S., CPSWQ Signature Title Interim City Engineer Phone Number 330-335-2740 Date Version: 20150917 The following information should be included in submission of the safety project application: 1. An electronic copy of the Safety Engineering Study 2. All Excel Analysis Files May include Crash Analysis Module (CAM) Tool, Economic Crash Analysis Tool (ECAT), HSIP Application and Scoring Tool. 3. Benefit-Cost Results (Economic Analysis) 4. DSRT approval signatures Office of Systems Planning and Program Management Page 3 of 3

APPENDIX H COST ESTIMATE

FY 2023 Construction State Route 57 /Seville Road Intersection Safety Improvement September 2017 Preliminary Cost Estimate ITEM DESCRIPTION TOTAL QUANTITY UNIT ESTIMATED PRICE TOTAL COST ROADWAY 201 CLEARING AND GRUBBING 1 LS $2,500 $2,500 202 PAVEMENT REMOVED 225 SY $12 $2,700 202 PAVEMENT REMOVED, ASPHALT 3,620 SY $8 $28,960 203 EXCAVATION / EMBANKMENT 1 LS $275,000 $275,000 659 SEEDING AND MULCHING 5,900 SY $2 $11,800 832 EROSION CONTROL 1 LS $35,000 $35,000 EROSION CONTROL PLAN 1 LS $10,000 $10,000 LANDSCAPING 1 LS $5,000 $5,000 ROADWAY SUBTOTAL: $370,960 DRAINAGE 202 PIPE REMOVED, 24" AND UNDER 100 FT $15 $1,500 605 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP 4,000 FT $10 $40,000 611 CATCH BASIN, NO. 2-2B 3 EACH $1,500 $4,500 611 CATCH BASIN, NO. 3A 8 EACH $2,250 $18,000 611 STORM CONDUIT, TYPE C 1,000 FT $70 $70,000 603 MANHOLE, NO. 3 5 EACH $3,000 $15,000 MANUFACTURED SYSTEM TYPE QUALITY STRUCTURE 1 LS $25,000 $25,000 DRAINAGE SUBTOTAL: $174,000 PAVEMENT 302 ASPHALT CONCRETE BASE, PG64-22 1,050 CY $125 $131,250 304 AGGREGATE BASE 1,165 CY $50 $58,250 407 NON-TRACKING TACK COAT 460 GAL $3 $1,380 407 NON-TRACKING TACK COAT FOR INTERMEDIATE COURSE 250 GAL $3 $750 442 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A 255 CY $180 $45,900 442 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE A 300 CY $145 $43,500 452 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS 225 SY $60 $13,500 452 8" STAMPED CONCRETE TRUCK APRON 480 SY $75 $36,000 609 COMBINATION CURB AND GUTTER, TYPE 2 2,000 FT $20 $40,000 609 CONCRETE MEDIAN 800 SY $65 $52,000 PAVEMENT SUBTOTAL: $422,530 TRAFFIC CONTROL SIGNING 1 LS $25,000 $15,000 PAVEMENT MARKING 1 LS $15,000 $10,000 TRAFFIC CONTROL SUBTOTAL: $25,000 LIGHTING 625 CONTINUOUS ROADWAY LIGHTING 1 LS $110,000 $110,000 LIGHTING SUBTOTAL: $110,000 O:\2017\2017082\01\Spreadsheets & Calculations\Cost Estimates\SR 57 Seville Cost Estimate.xlsx

FY 2023 Construction State Route 57 /Seville Road Intersection Safety Improvement September 2017 Preliminary Cost Estimate ITEM DESCRIPTION TOTAL QUANTITY UNIT ESTIMATED PRICE TOTAL COST SIGNALIZATION 632 TRAFFIC SIGNAL REMOVAL 1 EACH $10,000 $10,000 SIGNALIZATION SUBTOTAL: $10,000 MAINTENANCE OF TRAFFIC MAINTENANCE OF TRAFFIC 1 LS $25,000 $25,000 MAINTENANCE OF TRAFFIC SUBTOTAL: $25,000 MISCELLANEOUS 614 MAINTAINING TRAFFIC 1 LS $15,000 $15,000 619 FIELD OFFICE 6 MON $1,600 $9,600 623 CONSTRUCTION LAYOUT STAKES 1 LS $8,000 $8,000 624 MOBILIZATION 1 LS $40,000 $40,000 638 UTILITY RELOCATION 1 LS $13,000 $13,000 SPECIAL PERFORMANCE BOND 1 LS $8,000 $8,000 MISCELLANEOUS SUBTOTAL: $93,600 RIGHT OF WAY TEMPORARY R/W TAKE - COMMERCIAL 3 EACH $5,000 $15,000 TEMPORARY R/W TAKE - RESIDENTIAL 1 EACH $2,000 $2,000 PERMANENT R/W TAKE - MINOR - COMMERCIAL 0 EACH $25,000 $0 PERMANENT R/W TAKE - MINOR - RESIDENTIAL 0 EACH $10,000 $0 ACQUISITION SERVICES 4 EACH $6,000 $24,000 RIGHT OF WAY SUBTOTAL: $41,000 TOTAL CONSTRUCTION AND RIGHT OF WAY COST: $1,272,090 DESIGN ENGINEERING COST: (17% OF CONSTR. & R/W COST) $216,255 GEOTECHNICAL ENGINEERING COST: (1% OF CONSTR. & R/W COST) $12,721 ENVIRONMENTAL COST: (1% OF CONSTR. & R/W COST) $12,721 SUBSURFACE UTILITY ENGINEERING (SUE): (3% OF CONSTR. & R/W COST) $38,163 DESIGN CONTINGENCY COSTS (15% OF CONSTR. & R/W COST) $190,814 PROJECT SUBTOTAL: $1,742,764 3% INFLATION CONTINGENCY OVER 6 YEARS (18%): $313,698 PROJECT TOTAL WITHOUT CONSTRUCTION INSPECTION $2,056,462 CONSTRUCTION INSPECTION COST: (10% OF PROJECT TOTAL) $205,646 TOTAL: $2,262,108 O:\2017\2017082\01\Spreadsheets & Calculations\Cost Estimates\SR 57 Seville Cost Estimate.xlsx

APPENDIX I BENEFIT / COST WORKSHEET

FULL PROJECT AMOUNT

Safety Benefit - Cost Analysis Project Name Project Description Reference Number Analyst Agency/Company State Route 57 / Seville Road Intersection Safety Improvement 2017082.01 Curtis J. Deibel, P.E. GPD Group General Information Contact Email Contact Phone Date Performed Analysis Year cdeibel@gpdgroup.com (330) 572-2495 7/24/2017 2023 Select Site Types to be used in Benefit Cost Analysis: Comments: All Sites Countermeasure Service Lives, Costs, and Safety Benefits Countermeasures Service Life (Years) Initial Cost of Countermeasure Annual Maintenance & Energy Costs Salvage Value Net Present Cost of Countermeasure Total Cost of Countermeasures Summary of Annual Crash Modifications Net Present Value of Safety Benefits $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 CMF 1 Conversion of signalized intersection into single or multi lane roundabout 20 $1,742,764.00 $1,742,764.00 $1,742,764.00 2.826 $1,508,928 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 Totals $1,742,764.00 $0.00 $0.00 $1,742,764.00 $1,742,764.00 2.826 $1,508,928 Created by the Office of Systems Planning and Program Management

Safety Benefit - Cost Analysis Project Name Project Description Reference Number Analyst Agency/Company State Route 57 / Seville Road Intersection Safety Improvement 2017082.01 Curtis J. Deibel, P.E. GPD Group General Information Contact Email Contact Phone Date Performed Analysis Year cdeibel@gpdgroup.com (330) 572-2495 7/24/2017 2023 Benefit Cost Calculator Expected Annual Crash Adjustment Comments: Net Present Value of Project Net Present Value of Safety Benefits Net Benefit Benefit / Cost Ratio $1,742,764.00 $1,508,927.64 ($233,836.36) 0.87 Number of Fatal & Incapacitating Injury Crashes 0.113 Number of Injury Crashes 1.261 Number of Total Crashes 2.826 Safety Benefits and Project Costs Combined Cash Flows By Countermeasure Per Year $500,000 Part C Improvements Combined CMF 1 Conversion of signalized intersection into single or multi lane roundabout $0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 $500,000 $1,000,000 $1,500,000 $2,000,000 Created by the Office of Systems Planning and Program Management

Safety Benefit - Cost Analysis Project Name Project Description Reference Number Analyst Agency/Company State Route 57 / Seville Road Intersection Safety Improvement 2017082.01 Curtis J. Deibel, P.E. GPD Group General Information Contact Email Contact Phone Date Performed Analysis Year cdeibel@gpdgroup.com (330) 572-2495 7/24/2017 2023 Project Costs Only Cash Flows By Countermeasure Per Year $0 $200,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Part C Improvements Combined CMF 1 Conversion of signalized intersection into single or multi lane roundabout $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 $1,800,000 $2,000,000 $1,000,000 Return on Investment (Safety Benefits and Project Investments) $500,000 $0 $500,000 $1,000,000 $1,500,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 First year to observe a positive return on investiment: 2039 (16 years) Percentage of Service Life to observe a continuous Positive Return on Investment: 25.00% $2,000,000 Created by the Office of Systems Planning and Program Management

SAFETY REQUEST AMOUNT

Safety Benefit - Cost Analysis Project Name Project Description Reference Number Analyst Agency/Company State Route 57 / Seville Road Intersection Safety Improvement 2017082.01 Curtis J. Deibel, P.E. GPD Group General Information Contact Email Contact Phone Date Performed Analysis Year cdeibel@gpdgroup.com (330) 572-2495 7/24/2017 2023 Select Site Types to be used in Benefit Cost Analysis: Comments: All Sites Countermeasure Service Lives, Costs, and Safety Benefits Countermeasures Service Life (Years) Initial Cost of Countermeasure Annual Maintenance & Energy Costs Salvage Value Net Present Cost of Countermeasure Total Cost of Countermeasures Summary of Annual Crash Modifications Net Present Value of Safety Benefits $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 CMF 1 Conversion of signalized intersection into single or multi lane roundabout 20 $1,500,000.00 $1,500,000.00 $1,500,000.00 2.826 $1,508,928 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 $0.00 $0.00 $0.00 0.000 $0 Totals $1,500,000.00 $0.00 $0.00 $1,500,000.00 $1,500,000.00 2.826 $1,508,928 Created by the Office of Systems Planning and Program Management

Safety Benefit - Cost Analysis Project Name Project Description Reference Number Analyst Agency/Company State Route 57 / Seville Road Intersection Safety Improvement 2017082.01 Curtis J. Deibel, P.E. GPD Group General Information Contact Email Contact Phone Date Performed Analysis Year cdeibel@gpdgroup.com (330) 572-2495 7/24/2017 2023 Benefit Cost Calculator Expected Annual Crash Adjustment Comments: Net Present Value of Project Net Present Value of Safety Benefits Net Benefit Benefit / Cost Ratio $1,500,000.00 $1,508,927.64 $8,927.64 1.01 Number of Fatal & Incapacitating Injury Crashes 0.113 Number of Injury Crashes 1.261 Number of Total Crashes 2.826 Safety Benefits and Project Costs Combined Cash Flows By Countermeasure Per Year $400,000 Part C Improvements Combined $200,000 CMF 1 Conversion of signalized intersection into single or multi lane roundabout $0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 Created by the Office of Systems Planning and Program Management

Safety Benefit - Cost Analysis Project Name Project Description Reference Number Analyst Agency/Company State Route 57 / Seville Road Intersection Safety Improvement 2017082.01 Curtis J. Deibel, P.E. GPD Group General Information Contact Email Contact Phone Date Performed Analysis Year cdeibel@gpdgroup.com (330) 572-2495 7/24/2017 2023 Project Costs Only Cash Flows By Countermeasure Per Year $0 $200,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Part C Improvements Combined CMF 1 Conversion of signalized intersection into single or multi lane roundabout $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 $1,000,000 Return on Investment (Safety Benefits and Project Investments) $500,000 $0 $500,000 $1,000,000 $1,500,000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 First year to observe a positive return on investiment: 2037 (14 years) Percentage of Service Life to observe a continuous Positive Return on Investment: 35.00% $2,000,000 Created by the Office of Systems Planning and Program Management