Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Similar documents
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

Chapter 4 Traffic Analysis

3.0 PROJECT DESCRIPTION

Route 7 Corridor Study

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Regional Transportation Needs Within Southeastern Wisconsin

Access Management Regulations and Standards

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

91

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Final Project Prioritization Plan

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Project Description Form 8EE

INTERSTATE 540 IMPROVEMENT STUDY

Financial Project ID No(s).: and ETDM No(s).: and 14181

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Appendix D: Concept Screening

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

TABLE TRAFFIC ANALYSIS SCENARIOS

Mid Rivers Mall Drive/I-70 & Route 79/I-70 Interchange Study

Arterial Management Plan for US Route 250 and State Route 623

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Welcome! San Jose Avenue Open House August 25, 2015

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

Transportation and Air Quality Committee GEL Project Briefing and Update

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Donahue Drive Corridor Traffic Operational Evaluation

Capital Region Council of Governments

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB

Corridor Studies. LA 415 and LA 73

Figure 1: Vicinity Map of the Study Area

Iowa Highway 58 Corridor Improvement Study

Parks Highway: MP Lucus Road to Big Lake Road

Santa Clara I-280 CORRIDOR STUDY

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Atlanta Braves Stadium and Mixed- Use Development

THIS PAGE LEFT BLANK INTENTIONALLY

APPENDIXB. Traffic Operations Technical Memorandum

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

US 69 RELIEF ROUTE STUDY

Short and Long Term Needs

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Corridor Recommendations and Implementation

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

GENERAL DESCRIPTION. Page 1 of 5

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

STREET AND HIGHWAY PLAN

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011

ACCESS MANAGEMENT PLAN FOR SR-741 & MIAMISBURG-SPRINGBORO/ AUSTIN PIKE MONTGOMERY COUNTY, OHIO

Harrah s Station Square Casino

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

TRAFFIC IMPACT ANALYSIS

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

TECHNICAL MEMORANDUM

Basalt Creek Transportation Refinement Plan Recommendations

4.11 TRANSPORTATION/CIRCULATION

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Route 15 Congestion Report Findings

Traffic Technical Environmental Study

Access Management Regulations and Standards

Interstate 89 Exit 17 Scoping Study. Study Team Meeting #3 Notes

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Background on the Revisions to VDOT s Access Management Spacing Standards

FM #: ETDM #: 11241

Grade Separated Intersection

Road Safety Audit Report: Interstate 516

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

INNOVATIVE INTERSECTION DESIGN

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Freeway System Considerations

APPENDIX E: Transportation Technical Report

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Transcription:

June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide the public an opportunity to preview the preliminary concept and to gather comments on the project. At the meeting, displays of the project will be located throughout the room for viewing. Representatives from the Gwinnett County Department of Transportation, who can be identified by their name badges, will be able to discuss the project and assist you with any questions. There will be no formal presentation. An information handout package is being provided. The package includes information about the need and purpose of the project, a description of the design features, information regarding the purchase of right of way, a location map and a comment sheet. Your comments on the proposed project are welcomed. A court reporter will be available for those persons who would like to make a verbal statement about the project. You may also make a written comment and deposit it in the comment box. Written comments should be sent to Mrs. Amanda Reed, Assistant to the Director Community Relations, Gwinnett County Department of Transportation, 75 Langley Drive, Lawrenceville, Georgia 30046. In addition, comments may be faxed to 770.822.7478 or emailed to DOTCommunityRelations@gwinnettcounty.com. In order to expedite moving forward with this project, the County asks that all comments be submitted by July 6, 2015. Displays from the public information meeting will be available for viewing at the Gwinnett County Department of Transportation, 75 Langley Drive, Lawrenceville, Georgia 30046. Again, thank you for attending this meeting and for giving us your comments. Sincerely, Alan R. Chapman, PE Acting Director

Need and Purpose Statement Gwinnett County Department of Transportation Project F-0782, PI No. 0012698, proposes to (1) improve transportation access to and from the interstate highway system, (2) reduce crash frequency and severity on Interstate I-85 in the vicinity of the proposed project area, (3) improve traffic operations on the local roadway network, and (4) enhance economic development opportunities by constructing an interchange on Interstate 85 / SR 403 with SR 324 / Gravel Springs Road in Gwinnett County. Interstate 85 / SR 403 is a four lane roadway with a 64 ft. depressed median with a 70 mph speed limit. SR 324 / Gravel Springs Road, which is posted for a 45 mph speed limit and crosses over Interstate 85 / SR 403, was recently constructed by a separate GDOT project to be a four lane roadway with a raised median. There is presently no connection between these two roadways. Access, operational, and economic issues that will be addressed by the project are as follows: The SR 20 / Buford Drive interchange, located 2.7 miles west of SR 324 / Gravels Springs Road along I-85 / SR 403, is presently the only access point on I-85 / SR 403 for both local and regional traffic into and out of the Mall of Georgia area. SR 324 / Gravel Springs Road currently provides access to the east side of the Mall of Georgia and the commercial developments surrounding the regional mall from areas east of I-85 / SR 403. An interstate access point at SR 324 / Gravel Springs Road would provide direct access for southbound traffic into the Mall of Georgia area and provide an alternate route to the same area for northbound traffic wishing to avoid either the congestion of SR 20 / Buford Drive or the extended trip back to the commercial areas from Hamilton Mill Road. SR 324 / Gravel Springs Road has a densely populated residential area and new commercial shopping centers that support the residential developments. The existing SR 324 / Gravel Springs Road overpass on I-85 / SR 403 is located 2.7 miles east of the I-85 / SR 403 at SR 20 / Buford Drive interchange. Without interstate access at SR 324 / Gravel Springs Road, truck and vehicular traffic must travel 3.5 miles (measured from proposed SR 324 / Gravel Springs Road Interchange) on arterial roadways to reach the SR 20 / Buford Drive interchange to access I-85 / SR 403. Vehicular traffic usually travels northwesterly on SR 324 / Gravel Springs Road then turns west onto Mall of Georgia Boulevard and then turns south onto SR 20 / Buford Drive to the interchange. Truck traffic uses a little longer route by traveling on SR 324 / Gravel Springs Road to SR 20 / Buford Drive and then onto the I-85 / SR 403 at /SR 20 interchange. The crash rate data for I-85 / SR 403 from SR 20 / Buford Drive to Hamilton Mill Road indicate that this segment of I-85 / SR 403 has a moderate crash rate compared to the statewide crash rates for urban interstates. The injury rate for this segment of I-85 / SR 403 is slightly lower than the statewide average injury rate. However, the fatality rate ranges from 1.1 to 1.8 times the statewide average for fatalities on urban interstates. Fatality rates usually are high along parts of an interstate that has a mix of traffic traveling at widely varying speeds which is indicative of traffic congestion. Traffic congestion on the arterial roads crossing I-85 / SR 403 contribute to traffic queuing onto the freeway and create the potential for rear-end crashes on I-85 / SR 403 at the junction points of the interchanges. Specifically, I-85 / SR 403 at its junction points of SR 20 / Buford Drive and Hamilton Mill Road has had a high number of rear-end collisions.

Need and Purpose Statement continued The crash rate data for the segments of SR 20 / Buford Drive off of the I-85 / SR 403 at SR20 / Buford Drive interchange show that these segments have crash rates that are higher than the statewide crash rates for urban principal arterials. Traffic volumes on SR 20 / Buford Drive from Old Peachtree Road to Laurel Crossing Parkway have led to poor operational conditions with crash rates for 2006-2008 that are much higher than the statewide average crash rate. For that roadway segment, the crash rate ranges from 1.6 to 2.0 times higher than the statewide average. Injury rates on that segment of SR 20 / Buford Drive ranged from 2.7 to 3.3 times higher than the statewide average for urban principal arterials. SR 20 / Buford Drive from Laurel Crossing Parkway to Mall of Georgia Boulevard has become so congested that the crash rates on that particular segment were the second highest of the three SR 20 / Buford Drive segments analyzed and the corresponding crash rates were 2.6 to 3.7 times higher than the statewide average for that functional classification of roadway. Injury rates on that segment of SR 20 / Buford Drive were 3.0 to 5.7 times higher than the statewide average for those same years. Traffic volumes on the segment of SR 20 / Buford Drive from Mall of Georgia Boulevard to South Bogan Road result in lower crash rates as compared to the Laurel Crossing Parkway to Mall of Georgia Boulevard segment. The data indicate that the crash rates for the Mall of Georgia Boulevard to South Bogan Road segment were 2.7 to 3.2 times higher than the statewide average for urban principal arterials. Injury rates on this segment of SR 20 / Buford Drive were 3.4 to 4.1 times higher than the statewide average for those same years, and there was one fatality in 2007, which represented 3.8 times the statewide average rate. Interstate 85 / SR 403 showed deficient 2008 levels of service from SR 20 / Buford Drive north to Hamilton Mill Road according to the approved Interchange Justification Report (IJR). This is partly attributable to the aforementioned queuing backup from both the SR 20 / Buford Drive and Hamilton Mill Road interchanges onto the I-85 mainline. An additional interchange on I-85 / SR 403 between SR 20 / Buford Drive and Hamilton Mill Road would help improve the mainline operation of I-85 / SR 403 and, as previously noted, would likely reduce the potential for rear-end crashes. An interchange at I-85 / SR 403 at SR 324 / Gravel Springs Road would also improve the near-term operations of SR 20 / Buford Drive and Hamilton Mill Road by diverting traffic from these roadways. The business community has tried to develop the area in the vicinity of the project into a viable industrial and business area. Gwinnett County has already planned as part of their adopted Comprehensive Plan to facilitate this type of development. However, inadequate access for trucks would be a deterrent from the land being developed as planned by the County. Consequently, future employment opportunities from potential employment centers would be lost. Enhanced development of industrial and commercial properties within the project s vicinity would provide additional goods and services to the region and create significant employment opportunities.

Project Description Gwinnett County Department of Transportation Project, F-0782-01, PI No. 0012698 proposes four new ramps to create a new location, full access diamond interchange with the existing overpass of (non-controlled access) SR 324 / Gravel Springs Road over (controlled access) I-85 / SR 403. The interchange will be situated between the existing SR 20 / Buford Drive and Hamilton Mill Road interchanges at milepost 118 within Gwinnett County. No new bridge or bridge widening is proposed by this project. The southbound entrance ramp (Ramp A) will have two through lanes that converge to a single through lane prior to merging onto I-85 / SR403. The southbound exit and northbound entrance ramps (Ramps B and C, respectively) will each have a single through lane. The northbound exit ramp (Ramp D) will have two through lanes diverging from I-85 / SR 403. One of these lanes will be received from an auxiliary lane constructed by GDOT PI No. 110600 prior to this project. The intersection of SR 324 / Gravel Springs Road with the southbound ramp terminals will consist of dual left turn lanes onto both I-85 / SR 403 SB and SR 324 / Gravel Springs Road EB. Dedicated right turn lanes will be provided onto SR 324 / Gravel Springs Road WB and I-85 / SR 403 SB. The intersection of SR 324 / Gravel Springs Road with the northbound ramp terminals will consist of dual left turn lanes onto SR 324 / Gravel Springs Road WB. A single turn lane will accommodate the I-85 / SR 403 NB movements. A dedicated right turn lane will be provided onto SR 324 / Gravel Springs Road EB and I-85 / SR 403 NB. Traffic signals would be placed at both of these intersections. The project limits along I-85 / SR 403 are 3.14 miles long and dictated by the length of proposed ramps tapering into the through general purpose lanes and the advance signage for the interchange on both the general purpose lanes and the HOT managed lanes proposed by PI #110600. The project limits along SR 324 / Gravel Springs Road are 0.45 miles long and set where the turn lanes for the ramp terminals tie back into the through lanes near the intersections with Morgan Road and Camp Branch Road.

Right of Way Acquisition The proposed project is being designed by consultants employed by the Gwinnett County Department of Transportation. Agents of the Gwinnett County Department of Transportation will acquire all necessary rights of way. The Gwinnett County Department of Transportation has the responsibility, once a project is approved, of appraising, purchasing and, if required, assisting individuals, families or businesses in relocation. When purchasing property, the intent is to pay fair market value for the necessary property. The value will be established by qualified real estate appraisers, who will perform written appraisals using actual market data from the surrounding community. In making the appraisal, the appraiser will contact each property owner and arrange a convenient time to make an on site inspection of the property. The property owner may accompany the appraiser during this inspection. All appraisals are reviewed for accuracy to make certain that all items relating to the value have been considered. If only a part of the property is needed, that part will be purchased; in addition, payment will be made for any loss in value to the remaining property, if any. In all cases, when the County purchases property, additional payments will be made to the property owners for the cost of transferring ownership to the acquiring agency. These costs generally include transfer taxes, deed recording fees, mortgage prepayment penalties and the pro-rata share of the city of county taxes. Results of the concept plan and field studies show approximately 10 parcels will be impacted by this project. For additional information, please call 770.822.7400.

Location Map Project Location

Comment Form Name: Address: Contact Number: Do you support the proposed project? Comments: Signature Date Your comments may be submitted in writing to dotcommunityrelations@gwinnettcounty.com, fax to 770.822.7478 or mail to: Amanda Reed Assistant to the Director Community Relations Gwinnett County Department of Transportation 75 Langley Drive Lawrenceville, Georgia 30046