MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 12 August Braddock Dam

Similar documents
MR. DAVID DALE, SES, PE, PMP DIRECTOR, US

Olmsted Locks & Dam. Inland Waterways Users Board. MR. DAVID DALE, SES, PE, PMP DIRECTOR, Programs Great Lakes and Ohio River Division 01 April 2016

Kentucky Lock Project Update Inland Waterways Users Board

Inland Marine Transportation System Capital Investment Strategy

Inland Marine Transportation System

UPPER MISSISSIPPI RIVER SYSTEM NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM

Economic Overview. Melissa K. Peralta Senior Economist April 27, 2017

Canal Traffic performance Grain cargo through the Panama Canal Panama Canal Expansion program Conclusion

U.S. Army Corps of Engineers Navigation Fiscal Overview

Canal traffic performance Grain cargo through the Panama Canal Panama Canal Expansion program Conclusion

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

September 2016 Financial Results

CORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch

Absolute number of signed Memorandum of Agreement (MOA) or Notice of Award (NOA)

Project Budget and Schedule Status

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

The Economic Outlook. Economic Policy Division

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

The Israeli Economy 2009 The Caesarea Center Conference

Finance & Insurance Committee Item 8 February 12, 2018

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

The Changing Global Economy Impacts on Seaports and Trade Dr. Walter Kemmsies

Innovative Technologies for a Resilient Marine Transportation System

91 Express Lanes Model Update 2006 State Route 91 Implementation Plan. Gerald V. Nielsten May 18, 2007

2013 FEDERAL STORM RESPONSE

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

Sony Centre for Performing Arts

The Economic Outlook. Economic Policy Division

OHRIA Ontario Horse Racing Industry Association

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

Mouth of the Columbia River Jetties Three-Phase Construction Plan

Minnesota Ballpark Authority Board Meeting Minutes October 11, 2018

Sound Transit Financing and 3-County Road & Transit Funding

Webinar: Trends in renewable energy support

Company A Company A. Company A Board Meeting Presentation 12 th May 20XX

Container Terminals Operations & Planning

BC Games Society 2016/ /19 SERVICE PLAN

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services

FEASIBILITY STUDY DANBURY BRANCH ELECTRIFICATION PROJECT

Albeni Falls Dam Downstream Water Temperature Study Interim Results

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Going Green: How California is Reviving Passenger Rail. APTA/ AASHTO AASHTO 2008 State Public Transit Partnerships. August 7, 2008

Integrated Waterway Management of the Danube in Austria

CLAIBORNE LOCK AND DAM PERTINENT DATA

Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated )

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association,

Projections of UK Oil and Gas Production. Click to edit. and Expenditure. Master title style. March Click to edit Master subtitle style

BIG RIVER COALITION Advocating for a Mightier Mississippi River NATIONAL WATERWAYS CONFERENCE 91318

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members

Alley OUR BUSINESS SUMMARY

Shared Resource Conservation Manager Program Report Washington State University Energy Program, March 2013

ANALYZING THE SHIP DISPOSAL OPTIONS

LIFE HISTORY DIVERSITY AND RESILIENCE

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

AGENDA STAFF REPORT. CEO CONCUR COUNTY COUNSEL REVIEW CLERK OF THE BOARD Pending Review Approved Agreement to Form Discussion 3 Votes Board Majority

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

Town of Carbondale John M. Fleet Municipal Pool

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ARTICLE 8. Any Other Business a. Library Gathering Space Plan January 24, 2017, 5:30 7:00 p.m. b. Update on Planning Activities

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ECONOMIC DEVELOPMENT ELEMENT

Progress with the Road Investment Strategy

National and Virginia Economic Outlook Professor Robert M. McNab Dragas Center for Economic Analysis and Policy Strome College of Business

2026 Olympic and Paralympic Winter Games Bid Book Overview

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

I 595 Express Corridor Improvements Project. February 2014 Update

2019 TOWNSHIP MANAGER COMPREHENSIVE BUDGET PRESENTATION

Revenue Estimating Conference Lottery Sales February 27, 2009 Executive Summary

FAIRway Danube. a milestone for the realization of the Masterplan of the Danube and its navigable tributaries , Katja Rosner / viadonau

Annual results 2017 and strategy update. 09 March 2018

101 Corridor Managed Lanes

FY-16 Ongoing Contracts FY-16 Scheduled Contracts

Old Dominion University 2017 Regional Economic Forecast. Strome College of Business

Business Outlook Report 2017

The Texas Gulf Coast Overview and Outlook

Opening address for dinner-debate

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Citizens of the World Charter Schools Los Angeles FY Preliminary Budget Assumptions

Federal Water Resources Outlook

Old Works Golf Course Authority Board Meeting Wednesday Dec. 4th, 2013 Old Works Clubhouse 5:30 p.m.

A comment on recent events, and...

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

United Nations Conference on Trade and Development

EFFECTS OF EXTENDING AND EXPANDING ENERGY-EFFICIENCY TAX DEDUCTION FOR COMMERCIAL BUILDINGS

The Special Events Advisory Committee (SEAC) reviewed and discussed the January 30, 2014 staff report at their February 20, 2014 meeting.

ETU EUROPEAN YOUTH TRIATHLON CHAMPIONSHIP & FESTIVAL BID DOCUMENT 2017

TABLES AND CHARTS 2018 UPDATE

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

I-95/Temple Avenue Improvements Project Colonial Heights, VA

Earnings Reference for the Third Quarter of FISCAL 2018 (The fiscal year ending March 31, 2019)

2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining

Fiscal Year Budget Overview

MARINE INCIDENT SUMMIT INCIDENT BRIEFS FROM THE 2ND & 3RD QUARTERS OF CY 2014

Public Hearing Tarrant County. October 11 th, 2012

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

REGULAR MEETING MINUTES

Transcription:

Locks and Dams 2, 3, and 4 Monongahela River, PA (Lower Mon Project) Inland Waterways Users Board MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division Braddock Dam 12 August 2015 US Army Corps of Engineers Charleroi Locks

Agenda Financials Project Overview Schedule Ongoing Construction at Charleroi Images of Charleroi Construction Scorecard S Curve Challenges Discussion 2

Locks and Dams 2, 3, and 4, Monongahela River, PA Total Project Cost Forecast: $1,220,000,000 ARRA CG IWTF Total FY13 Allocation: $1,510, 007 $11,093,652 $11,093,652 $23,697,311 FY14 Allocation: $0 $36,336,500 $36,336,500 $72,673,000 FY15 Allocation: $(50,711) $28,016,000 $28,016,000 $55,981,289 FY16 Budget: $0 $26,000,000 $26,000,000 $52,000,000 Remaining Balance: $240,632,377 $240,632,377 $481,265,673 Remaining Balance Change From Last Meeting $-1,513,033,001 Note: Changes Total project cost revised from $2,733 M to $1,220 M. $1,220M reflects a non-certified risk informed cost and schedule forecast to reach over 90% of project benefits by 2029. This cost does not include the Port Perry Railroad Bridge relocation nor the Charleroi Land Chamber. Remaining balance revised from $1,994,298,674 to $481,265,673. Reflects removal of Port Perry Bridge and the Charleroi Land Chamber and estimated allocations of $738M thru FY 2016. Funding Overview Original Authorized Cost: $556M 902 Limit: $1.76B ARRA Funding (FY09-FY14): $68.4M Engineering & Design Cost: $603M * Supervision & Admin Cost: $207M Mitigation: $12M * $603M includes all Engineering & Engineering During Construction Next Steps Award Charleroi River Chamber Completion (Base plus Options) Contract in FY2015 Current Status of the Project Charleroi Emptying Basin Construction On Schedule Charleroi M22-M27 Construction On Schedule

Lower Mon - Project Costs ($million) Total Project Authorized Cost (1992) $506 Authorized Total Cost Inflated (Oct 2014) $940 Cost Forecast (Oct 2015) $1,138 Not escalated Fully Funded Cost Forecast (Oct 2015) $1,220 Fully funded thru 2029 Project 902 Limit: $1,761,250,000 Forecasted cost estimate $1,220,000,000 Fully Funded thru 2029 Cost forecast is a working estimate (October 2015 price level) including risks, not certified Cost forecast and schedule includes the WRDA 2014 Olmsted IWTF cost share change and IWTF revenue structure changes Cost forecast does not include Port Perry Railroad Bridge nor the Charleroi Land Chamber Estimated allocations thru FY 2016 - $738.7 million Estimated sunk costs (investments) thru FY 2015 - $579 million Note: This new slide reflects the uncertified cost forecast to achieve over 90% of project benefits. Cost/schedule recertification is scheduled for FY2016 at which time this table data could be updated and a new baseline established. 4

Pre-Project Condition Lower Mon - Project Overview Post-Project Condition L/D 2 Braddock L/D Major Project Features New Dam at Braddock New Locks at Charleroi Dredging Removal of Locks and Dam 3 Relocations L/D 3 L/D 3 L/D 4 Charleroi L/D 5

Lower Mon - Project Schedule Major Feature Construction Last Reported Completion (May 2015) Charleroi River Wall FY 2016 Charleroi Dam Emptying Basin FY 2016 Charleroi M22-M27 FY 2018 Charleroi Dam Stilling Basin FY 2021 Charleroi River Chamber Completion FY 2022 Dredging Pool 3 FY 2022 Relocations Variable Lock and Dam 3 Removal FY 2023 Revised This chart depicts the early schedule based on the revised Olmsted cost share, the projected increase in IWTF revenue, and the Lower Mon remaining the second priority for inland navigation construction Specific relocations are associated with pool changes so their timing is variable 6

Locks and Dams 2, 3, and 4, Monongahela River, PA Schedule of Remaining Work Design Initiated Contract Award Construction Complete *2 Project Benefits*3 Capitalized Cost Closeout*3 Charleroi River Wall 1-Oct-95 27-Sep-04 14-Dec-15 S 2022 2025 Charleroi Emptying Basin 1-Oct-95 30-Sep-13 26-Dec-15 S 2022 2025 Charleroi River Chamber (M22-M27) 1-Oct-95 15-Aug-14 December 2018S 2022 2025 Charleroi Dam Stilling Basin 1-Oct-95 FY 2018 S FY 2021 S 2022 2025 Charleroi River Chamber Completion 1-Oct-95 FY2015 S FY 2022 S 2022 2025 L/D 3 Removal 2020 2021 S FY 2023 S 2022 2025 Dredging 1-Oct-95 2017 S FY 2022 S 2022 2025 Municipal Relocations *1 1-Oct-95 Multiple Multiple NA 2025 * 1: To complete all municipal relocations, multiple relocation agreements are required. * 2 Dates are achievable based on the most efficient funding profile. * 3: Project benefit and close out dates are based on the most efficient funding profile and breaching of Dam 3. Early contract completion for Dam 3 removal extends into 2023. 4: Over 90 % of project benefits can be achieved without constructing the Charleroi Land Chamber or relocating the Port Perry Railroad Bridge both of which have been removed from this slide. 7

Lower Mon Charleroi Ongoing / Pending Construction (Plan - Visual) Emptying Basin Planned Complete FY 2016 (64% complete) M22-M27 Planned Complete FY 2018 (11% complete) RCC Base Contract (M1-M7) Planned Complete FY 2022 RCC Option 1 (M11-M16) Planned Complete FY 2022 RCC Option 2 (M8-M10) Planned Complete FY 2022 RCC Option 3 (M17-M21) Planned Complete FY 2022 RCC Option 4 (In-Chamber) Planned Complete FY 2022 RCC Option 5 (Chamber-Operational) Planned Complete FY 2022 Stilling Basin Planned Completion FY 2021 Completion date of the Charleroi River Chamber could be as late as 2027 if not awarded efficiently. Remaining project features not shown on this slide: Dredging Pool Clearing Lock and Dam 3 Removal Relocations 8

Lower Mon Charleroi Middle Wall (Isometric) M22-M27 Planned to Complete in FY 2018 (Under Contract) (11% complete) RCC Base Contract (M1-M7) Planned to Complete in FY 2022 RCC Option 1 (M11-M16) Planned to Complete in FY 2022 RCC Option 2 (M8-M10) Planned to Complete in FY 2022 RCC Option 3 (M17-M21) Planned to Complete in FY 2022 Option 4 and Option 5 not shown in isometric view. Completion date of the Charleroi River Chamber could be as late as 2027 if not awarded efficiently 9

Charleroi Construction Images 1 2 3 4 Emptying Basin Contract: 1 Pedestal template fabrication; 2 Precast Segment. M22-M27 Contract: 3 Excavation at downstream closure; 4 Drilled shaft and King Pile template. 10

Expenditures Planned (BCWS) Earned (BCWP) Actual (ACWP) Locks and Dams 2, 3, and 4 Monongahela River Project Time and Cost Scorecard Thru June 2015 $ 556.2 M $ 570.6 M $ 569.0 M Target: Actual as compared to Planned: (<5% = Green); (>5% and <10% = Yellow); and (>10% = Red) Values shown reflect project sunk cost of $550.6M thru FY 2014 and Current data thru June 2015 SPI=1.03, CPI=1.003 Schedule (Baseline)/(Current Early) Overall Project Completion 2071 / 2061 Realize over 90% of project Benefits 2027 / 2022 Reserve Balances (estimated): -Contingency to >90% of benefits: 52 Months -Management Reserve not yet determined Opportunity to move project benefits to the left due to Olmsted cost share revision and an increase in the fuel tax Estimated Cost at Completion >90% benefits Total project BAC(FF) $1.2 B $ 2.73 B EAC(FF) $1.2 B $ 2.73 B Estimated from revised cost and schedule forecast fully funded thru 2029 and estimated costs thru FY 2015 Reserve Balances (FF): Project Contingency $ 0.151 Billion Sunk Cost (thru June 2015): $ 0.57 Billion Milestones Status for the Next 6 Months Charleroi River Chamber Completion (RCC) RTA: Scheduled 23 Apr 2015 Actual 23 April 2015 Advertise RCC: Scheduled 5 June 2015 Actual 3 June2015 Open Bids for RCC: Scheduled 3 August 2015 Award for RCC: Late August early September 2015 11

Lower Mon S Curve or the Port Perry Bridge ASSUMPTIONS 1) 2073 project completion is based on the project schedule included in the 2014 certified cost and schedule. 2) $2.7 Billion is the fully funded Total Project Cost (TPC) certified in 2014. 3) Contingencies includes future risks from the CSRA associated with EDC, S&A, Land, and construction. 4) The schedule and estimate assume capability level funding will be provided after Olmsted is completed. 5) THIS IS A DRAFT BASELINE. Basis = March 2014 Certified Total Project Cost Estimate Originator = Steve Fritz, Project Manager and Sean Weston, Cost Engineer Approved By = NOT READY FOR APPROVAL July 2015 Current Estimated Completion Date Including Contingency For Official Use Only - Not for Release 12

Lower Mon S Curve or the Port Perry Bridge ASSUMPTIONS 1. This is a DRAFT BASELINE showing late schedule 2. 2029 project completion is based on assumed funding profile including risk. It is not certified. 3. $1.22 Billion is the fully funded total project cost forecast. It is not certified. 4. Contingencies includes future risks from the CSRA associated with EDC, S&A, Land, and construction. This slide has replaced the previous S Curve Slide Basis = Oct 2015 Cost Forecast with Revised Funding Profile NOT CERTIFIED Originator = Steve Fritz, Project Manager and Sean Weston, Cost Engineer Approved By = NONE July 2015 Current Estimated Completion Date Including Contingency For Official Use Only - Not for Release 13

Future Challenges Most Efficient Schedule & Funding Continue to move project schedule left at every opportunity Funding available when needed Site constraints at Charleroi and/or Victory Hollow Multiple contractors sharing these sites Emptying Basin Contract M22-M27 Contract River Chamber Completion Contract Dredging Contract Stilling Basin Contract 14

Lower Mon Discussion/Questions 15