McLean Main Street Public Forum Follow-up

Similar documents
RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

A Guide to Great Streets: The Basics. September 25, 2009

Table #6 VISION CHARACTERISTICS

MARTIN LUTHER KING JR. WAY

TRANSPORTATION COMMISSION Agenda Staff Report

A Plan for The Beautiful Way NOVEMBER 16, 2009

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

complete streets design and construction standards public primer City of Edmonton

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

STONY PLAIN ROAD STREETSCAPE

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

1.3 Pedestrian Environments

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

5 CIRCULATION AND STREET DESIGN

Streetscape: Core Shopping District

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Multimodal Through Corridors and Placemaking Corridors

NJDOT Complete Streets Checklist

TRANSPORTATION STANDARDS

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction

Illustrated Principles of Good Planning

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

S T A T I O N A R E A P L A N

Guthriesville Village Manual of Written & Graphic Design Guidelines

PUBLIC REALM MASTER PLAN

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

SURVEY minutes to complete this questionnaire. Your feedback will help the City determine a future design for Ocean Avenue and Geneva Avenue. Thanks!

REDEVELOPMENT OPPORTUNITY! FOR SALE

SPRINGFIELD REVITALIZATION REPORT

WELCOME! TOWN CENTRE PARK INFORMATION SESSION WHAT IS HAPPENING? GOALS FOR TODAY. TOWN STAY CONNECTED WITH US! #1 INFORM WE ARE HERE

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

STREETSCAPE CONCEPTS

NEWMARKET UPHAM S CORNER

CONNECTING PEOPLE TO PLACES


A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

MASTER BICYCLE AND PEDESTRIAN PLAN

Plainfield Gateway. Plainfield Context

Ajax: The Road to Complete Streets

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Sidewalk Cafe City of St. Petersburg City Code Chapter 16, Land Development Regulations

Transportation Planning Division

Plant City Walk-Bike Plan

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

FONTAINE AVENUE STUDY Final Report

Ann Arbor Downtown Street Plan

COMPLETE STREETS PLANNER S PORTFOLIO

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

This chapter describes the proposed circulation system and transportation alternatives associated with

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Active Neighborhood Checklist: Protocol

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Presentation Comments and Questions

Bridges and Arizona Crossings

City of Seattle Edward B. Murray, Mayor

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

Land Use and Transportation Concepts for University Hill Memorandum to the Institutional Focus Group. Submitted by Wallace Roberts & Todd, LLC

Appendix B - Street Sections

Better Market Street Project Update. Urban Forestry Council September 17, 2014

C C C

San Jose Transportation Policy

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Thesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

Sponsored by Mrs. Gina Gregory and Mr. Reggie Copeland.

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

City of Darlington Beautification Report

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

summary of issues and opportunities

UDC Street Cross Sections

Better Market Street Project. Project Update January 15, 2015

STREETSCAPE CONCEPT PLAN

Monterey Road Complete Streets

City of Walnut Creek TELEGRAPH AVENUE BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Cottage Grove Road Activity Centers Plan

5 Circulation & Parking

Existing Pedestrian Conditions. PSAC February 8, 2011

Transcription:

McLean Main Street Public Forum Follow-up Sponsored & Hosted by John W. Foust, Dranesville District Supervisor McLean Planning Committee Fairfax County Office of Community Revitalization and Reinvestment April 30, 2008

THE SITE & EXISTING CONTEXT

Old Dominion Dr. Beverly Rd Location of proposed Main Street Sub Area 6 Sub Area 5 Ingleside Ave Chain Bridge Rd Main Street Study Area

Old Dominion Dr. Beverly Rd Location of proposed Main Street Sub Area 6 Ingleside Ave Sub Area 5 Chain Bridge Rd

Chain Bridge Center

Main Street Vision in Comprehensive Plan The Main Street is a new, primarily pedestrian-oriented street between Chain Bridge Road and Beverly Street, which encourages leisurely window shopping as well as outdoor seating and dining. This new street should provide two traffic lanes and parallel parking, with the potential at the northern end for a vendor s island. The pedestrian concourses along either side should be 20 to 25 feet between buildings and the street s curb. Each concourse should have a minimum 2-food refuge strip adjacent to the road, a minimum 5-food planting strip to accommodate privacy hedges and shade trees, and a pedestrian area for walking and dining ranging from 13 to 18 feet in width. Shade tree spacing should be approximately 30 feet apart, and be coordinated with the location and lighting fixtures

Main Street Public Forums April 3 and 4

THE PUBLIC FORUMS April 3 and April 4

Main Street Public Forums April 3 and 4

Main Street Public Forums April 3 and 4

Main Street Public Forum Question Charts April 3

THE QUESTION CHARTS & SURVEYS

Main Street Public Forum Question Charts April 4

SURVEYS 317 persons submitted surveys on-line as of April 29 107 persons submitted surveys in person or by fax as of April 29 Surveys are continuing to be received Although there was some repetition of comments and a broad spectrum of opinions, generally the survey results reflected the key trends indicated in the Question Charts

KEY TRENDS EVOLVING FROM THE QUESTION CHARTS & SURVEYS

April 3 April 4 Key Trends A coordinated mixed-use development should be created as a core for McLean Main Street should be pedestrian-oriented with vehicular access and convenient, limited on-street parking It would be nice to have a place in McLean that allowed for a gathering or coming together of residents in a public setting. McLean needs a new look.

April 3 April 4 Key Trends A mixture of uses should be provided to serve McLean, including retail, residential, office, civic, entertainment, arts and recreational First floor uses should be retail, eating establishments and other similar uses There must be a balanced mix. If it is all dining then what do people do after they eat? You need to allow for the opportunity to keep people in the space.

April 3 April 4 Key Trends Main Street should be accessible by all modes of transportation on foot, bicycle, transit, automobile We need to be able to get there without driving Need crosswalks & improved traffic signal. People aren't going to take a bus here but it would be nice to offer a shuttle service from the area retirement facilities so that there is a mix of users here.

April 3 April 4 Key Trends Building heights should be varied and range from 2-6 stories, with any 6-story building being the exception rather than the norm. Strive for a small town or European village feeling. Limit the amount of 5 & 6 story components.

April 3 April 4 Key Trends Retention of locally owned and run businesses is encouraged Neighborhood-serving and convenience retail uses should be retained If you demolish the Old Firehouse, you need to find a good alternative for the activities.

April 3 April 4 Key Trends If the Old Firehouse must be demolished to make way for Main Street, elements of the building should be retained and the use (Teen Center) should be relocated Teen center is very necessary.. but it needs to be in a different building.

ADDITIONAL CONSIDERATIONS The new development should have a sense of place unique to McLean Main Street should be enlivened with open spaces, plazas and public amenities such as art, fountains, street furniture, specialty paving, pedestrian scaled lighting, landscaping and outdoor dining opportunities, as envisioned in the current Vision for the Future for McLean and the Design Standards Convenient and accessible parking should be provided Roof heights should be varied, building heights should be stepped back and facades should be articulated to create indoor/outdoor sitting and meeting places This is perhaps a once-in-a-lifetime opportunity to make a change to downtown McLean. Our efforts will echo through future generations. Let's do this comprehensively! I think we're already thinking 'Big Picture' so we are doing it right.

EXAMPLES OF EQUIVALENT DEVELOPMENTS

Santana Row, San Jose CA, indicating 4 & 6 story buildings; and focus building in median

Silver Spring: Downtown

Clarendon: Market Commons

Clarendon: Market Commons

Bethesda Row, MD

European examples