Attachment C. Standard Operating Procedures. AMBIENT AIR MONITORING PROGRAM for the 130 LIBERTY STREET DECONSTRUCTION PROJECT

Similar documents
STANDARD OPERATING PROCEDURES. Andersen Instruments Federal Reference Method (FRM) Ambient Particulate (PM 10 /PM 2.

Met One E-BAM Particulate Monitor

R2S Standard Sampling Assembly OPERATION PROCEDURE

EMT EnvironmentalMonitoringTECHNOLOGIES

STANDARD OPERATING PROCEDURE VORTEX-GENIE 2

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

_ pressure transducers. User Manual

InFlow Modular perfusion bioreactor

Installation of Your SprayMaster System

OEM Manual. MODEL ½ Digit DRUM SCALE

OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

Instruction Manual EMA 84 Digital Pressure Gauge

Issue OWNER S MANUAL. GAMMA RACQUET SPORTS GAMMA Sports All Rights Reserved

NOVALYNX CORPORATION MODEL WEATHER STATION INSTRUCTION MANUAL

Title: Standard Operating Procedure for Elemental and Organic Carbon (EC and OC) using Non-Dispersive Infrared Detection (NDIR)

Thermo Environmental 48C Carbon Monoxide QA Plan Section I Electronic Calibration Branch Responsibilities

Installation Instructions

Model 130M Pneumatic Controller

TJF-Q180V Cleaning and Disinfection Checklist

STANDARD OPERATING PROCEDURE FORCE DIAL FDN 100

CAUTION: YOU MUST READ THE FOLLOWING BEFORE OPERATING THE SNOWMAN.

OPERATING PROCEDURE. Number: V2. Authors. Approvals

Model 106 DPI "Micro-switch" Installation and Operating Instructions

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

STANDARD OPERATING PROCEDURE FORCE DIAL FDN 100

RC 195 Receiver-Controller

Overview. Front Panel: Keypad and Display

Bermad Model:

TJF-Q180V Cleaning and Disinfection Checklist

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

SILENTAIRE TECHNOLOGY

CART FOR CENTURION 1500+

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Title: Standard Operating Procedure for The Tapered Element Oscillating Microbalance (TEOM)

Powermax machine-side reference guide For mechanized applications with Powermax1000, Powermax1250 and Powermax1650

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

FX134, FX1234, FX3030 Problem and Solutions

Instruction Manual for Configura Cushionair Portable Pump

with O 2 Controller Instruction Manual

SmartCal. SmartCal Troubleshooting Checklist

Columbus Instruments

SILENTAIRE TECHNOLOGY

UNIVERSAL TUBE HOLDER SYSTEM

Title: Standard Operating Procedure for Measurement of Ethylene (C 2 H 4 ) in Ambient Air by Reduced Gas Detection (RGD)

STANDARD OPERATING PROCEDURES

Model 420-HY Pressure Regulating Hydrant Valve

Mass Spec will not Autotune

4.0 Audit Procedure for the MetOne SASS Speciation Sampler

OPERATING AND MAINTENANCE MANUAL GOLD LINE EXTRACTION CLEANERS M14-M26

Digital pressure gauge Model CPG500

Drawn up by: / RK Revision: 01 Reviewed: Page: 1 of 23 HI-SR 540 USA. Operating instruction SR 540 Face Shield

AMP Oil Free Manual AMP 50-8-TC AMP 50-6-D AMP General User and Maintenance Instructions

SOP for Karl Suss MJB3 #1 Mask Aligner

STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA

Title: INSTRUMENT AND EQUIPMENT DOCUMENTATION AND RECORDS

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

Vertex VP Operation and Maintenance

Bold Line Top Stage Incubator

SpectraPure PUMPED RO SYSTEMS (PSP) User s Manual for PSP-1500 Systems

User Instruction Manual

Constant Pressure Inlet (CCN) Operator Manual

Apex Evaporator Manual

USER S MANUAL SPOON KIT FOR AI TORNADO GRENADE

In Vivo Scientific, LLC INSTRUCTION MANUAL

DPC-30 DPC-100. Reference Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER FILTER DRYER

STANDARD OPERATING PROCEDURE

Cover Page for Lab Report Group Portion. Pump Performance

Easy Nest Kits. Installation Suggestions

Vessel Installation and Operating Manual

SAMPLING GUIDELINES FOR THE BI-AIR FILTER CASSETTE

Instruction Manual BA90 Precision Barometer

5 Channel Calibrator

TMArrayer Users Guide

STANDARD OPERATING PROCEDURES

Our technical information is based on Tip: calls attention to special information.

Customer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist

AQUAMATIC EASY NEST KITS INSTALLATION SUGGESTIONS

STANDARD OPERATING PROCEDURE

MASSACHUSETTS STATE POLICE CRIME LABORATORY. Certificate of Calibration Procedure for the Alcotest 9510

12 Volt Inflator. Operator s Manual. Model: ICC12F, ICC12FC, ICC12FCN, ICC12FCM, ICC12N

911A Summa Canister Sampler

RH800 & 2000 BASIC OPERATIONS

Bante810 Benchtop Dissolved Oxygen Meter Instruction Manual

OFI MODEL 20 CONSTANT SPEED BLENDER INSTRUCTIONAL MANUAL

User Manual GRI- 1500Li

PANACEA P200 STAINLESS STEEL USER MANUAL

Operator s Manual. The Bullet Blender Gold BB24-AU, BB5E-AU

Portable Oil Lube Air Compressors

SCS Field Revision No. 1.0 June 2001 STANDARD OPERATING PROCEDURE (SOP) FOR FIELD OPERATION OF THE SEQUENTIAL CYCLONE SAMPLER (SCS)

Instruction Manual Updated 7/26/2011 Ver. 2.2

Installation and Operating Manual

OPERATIONS MANUAL. TE-5170V-BL Total Suspended Particulate Volumetric Flow Controller High Volume Air Sampler

CJMJ.DPNQBDU. Instruction for use. Neonatal phototherapy device. BILI-COMPACT WY 1816/ Year of manufacture D2017_00

User's Manual. Heavy Duty Dissolved Oxygen Meter. Model

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

1. CONDITIONS FOR USE 2. SAFETY

Transcription:

Attachment C Standard Operating Procedures AMBIENT AIR MONITORING PROGRAM for the 130 LIBERTY STREET DECONSTRUCTION PROJECT LOWER MANHATTAN DEVELOPMENT CORPORATION 1 Liberty Plaza New York, New York Prepared by: TRC Corporation Boott Mills South 116 John Street Lowell, MA 01852 (978) 970-5600

STANDARD OPERATING PROCEDURES Thomas Pump for Asbestos AMBIENT AIR MONITORING PROGRAM for the 130 LIBERTY STREET DECONSTRUCTION PROJECT LOWER MANHATTAN DEVELOPMENT CORPORATION 1 Liberty Plaza New York, New York Prepared by: TRC Corporation Boott Mills South 116 John Street Lowell, MA 01852 (978) 970-5600

Standard Operating Procedures Thomas Pump for Asbestos Revision 0 November 2005 Author Kelly Holland Technical Reviewer Dave Gill Project Manager Gary Hunt QA Officer Liz Denly

Section TABLE OF CONTENTS Page 1.0 PURPOSE OF SOP... 1 2.0 EQUIPMENT DESCRIPTION... 1 2.1 PARTS OF THE ASBESTOS SAMPLER... 1 3.0 EQUIPMENT OPERATION... 1 3.1 EQUIPMENT ASSEMBLY... 1 3.2 SETTING/VERIFYING FLOW RATE... 1 3.3 SAMPLING... 1 4.0 CALIBRATION... 2 4.1 CALIBRATION PROCEDURE... 2 5.0 MAINTENANCE... 2

1.0 PURPOSE OF SOP This SOP was designed to describe the procedures used to sample for asbestos in ambient air in accordance with NIOSH Method 7402 Asbestos by TEM following the recommendations for personal sampling. 2.0 EQUIPMENT DESCRIPTION The Thomas Pump is a high volume air pump with a regulator to control airflow. The operator will refer to the manufacturer s operation manual for pictorials and additional information to aid in performing maintenance and operations. 2.1 Parts of the Asbestos Sampler The system is made up of five primary parts: timer, pump, regulator, rubber tubing, and sample stand. 3.0 EQUIPMENT OPERATION In order to operate the Thomas pump, it is necessary to assemble the instrument. 3.1 Equipment Assembly 1. Connect the regulator to the Thomas pump. 2. Connect one end of the rubber tubing to the regulator. 3. Connect the other end of the rubber tubing to the sample holder. The sample holder should be set at a height of approximately 3 feet. 4. Plug the Thomas pump into the electric timer and set the timer to the correct time. 5. Connect the male cord of the timer plugs into the line voltage. Once the Thomas pump is assembled correctly according to this section and connected to a power supply, the instrument is ready for operation. 3.2 Setting/Verifying Flow Rate The flow rates are set with a regulator that controls the airflow. Flow rates are verified before and after sampling as discussed in Section 4.0. (Note: For the 130 Liberty Street ambient air program, the desired sample volume is 2.88 m 3. The flow rate is adjusted based on the work period.) 3.3 Sampling The Asbestos sampler may be operated at ground level or on rooftops. The sampler should be located in an unobstructed area. NOTE: On and off times and weather conditions during sampling periods should be recorded. Air concentrations may fluctuate with time of day, temperature, humidity, wind direction, and velocity. 1. Remove the protective caps from the TEM cartridge. SOP for abestos pump.doc 1

NOTE: Sampling media for asbestos TEM consists of mixed cellulose ester membrane filters, 0.45-µm pore size in a 25 mm diameter cassette. The media will be supplied and certified by the analytical laboratory. 2. Connect the asbestos TEM cartridge to the rubber tubing. Make sure the cartridge is hanging down to prevent water or other debris from falling into the filter. 3. Make sure all cords are plugged into their appropriate receptacles and that the rubber tubing between the sample and pump is connected and not pinched. 4. Prepare the timer: a) To set the START time, attach a (green) ON tripper to the dial face on the desired START time (the beginning of the work shift). b) To set the STOP time, attach a (red) OFF tripper to the dial face on the desired STOP time. c) To set current time, grasp dial and rotate (clockwise only) until correct time appears at time pointer. 5. Manually trip timer switch on to determine if sampler is operating properly. 6. Manually trip the switch off. If the timer is set correctly you are ready to sample. 7. Record start time and pump flow rate. 8. At the end of the sampling period, record stop time and post pump flow rate. 9. Carefully remove the filter cartridge from the rubber tubing and place the protective caps on the cartridge. 10. Label the cartridge and transport it to the analytical laboratory. 4.0 CALIBRATION The Thomas pump should be calibrated before and after every sample. 4.1 Calibration Procedure 1. Connect a Dry-Cell Bios flow meter to the actual sample cartridge by using a rubber tube. 2. The tubing is connected to a protective cap with a hole in the middle to allow airflow. 3. Adjust the regulator on the pump until the desired flow rate is achieved. 5.0 MAINTENANCE Most of the routine maintenance items can be done in the field. If more time is needed to fix or troubleshoot a problem, replace the whole unit with a spare and finish working on it in the repair lab. This will minimize the station down time. All work on the equipment will be documented in the site equipment log, signed, and dated by the person performing the work. SOP for abestos pump.doc 2