ENGINEERING + SERVICES INSPECTION, MAINTENANCE + RECERTIFICATION (IMR)

Similar documents
Hose Management Inspection Guidelines for HP Drilling and Production Hoses

DRILLING HOSE SOLUTIONS

CHE Well Testing Package/Service:

Testing Services Overview

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Warning: NEVER ALTER TEST EQUIPMENT

N2 Membrane+ Nitrogen Production Systems for Offshore. Where you are. Where you need to be. We are here too.

Phuel Modular Control Units

KMB 18/28 (BANDMASK) OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

drilltech land drilling pipelining B y W i r e r o p e i n d u s t r i e s

International Association of Drilling Contractors North Sea Chapter HPHT Guidance on MODU Safety Case Content

OIL & GAS DRILLING PROGRAM

AUTOMATIC HOSE TEST UNIT, TYPE SPU

A hose layline contains important information for specifying the replacement assembly: manufacturer, hose trade name, working pressure and hose ID.

Flexible hoses - Non-metallic materials

High Pressure Iron (HPI) Recertification Guidelines & Procedures

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Dry Gas Couplings. Service Instruction 3 Tank Unit. Subject to design changes Art. nr: PR Version:

Aging Cell, OFITE Style. Included Items

Hose related sections of API RP 7L Proposed changes for 2 nd Ed. draft 5 June 2018.

Bermad Pressure Reducing. Model: 42T

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

DRAFT 12/17/03 KMB 18/28 (BANDMASK) OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

Flexible Engineered Solutions International CALM Buoy Swivels

PRC CO ² -LASER PRESENTATION

VRS Assembly & Operating Instructions

ANNUAL DYNAMIC POSITIONING TRIALS FOR DYNAMICALLY POSITIONED VESSELS

F-08 HIGH-PRESSURE HOSE USED IN CO2 SYSTEM

Specifications For Threaded and Butt Weld Hammer Unions

KMB 18/28 (BANDMASK) MONTHLY MASK INSPECTION APPENDIX A

Guide for Evaluating Your Hose Assembly Supplier

Triple Tine Mechanical Grapple

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

Protection Group Providing Solutions. Developing Your Emergency Preparedness

RP 6.0: INSPECTION AND CERTIFICATION OF BLOWOUT PREVENTERS

MoBiLe CrAnes. surelift. B y W i r e r o p e i n d u s t r i e s. tower CrAnes. port CrAnes

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

SEMI-SUB AND JACK UP DRILL RIGS SPECIALIST CLEANING SERVICES & EQUIPMENT RENTAL SOLUTIONS

INSPECTION & NON-DESTRUCTIVE TESTING

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

General Performance Data Hose Ref Minimum Bend. Safety Pressure at 20 C (BAR) Working Pressure at. Flow Rate at 3 bar (lit/min) Working Pressure

OFFSHORE CRANES & ACCESS SYSTEMS

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

Rubber Dock Hose care, Use & Maintenance

Total Tank Protection

Centre of Excellence for Subsea Safety

GATES ENGINEERING & SERVICES


Model: 43T. Bermad Pressure Relief Valve

Taking Safety & Professionalism to New Heights!

Fully integrated solutions for improving safety, emissions control and product integrity

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

Hydrostatic Pressure Testing

. Korea Safety Management System

OPERATOR SERVICE MANUAL

All hoses are not the same. ERIKS Hose Technology

Drass. 700 Series Surface Diving System

Fall Protection. ANSI-What is it, Why is it important? Craig Firl. March 5 th, Company Private

Innovative Pressure Testing Equipment

170-CG Feed Unit SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

2/15/06 Nora Ghobrial

( SC) NOTE: KMDSI strongly recommends that all repairs be performed by trained Personnel.

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

THE NATURAL CHOICE. High end valves for the natural gas value chain. Inspired By Challenge

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

// ADapters GUIDelines

HIGH FLOW HIGH PRESSURE PUMP type BMS

Engineered solutions for complex pressure situations

AWHEM RECOMMENDED PRACTICE

PDY TON HYDRAULIC CRIMPING TOOL WARNING

FRONT DERAILLEUR 10/11x3

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

DK ton, Double-acting, Die-type Crimping Tool

New ANSI Fall Protection Standards

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

LEAK SEALING SYSTEMS

Product Bulletin No.: D99-RRV2015-PIB-001

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

KIRBY MORGAN DEEP SEA DIVING HELMETS ALL MODELS HELMET AND EMERGENCY GAS SYSTEM DAILY SET-UP AND FUNCTIONAL CHECKLIST APPENDIX A2.

Dräger Swede Survival System Phase 1 Flashover Development Observation

SOP GEN-007X Crane and Winch Operations

Drilling Equipment Services

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

SAFETY MEASURES. These important guidelines should always be followed to work safely with the PRIMATECH pneumatic stapler model Q180:

Information. And. Procedure. Manual

Standards of Practice Personal Protective Equipment

Checklist for care of Respirators

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

W E NE E D TO TA LK A BOUT COLD FLOW. The Problem With The Cold Flow Standard.

How HSE regulates onshore oil and gas

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

USERS GUIDE. Where Accuracy Begins With Craftsmanship. About Your Bow. Safety. Maintenance. Storage

Permanent buoyancy systems. matrix composites & engineering

CONFINED SPACE ENTRY & RESCUE

Transcription:

ENGINEERING + SERVICES INSPECTION, MAINTENANCE + RECERTIFICATION (IMR)

7 STEPS TO HOSE VALUE AND REGULATORY COMPLIANCE

Periodic inspection and testing of flexible hose assemblies is an essential component of a effective hose management program. Assemblies being removed and repurposed should also be inspected and tested to ensure the hose meets application demands. In drilling and well service applications onshore and offshore, an IMR program helps maximize asset reliability, value, and uptime. Gates Engineering + Services (E+S) offers complete IMR service to meet OEM revalidation procedures and recommended best practices, while complying with industry standards. Hose applications include: A comprehensive hose management program, including IMR, can deliver more than $40K-$340K/hour of customer business value through increased operational performance and reliability. Hose management/imr, through the reduction of HSE events, can deliver $250K savings per HSE event avoided. Rotary Drilling/Vibrator Cementing Choke + Kill BOP Lines Sour Service Drag Chain With over 20 years experience in hose recertification and 100 of manufacturing experience, Gates offers IMR services through on-site modular mobile units or an E+S service facility. The service produces quantifiable business value via these client benefits: Improved equipment integrity Optimal production revenue Reduced cost of non-compliance Lower risk of: unscheduled maintenance property damage personnel injury environmental cleanup Application performance requirements, as well as regulatory standards, require visual exterior inspection, visual interior inspection and hydrostatic testing before a hose assembly can be returned to service. Gates goes beyond these three requirements with our IMR service.

GATES 7-STEP IMR SERVICE Step 1 Hose Identification and Specifications The following information is recorded on an IMR Identity Sheet before inspection and testing. Hose serial number Hose I.D. Overall assembly length Application Maximum working pressure Test pressure Last inspection date Manufacture date Step 2 External Cleaning Using a soap/degreaser/water mixture, the entire length of the hose is scrubbed to loosen all dirt and debris on the cover and fittings. Step 3 Internal Cleaning The inside of the hose is cleaned using a high pressure washer. Degreaser is then passed through the hose to ensure the inner tube is cleaned. An air gun shoots a foam pellet down the length of the hose until the tube is dry. Step 4 External Inspection The external cover is physically and visually inspected for damage or abnormalities. End fittings and seals are closely inspected for deformations or marks. Any damage to the outer cover or fittings is noted and may be visually recorded as well. The hose assembly must pass this inspection before proceeding to the next step. Step 5 Internal Endoscopic or Borescopic Inspection An endoscopic camera or borescope is used to examine and record the condition of the inner tube of the hose assembly. Tears, gouges, abrasions, and cracks are identified and noted. For smaller diameter hoses internal inspections can also be carried out using a long mirror which can inspect the canule (inner end fitting). The hose assembly must pass this inspection before proceeding to the next step. Step 6 Hydrostatic Pressure Testing Hydrostatic tests are used to verify the integrity of the hose and coupling interface, as well as confirm that hose reinforcement is completely intact. Testing is conducted in accordance with the OEM's specification, industry and regulatory standards, and may include specific customer requirements. During this step, the hose assembly is inspected for leaks, malfunctions, and all results are recorded. Pressure testing capabilities include: 60,000 psi/414 MPa pressure test 25,000 psi/172 MPa pressure test and chart recording 45,000 psi/310 MPa pressure test and chart recording 2,000 psi/13.7 MPa pressure test (high volume)

Die penetrant testing Air/water submersion leak testing Example of a Coflexip hose test: in accordance with API RP53, API RP17B, API 7K, and API 16C, these test pressures are relevant to: Working Pressure (psi/mpa) OEM Test Pressure (psi/mpa) Holding Time (hrs.) 5,000/34.5 10,000/70 24 10,000/70 15,000/103.5 24 15,000/103.5 22,500/155 24 Step 7 Recertification + Documentation After passing all inspection and hydrostatic testing requirements, it will be recertified and documentation will be provided. IMR Reports: Inspection Report (Original) Pressure Test Certificate (Original) Dual Pen Chart (Attested True Copy) Calibration Certificates (Attested True Copies) Release Note from certified third party witness body (Attested True Copies) Endoscopic video (optional at extra cost if required) MEET NEW REGULATIONS AND STANDARDS Aggressive and comprehensive regulations and oversight are being initiated to improve the safety, efficiency and environmental custodianship of drilling activities worldwide. Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) will strengthen U.S. drilling requirements on the U.S. outer continental shelf for everything from well design, permitting, and workplace safety to environmental responsibility and corporate accountability. UK Offshore Operators Association (UKOOA) works to strengthen the offshore oil and gas industry in the UK, preparing documentation such as Flexible Hose Management Guidelines. Many other organizations worldwide provide industry standards, policies, regulations, and recommended practices covering every aspect of drilling activity and well control such as API, DNV, and ABS. Gates IMR service assists clients in all aspects of regulatory compliance and recertification of all hoses installed on rig equipment.

POWERING PROGRESS Gates Corporation 1551 Wewatta Street / P.O. Box 5887 / Denver, CO 80217-5887 800.777.6363 / Fax 303.744.4499 Gates.com 20402-3E October 2011