November 2011 SFMTA Livable Streets Report to the San Francisco Bicycle Advisory Committee (BAC)

Similar documents
Compiled by the SFMTA Livable Streets Subdivision Staff

Compiled by the SFMTA Livable Streets Subdivision Staff

Vision Zero Priority Projects (March 2017)

BICYCLE STRATEGY UPDATE

San Francisco 2009 Collisions Report April 21, 2011

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

DPT Bicycle Program Report to the BAC 1/13/05

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

The Wiggle Route in Context

Upper Market Street Bike Lane Project

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

City of San Diego Vision Zero Draft Strategic Plan FY 2017

San Francisco 2008 Collisions Report December 18, 2009

Welcome! San Jose Avenue Open House August 25, 2015

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Golden Gate Park Traffic Safety Improvement Project

Central Freeway and Octavia Circulation Study

Freeway ramp intersection study

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Glebe Neighbourhood Cycling Plan

VISION ZERO SF: ELIMINATING TRAFFIC DEATHS BY 2024 JANUARY 5, 2017

Mission Bay Loop (MBL) Public Meeting

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Red Light Camera Annual Report 2014

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Pedestrian Safety Workshop SAN FRANCISCO, CALIFORNIA

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

San Francisco Pedestrian Safety Capital Improvement Program: A Step Towards Vision Zero

SFMTA PROJECT TIMELINE

2019 Prop K 5-Year Prioritization Program Update Prop K Project Ideas - Public Survey Results

Station 1: Street & Sidewalk Upgrades

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Bicycle Master Plan Goals, Strategies, and Policies

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

ROADWORK AND INFRASTRUCTURE OVERSIGHT

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

ABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

Zlatko Krstulich, P.Eng. City of O9awa

District 6 & Citywide Non-Transit Project Delivery Status Report

Bicycle Facilities Planning

Geary Corridor Bus Rapid Transit

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Citizens Advisory Committee March 26, 2014

ABOUT THIS OPEN HOUSE

Bicycle Network. Vision Zero San Francisco The City and County of San

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Active TFCA Projects to Date - TFCA Allocations and Total Project Costs San Francisco County Transportation Authority

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Project Status Update

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Bicycle Strategy Capital Projects Polk Street Northbound Separated Bikeway 481, ,

Polk Streetscape Project

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

North Shore Transportation Improvement Strategy

OneBayArea Grant Application

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

City of San Francisco 2010 Bicycle Count Report

Geary Bus Rapid Transit Project

Broad Street Bicycle Boulevard City Council Study Session Summary

Central Avenue Bikeway Traffic and Safety Impact Assessment

AGENDA ITEM G-2 Public Works

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Public Information Centre

Draft North Industrial Area-Wide Traffic Plan

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

New Castle County Bicycle Plan. Heather Dunigan ext

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Solana Beach Comprehensive Active Transportation Strategy (CATS)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Transcription:

November 2011 SFMTA Livable Streets Report to the San Francisco Bicycle Advisory Committee (BAC) See www.sfgov.org/bac for more information. Compiled by the SFMTA Livable Streets Subdivision Staff A. BICYCLE PLAN 1. BIKE LANE PROJECTS: Since the full lifting of the injunction in August 2010, nineteen (19) bike lane projects have been completed, adding over 14 miles (14.65) of bike lanes to the bicycle route network. To date, 57% of the bike lanes identified in the San Francisco Bike Plan have been implemented, adding over nineteen miles (19.35) of bike lanes to the network. The next bike lane projects scheduled for implementation are: Project 6-5 Portola Drive, O Shaughnessy Boulevard to Sloat Boulevard Project 8-4 John Muir Drive, Lake Merced Boulevard to Skyline Boulevard Project 5-4 Bayshore Boulevard, Cesar Chavez Street to Silver Avenue 2. SHARROWS: Staff has recently completed a full audit of the sharrow database, establishing a more accurate record of the total number of sharrows installed and planned, as well as the total miles of streets with sharrows installed and planned. The following totals should serve as the baseline for all future updates. Since the injunction modification in November 2009, approximately 2,700 sharrows have been installed, totaling approximately 45 miles of roadway. After full implementation, approximately 3,000 sharrows will be installed on approximately 67 new miles of roadway. Note these revised totals differ from the estimates cited in the 2009 Bicycle Plan. Generally, the differences are due to a refinement of the way the number of sharrows for a typical block are estimated, the removal of certain streets due to speed or grade, and the removal of streets in the Presidio which is not under CCSF jurisdiction (note, however, MTA still intends to coordinate with the NPS to install sharrows in the Presidio). 3. SIDEWALK BIKE RACKS: 84 new bicycle racks are in the process of being installed since the last report to the BAC, which will bring the citywide total to 2,439. 29 additional racks have been stenciled. There are approximately 300 sidewalk bike rack requests to be evaluated. San Francisco Municipal Transportation Agency One South Van Ness Avenue, Seventh Fl. San Francisco, CA 94103 Tel: 415.701.4500 Fax: 415.701.4430 www.sfmta.com

Page 2 of 8 4. AUTOMATED BIKE COUNTERS: All bike counters have been installed. Staff continues to work with the Department of Technology and the manufacturer to investigate and correct operational issues a couple locations. B. FACILITIES & PROJECTS 1. ON-STREET BIKE CORRALS: 12 bike corral work orders have been sent, to be installed before 2012. 2. 17 th STREET BICYCLE PROJECT: Parking changes associated with the installation of bike lanes between Harrison Street and Potrero Avenue were approved at the SFMTA Board on September 20. The bike lanes will be implemented in conjunction with the 17 th Street paving project in the fall of 2011. 3. BROADWAY TUNNEL BICYCLE PROJECT: The SFMTA Traffic Signal Shop surveyed the conduits and proposed a shorter conduit run by using a fuse to power the LED blank-out sign. SFPUC has agreed to the shorter run and is revising the SFMTA-SFPUC MOU. Meanwhile, the sign vendor has been provided sign specifications and asked to provide a quote to purchase the sign. 4. CESAR CHAVEZ (EAST): Legislation to remove all of the parking on Cesar Chavez Street from Kansas Street to Pennsylvania Street was approved at a public hearing on September 14. A request for additional funding to add a buffer to the bike lanes and some green pavement has been submitted. A few design details are still being worked out but the project should be completed in the spring of 2012. (No update) 5. JFK DRIVE CYCLE TRACK: Staff continues to work with members of the Physical Access Committee to refine the design. SFMTA is still planning for a January implementation. 6. FELL/OAK BIKEWAYS: A second public workshop will be held on December 3 rd from 10am to 2pm at the San Francisco Day School (350 Masonic Ave.). Members of the public are invited to stop by at any time between 10-2 to provide input on potential design elements of a separated bikeway along Oak and Fell between Scott and Baker. 7. HOLLOWAY AVE TRAFFIC CALMING AND BIKE LANES: Beverly Street to Ashton Avenue Staff is still coordinating with the Planning Department on environmental review before proceeding to a public hearing with parking changes, bike lane and speed humps. (No update)

Page 3 of 8 8. PORT of SAN FRANCISCO BIKE PROJECTS: Design is complete for a cycle track for Cargo Way, and the project will be going out to bid this winter. Construction is expected to be complete by mid-2012. Staff continues to work with the Port, the Mission Bay Developers Group, and the Mission Bay CAC on cycle track designs for Terry Francois Blvd that could be implemented when new roadway is built. 9. BICYCLE SHARING: The draft RFP is under review by Caltrans and the BAAQMD expects to complete any necessary revisions and release it before the holidays, in time to choose a vendor in early 2012. Launch is anticipated in spring/summer of 2012, likely with a staggered rollout. The bike sharing team has identified over 75 potential station locations with the expectation that around a third will not pan out for various reasons, leaving us with our goal of 50. Coordination work with the Port, Redevelopment TJPA, Caltrain and the Planning Department is ongoing. Planning has confirmed for that bikesharing is an allowable use at the majority of the privately owned public open spaces in the Financial District. 10. 8 th STREET: Staff met with community stakeholders and developed conceptual design of short-term road diet with painted buffer to be coordinated with DPW repaving project, currently scheduled to begin in early 2012. Staff is also working with Eastern Neighborhoods Transportation Implementation Planning Study (EN TRIPS) project team to develop parking-buffered bike lane design that could be implemented as funding becomes available. Pursuing the road diet requires environmental review and clearance by the Planning Department. 11. BAYSHORE BOULEVARD: Striping drawings are currently being revised. 12. PORTOLA DRIVE, O SHAUGHNESSY TO WEST PORTAL: The work order for this portion of Portola Drive was sent in mid-november. Work should be complete in late November or December. 13. OUTER SUNSET SAFE ROUTES TO SCHOOL: Staff is exploring ways to include bike facilities as part of an upcoming Safe Routes to School project along Ortega Street between 37 th and 41 st Avenues. The traffic calming component of the proposed design includes pedestrian refuge islands at the intersections of Ortega Street and 38 th, 39 th, 40 th, and 41 st Avenues and bulbouts and raised crosswalks at the intersection of 37 th Avenue and Ortega Street. In addition to these traffic calming devices, staff is proposing sharrows in the westbound direction of Ortega Street between 37 th and 41 st Avenues, a parking buffered bike lane in the eastbound direction of Ortega Street between 37 th and 41 st Avenue, and bike lanes on Ortega Street between 41 st Avenue and Lower Great Highway and between 34 th Ave and Sunset Boulevard. Staff is in process of outreaching to the community and to the two schools in the area. Planning and design for the proposed design must be complete by February of 2012. (No update)

Page 4 of 8 14. WIGGLE BIKE ROUTE IMPROVEMENTS: Based on recommendations from the Think Bike workshop in September, staff is planning and designing near-term bicycle and pedestrian improvements for the Wiggle bike route. Improvements identified so far include green-backed ( super ) sharrows and continental crosswalk markings along the route from Steiner Street to Scott Street. Wayfinding and traffic engineering improvements to the Market/Duboce/Buchanan intersection are under consideration. An application was submitted for a $25,000 Bikes Belong grant to add green bikespecific treatments on Duboce Avenue in coordination with the Church and Duboce Track and Roadway Improvement Project. C. FUNDING 1. SFMTA CAPITAL PLANNING EFFORT: The Capital Improvement Program outlines the funding priorities for the SFMTA for the next 5 years. The Capital Improvement Program is fiscally constrained and is a detailed look of the SFMTA priorities. It is a more detailed than the 20 year Capital Plan, which is not fiscally constrained. SFMTA staff will brief the BAC about the SFMTA Capital planning process at the scheduled December meeting. The goal is to garner BAC support before the end of the calendar year. D. BIKE ED AND SAFETY 1. BICYCLE LANE MARKING EXPERIMENTS: Door zone markings have been striped on one block of 17 th Street for evaluation. Staff continues to make observations. Staff has completed observations of approach treatments phase 2 (broken white). Phase 3 (sharrows to replace the broken white) should be marked in early November with observations to follow later in the month. SFMTA Staff identified locations for colored bike lanes where bike lanes are present to the left of vehicle right turn pockets. Before evaluations are being conducted at the pilot locations to observe cyclist and motorist merging and yielding behavior: Grove/Polk, 9 th /Howard, Market/Duboce, Embarcadero/Lombard, Howard/Embarcadero. (no change) 2. BICYCLE COLLISION REPORT: The SFMTA Livable Streets subdivision is still drafting the 2009 Bicycle Collision Report. The report draws upon a full year s data to identify patterns in traffic violations that involve a bicycle collision. The data gathered in this report is summarized and directed the San Francisco Police Department in order to prioritize locations and violation types for targeted enforcement. The 2009 Bicycle Collision Report is still under development. (No update) 3. BICYCLE SAFETY EDUCATION CLASSES REQUEST FOR PROPOSALS (RFP): The SFMTA is currently in negotiation with the winning proposer on the new Bicycle Safety Education Classes contract. This contract has a broader scope than in previous years, including a three-year term and a Muni Operator Bicycle Safety Video

Page 5 of 8 for newly hired operators. The new contract is expected to be finalized and executed by late December 2011. 4. LIGHT UP THE NIGHT BIKE LIGHT GIVEAWAY: SFMTA staff and the San Francisco Bicycle Coalition (SFBC) are working together to increase the visibility and safety of people riding bicycles at night by giving out free bicycle lights and safety information as part of their Light up the Night campaign. Throughout the months of November and December, SFMTA and SFBC staff and volunteers will host bike light giveaway events to distribute front and rear bicycle lights to people whose bicycles do not already have lights. E. Miscellaneous 1. THINK BIKE: On September 19 th and 20 th the SFMTA co-hosted a promotional and design workshop. Local transportation professionals and community members drafted conceptual designs for the Wiggle, upper Polk Street, and mid Market Street. The SFMTA is seeking funding to implement some of the proposals and undertake more planning/design for other proposals. One grant source for $25,000 was identified and will be applied for green pavement treatments along the Wiggle. 2. INNOVATIVE TREATMENTS TOOLBOX: Staff has updated toolbox entries and have begun identifying feasible locations for implementation of innovative treatments. (No change) 3. SPOT IMPROVEMENTS: a. Shorter term: Signage on the Shrader Valve notifying motorists on southbound Shrader Street with a more conspicuous sign than presently; and notifying westbound cyclists on the Panhandle Path with path cross-hatching and signage to route cyclists to the crossing of Fell Street at Shrader Street. We still observe a lot of cyclists riding westbound into Stanyan Street directly from the Panhandle Path, many with bike rental bags on the front. Additional signage and/or markings on the Panhandle Path directing cyclists to cross Fell Street at Shrader Street will be addressed as part of the John F Kennedy project, scheduled for implementation in December. Motorists on southbound Shrader Street should obey the extinguishable NO RIGHT TURN sign which illuminates when the Panhandle Path has a green left turn arrow; no other signage is recommended. (No change)

Page 6 of 8 Improved signage at intersection of Market and Castro streets guiding westbound bicyclists to use 17 th Street and Corbett Avenue instead of Market Street all the way to Portola Drive. This item has been logged in. Response expected by November. No update. Extend the Post Street bike lane from Steiner Street to Webster Street. Add sharrows on Geneva Avenue from Moscow Street to Brookdale Avenue and investigate adding a bike lane in the uphill (westbound) direction. Additional signage requested on the Kezar path between Lincoln Way and Third Avenue. Review St. Francis Circle for signage and stencils to clarify cyclist route Duboce and Market Street eastbound cyclists end up in crosswalk Contraflow improvements to Lyell Street signage (No Turn EXCEPT BICYCLES) or two-stage turn on Alemany St. Currently, there is no legal way to access this route from EB Alemany Street. Third Street north of Cargo Way Add sharrows This project will be added to a funding request later in this fiscal year. Update to come at meeting. Staff does not feel that church parking in a bike lane would be significantly different than church parking in a regular travel lane. Furthermore, staff feels that a bike lane six days of the week would be a positive addition to the network. Sharrows were ordered here as part of a city-wide work order. Work should be completed in the coming months. (No update) Work order submitted: Update of existing bike warning sign to include AHEAD placard. Additional bike warning sign closer to intersection of 3 rd Avenue/Kezar Drive/Lincoln Way. Realignment of Westbound Lincoln Way to intersect Kezar Drive closer to a 90 degree angle. (No update) Staff reviewed signage and striping and found the existing signage and striping adequate. Design alternatives being considered as part of Wiggle bike route improvements. This item has been logged in. Response expected in February. North of Cargo Way, Third Street is no longer part of the Bicycle Network. As such, Livable Streets does not plan to install sharrows at this location.

Page 7 of 8 Powell Street parklet problematic metalwork, little space is left for cyclists between the cable car tracks and the parklet, truck turns, lighting The SFMTA does not feel that there are roadway space issues related to the parklet installation. As regards the metalwork, the SFMTA has forwarded concerns on to the Planning Department, the lead agency for parklets. b. Longer Term: Stockton Contra-Flow Lane Study Preliminary review indicates that creation Presently cyclists trying to reach the of a northbound contra-flow lane may Stockton Tunnel from the south and west require removal of heavily-used loading have no efficient way to legally ride to the zones along Stockton Street, and Tunnel. A one block northbound contraflow lane on Stockton Street from Post to the intersection of Stockton and Sutter reconfiguration of the pedestrian island at Sutter streets would allow cyclists to travel streets. While cyclists may currently use one block north from Post Street toward this route, the SFMTA has no short-term the tunnel. plan to make other modifications here. (No change) Improved signage for Cesar Chavez Existing Cesar Chavez Street (West) Street pathway under the US 101 project may address pathway wayfinding Freeway interchange Cyclists riding for cyclists traveling eastbound on Cesar northbound on Bayshore Boulevard and Chavez. Existing Cesar Chavez Street eastbound on Cesar Chavez Street are (East) project will explore several often confused about entering and possibilities for the design near the tracking the pathway under the US 101 interchange, including wayfinding signage. Freeway interchange. Supervisor Cohen Resolution expected by April 2012. A recently commented on attempting to ride community meeting to discuss the US 101 through this interchange known as the interchange has not been scheduled but hairball. will be announced in the next month or two. (No change)

Page 8 of 8 Add bike signal at intersection of Market and 12th streets to reduce eastbound bicycle delay. Better bike network transition from Market Street to Corbett Avenue in downhill direction, or sharrows on Market Street to Castro Street. Data requested regarding bicycle theft. The intersection of 12th Street at Market Street and improving the eastbound bicycle progression has been reviewed in the past. To improve eastbound progression, add bicycle signals and still maintain pedestrian and Muni service, the intersection would require significant signal modifications to the existing equipment. With the upcoming Market Street paving and corridor improvements scheduled, our hope is that we can include those changes and increase the progression of bicycle users through the 12th Street intersection. (No changes) After conducting a field review, staff is assessing way-finding signage which could make transition clearer. Staff is also exploring long term solution of routing bicycles onto south sidewalk and providing an exclusive phase for a box left turn. As for sharrows on Market St, SFMTA currently installs sharrows only on designated bicycle routes and Market St between Corbett and Douglass is not part of the bicycle route network. Staff is open to the idea of sharrows elsewhere on a case-by-case basis but would need to develop some sort of criteria for this. Currently, the SFMTA does not have geographic data regarding bike theft. Bike thefts may be reported to SFPD but information is not analyzed by the SFMTA.