The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

Delayed Coker Safe Sampling Tar or Spalled Coke

OPERATION and MAINTENANCE Guide

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Delayed Coker Automation & Interlocks

8. Fall Protection Procedures WAC

Crane & Rigging Brain Teasers

SOP GEN-007X Crane and Winch Operations

Low Coking Temperatures & Recent Site Experience

Premium PowerPoint Presentation. Rigging Review

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH.

H. Control of Hazardous Energy: Lockout/Tag Out

VL 2K LIFT D-L WINCH INSTRUCTIONS (Applies to P/Ns , , , , , )

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP50-H-14 HYDRAULIC WINCH.

Lockout Tagout Program

At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest.

MANITOWOC MODEL TON CAPACITY

ROOFING FALL PROTECTION 27.I

End of Book Questions Chapter 5 General Aircraft Maintenance

Winchline n a box WINCH LINE SELECTION GUIDE. Wire Rope Winchlines are superior to most other winchlines found in the market place due to the

Heavy Equipment Technician Rigging

VL SHEAVES/CABLE UPGRADE KIT INSTRUCTIONS

Lockout/Tagout - Energy Control Program

SERVING MANUFACTURERS, DISTRIBUTORS & RELATED SERVICE PROVIDERS FOR THE MATERIAL HANDLING INDUSTRY SINCE

CORPORATE SAFETY MANUAL

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

Surface exploration drilling

comfort without compromising on performance and to fit your various needs on touring,

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1

Lock Out/Tag Out Control of Hazardous Energy

Wildcat LB Winch Kit. Operator s Manual Installation Instructions Replacement Parts List. With Wireless Control System.

General Isolation Procedures

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS

PRO Lifting Operations

Hoisting Equipment Cable puller & Accessories

ANNUAL IDOL COMPLIANCE TRAINING

FCX Department of Occupational Health and Safety. Flagging and Barricading Guideline

Fall Protection University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob Wells

Update 29 CFR Subparts D & I

2523-LDG-E. Leader s Guide

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

User Instruction Manual Tripod Anchorage Connectors

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

MSA Latchways Ladder System

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40M-12 and all WIDE DRUM variations of this HAND OPERATED WINCH.

Lockout/Tagout Safety Policy

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL Estimated INDETERMINATE

OPERATIONS/PARTS MANUAL FOR PATTERSON'S HAND OPERATED WINCH

Final Assembly Instructions Bikes with Threaded Headsets

WINCH USER GUIDE WARN 3000ACI Utility Winch Part Number: 93000

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

The most versatile Fall Protection EVER

John Paul (JP) Jones President

FALL PROTECTION PLAN INSTRUCTIONS

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

FALL PROTECTION / ELEVATED WORK

Lockout / Tag out Program

GUIDELINES FOR USE GUARD

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

Final Assembly Instructions Bikes with Quill Stems

Workman Confined Space Entry Kit

Isolation Lockout and Tagging

BALL STOP INSTALLTION GUIDE

Wilson County Emergency Management Agency 110 Oak Street Lebanon, Tennessee 37087

Region: USA Language: EN Number : TB0031 Revision : B. Total Page: 3 Page n : 1 First Issue: 10/2014 Rev. Date: 10/08/2014

THE OSHA LOCK-OUT/TAG-OUT STANDARD

Ground Release Shackle

8012, 8018 & ,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES

FALL PROTECTION LADDERS ACCESSWAYS

WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

EXHIBIT A FALL PROTECTION POLICY

OPERATIONS/PARTS MANUAL FOR PATTERSON'S STRAP WINCH

University of Arkansas Office of Environmental Health and Safety

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada)

CONTENTS: 57100AH 100 Ton Air/Hydraulic Shop Press OWNER'S MANUAL

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent

PF30 Inspection & Maintenance Manual

Parts of the Ship. Terms you should already know

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL

Wilkins Safety Group

Proof load is the load applied in performance of a proof test. Proof test is a nondestructive tension test performed by the sling manufacturer or an

Methods of installation of ADSS fiber optic cables

No ' Long No ' Long

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

Fall Protection / Open Holes & Guardrail

Standard Operating Procedures

Developed by Engineers Bobby Bartlett, Eric Klaas, and Ron Schroeder December 2010

Transcription:

Delayed Coker Coke Drum Winch and Cables Presented by Evan Hyde and Andrew Worley @ Galveston coking.com May-2015 MJ a Moloney - ExxonMobil May-2012 coking.com 0

Presenter Evan Hyde http://www.nola.com/news/baton-rouge/index.ssf/2014/11/contractor_working_with_exxonm.html A man working as a contractor at the ExxonMobil Baton Rouge Refinery lost both of his legs on Thanksgiving Day, according to WAFB-TV. ExxonMobil officials say the contractor was injured during the regular course of operations. The man, who has yet to be identified, was treated at the scene and taken to a local hospital. "We regret that this incident occurred. Our thoughts and prayers are with the contractor and his family Refinery Manager Mark Northcutt told WAFB. An investigation has been launched to look into the incident. 1

Purpose for this Presentation: Presenter Evan Hyde To reemphasize key design and procedural points associated with winch and cable operations, particularly when equipment behavior is abnormal. Please return to your site and make sure that these points are covered in your Delayed Coker Operating Procedure 2

Presenter Andrew Worley Items for Consideration Winch Cable Sheaves Crosshead Guide Crosshead Guide Sheave Cable Winch 3

Basic Wire Rope Construction: Presenter Andrew Worley 4

Wire Rope and Pulley System (API 8C) : Presenter Andrew Worley Crosshead assembly: guides and centers the cutting assembly in the coking structure Traveling block: raises and lowers the cutting assembly in the coking structure via the wire rope Crown block: sits directly above the traveling block and is the complementary stationary block to the traveling block Lead block: makes the wire rope transition between its horizontal run from the crown block and its vertical run to the hoist Guide block: controls the fleet angle and spooling of the wire rope onto the hoist drum Hoist (not shown): provides the motive force for raising and lowering the cutting assembly Wire rope: transfers the cutting assembly loads through the pulley block system to the hoist Load cell: part of the instrumentation sensing the tension load of the hoisting system 5

Presenter Andrew Worley Reeving and UnSpooled Cable: ONE PART TWO PART THREE PART FOUR PART Reeving refers to the number of wire rope cables supporting the load (number of ropes passing through a horizontal plane between the traveling block and the crown block) Most decoking systems use four part 4-Part Reeving means: - The weight load in the wire rope is ¼ the cutting assembly weight. - Conversely, when the hoist stalls, the wire rope system will impart a vertical load to the structure of 4X the hoist stall. - MOST IMPORTANTLY, 1 ft of drill stem movement will equate to 4 ft of unspooled cable movement 6

Presenter Jay Jones Key Points: => Facilities Design Features to Consider - Winch Cable Guard Locked in Place - Cable Enclosed in a Locked Cage from Winch to Shed Roof - Auto Winch Stop on Slack Cable - Cable Tensiometer => Regular Preventive Maintenance is Essential - Winch Tasks (regular, seasonal and turnaround overhaul) - Cable, Sheave & Guide Rail Tasks (regular, seasonal and end-of-life) => Procedures Need to Clearly State the Following Points and All Technicians & Supervisors Need to be Thoroughly Trained - ANY work with the cable requires installation of drill stem clamps to prevent uncontrolled movement UNLESS the drill stem is already resting on its stops and secured - Cages must be locked and only opened by authorized personnel 7

Coke Drum Winch, Guides and Cable Safety Presenter Evan Hyde Old Design with Winch in Cutting Shack Complete Cage Enclosure of the Winch Spool and Cable in the Shack is Recommended 8

Coke Drum Winch, Guides and Cable Safety Coke Cutting Winch Outside Shack Presenter Evan Hyde - Complete Winch Cable Guard Recommended 9

Coke Drum Winch, Guides and Cable Safety Coke Cutting Winch Outside Shack - Complete Winch Cable Guard in Place Presenter Evan Hyde 10

Presenter Evan Hyde Procedural Warnings to Consider: Operating decoking console in bypass without proper authorization can result in damage to equipment and injury to personnel. Prior to Cut, the cutter should verify that: All personnel are clear of the structure at grade, on the bottom head deck, the cutting deck and stairways. Telescope is secured to the bottom of the drum (if no slide valve) Signs and chains restricting access are appropriately in place All LOTO (Lock-Out, Tag-Out) locks are in place Communicate with Coke Handlers to ensure there is room for the coke and they are aware cutting will begin Additionally: Equipment PM s are up-to-date Cable rope is in good repair Guide Rails are in good repair visually and no none issues per previous cutter 11

Presenter Evan Hyde Procedural Warnings to Consider: In the event that the drill stem hoist cable becomes Tangled or Unspooled: STOP AND NOTIFY YOUR SUPERVISION. DO NOT ATTEMPT TO REPAIR OR STRAIGHTEN CABLE. THIS IS A MAINTENANCE ACTIVITY REQUIRING PROPER AUTHORIZATION. In the event that the drill stem hoist cable becomes Tangled or Unspooled, or the Crosshead Guide is stuck, drill stem clamps must be installed on the drill stem. => The only exception is when the crosshead is already resting on the bottom stops or the drill stem is resting on the top head or deck. 12