Lake Waterford Community Association Meeting. November 15, 2016

Similar documents
Pavement Management Program

CITY OF SOUTH DAYTONA

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

City of Davis Pavement Management Program

Legislative Update Williamsburg Residency

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Access requests to County streets and roadways are processed through one of the following methods:

2018 ROAD MAINTENANCE PROGRAM

IMPLEMENTATION WORKBOOK

C ITY OF B EDFORD H EIGHTS

City Avenue Projects

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

Taylor Road Resurfacing Project

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

City Avenue Projects

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Project Update May 2018

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Henderson Ave. Complete Streets Project

Driveway Design Criteria

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Fleur Drive Reconstruction

Paving for Progress Municipal Streets Seminar

Keeping good roads good

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

City of Margate, Florida. Neighborhood Traffic Management Manual

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Bluffdale/ UDOT South High-T Intersection Project Type Operations

District Construction Projects

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

CY2017 Summary of STP applications

Final Sidewalk Feasibility Study

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

APPENDIX D COST SUMMARY TABLES

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

YAVAPAI COUNTY PUBLIC WORKS

Culpeper District. Albemarle County Monthly Report October, 2011

Complete Streets Funding Program Project Prioritization Plan

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

SECTION 3 STREET DESIGN

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

RZC Appendix 8A Marymoor Subarea Street Requirements

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

APPENDIX L: COST ESTIMATING TOOLS

Chapter 4: Funding and Implementation

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Smoothing Out the Bumpy Road Ahead

Engineering - Bicycle and Pedestrian

ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16

5. RUNNINGWAY GUIDELINES

Building Great Neighbourhoods BONNIE DOON

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

FDOT Treasure Coast Traffic Report

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

BOI / DRH S. 13 th Street Mixed use office/retail development with residential dormitory

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

CSAH 101 Preliminary Design

SUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Corridor Recommendations and Implementation

CTH M HIGHWAY PROJECT CTH Q to STH 113

Safe Routes to School Action Plan Aberdeen, Idaho

Project Name Project Description Authorized Amount

Driving Indiana s Economic Growth

Item No. 14 Town of Atherton

February 11, 2016 TPO Board Presentation

Pavement Management Report. City Council Meeting of May 21, 2013

The City of Port Moody 2013 Paved Road Network Condition Assessment

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

Building Great Neighbourhoods LANSDOWNE

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Field guide for Accessible Public Rights-of-Way Edition

Board of Supervisors February 27, 2017

LAURIER HEIGHTS MEETING TWO MAY 22, :30-8:30 PM. ALLEY RENEWAL Why are the alleys not being upgraded?

Tacoma Streets Initiative 2017 Progress Report City of Tacoma Public Works Transportation Commission February 21, 2017

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Cincinnati Dayton Rd Widening

Transcription:

Lake Waterford Community Association Meeting November 15, 2016

Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements Questions 2

Completed Projects Eastern District Police Station Lake Waterford Park Challenger Field Pasadena at Lake Waterford Intersection Improvements Pasadena Elementary School Sewer Pumping Station, Force Main and Sewer 3

Pavement Management Program Existing Pavement Network Inventory: 1,803 total centerline miles of County-maintained roadway 158 arterial centerline miles 414 collector centerline miles 1,231 local centerline miles Condition Ratings: Rated on scale of 0-100 Scored on 14 different deficiency categories Each road rated every 3 years 4

Pavement Management Program Preventative Maintenance Strategy 5

Pavement Management Program Treatments Crack Sealing Asphalt sealer is applied to roadway cracks to prevent water penetration Full Depth Patching (N/A) failing areas of the roadway are removed and replaced 6

Pavement Management Program Treatments Slurry Seal / Micro Surfacing (70-85) an application of liquid asphalt emulsion, aggregate, and additive fillers to provide improved skid resistance and extend the remaining service life by sealing out water penetration and oxidation Cape Seal (60-75) a two part treatment first consisting of an application of tar and chip (liquid asphalt and small stones used to fill cracks) followed by a slurry seal or micro surfacing to provide improved skid resistance and seal the road surface

Pavement Management Program Treatments Resurfacing/Repaving (50-65) a rehabilitation treatment including patching of failed areas, milling of deteriorated existing pavement surface, and replacement with new hot mix asphalt providing a new riding surface Full Reconstruction (below 55) a major rehabilitation treatment including full replacement of existing sidewalk and curb/gutter in addition to the resurfacing described above

Pavement Management Program Treatment Costs per Lane Mile Treatment Type Applicable Rating Range Treatment Cost/ Lane Mile Crack Seal 80-95 $1,500 Slurry Seal / Micro Surfacing 70-85 $15,000 - $25,000 Cape Seal (ST+SS) 60-75 $30,000 - $50,000 Hot Mix Asphalt Overlay 50-65 $100,000 - $200,000 Full Reconstruction Less than 55 $500,000 - $650,000

Roads in Selby Grove Area Roads Resurfaced (HMA) April 2016 Road Rating Dwyer Avenue 99 Hopeland Avenue 99 Ken Mar Avenue 99 Kent Avenue 99 Pleasant View Avenue 99

Roads in Selby Grove Area continued Roads with Ratings >77 To be Rerated Winter 2017-2018 Road Rating Altona Avenue 78 Christy Road 88 Delma Avenue 85 Drum Avenue North 81 Drum Avenue South 76 Drum Court 92 Edward Drive 86 Hasting Lane 78 Irene Avenue 77

Pavement Management Program Selby Grove Subdivision

Pasadena Road Sidewalk Project Number: H525703 Budget: $3,739,000 Current Phase: Bid Documents Projected Bid Open: Winter 2016 Projected Construction Start: Spring 2017 Projected Duration Phase 1 (Sidewalks & Stormwater): 270 Days Projected Duration Phase 2 (Road Resurfacing): 8 weeks Projected Construction Completion Phase 1: End of 2017

Pasadena Road Sidewalk Project description: Installation of traffic calming devices to include: Median islands along Pasadena Road at approximately 300 east of Ken-Mar Avenue (near school) and 150 west of Lake Waterford Park entrance Raised intersection at Pasadena Road and Penny Lane Installation and reconstruction of approximately 5,300 linear feet of ADA compliant sidewalk to provide a continuous sidewalk from MD 2 (Ritchie Highway) to MD 648 (Waterford road) Construction of associated curb and gutter and driveway aprons along the south side of Pasadena Road Installation of storm drain inlets and pipe Installation of stormwater management facilities Repaving of Pasadena Road Traffic will be managed by closing one travel lane during off-peak traffic hours. (Peak hours are 7am to 9am and 4pm to 7pm.) There will be isolated water service interruptions to allow for relocating water meters and water services where these conflict with the proposed work

Pasadena Road Sidewalk Median Island

Pasadena Road Sidewalk Raised Intersection RAISED INTERSECTION (WEST PALM BEACH) Example from Federal Highway Administration http://safety.fhwa.dot.gov/intersection/resources/fhwasa06016/chap_6.htm

Pasadena Road Sidewalk New Construction NO SIDEWALK ALONG PASADENA ROAD (MAPLE AVENUE AHEAD)

Pasadena Road Sidewalk Reconstruction EXISTING SIDEWALK ALONG ELEMENTARY SCHOOL FRONTAGE

Pasadena Road Sidewalk Connection to MD648

Pasadena Road Sidewalk Typical Section

Pasadena Road Sidewalk Stormwater Management

Thank You