EuroVelo13. Iron Curtain Trail. A Trans-national Action Plan for its implementation

Similar documents
Pilgrims Route EuroVelo 3 Workshop. EV3-ST James Way Project 8 th of December 2011 Brussels, Belgium

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

CYCLING FOR GROWTH: USING EUROPEAN FUNDS FOR CYCLING

EuroVelo Overview Route Database

Map of the Iron Curtain Trail. About the project. 3 About the project 5 Project activities 8 ICT Project Partners. History

The European Certification Standard (ECS) objectives, principles and methodology. Ben McEldowney,

Michael Cramer MEP. Closing Plenary Velo-City Global. Cycling in Europe. Presentation by Michael Cramer Taipei, March 1 st 2016

Beer statistics edition. The Brewers of Europe

EuroVelo. European Certification Standard for the European cycle route network. Second revised edition

GRISI PLUS Networking Seminar. WRA - Synopsis of Good Practices from an International Perspective

Cycling Europe. Jesús Freire, Business Development Officer European Cyclists Federation. Prague House, Brussels. 17 th September 2018

Beer statistics edition. The Brewers of Europe

Beer statistics edition. The Brewers of Europe

THE PEP Partnership on Cycling

Eurovelo in Greece: A small step for Eurovelo a huge leap for Greek tourism

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

Road Safety Vademecum

Introduction to the European Mobility Week Campaign. Jerome Simpson - REC

Country fact sheet South Korea

España, Portugal + Important roads of Europe 2012 FX

CFE certification Bicycle-friendly Employer

EUROPEAN RIDERS, HORSES AND SHOWS AT THE FEI 2012

Outline of the Position Duties and Responsibilities

2016/17 UEFA European Under-17 and Under-19 Championships Qualifying round draws. 3 December 2015, Nyon, Switzerland

THE PEP Partnership on Cycling Pan-European Master Plan for Cycling

Fibre to the Home: Taking your life to new horizons!

23 November 2018, Nyon, Switzerland. 2019/20 UEFA European Women s Under-17 and Women s Under-19 Championships. Qualifying round draws

Selection statistics

2016/17 UEFA European Women s Under 17 and Women s Under 19 Championships Qualifying draws

EUROPEAN MOBILITY WEEK September 2015

Road Safety Pledge. Route to vision zero 2050 in Europe The Hague, June 14th, Malta. Luxembourg Lithuania Latvia Italy

A bicycle map depicts the local bicycle lane network. It also gives recommendations for routes,

154074/EU XXV. GP. Eingelangt am 14/09/17 PE-CONS 25/1/17 REV 1 EUROPEAN UNION. Strasbourg, 13 September 2017 (OR. en) PE-CONS 25/1/17 REV 1

The revival of wolves and other large predators and its impact on farmers and their livelihood in rural regions of Europe

Architecture - the Market

Common Market Organisation (CMO) Fruit and vegetables sector Evolution of EU prices of certain F&V

InnoAquaTech. An Opportunity for Aquaculture in South Baltic

Country fact sheet Germany

Status of the Fairway Rehabilitation and Maintenance Master Plan for the Danube and its navigable tributaries (dated )

LITHUANIAN STATE ROAD NETWORK: YESTERDAY, TODAY AND TOMORROW

Peter Ch. Löschl, ABA Invest in Austria June Austria Investment Climate Reasons to Invest in Austria - Perspectives

Cycling is Central: Transnational Ideas, Projects, and Experiences. Local Bicycle promotion

Selection statistics

Conclusions. on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries. Danube Ministers Meeting

Lecture 3 The Lisbon Strategy

Active Travel Strategy Dumfries and Galloway

UEFA Nations League 2018/19 League Phase Draw Procedure

AGENDA. Stakeholder Workshop

Growing Bicycle Travel & Tourism for Economic Development Jeff Miller, VP North America

UEFA EURO 2020 Qualifying Draw Procedure

European Commission Policy, Promotion & Funding for Cycling Madeleine Kelly-Tychtl Directorate-General for Mobility & Transport

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Public Bicycle Sharing Scheme

NEW COMMERCIAL VEHICLE REGISTRATIONS EUROPEAN UNION 1. July and August 2017

The Value of Cycle Tourism

Iron Curtain Trail. Trans-national Action Plan. Sustainable mobilty along the newest EuroVelo route. Prepared by: European Cyclists` Federation (ECF)

2 nd Road Safety PIN Conference 23 June 2008 Countdown to only two more years to act!

Target Group The target groups were cyclists, as well as representatives of creative arts and other members of the public.

Metropolises on the move ALLIANCE FOR CYCLING

Selection statistics

2014/15 UEFA European Under-17 and Under-19 Championships Elite round draws. 3 December 2014, Nyon, Switzerland

Project Name: Smart Choice for commuters - BIKE2WORK Contract N : IEE/13/585/SI Duration: 36 months

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Report of the third meeting of THE PEP Partnership on Cycling Promotion

The European Transport Safety Council s proposals for a safety component in a future EU Cycling Strategy

Selection statistics

UEFA Futsal EURO Preliminary & Main Round Draw Procedure

Embassy of Hungary. Invest in Hungary. HE Péter Szabadhegy Ambassador of Hungary

Traffic Safety Basic Facts Main Figures. Traffic Safety Basic Facts Road Safety. Urban Areas. Country Overview.

Max Sort Sortation Option - Letters

ONTARIO BIKE SUMMIT 2012 Louisa Mursell Projects Director Phone: /

DEVELOPMENT AID AT A GLANCE

Selection statistics

Swedish Opinion on Nuclear Power

What s the Opportunity in Russia and Eastern Europe for Chile? 25 th October 2011

SHARING GETS YOU FURTHER

Cycling for the Future A Fresh Approach for WA

Available online at ScienceDirect. Transportation Research Procedia 14 (2016 )

Agenda : Self-assessment : Coffee break : Action plan

Swedish Opinion on Nuclear Power

Cycling Strategy: Initiative of the Charter of Uherske. cyclists)

Promoting Cycle Tourism

PIN Flash 18 - Background tables

The V4 Tourism Co-operation joint promotion of 4 Central- European countries

Traffic Safety Basic Facts Main Figures. Traffic Safety Basic Facts Road Safety. Urban Areas. Country Overview.

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

REPORT. 1 st Steering Group Meeting (output ) Brno, 10 th October Project Central MeetBike (3CE343P2)

Juni 2013 DI Bernhard Engleder,

Aalborg. T51.1 Cycle Motorway in Aalborg

2018 ADFC-Travelbike Bicycle Travel Analysis

FIL Qualifying Event Proposal. Problem Statement. Proposal for voting at GA

Valuing Cycling: 200,000,000,000 Today 1,000,000 jobs Tomorrow. Randy Rzewnicki, PhD, Policy Officer ICTH London, 8 July 2015

CURRENT DEMOGRAPHIC SITUATION IN LATVIA

WEST YORKSHIRE LTP CYCLE PROSPECTUS

Bike sharing in 10 European countries report. Module 3: Czech Republic

Meeting of all the Latvian organisations involved in Intelligent Energy Europe. Riga, 29 October Riga Energy Agency

Social Convergence, Development Failures and Industrial Relations: The Case of Portugal

The Baltic economies: Current situation and future trends, possibilities and pitfalls

Policy factsheet 2 MOBILITY MANAGEMENT MEASURES FOR SCHOOLS.

Lithuanian export: is it time to prepare for changes? Aleksandr Izgorodin Expert

Transcription:

EuroVelo13 Iron Curtain Trail A Trans-national Action Plan for its implementation

2

Background 3 EuroVelo13 - Iron Curtain Trail, A Trans-national Action Plan for its implementation Mission: The mission of the Iron Curtain Trail (ICT) is to experience the history of Europe and explore and develop the border regions of Europe by cycling. The route leads from the Barents Sea to the Black Sea and is more than 10.400 km long (approximately 8.800 km of which is inside the EU and 1.600 km is located outside). The ICT is the longest route of the European cycle route network - EuroVelo 1 which was initiated by the European Cyclists Federation to develop a network of high-quality cycling routes linking all countries in Europe. It can be used by long-distance cycle tourists, as well as by local people making daily journeys. The ICT is expected to generate annually 3,3 million daytrips, 849.000 holiday trips and have an economic impact of 355 million Euro when it is fully developed 2. In order to reach its full potential as the EuroVelo 13 route, we collected and evaluated the potential itineraries, services, promotion / marketing conditions, the organisational and financial background of the ICT and defined the necessary actions until 2020. This work was done for Finland, Estonia, Latvia, Lithuania, Germany 3, Czech Republic, Austria, Slovakia, Hungary 4, Serbia, Romania, Bulgaria, FYR of Macedonia, Turkey and Greece in 2011, supported by European Commission DG Enterprise and Industry under the Sustainable Tourism Grant. The cost of the core activities (including development and operational costs) is 351 million Euro (for 2012 2020)! The connecting activities will cost an additional 20 million Euro but they will serve mostly other target groups (mainly not cyclists along the ICT). It is therefore considered worth investing European, national, regional, local public and private resources in the ICT because the yearly total economic impact is more than the whole development and maintenance cost for 2012-2020! Goals: This document aims to provide an overview on the current situation, necessary actions and their costs. Detailed information is available on the relevant webportals (www.eurovelo.org) for the above mentioned countries. We aim for higher official recognition and dedicated resources to implement the actions on the local, regional, national and European levels. This publication summarises the current situation and necessary actions in the following fields: Route infrastructure Services Marketing, promotion and communication Organisation and financing 1 More information: www.eurovelo.org 2 According the study EuroVelo Challenges and Opportunities ordered by the European Parliament. 3 Except Bavaria and Saxony. 4 Only for the Austrian Hungarian border (not for the border of Hungary with Slovenia, Croatia, Serbia)

4 Route Infrastructure Components of the Iron Curtain Trail

Route infrastructure 5 Current situation The final itinerary is more than 10.400 km, of which 8.800 km is inside the EU. Currently we have information about 87% of the itinerary 5. 80% of the itinerary is on low traffic or traffic free roads and cycle paths but there are serious quality problems with approximately 5% of them. A further 7% are located on high traffic roads (mostly in Poland, Bulgaria, Estonia and Latvia) so 11% of the total itinerary currently has inappropriate conditions where urgent actions (e.g. construction works) are needed. 17% is already signed as a national or regional route, 8% as (another) EuroVelo route and 1% as EuroVelo 13 - ICT (in Slovakia and Germany). There are some very challenging conditions (for less athletic cyclists) between service points / settlements at either end of the route. In the sparsely-populated North there are very long distances to cover, whilst in the south there are some high elevations in some of the mountainous regions. There are national standards for cycling infrastructure in the Northern and Central European countries but they are mostly missing in the South. Route quality and maintenance works and are not standardised or controlled. EuroVelo13 - Iron Curtain Trail, A Trans-national Action Plan for its implementation Proposed core actions Detailed planning is necessary to prepare the construction works. All actions and dimensions mentioned below are only preliminary estimations. New segregated cycle paths / cycle lanes or asphalted hard shoulders are needed on close to 900 km of the route. The majority of these developments (400 km of cycle paths) are proposed by the Polish partners but they are also required in Latvia (149 km), Estonia (91 km), Germany (91 km), Bulgaria (68km) and smaller sections are needed in some of the other countries too. 300 km requires shared lanes, cycle lane marking and / or traffic calming. On more than 600 km it was proposed to renew facilities and / or improve the surface of existing facilities (needed mainly for cyclists). Maintenance of the cycling facilities and signing is necessary to sustain the results of the developments and achieve the fullest potential of the route. EuroVelo signposting in addition to the existing signs is proposed on 2,200 km and complete (EuroVelo) signing is proposed for 6,900km. In the mountainous regions, the establishment of bike delivery capacities and improved conditions on buses and trains is needed. The Polish partners have identified a need for more than 26.000 bike storage units. Standards for cycling route infrastructure are needed in 7 counties whilst a handbook for maintenance works and monitoring is needed in every country. Automatic counters should be installed on 127 sections. The data should be processed and verified every year until 2020 in all countries. Connected route infrastructure development actions (mainly not for cyclists) Construction of new public roads is needed on close to 200 km and the repair of the asphalt on public roads / streets is necessary on approximately 500 km, generally for the local population. 5 No information: Norway, Russia, Slovenia, Croatia, Serbia (border with Hungary), Hungary (border with Slovenia, Croatia, Serbia). Not complete information: Poland, Bavaria and Saxony (Germany).

6

Services 7 Current situation The whole of the ICT was split into 229 daily sections and we tried to ensure there is at least basic and/ or standard accommodation available at the end of each section. Unfortunately there are 35 sections which were reported as having inappropriate service conditions, mostly in Finland (16 sections) and Poland (19 sections) 6. In addition, there are 64 sections with serious quality deficiencies ( just appropriate service conditions ) along the route (mostly in Latvia and Bulgaria) but it is possible to find basic services on these sections. Generally the service providers are cycling friendly in the Northern section of the route but there are no official cycling friendly service systems in place. In the central part there are cycling friendly service systems in every country. In the Southern section, traditional hospitality providers could provide a good basis for the development of such schemes but they do not exist currently. Bike repair services are generally available in the central section but there are serious deficiencies in Finland and in the Southern section. E-bike rental and charging services are not developed anywhere along the itinerary. EuroVelo13 - Iron Curtain Trail, A Trans-national Action Plan for its implementation Proposed core actions Development of basic accommodation is needed on 20 sections in Finland (providing home stays in existing farmhouses) and on 1 section in Romania. Transforming accommodation to cycling friendly is needed on 90% of the route. Transforming retail shops and restaurants to cycling friendly was proposed on 162 sections (everywhere, except in Germany), whilst transforming attractions was proposed on 112 sections (only in the North and South). Training and awareness-raising for the staff of services and attractions was proposed in the North (Poland) and in the South. It is necessary to establish a label and quality criteria system for cycling friendly services on the national / regional level in every country along the whole ICT, except Poland, Germany, Austria, the Czech Republic, Slovakia and Hungary, where they exist already (N.B. Slovenia and Croatia also have one) Every country highlighted the need to organise and control the network of cycling friendly services. Rest stations were proposed on 118 sections in Finland (38), Germany (22), Poland (22), the Czech Republic (12), Estonia, Latvia, Austria, Slovakia and Hungary. Bike repair stations are needed on 73 sections, mostly in Finland (38) but also in Estonia and Latvia, in the Southern (11) and Central (7) sections. New bike rental stations are proposed on 66 sections in Finland (43), Latvia (5), Slovakia (1), Hungary (6), Bulgaria (2) and in the Czech Republic (9). The establishment of pedelec stations was proposed on 68 sections in Finland (37), Poland (22) and in the Czech Republic (9). A bicycle centre providing complex services was proposed in Lithuania only. An help line to aid cyclists in emergency situations was proposed in Finland, Hungary and in every country in the Southern section of the route. 6 In Poland the route proposed by the PSWE mostly does not follow the touristic Baltic Sea coast but instead discovers remote rural areas. It therefore does not allow for the use of existing touristic services but does open up new opportunities for the rural communities.

8

Marketing, promotion 9 EuroVelo13 - Iron Curtain Trail, A Trans-national Action Plan for its implementation Current situation Several regions along the ICT are already well known among cycling (and other) holiday makers, some even as cycling holiday destinations: Tallin in Estonia, the Latvian seaside between Riga and Jurmala, the Lithuanian Seaside Cycle Route, the Baltic Sea coast from Gdansk to Gdynia, the Baltic Sea Cycle route in Germany, Neusiedler See / Ferto area, Harz, Sumava, Elbe-route, Upper and Lower Austria, the Danube Cycle Route (EuroVelo 6) at the Iron Gate and the Black Sea coast. Even those areas that are not necessarily among the touristic hot-spots of Europe, are still well known regionally and can serve as a basis for cycling tourism promotion along the ICT. The ICT EV13 route is usually not mentioned in any official promotion or marketing activities of the above mentioned tourism destinations. The Bikeline Guide and Michael Cramer s book and website about the ICT are the main sources of dedicated information for cycling tourists. There are 53 sections currently without websites containing any detailed information for cycling tourists, mostly in the South but even some of the Central and Northern sections do not have information available on the internet. Those websites that do exist do not reference each other and are not connected. The printed information (e.g. brochures, free maps etc.) available does not properly cover the route, and there are 140 sections where printed promotion tools are missing or not complete. Proposed core actions A marketing plan for the route and regular surveys of the users and market is needed in every country and on the trans-national level as well. The route should be integrated into the existing tourism offers, relevant existing web portals, guidebooks and maps, printed promotion tools, advertisements activities, presentations at fairs, existing social media etc. These activities can be useful in those countries and regions where there are well developed tourism products and promotional tools that can serve as a basis for future development. In case of less frequented touristic destinations we should support the development of cycling tourism offers especially for the EuroVelo13 Iron Curtain Trail. In every country we need an internet portal if there is not a national / regional (cycling) tourism web portal which could easily accommodate detailed information for this special route. These portals have to be connected under the EuroVelo 13 route portal within the EuroVelo.com umbrella on the transnational level. Based on this detailed information we propose to develop applications for smart phones and / or audio guides (which has already been started in Finland). We propose to publish printed promotion tools, organise cycling promotion events for the public and study trips for journalists and publish press releases, PR articles and direct advertisements. We propose to install info points and info stands on 115 sections along the route.

10 Countries Length (km) Cost in million Euro Cost per km in Euro Summary (all sections and costs) 10,463 351.1 33,560 Norway 100 7 n.a. n.a. Finland 1,744 0.9 491 Russia 600 8 n.a. n.a. Estonia 1,061 15.7 14,819 Latvia 562 32.3 57,494 Lithuania 106 11.1 104,825 Poland 792 234.5 296,036 Germany 1,706 23.9 13,986 Czech Republic 491 4.7 9,605 Austria 415 1.6 3,803 Slovakia 92 1.0 10.886 Hungary (border with Austria) 163 2.2 13,398 Border between Hungary and Slovenia / Croatia / Serbia 500 9 n.a. n.a. Serbia (border with Romania) 353 2.3 6.492 Romania 384 1.4 3,764 Bulgaria 1,038 16.3 15,742 FYR of Macedonia 173 0.7 3,977 Greece 55 0.4 7,276 Turkey 128 0.8 6,521 Trans-national activities All 1.3 127 7,8,9 Estimation - the itinerary is not defined.

Organisation and financing 11 EuroVelo13 - Iron Curtain Trail, A Trans-national Action Plan for its implementation Current situation: The European Parliament accepted a proposal of Michael Cramer and asked the European Commission and the Member States to consider the EuroVelo-Network and ICT as an opportunity for promoting European trans-border cycling infrastructure networks, supporting soft mobility and sustainable tourism. It provides a good basis but the ICT (and cycling generally) is not integrated to the tourism, transport, regional development and rural development strategies, programmes and funds. Responsibility for the development of the ICT is mostly clear for the Northern section but still largely undefined for the Central and Southern sections. The road authorities have to be responsible for the majority of the route infrastructure development actions together with public transport providers. The National EuroVelo Coordination Centres (NECCs) should be responsible for the monitoring in the future. The tourism boards and the NECCs are responsible for the coordination of services, promotion and marketing. Private enterprises will need to undertake the service development tasks. The management of the EuroVelo routes in every country is a shared responsibility but has to be steered by the NECCs on the national level and by the ECF 10 on the European level. Financing possibilities: National, regional, local authorities mostly have very limited resources. There is a serious lack of dedicated European financial resources in the current financing period (2007-2013) but significant potential in the next one (2014 2020). In every region (in the EU) the rural development programmes (EAFRD 11 ) can co-finance all the local activities. Most of the regions along the ICT in the EU are entitled to receive regional subsidy (ERDF 12 ) to provide resources for the investments. The directly cross-border route actions can be financed from the cross-border and trans-national programs. Proposed core actions: Awareness-raising to convince the decision makers and the stakeholders. Appointment of the responsible organisations / individuals, the creation of NECCs (where they do not currently exist) and the establishment of trans-national management. Create working groups for route infrastructure, services and marketing and steering groups for route development and strategy. Official support for integrating the ICT into relevant strategies and programmes and the implementation of the action plans. Allocation of significant financial and human resources on every level. Precise survey of the whole itinerary by GPS. Training and study tours to improve the special knowledge of professionals. Preparation and implementation of individual projects. Establish a ranger system to monitor the route conditions. The summary cost of all the activities along the route is 351 million Euro (for 2012 2020). These total costs are equivalent to the construction of only a few km of motorway. It is proposed that 15% of the actions can be carried out in the short term, 29% should be undertaken in the medium term, whilst 55% are long term activities. 10 European Cyclists` Federation, the coordinator of the European cycle route network 11 European Agricultural Fund for Rural Development 12 European Regional Development Fund

Publishing credits This document was implemented in the project EuroVelo Central Coordination, financed by the European Commission, Directorate-General for Entrepreneurship and Industry (under Grant Agreement # SI2.ACGRACE038703800). Publisher: European Cyclists` Federation (ECF) Design: Digitária Kft., Krisztina Takács, H - Pilisvörösvár Authors: Ádám Bodor, Ed Lancaster, ECF Supported by the 3 international consortia which developed Trans-national action plans for the northern (lead partner: PSWE Poland), central (lead partner: EPA Czech Republic) and southern (lead partner: ASWM Bulgaria) sections. Photo credits: Cover and 2: Nadace Partnerstvi, 4: David Tucker/ADFC, 6: Cycling Hungary Alliance, 8: PSWE, 10: David Tucker/ADFC. This publication is part of the ECF EuroVelo publication series. It should be read in conjunction with following publications and with the national status reports and action plans: EuroVelo, the European cycle route network EuroVelo, the European cycle route network, Development Strategy 2012-2020 EuroVelo, National Coordination Centres, guidance on application process EuroVelo, Signing of EuroVelo cycle routes EuroVelo, Corporate design of EuroVelo cycle routes (planned) EuroVelo, Web solutions for EuroVelo cycle routes (planned) Additional guidelines over time More information: European Cyclists` Federation, Brussels eurovelo@ecf.com www.eurovelo.org (c) European Cyclists Federation December 2011 The ECF EuroVelo project is supported by: