Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

Similar documents
Route 28 Corridor Safety and Operations Study

Route 28 Corridor Safety and Operations Study

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

Project Description Form 8EE

TRASBURG RANSPORTATION

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

City of Fairfax, Virginia City Council Work Session

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

Figure 1: Vicinity Map of the Study Area

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Boston Post Road Design Feasibility Study

DUNBOW ROAD FUNCTIONAL PLANNING

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

County of Fairfax, Virginia. Department of Transportation

The Year Ahead: Virginia Department of Transportation Northern Virginia District

CSAH 101 Preliminary Design

TECH MEMOS #3 & #4 EXISTING AND FUTURE TRAFFIC CONDITIONS TRAVEL FORECASTING APPROACH CITY OF NOVI THOROUGHFARE MASTER PLAN

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Land Use and Transportation Town Hall September 17, 2018

Grant Avenue Streetscape

Multi-Modal Traffic Analysis. Parisi and Associates

Legislative Update Williamsburg Residency

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Fairfax County Parkway Widening Fairfax County

Harrah s Station Square Casino

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Delaware Avenue Corridor Study

Route 15 Congestion Report Findings

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Project Description Form 6V

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

APPENDIX D COST SUMMARY TABLES

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Water Street Promenade Engineering and Design Services

Glenn Avenue Corridor Traffic Operational Evaluation

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

Giles Run Connector Road

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Washington St. Corridor Study

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Lynchburg District Update

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

ARRENTON RANSPORTATION

Conversion of One-Way Couplet Streets to Two-Way

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Route 7 Corridor Study

Route 29 Solutions Projects

Cincinnati Dayton Rd Widening

List of Display Boards

Access Routes from US 101 to the Richmond San Rafael Bridge

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Shockoe Bottom Preliminary Traffic and Parking Analysis

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Project Description Form 8AA

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Station Plan: Penn & 43rd Avenue

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

3.0 PROJECT DESCRIPTION

Transportation Corridor Studies: Summary of Recommendations

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Bay to Bay Boulevard Complete Streets Project

WHANGAREI IMPROVEMENTS

Albany Shaker Road Corridor Study Public Meeting # 2

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Washington DC Section of ITE Project Briefing

CITY OF SPOKANE VALLEY Request for Council Action

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Transportation Planning Division

FY 2006 TRANSPORTATION CAPITAL PROGRAM

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming

Transcription:

Route 28 Corridor Safety and Operations Study Public Information Meetings July 20 and 22, 2015 1

Study Goals and Objectives Phase 1 Short-term Short-term improvements Ability to implement quickly Cost effective Phase 2 Long-term Wider scope of alternatives Currently being planned by Prince William County and City of Manassas 2

Study Area Route 28 Centreville Road From South of I-66 To Liberia Avenue Localities/agencies included: Fairfax County Prince William County City of Manassas Park City of Manassas Virginia Department of Transportation 3

Planned Corridor Activities NVTA Route 28 Widening and Improvement Project In Loudoun: Route 28 South widening from Sterling Boulevard to the Dulles Toll Road, providing hot spot improvements 4

Planned Corridor Activities In Prince William (4 ½ miles): Route 28 widening from Linton Hall Road to Fitzwater Drive Includes the realignment of Vint Hill Road Route 28 widening from Route 234 Bypass (PWC Pkwy) to Linton Hall Road 5

Planned Corridor Activities In the City of Manassas: Route 28 widening from Godwin Drive to the Southern City/Prince William County limits Route 28 (Manassas Bypass) Study 6

Planned Corridor Activities NVTA Route 28 Widening and Improvement Project In Fairfax: Route 28 North widening from McLearen Road to the Dulles Toll Road Route 28 South widening from the Dulles Toll Road to Route 50; and 7

Planned Corridor Activities NVTA Route 28 Widening and Improvement Project Route 28 widening from Prince William County Line to Route 29 From 4 lanes to 6 lanes Both directions Planned to be in place by 2020 8

Candidate Improvement Identified over 100 safety and congestion related candidate improvements Screened by local agencies Screened by Steering Committee Identified five (5) for advancement to design Series of immediate action items 9

Steering Committee Recommended Improvements Candidates for further advancement: 1. Additional northbound lane(s) - Rt 28 2. Sidewalk/path - eastside near Bull Run Bridge 3. Sidewalk/path westside, Spruce Street to Leland Road 4. Southbound left-turn bay extension at Liberia Avenue 5. Roundabout intersection at Ordway/Compton 10

Analysis Overview Study Analysis elements: Developed traffic forecast model for design year 2020 Widening of Rt 28 from Upperridge to Bull Run Bridge, in base Performed traffic analysis Developed benefits using HSIP process Developed preliminary design sketches Developed cost estimates Developed cost-benefit ratio and recommendations 11

Item 1: Additional Lanes on Route 28 Route 28 Widening Widen from existing 4 lanes to 6 lanes Bull Run Bridge to Upperridge Drive/Old Centreville Road Fairfax County Advancing to design 12

Additional Lanes on Route 28 Route 28 Widening Travel time under existing conditions Expected improvement of 15 minutes (33%) in corridor for AM northbound peak From existing average travel time of 45 mins. to 30 mins. Liberia Avenue to New Braddock Road Projected Benefit Additional capacity Needed to keep pace with projected growth 2020 travel time with planned additional development 4 minutes better than existing (9%) 13

Sidewalk, Eastside at Bull Run Design overview Shift curb line, use median area, 700 in length Removes portion of 2-way left turn lane area Little to no impact on PWC Park Cost = $1.1M Benefits Construction $870,000 Engineering $250,000 Right-of-way $0 High safety value Pedestrian/Bike system continuity 14

Sidewalk/path - Eastside near Bull Run Bridge 15

Sidewalk, Westside Spruce St to Leland Rd Safety related improvement Adds 1,400 of sidewalk, westside of Route 28 Addresses pedestrian/bicycles in roadway 16

Sidewalk/path Westside Spruce Street to Leland Road 17

Sidewalk, Westside Spruce St to Leland Rd Improvement Benefits Removes pedestrians/bicycles conflicts from roadway Provides pedestrian access to private school Design constraints Drainage and slope areas Vegetation Cost = $2.5M Construction $1,700,000 Engineering $460,000 Right-of-way $325,000 High cost benefit ratio (3 to 1) 18

SB Left-Turn Bay Extension at Liberia Avenue Intersection improvement : Additional storage for southbound to eastbound left turn vehicles 19

Southbound Left-Turn Bay Extension at Liberia Avenue 20

SB Left-Turn Bay Extension at Liberia Avenue Intersection improvement to address: Southbound left turning traffic queuing into southbound through lanes during peaks Reduction in rear-end accidents Requires access changes: Make Kincheloe Drive Right in-out only Shopping center driveway, right out only, possibly support left turn in Cost = $250K Construction $190,000 Engineering $55,000 Right-of-way $0 21

Roundabout at Ordway Old Centreville Road Serves as a parallel alternative route Address off-set intersection in close proximity to the of Compton Road and Route 28 Roundabout would: Re-align the approaches to intersect at 90 degrees Change the intersection control from minor street stop to a roundabout operation. Increase the approach geometry for the intersection of Compton Road with Route 28 Dual lefts, a through lane and a right turn lane. 22

Roundabout Intersection at Ordway Rd/Compton Rd 23

Roundabout at Ordway Rd/ Compton Rd Intersection improvement to address: Address intersection spacing between Ordway Road and Route 28, more queuing space Congestion reduction at Ordway Road/Compton Road/ Route 28 (LOS A/B) Address queuing on EB leg of Ordway Rd/Compton Rd/ Route 28 Cost = $6.2M Construction $4,700,000 Engineering $925,000 Right-of-way $580,000 Recommend traffic calming study for Old Centreville Road during the design phase 24

Design Recommendations Summary Route 28 widening north of Bull Run Fairfax County and NVTA underway Sidewalks Sidewalk/path westside Spruce St to Leland Rd Sidewalk/path - eastside near Bull Run Bridge Part of completion of pedestrian/bicycle plan SB Left-Turn Bay Extension at Liberia Ave Roundabout Intersection at Ordway Rd/ Compton Rd 25

Signal Retiming Activities VDOT On-Going Recommendation Implementation Signal retiming on Route 28 Upperridge Road to Bull Run completed Bull Run to Manassas Drive completed Liberia Avenue retiming data collection phase Portner Avenue Mathis Avenue Route 28 Manassas Junction Euclid Avenue 26

Corridor Improvements VDOT Traffic Engineering Activities: Cross Street # Candidate Improvement Machen Rd 2 New Braddock Rd 7 Add Right Lane Must Turn Right sign and pavement markings to the southbound lanes 100-150 ft. south of the intersection (to supplement existing sign and pavement markings downstream) Currently under review EB center signal head serving thru-left lane should be four-section signal head Compton Rd 14 Install supplemental signal head on Ordway Rd EB approach Rugby Rd 17 Install intersection warning signs with road name plaque Rugby Rd 20 Relocate school pedestrian crossing sign SB Rt 28 Maplewood Dr 21 Install advance Next Signal guide signing Manassas Plz / Browns Ln Old Centreville / Blooms Quarry Ln Orchard Bridge Dr 23 Install advance Next Signal guide signing 25 Install intersection warning signs for SB with road name plaque Citizen Review and adjust southbound left turn indications to address visibility comments from citizens, alignment or replacement possible. 27

Planned Corridor Activities Old Centreville Road Bull Run Bridge, Major Rehab Project Existing Rt 28 alternative route Work starts in Summer 2016 Estimated construction cost = $1.9M Deck replacement, no additional capacity Old Centreville Rd Will be reduced to one reversible lane with signalization Impact, moves existing bottleneck south 28

Information Web Page Study-specific information Reports and presentations http://www.vdot.virginia.gov/projects/ northernvirginia/route_28_corridor_study.asp Comment Email Address: meeting_comments@vdot.virginia.gov 29

Thank You! Questions / Comments? meeting_comments@vdot.virginia.gov VDOT contacts: Mr. Tom Fahrney tom.fahrney@vdot.virginia.gov Mr. Robert Iosco robert.iosco@vdot.virginia.gov NVTA Contacts: Monica Backmon monica.backmon@thenovaauthority.org 30