Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

Similar documents
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Road Diets FDOT Process

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Linking Transportation and Health in Nashville & Middle Tennessee

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

LANE ELIMINATION PROJECTS

Welcome to the Quebec Alternatives Analysis Public Meeting

Prince George s County plans, policies, and projects

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Pedestrian & Bicycle Safety Innovations & Applications

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Safe Streets. City of Lake Forest Park. March 21, 2017

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Lawrence Avenue Streetscape Concepts August 30, 2011

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

San Jose Transportation Policy

Fields of St. Croix HOA Meeting. October 27, 2016

C C C

Creating Complete Streets to Accommodate All Users

Road Diets: Reconfiguring Streets for Multi-Modal Travel

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Financial Project ID No(s).: and ETDM No(s).: and 14181

Citizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

KEARNY MESA COMMUNITY PLAN UPDATE

Board of Supervisors February 27, 2017

Physical Implications of Complete Streets Policies

Designing Complete Streets: What you need to know

Donahue Drive Corridor Traffic Operational Evaluation

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Transportation Planning Division

MAKE YOUR PLACE IN CHANNELSIDE

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Ocean Park Boulevard Green Street Project Community Workshop

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Bicycle and Pedestrian Plans and Improvements

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Lord Overpass Multi-Modal Boulevard. Nicolas Bosonetto, P.E.

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Glenn Avenue Corridor Traffic Operational Evaluation

The DC Pedestrian Master Plan

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

5 CIRCULATION AND STREET DESIGN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Appendix A-2: Screen 1 Alternatives Report

Designing for Pedestrian Safety in Washington, DC

Thank you for attending

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

East Burke Transportation, Safety and Capacity Improvements

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Transportation Planning Division

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Capital Metro Downtown Multimodal Station

Omaha s Complete Streets Policy

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Paoli Road Improvement Feasibility Study

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

2012 PRIORITY TRANSPORTATION PROJECTS

Completing the Vision

Transportation Policy Manual

Maywood Town Hall Meeting. May 4, 2016

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

County Board Workshop

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

NEWMARKET UPHAM S CORNER

122 Avenue: 107 Street to Fort Road

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

FONTAINE AVENUE STUDY Final Report

East 12 th Street Bikeway Feasibility Study

Presentation Starts at 5:30 PM

Project Kickoff Meeting February 15, 2018

Welcome. If you have any questions or comments on the project, please contact:

COMMUNITY MEETING AGENDA

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

THE NACTO MANUALS AND DESIGNING FOR VISION ZERO ZAKI MUSTAFA SHIRLEY ZAMORA

Tonight is for you. Learn everything you can. Share all your ideas.

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Transcription:

Presentation Outline Project/Study Purpose Study Area Map Existing Conditions Future Conditions Understanding the Streetside Similar Walkable Environments Conceptual Alternatives Magnolia/NE 1st Ave Block Options p Next Steps 2

Study Purpose Study Purpose: Use a context sensitive approach to develop walkable urbanized environment Establish a multi modal approach for realizing the future vision of SR 40 Project Objective: Identify and evaluate alternative improvement concepts to be advanced to the design phase Corridor Development Plan SR 40 Downtown Concepts from City of Ocala s 2035 Visioning Plan 3

Existing Conditions: SR 500/US 441 to Watula Ave 5

Existing Conditions: Watula Ave to NE 8th Ave 6

Future Development: FDOT Intersection Improvement Project SR 40 (Silver Springs Boulevard), from US 441 to Magnolia Avenue 9

Existing Conditions Map: SR 500/US 441 to Watula Ave 10

Existing Conditions Map: Watula Ave to NW 8th Ave 11

Existing Conditions: Bike/Ped Crash Data (2008 2012) 12

Existing Conditions Summary Auto Crash Types (2008 2012) 31,000 Annual Average Daily Traffic NW 2nd Ave A Si Signall to t be b Removed R d Several Unmarked Crosswalks Existing Pedestrian Refuges Constrained Roadway with Narrow Sidewalks Better Connectivity for North/South Movement Needed 13

Understanding the Streetside Furnishings Frontage Zone Zone Edge Throughway Zone Zone 15

Understanding the Streetside: Design Parameter Comparison Thoroughfare h hf i Parameters for f Walkable lk bl Urban b Thoroughfares h hf ITE s Design 16

Similar Scaled Walkable Environments 18

Examples of Best Practices d i Channelization Ch li i Pedestrian h d Crosswalks C lk Enhanced Integration with Narrow Sidewalks Curb Extensions 19

Typical 90 Cross Section (SR 500/US 441 to Watula Ave) E i ti C diti Existing Conditions 20

Typical 80 Cross Section (Watula Ave to NE 8th Ave) E i ti C diti W t l Ave A to t NE 8th Ave A Existing Conditions Watula 21

Alternative A: Typical 90 Cross Section R i d Median M di Concept C t SR 500/US 441 tto Watula W t l Ave A Raised 22

Alternative A: Typical 80 Cross Section R i d Median M di Concept C t Watula W t l Ave A to t NE 8th Ave A Raised 23

Alternative B: Typical 90 Cross Section L R d ti Concept C t SR 500/US 441 tto Watula W t l Ave A Lane Reduction 24

Alternative B: Typical 80 Cross Section L R d ti Concept C t Watula W t l Ave A to t NE 8th Ave A Lane Reduction 25

Conceptual Corridor Plan: Alternative A R i d Median M di Concept C t SR 500/US 441 tto Watula W t l Ave A Raised 26

Conceptual Corridor Plan: Alternative A R i d Median M di Concept C t Watula W t l A t NE 8th Ave A Raised Ave to 27

Conceptual Corridor Plan: Alternative B L R d ti Concept C t SR 500/US 441 to t Watula W t l Ave A Lane Reduction 28

Conceptual Corridor Plan: Alternative B L R d ti Concept C t Watula W t l A t NE 8th Ave A Lane Reduction Ave to 29

Magnolia/NE 1st Ave Block: Alternative A Option A Additional EB left turn lane at Magnolia Ave Additional EB Left Turn Lane at Magnolia Avenue Magnolia Ave, between SR 40 and NE 1st St, becomes two way street 30

Magnolia/NE 1st Ave Block: Alternative A Option 1A Additional EB left turn lanes at Magnolia Ave and NE 1st Ave Additional EB Left Turn Lanes at Magnolia Avenue & NE 1st Avenue Magnolia Ave and NE 1st Ave become two way streets 31

Magnolia/NE 1st Ave Block: Alternative A Option 2A Additional EB and WB left turn lanes at Magnolia Ave and NE 1st Ave Additional EB & WB Left Turn Lanes at Magnolia Avenue & NE 1st Avenue Magnolia Ave and NE 1st Ave both remain one way streets 32

Conceptual Alternatives Summary Alternative A Alternative B 4l 4 lane raised i d median di conceptt L Lane reduction d ti conceptt Accommodates automobile movement Adds buffered bike lanes 10 wide sidewalks West of Watula Adds +50 parallel parking spaces 8 wide sidewalks East of Watula 10 wide sidewalks West of Watula Remains within existing ROW 5 wide sidewalks East of Watula Curb extensions at select locations Remains within existing ROW st Additional EB & WB Left Turn Lanes at Magnolia Avenue & NE 1 Avenue Preserves existing pedestrian refuges Curb extensions at select locations Requires additional traffic analysis 33

Next Steps ll i Data Collection Planning Review/Needs Assessment Alternatives Identification/Development Alternatives Development Meeting Deliverable: Alternatives and Strategies Report Concept Development & Evaluation Concept Development Public Meeting Deliverable: Corridor Assessment Summary Implementation Strategy Deliverable: Corridor Development Plan 34