WDA response to O'Brien summary of recommendations dated 4 September 2017

Similar documents
YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

5. RUNNINGWAY GUIDELINES

Welcome to the McKenzie Interchange Project Open House!

Washington DC Section of ITE Project Briefing

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Strategy for Walking & Cycling Action Plan

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Project Description Form 6V

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

ADVANCED TRANSIT OPERATIONS AND MODELING

Draft North Industrial Area-Wide Traffic Plan

Durham Region Long Term Transit Strategy

Regional Transportation Needs Within Southeastern Wisconsin

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Community engagement guide May 2018

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Tunnel Reconstruction South 5 th Street Association October 16, 2018

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

PROJECT FACT SHEET May 25, 2018

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Transportation Master Plan Advisory Task Force

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Tonight is for you. Learn everything you can. Share all your ideas.

Route 7 Corridor Study

Terwillegar Drive Expressway Draft Concept Plan

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

Chapter 6 Transportation Plan

Harrah s Station Square Casino

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

PROJECT FACT SHEET March 21, 2018

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

City of Waterloo Complete Streets Policy

North Coast Corridor:

Welcome. If you have any questions or comments on the project, please contact:

Works Approval Application. G.2 Traffic

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

ACTIVE TRANSPORTATION

Route 29 Solutions Projects

1. Provide a dedicated westbound approach bus lane at the intersection;

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Public Event 1 Community Workshops

Performance Criteria for 2035 Long Range Transportation Plan

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

Chapter 5 Future Transportation

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

Wellington Public Transport Spine Study

The Consultation has now ended.

C C C

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Frome Street Bicycle Route

York Region Population and Employment Growth

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Precinct 15 Blackshaws Road Altona North Development / Structure Plan Transport Assessment

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

102 Avenue Corridor Review

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

CHIEF PEGUIS TRAIL EXTENSION WEST

Bicycle Master Plan Goals, Strategies, and Policies

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

APPENDIX D. May 22, 2002 Open House Summary and Materials

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Multimodal Analysis in the 2010 Highway Capacity Manual

Classification Criteria

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

2. Context. Existing framework. The context. The challenge. Transport Strategy

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Traffic and Transport Assessment

Public Consultation Centre

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

The following notes describe comments received that were written/drawn on maps by workshop participants.

43 rd Avenue, Skillman Avenue Protected Bike Lanes

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Public Meeting #1 Comment Summary

List of Display Boards

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Transcription:

WDA response to O'Brien summary of recommendations dated 4 September 2017 O'Brien recommendation 1. Incorporate sustainable solutions such as travel demand management, active traffic management, multimodal transport, integrated land use planning into the project. WDA response This is a submission. Not agreed. 2. Provide justification for moving away from the earlier proposed alignment. See PN71. 3. Extend the local area in the TIA to include intersections along Melbourne Road, Millers Road, Geelong Road, Grieve Parade, Kororoit Creek Road and Blackshaws Road. 4. Update the TIA to provide turning movement estimates at interchanges and local intersections and undertake a proper analysis of local impacts in terms of intersection degree of saturation (DOS), and estimates of queue lengths and delays for individual lanes and turning movements. See PN69. This level of detail is not required across the Project at this stage of the process. Microsimulation modelling outputs of specific intersections have been provided where requested by the IAC. 5. Provide detailed strategic and spreadsheet modelling outputs and

adjustments in the TIA. 6. To minimise the demand for truck use of local roads, it is my strong recommendation that the proposed direct tolls on trucks between [Millers Road] and Melbourne [Road] be removed. 7. Provide further details for pedestrian and cyclist path connections, safety, and dedicated infrastructure serving connections to the Federation Trail from key local roads, overpasses and through interchanges. 8. Develop a strategic link from Grieve Parade to Market Road as a long-term measure (as per the Brooklyn Evolution Long-term Framework Plan). This will be addressed through detailed design. This is outside the Project scope. 9. Extend the new fifth westbound lane to Forsyth Road interchange. This is outside the Project scope and is a matter for VicRoads. 10. Examine and explain why there is a need for a 3-lane outbound tunnel that reduces to 2 lanes immediately after exiting the tunnel. 11. Provide further details of traffic impacts arising from the construction compounds and haul routes including microsimulation models showing The outbound southern portal should be reviewed as part of detailed design. This will be addressed in the CNVMP and the Traffic Management Plans in accordance with

peak congestion conditions during construction and also the analysis to NVP3 and TP3. assess traffic performance during construction. 12. Provide access to the southern tunnel portal compound via a link under WGF from the north not via New Street. 13. An alternative recommendation to removing direct tolls on trucks between Grieve Parade and Melbourne Road is to introduce full truck bans on Blackshaws Road, Hudsons Road, North Road, Millers Road and Kororoit Creek (east of Millers Road). 14. Preserve Millers Road as key N-S corridor for residents, businesses, pedestrian and cyclists, and upgrade the Grieve Parade interchange by adding ramps to/ from the M80 Western Ring Road and construct new west-facing ramps to Dohertys Road to Princes Freeway. Truck bans will be implemented on Blackshaws Road and Hudsons Road. This is outside the Project scope. 15. Assess ramp metering operations and determine upgrades, such as number of metering lanes at the on-ramps. This is an operational detail. 16. An alternative to truck bans on Millers Road is to enhance landscaping, As well as removing the toll point between Grieve

cross section and local access on Millers Road north of the freeway to Parade and Millers Road, WDA is tailoring offreservation noise mitigation for residents of minimise impacts to local residents and businesses. A corridor study is required on Millers Road between Geelong Road and Blackshaws Road to Millers Road. VicRoads will continue to monitor propose improvements to mitigate impacts of additional traffic using this network operation on Millers Road. route. 17. Provide dedicated bus lanes and priority measures to assist bus operations and services. Public transport should be prioritised/augmented during construction to assist managing traffic capacity/performance along the Project corridor. 18. Transit lanes should be provided to encourage multi-occupant passenger vehicles on the Freeway (even if these are only at on-ramps). 19. Provide further details on pedestrian and cyclist path connections, safety and dedicated infrastructure onto the Federation Trail from key local roads, overpasses, and through interchanges. 20. Provide grade separation of Federation Trail at Hyde Street with a seamless connection to the Coastal Bay Trail, including an upgrade of the shared use This does not require a recommendation by the IAC. This does not require a recommendation by the IAC. This repeats item 7 and will be addressed through detailed design.

path between the end of Federation Trail and the West Gate bike punt. 21. The proposed upgrade of Federation Trail west of Millers Road to be a full reconstruction in concrete, including public lighting, and should be implemented along the upgraded and new alignment of the Trail. 22. Provide a shared path through the land along the edge of the Freeway and connecting the State Government land to the west of Beevers Street (that could also be used for emergency vehicle access). 23. In the design of the two pedestrian overpass upgrades consider current access to the ramps and ensure connections are provided to a high standard in consultation with HBCC. 24. All proposed new and upgraded active transport linkages should be delivered as early as possible to encourage travel behaviour change and ongoing local connectivity. 25. A corridor study should be undertaken on Geelong Road to identify upgrades to the Grieve Parade, Millers Road, Francis Street and McDonald Road intersections. This will be addressed through detailed design. This will be addressed through detailed design. This does not require a recommendation by the IAC. This is not warranted by the Project and is a matter for VicRoads.

26. The project should contribute to the LATM plans for Altona North, South Kingsville, Spotswood and Brooklyn areas. 27. Provide a shared path through the land along the edge of the Freeway and connecting the State Government land to the west of Beevers Street (that could also be used for emergency vehicle access). This repeats item 22 and is not warranted by the Project. 28. Reconfigure Blackshaws Road / Shute Street / Melbourne Road intersection to achieve additional capacity 29. Consider pedestrian/cycling links to Spotswood and Newport Rail stations. 30. Improve the link between the proposed open space at Precinct 15 and Edwards Reserve through the establishment of a shared path along the railway reserve. 31. Address the undesirable issue of Freeway access from the local street network in Spotswood, e.g. intersection treatments, parking and local access

consideration. 32. Introduce truck bans in Spotswood to protect the local area from traffic short cutting through the area. 33. The use of Hall Street as a construction traffic route is not supported due to the environmental, amenity and visual impacts on the Emma McLean Kindergarten and an alternative access is required to be identified. This will be addressed in the CNVMP and the Traffic Management Plans in accordance with NVP3 and TP3. 34. Further analysis required in regard to the traffic impact on Douglas Parade and Hyde Street. 35. Further detail is required on likely frequency and impacts of tunnel closures during operation and incidents and the stated use of the Hyde Street ramps to detour traffic. 36. If a shared path has a high proportion of commuters then consideration should be given to developing segregated paths to minimise conflicts

between cyclists and pedestrians (p. 32). 37. Dynamic tolling should be considered to achieve project objectives (p. 41). 38. Viewing the micro-simulation model, both Chirag and I were surprised how uncongested the roads were _suggesting model errors given the large increase in traffic on Millers Road. The model output volumes need to be compared to existing to check that they are realistic. Who is Chirag? No response necessary. 39. The parts of the model need to be connected to show realistic operation e.g. Millers Road had a break between Geelong Road and WGF. This has been explained and does not require a recommendation by the IAC. 40. The model needs to incorporate the Altona Gate access and include appropriate demands to and from it. 41. New west-facing ramps between M80 and Grieve Parade should be incorporated into detail design _even if only to future-proof the design (this recommendation does not over-ride my recommendation that the

ramps be built as a part of the Project). 42. New west-facing ramps between Princes Freeway and Dohertys Road should be incorporated into detail design _even if only to future-proof the design (this recommendation does not over-ride my recommendation that the ramps be built as a part of the Project). 43. The ramps proposed above should be designed in accordance with my modified plan (Figure 1) and associated discussion in the Second Addendum Report). 44. The northerly extension of Grieve Parade should be in accordance with the Brooklyn Evolution Long-term Framework Plan.