Southcote Road Improvements Class Environmental Assessment Study

Similar documents
Welcome to the Open House

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Highway 56 Traffic Study Rymal Road to Cemetery Road

Casablanca Boulevard & GO Station Access

List of Display Boards

APPENDIX L: COST ESTIMATING TOOLS

WELCOME TO OPEN HOUSE # 1 June 14, 2017

TRANSPORTATION NEEDS ASSESSMENT

NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

122 Avenue: 107 Street to Fort Road

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Zlatko Krstulich, P.Eng. City of O9awa

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

Terwillegar Drive Expressway Draft Concept Plan

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Chapter 3 DESIGN SPECIFICATIONS

Sustainable Transportation Initiatives and Plans in Caledon

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

4. ALTERNATIVE DESIGN

Appendix O. Assessment of Bicycle Facility Alternatives

NORTH DOWNTOWN N EAST WEST

Durham Region Long Term Transit Strategy

Sixth Line Development - Transit Facilities Plan

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Classification Criteria

Public Information Centre


Dundas Street (Regional Road 5) Corridor Improvements Class EA. Welcome to Public Information Centre #3. Thursday, September 13, 2012

5. RUNNINGWAY GUIDELINES

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Bicycle Master Plan Goals, Strategies, and Policies

Monroe Street Reconstruction

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Service Business Plan

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Transportation Assessment

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

INDEX. Geometric Design Guide for Canadian Roads INDEX

Giles Run Connector Road

BAYVIEW DRIVE & BIG BAY POINT ROAD

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Shifting Gears for a Healthier City

Bank Street Widening Class EA Study Leitrim Road to Rideau Road. Gloucester South Seniors Centre, 4550 Bank Street

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Public Works and Infrastructure Committee. General Manager, Transportation Services

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

Dundas Street (Regional Road 5) Corridor Improvements Class EA Neyagawa Boulevard to Oak Park Boulevard. Welcome Public Information Centre

APPENDIX L. Design Criteria

Downey Road. Transportation Improvement Study

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

102 Avenue Corridor Review

Transportation Planning Division

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

WELCOME Public Information Centre

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

LANE ELIMINATION PROJECTS

VIII. Project Prioritization & Implementation

CTH M Reconstruction

Building Great Neighbourhoods QUEEN ALEXANDRA

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Executive Summary Route 30 Corridor Master Plan

Route 15 Congestion Report Findings

Cycle Track Design Best Practices Cycle Track Sections

Lawrence Avenue Streetscape Concepts August 30, 2011

Broadway Complete Streets Project

Board of Supervisors February 27, 2017

Major Bike Routes 102 Avenue Workshop April 21, 2015

2.0 LANE WIDTHS GUIDELINE

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Application of a Complete Street

Edenbrook Hill Drive Traffic Calming Study

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Environment and Public Works Committee Presentation

COMMITTEE RECOMMENDATIONS. That Council approve:

Transcription:

1 Southcote Road Improvements Class Environmental Assessment Study Public Information Centre #1 May 24, 2018

Study Area 2

3 Welcome The Ancaster Transportation Master Plan (2011) outlined a long range plan to address transportation issues in Ancaster. The Plan identified the opportunity to widen Southcote Road to three lanes with a two-way left turn lane. This study is assessing the need for traffic operations and safety improvements, and active transportation design features on Southcote Road. This project will: CONFIRM the need for improvements to Southcote Road SUMMARIZE existing/future engineering and environmental opportunities and constraints IDENTIFY options for the corridor improvements OBTAIN public/agency input CONFIRM the recommended design for improvements to Southcote Road.

4 Class Environmental Assessment Process The Study is following the requirements of the Municipal Class Phase 1: Problem/ Opportunity Identify problems/ opportunities to be addressed in the planning and design process Confirm the need for improvements Prepare a Problem Statement Included in the Transportation Master Plan Environmental Assessment (EA) (as amended after 2015) for a Schedule C (major) project. The Class EA process ensures: Relevant engineering and environmental factors are considered in the planning and design process Public and agency input is integrated into the decision making process. Phase 2: Phase 3: Phase 4: Alternative Solutions Design Options for Preferred Solution Environmental Study Report (ESR) Phase 5: Implementation Develop alternative solutions for improving the roads Overview of existing and future conditions Consult with review agencies and the public Identify design options for the preferred solution Detailed overview of existing/future conditions Evaluate design options and select a preferred option Consult with review agencies and the public Complete an impact assessment of the preferred design Document the decision- making process in an ESR for a Schedule C project Public Information Centre #1 May 2018 Public Information Centre #2 Fall 2018 Make the ESR available for public and agency review and input Design and construction phase Project must be designed and constructed as outlined in the ESR

5 Ancaster Transportation Master Plan (TMP) Relevant recommendations include: Widen Southcote Rd to three lanes, with a centre two-way left turn lane Traffic collisions are not high enough to require mitigation, however the corridor should be further reviewed to identify operational issues Reduce speed limit to 50 km/h Community members recommended sidewalks be included along both sides of the roadway and pedestrian crossings be considered Shifting Gears Cycling Master Plan (2009) recommended a dedicated bike lane on Southcote Rd, from Golf Links Rd to Garner Rd E

Existing Conditions 6

Existing Conditions 7 Roadway & Active Transportation Two-lane rural roadway has been posted at a speed of 50 km/h Designated Minor Arterial in the 1 Collision 1 Collision Official Plan 9 Collisions 9 Collisions Seven roadways access Southcote Rd along with several driveways 2 Collisions 1 Collision Signalized intersections at Golf Links Rd and Garner Rd Overpass bridge at Highway 403 Sidewalks not continuous throughout On-street shared cycling lanes (Sharrows) near Golf Links Rd. No other designated cycling facilities Collision data (2013-2017) indicates there were 19 reported collisions, and the majority occurred at intersections in clear weather conditions during daylight hours

Phase 3 Design Options 8 Phase 3 of the Class EA process is currently underway and involves developing and evaluating design options to address the recommendations outlined in the Ancaster TMP. What would you like to see on Southcote Road? Place a dot on the examples below that are most important to you. On-road cycling lanes Off-road cycling lanes Multi-use path Sidewalks Transit Are there other features we should consider?

Phase 3 Design Options 9 Southcote Rd. will be rebuilt to an urban cross section (which includes curbs and gutters). We are reviewing the following design features: Sidewalks with on-road cycling lanes. Sidewalks with Low Impact Development (LID*) features and on-road cycling lanes. Sidewalks with a multi-use trail and off-road cycling lane. *Low Impact Development or LID is an innovative approach to land development that mimics the natural movement of water in order to manage stormwater (rainwater and urban runoff) close to where the rain falls. LID uses small, simple design techniques and landscape features that filter, infiltrate, store, evaporate, and detain rainwater and runoffs at the lot level. Benefits could include: flood reduction, water quality protection and improvement, increased property values, and climate change adaptation.

10 Phase 3 Design Options The following are artistic renderings of the current conditions & potential design options Two-way Centre Turn Lane Sidewalk Multi-use Path Current Conditions Concept 1 On-road Bike Lane On-road Bike Lane

11 Phase 3 Design Options The following are artist renditions of the current conditions & potential design options Two-way Centre Turn Lane Low Impact Development Feature Sidewalk Sidewalk Two-way Centre Turn Lane Sidewalk Low Impact Sidewalk Development Feature On-road Bike Lane Concept 2 On-road Bike Lane Off-road Bike Lane Concept 3 Off-road Bike Lane

Phase 3 Design Options 12 Input received Active Cultural Heritage Traffic Operations today will be used Transportation and Safety to finalize and evaluate the design options. The recommended Road Design Preferred Natural Heritage design will be Options Design Option presented at Public Information Centre #2. Land Uses & Public and Capital and Socio-Economic Agency Feedback Maintenance Environment Costs

Next Steps 13 Public Information Centre #2 is anticipated to be scheduled in Fall 2018 and will: Present the recommended for input Outline the proposed construction staging and timing Thank you for attending! Your input is important to the outcome of this project. Please complete a comment form and return it by: June 8, 2018 Personal information collected and recorded at the Public Information Centre or submitted in writing on this subject is collected under the authority of the Municipal Act, 2011 and will be used by members of Council and City of Hamilton staff in their review of this matter. With the exception of personal information, all comments will become part of the public record.