Building the Corel Endeavour

Similar documents
Constitution Instructions

MARIA HF31. SCALE: 1/72 Length: 365 mm width: 85mm height: 295 mm

Parts of the Ship. Terms you should already know

8-GUN CORVETTE ASSEMBLY INSTRUCTIONS

Hansa COG 14 th century SCALE: 1/72 Length: 430mm Width: 210mm Height: 330mm

LE CERF, Scale: 1/72 Length: 685mm Width: 255mm Height: 520mm

Stevenson Projects Building the Hull Top Deck and Bulkheads

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener

Armed Virginia Sloop - Part 4 Deck Fittings

Building a model of a Thames Barge

GREEK TRIREME, 480 B.C. Scale: 1/72 Length: 515mm Width: 180mm Height: 220mm

USS. Build the CONSTITUTION. The world s oldest commissioned naval vessel afloat

VALDIVIA BUILD LOG Dr Ron

Paddle Steam Ferry COMMODORE PERRY

HMS Colossus Dive Trail

Euromodel Falmouth Part 5 SHIP S BOAT - v.03. An interpretive build of the. SHIP S BOAT.05.v.03

KNARR. SCALE: 1/35 length: 440mm width: 300mm height: 400mm

LITTLE TRI construction

Vikings ship GOKSTAD, 9 th century Scale: 1/72 Length: 305mm Width: 135mm Height: 182mm

Place a rope coil here

aero naut Order No. 3009/00

Making Spars for the Schooner Jeanette

In Part 6 of this series, we completed building and painting the hull and rigged the bowsprit. Now, we re ready to make up the masts and spars.

Classic Crosby Wianno Senior in excellent condition. Just launched for the 2018 season SALTWORKS is ready to go to her next owners

Table 4. Key to parts shown on the plans of the pinas (see plan drawings 1 5 following table).

Colvic Watson 28 "Lady Rachel"

Cornish Crabbers Shrimper 19 Curlew

Mount the actuator in the bracket provided and install a 24-foot EFTC cable to the actuator.

An Australian Classic by spectre.com

Friendship 30 Apogee

WILLEY CAT SHEET B. Daggerboard - 9mm x 2 Daggerboard Ballast - Lead/Epoxy - 6" diameter

s/v Syrinx History

Carving Ship Model Hulls Laminated and Machine Carved Hulls

Shrouds, dead-eyes and ratlines

Appendix 1: How To Install the Northeaster Dory Sailing Component Kit Upgrade

The True Confessions of Charlotte Doyle

STANDARD SPECIFICATIONS

Building (and Carving?) Royal Caroline

FDR CHRYSLER 16' CATAMARAN (MUSKETEER) The initial rigging of a sailboat is not difficult, but if the boat is strange

The Matthew was the ship on which explorer John Cabot sailed to the New World in John Cabot s Ship THE MATTHEW

MAST RAISING AND LOWERING

Constructing the Masts

AMYA SeaWind Class Rules

New Zealand. Day 1. Meeting the ship in the morning. Ben Riccini Page 1

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

Make Model Length Price Year Condition. Beneteau First m EUR 14, Used. Boat Name Hull Material Draft Number of Engines Fuel Type

CR 914 Class Rules. Revised July 15, 2000 See also CR-914 Class Rule Interpretations

Specifications Bestewind 50

Sailing Cat Project - An opportunity for the new owner! Price Reduced. Listing ID: 3007

NAV-COM OFFICER PREP FOR SEA CHECKLIST

AMYA SeaWind Class Rules

CATBOX. A Puddle Duck Racer. By Jim Michalak

OPERATIONAL CHECK LIST

Kayak Trailer Project.doc

TECHNICAL DESCRIPTION MASTHEAD SLOOP:

The USA Canterbury J. Class Rules


Jeanneau Sun Odyssey 39 DS. Price: 89,995

Introduction. low deck spinnaker launching and retrieval system for quick and easy sail handling to allow the real focus to be on sailing.

Fountaine Pajot Tobago 35 CAT ALEE

37' Alden Schooner Schooner Location: Poulsbo WA

World Explorers. By Sandy Tasker SAMPLE

ODOM CLASS SPECIFICATIONS

Telescopic winch handle Speedfriend"

AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE

Wooden Canoe. Building a One-Off Wood & Canvas Canoe. Ray Arcand: A Living Link to the Past. Issue 134, April 2006 Volume 29, No.

Travel-Lift Operating Procedure. To that end, we would like to introduce the following procedure for HMPC lifting operations.

Wysiwig - Wayfarer Rigging Guide

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

H.M. SCHOONER PICKLE THE TRAFALGAR DISPATCH

WESTERLY MARINE LONGBOW & BERWICK W 3 1 aft cockpit

Sweden Yachts 54 / Specification

Construction Chapters Index

Miss Joy Boat Manual

General Assembly Venice Lagoon Boat Length 8.2m Beam m Disp kg Power - 10/15hp (Short Shaft)

INSTALLING YOUR CLC RUDDER

Blazer Marine, Whiplash Sport 40

Sails. Sails: extract from 'Super-detailing the Cutter Sherbourne' page 1 George Bandurek

Year: 1970 Heads: 1 Location: Plymouth Cabins: 2 LOA: 32' 0" (9.75m) Berths: 5 Beam: 9' 2" (2.80m) Keel: Long Min Draft: 5' 6" (1.

RUDDER KIT INSTRUCTIONS

SONATA YACHT ASSOCIATION OF VICTORIA INC. P.O. Box 6010, M.D.C. Doncaster, Victoria 3108

Chinese War Junk Model: A Representation of the Not-So-Triumphant War Junks

LEGO Pirate Wars. Minifig Chart Minifig Melee Attack Captain, Lieutenant 4 5 Marine 3 4 Pirate 1 3 Imperial Sailor 1 2

Classic Yacht Brokerage

1/10 th Scale 1956 Ted Jones Classic Hydroplane

Bowsprit Hinge on "Bumble Chugger" By Robin Whittle, Shrimper 124 (Bumble Chugger) (Winter 2003)

In each step, the needed parts are shown the number right below. Locate all parts for the step.

How to Operate the MYC Support Boats and Equipment

Essential Rig Tuning Guide The Ins and Outs of tuning your mast.

Cleopatra British Obelisk Transport Barge. Kartonbau.de Exclusive Edition

SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT

SPECIAL ISSUE # 6 AUGUST 2017

Follow these easy steps to properly assemble your new Zim 420

ASSEMBLY INSTRUCTIONS

CAMPER & NICHOLSON XYRIS CLASS 30 FT SLOOP SOLD

Topaz OMEGA Rigging Instructions

PACK 24 RAINGUTTER REGATTA November 19, 2010 (7pm at Hawthorne)

Broadblue Rapier Standard Specification

45a. Ghid de asamblare. Numerele 45-48

SHIELDS PARTS PRICE SHEET

Transcription:

SPECIAL ISSUE # 7 DECEMBER 2017 All photographs and articles published remain the copyright property of the contributor and SMSC unless released. Building the Corel Endeavour Photos and commentary by Leon Griffiths One of the more popular kits of the HM Bark Endeavour is the kit made by Corel Ship Models. Leon has built a number of these over the years but this time we are again privileged to be able to publish Leon s article in which he shares his experience in building the entire model from the box, from laying the keel to the finished product with photos and comments. Leon built this wooden model ship kit on commission by Anthony Davis. The model from the kit is of double plank on frame construction and is for an intermediate level modeller. HM Bark Endeavour, was a British Royal Navy research vessel commanded by Lieutenant James Cook on his first voyage of discovery, to Australia and New Zealand from 1769 to 1771. Launched in 1764 as the collier Earl of Pembroke, she was purchased by the Navy in 1768 for a scientific mission to the Pacific Ocean, and to explore the seas for the surmised Terra Australis Incognita or "unknown southern land". Renamed and commissioned as His Majesty's Bark the Endeavour, she departed Plymouth in August 1768, rounded Cape Horn, and reached Tahiti in time to observe the 1769 transit of Venus across the Sun. She then set sail into the largely uncharted ocean to the south, anchoring off New Zealand in April 1770. In April 1770 Endeavour became the first seagoing vessel to reach the east coast of Australia, when Cook went ashore at Botany Bay, now a Sydney suburban area. Endeavour then sailed north along the Australian coast where she was almost lost having run aground on the Great Barrier Reef, but after repairs she finally returned to England on 12 July 1771. She had been at sea for nearly three years. Largely forgotten after her epic voyage, Endeavour spent the next three years shipping Navy stores to the Falkland Islands. Renamed and sold into private hands in 1775, she briefly returned to naval service as a troop transport during the American Revolutionary War and was scuttled in a blockade off Narragansett Bay, Rhode Island in 1778.

1 All the frames are locked in position with the decks insuring correct alignment. 2 The first plank is placed and the fairing of the frames is complete. 3 The dark plank is marking the gun deck. The maths is correct with both sides equal 4 The planning of the planks now includes stealers at the rear to ensure the gap from the planks to the keel remains equal. 5 All decks have the mast holes in the correct place. The planks have been tapered at the front to a measured formula. 6 While the planks where drying, the cargo hatches were made.. - 2 -

7 Changing the direction that the planks lie, allows for the planks to be installed without stress. 8 Clamps are needed to lock all difficult planks onto the frames. 9 The cannon port holes are located and the gun carriages installed. 10 The plank next to the keel is laid. This plank is known as the Garboard Plank. 11 The hull will be sealed with 3 more planks. 12 The planks have to be crimped so that the timber turns to the frame with ease. - 3 -

13 The hull is seal closed. 14 The hull will be left to dry for 24 hours then the hull will be smoothed with files and glass paper. 15 I am continuing the planking below the main whale. Cannon ports are cut and will be sized. 16 The planking of the hull is closing. Triangle gaps or stealers are created at the AFT end of the dead wood. 17 All planks are crimped and shaped to the hull with a minimum of stress. 18 The walnut hull planking is sanded and sealed. -4-

19 The stand is constructed. The hull planks are cut, trimmed and sanded to form the rabbit joint around the stem of the bow. Later this part of the stem will be covered with walnut. Animal cage at the rear is constructed. 20 Cap rails made of flexible beech are installed. All the decks are laid using silver ash and the inside bulwarks are lined with walnut. 21 The transom is completed and installed and the gallery windows are glazed and put on. 22 Fenders are added as well as the accommodation ladder has been installed. All cannon ports are sized ready for completion. 24 The stairs are in, grates are finished, and bilge pump, capstan and helm have been installed. The surrounds for the mast are called mast heels. 23 The hull is complete and the deck furniture is being added. -5-

25 Two anchors, two cat heads for the anchors and the assembly of the ships boat have been painted. Ship s stand has been adjusted to the hull. The name tag has been made for presentation. 26 Boat cradle, windlass, cannon and cat heads are in. 27 Rudder has been installed and the cannon port holes have been sized. 28 Note the correct alignement of the ports. 30 All deck furniture now installed and sealed with estapol 29 All planking, whales and fenders meet together at the stem post. - 6 -

31 All the channels have been put on.. 32 The bow sprit housing has been installed. 33 The pin rails for the rigging are complete. 34 A beautiful shot of the rudder and rear gallery windows glazed with clear plastic now finished. 35 The dead eyes have been mounted on the channels and the anchors have been rigged. 36 The anchor cables have been set through the haws pipes. - 7 -

37 All swivel guns have been fitted. 38 The ships boat is finished and rigged into position in the waste of the ship. 39 The chain link assembly has been added to the dead eyes and secured with nails. 40 Tying the ratlines 41 All the ratlines are on the lower shrouds 42 Lower ratlines cut -8-

44 All ratlines are even. 43 45 Upper shrouds and ratlines are on My lovely wife Josephine making sails 47 The sails are held in place on scrap thin MDF and are dried to the shape required 46 All the sails have been soaked in a PVA and water solution and are attached to the yards 48 Starting from the aft end the sail is rigged to this mast -9-

49 Lower sails are on 50 Note, the mainsail is omitted 51 All square sails are on and the lifts have been rigged 52 Jibs have been added 53 All other sail rigging now on 54 Packaging hull blocks have been added and screws have been drilled through the keel - 10 -

55 Base board added to aid in the transport of ship to Queensland 56 Rope coils dress the pin rails Another wonderful project Leon! 57 Water barrels are on the ships boat now add the flags and FINISHED!! Thank you for sharing it with us. - 11 -