Nextech. Trunnion - Mounted Ball Valve. Installation and Operations Maintenance Manual

Similar documents
INSTALLATION, OPERATION and MAINTENANCE MANUAL

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

WHEATLEY Series 500 Swing Check Valve

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

WKM Model 320F Floating Ball Valve

BUTTERFLY VALVES Series 800

Installation, Operation and Maintenance Manual for Back Pressure Regulator

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

FLANGED TWO-PIECE BALL VALVES

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

VALVES & MEASUREMENT

FLANGED TWO-PIECE BALL VALVES

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Engineering Data Sheet

WHEATLEY Series 822/820 Swing Check Valve

TITAN FLOW CONTROL, INC.

FLANGED MULTI-PORT BALL VALVES

DelVal Flow Controls Private limited

INSTALLATION, OPERATION & MAINTENANCE MANUAL

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

ARGUS MODEL C PIG VALVE

Installation & Operation Manual Proven Quality since 1892

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

MUELLER. Xp, & Lineseal 350 Butterfly Valves

WW-730. Pressure Sustaining/Relief Control Valve

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

Telefon (+45) Telefax (+45)

Design DSA Steam-Atomized Desuperheater

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

Bermad Pressure Reducing. Model: 42T

Types 95L and 95H Pressure Regulators

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

OPERATING AND MAINTENANCE MANUAL

Operating instruction

Installation, operation & maintenance manual - original version

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

WW-720. Pressure Reducing Control Valve

VALVE GLOBE CAM TS OF 11 DOC NO REV. NO DATE PAGE NO. maximum life. DESIGN CONDITION 1g of force in. property damage.

HAYWARD FLOW CONTROL FLV SERIES, PVC/CPVC FILTER VESSEL INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

MEGR-1627 Instruction Manual

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Types 749B and R130 Changeover Manifolds

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Instruction Manual Pressure Relief Valve and Rupture Disc Chlorine or Sulfur Dioxide, Series 869

Model: 43T. Bermad Pressure Relief Valve

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

TECHNICAL DATA. Page 1 of 12

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

1200B2 Series Service Regulators. Instruction Manual

WW-720. Pressure Reducing Control Valve

64 Series Pressure Reducing Regulators

Fisher DSA Steam-Atomized Desuperheater

PC3_ and PC4_ Pipeline Connectors

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

Manual Actuated Boiler Blowdown Valves

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

Pibiviesse High Performance Control Ball Valve

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Types S100K and S102K Pressure Regulators

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Combination Air Valve

Instruction Manual HAITIMA. 3-PCS Ball Valve 2012CD/2013CD. HIM-39 Version: C

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

TITAN FLOW CONTROL, INC.

Type CT88 Backpressure Regulator

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

Atmospheric relief valve type 1100 Installation and maintenance instructions

SECTION BUTTERFLY VALVES

Eaton Filtration, LLC

Installation Instructions

Installation Instructions, Pressure Regulator Series

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Armored Gauge O S & Y Bolted Bonnet Valves Series BB-100

KTM METALTITE BALL VALVES - FLOATING TYPE INSTALLATION AND OPERATION MANUAL

Instructions. Control Solution ICF 20-4, ICF 25-4, ICF ICF 40-4, ICF 20-6, ICF 25-6, ICF 32-6, ICF 40-6, Direction and position.

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Fisher DVI Desuperheater Venturi Inline

KECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

V46 Series 2-Way Pressure-Actuated Water-Regulating Valves With Union Fittings

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

Transcription:

Nextech Trunnion - Mounted Ball Valve Installation and Operations Maintenance Manual

After ValvTechnologies NEXTECH valves are assembled and tested, the valves are left in the full open position and end protectors are installed. The valves are crated or boxed to prevent damage during shipment. RECEIVING AND PREPARATION FOR INSTALLATION 1. Remove shipping protection and check that the serrations on flange faces are not damaged. 2. Inspect valve/actuator for transportation damage. 3. Inspect valve bore and remove any debris. 4. Cycle the valve and inspect the ball for coating damage. 5. Reinstall the end protectors immediately after inspection. IMPORTANT: Actuators are not to be mounted, removed, adjusted or reinstalled from the valve except by trained ValvTechnologies service technicians. Notify ValvTechnologies or nearest representative when such operations need to be performed. STORAGE The following measures should be taken when storing valves for short term: 1. Make sure the valve end connection covers remain in place during storage. 2. It is recommended that valves be stored indoors. If the valve has no actuator and will be stored outdoors, the exposed stem or drive sleeve should be covered to avoid accumulation of water and debris. For long term storage preservation, refer to WHSEWI 235. A copy of the document can be obtained from ValvTechnologies. INSTALLATION CAUTION! Ensure that the pipeline is fully clean before installing the valve in the line. Foreign matter and debris will cause damage to the ball and seat seal surfaces resulting in seat leakage during commissioning. Ensure during commissioning and pipeline flushing the valve is kept in the fully open position. Nextech valves are bi-directional and may be installed in horizontal (with the stem upwards) or vertical position with flow from either direction. It is not recommended to install the valve such that the actuator is underneath the valve. Dirt or debris from the pipeline could enter the body cavity and cause damage to the stem packing. During handling, lifting, or installing a valve, keep the valve in the full open position whenever possible. This will prevent foreign objects from damaging the ball. The end protectors should be kept in place until final installation to protect the end connection faces. Protect any fittings against damage from the lifting devices. IMPORTANT: NEVER use hand wheels, gearbox, actuator or any other protruding part of the valve as a support for lifting the valve. 1. The valve should be lifted such that the body and end cap support the load. The end connection necks are suitable places for attaching lifting slings. 2. If the valve is equipped with lifting lugs, these should be used for handling. NOTE: Lifting lugs, if provided, are attached to balance the weight. Never use just one lifting lug for lifting.

Flanged End Valves 1. Don t attempt to correct pipeline misalignments with flange bolting. This will transfer piping stress to the valve. 2. Use only approved gaskets (not supplied). 3. The bolts and nuts used to bolt the valve into the line should be lubricated to obtain proper loading on the valve. 4. When tightening bolts, use the crisscross method and gradually tighten each nut, repeating several times, to ANSI or gasket manufactures specification. Excessive tightening can cause damage and/ or leakage to the end flanges or body-to-body end joint. Weld End Valves NOTE: The following DOES NOT APPLY to valves manufactured and certified to the PED directive. 1. Use solvent to clean grease or dirt from the ball and/or bore of the valve. 2. Electric welding equipment is preferred. However, if only oxygen-acetylene welding equipment is available, extreme caution should be taken to prevent excess welding temperature. The use of radiation shields is advised if heat damage to the actuator is a concern. 3. Care is to be taken to minimize weld slag and splatter within the valve bore. The ball should be in the Full Open position during welding. 4. Make sure the temperature of the body/seat area does not exceed 600 F. (Check with Tempil stick or thermal chalks.) 5. Avoid rapid application of excess welding material. 6. Localized stress relief is acceptable. Do not furnace stress relieve without consulting Valvtechnologies Engineering. 7. Thoroughly flush the pipeline after welding to remove the weld slag and splatter, before cycling the valve. CAUTION! Never perform any welding with the ball in the closed position without pipe pups. NOTE: Welding must be done by qualified welders using approved ASME Code Section IX procedures. Normal Operation NEXTECH metal-seated valves require no lubrication. OPERATION ValvTechnologies NEXTECH I valves operate from full - open to full - close by a 90 turn of the stem. The valve closes in the clockwise direction. The keys on the stem or drive sleeve going into a gearbox are in-line with the bore of the valve and can be used to indicate ball position. IMPORTANT: Valves should be insulated when temperature differentials greater than 400 F (205 C) are expected.

For gear operated valves, the gearbox Open - Close adjustment has been done prior to shipment and must not be disturbed. Valve position is determined by arrows on top of the gear unit that indicate the OPEN or CLOSE positions. NOTE: Handwheel rotation in the clockwise direction (Looking from the handwheel end) closes the valve, and counter clockwise rotation opens the valve CAUTION! DO NOT apply extra force or leverage after the end stops of the gear unit have reached their final setting position. CAUTION! Intermediate positions of the valve should be avoided, as high velocities produced by the narrow opening will produce erosion of the seats and ball. For actuated valves, the actuators should be operated and maintained as per their manufacturer s written instructions. The actuators have OPEN and CLOSE indicators on the top of the unit. Limit switch and position indicator operation should be observed as the valve is cycled several times IMPORTANT: In the event that maintenance is necessary, obtain the part number from the actuator nameplate and contact ValvTechnologies or nearest representative. Block and Bleed Applications ValvTechnologies NEXTECH valves can be optionally fitted to provide double block and bleed capability of line pressurization. This means that body cavity pressure can be relieved to atmosphere while pressure is coming form both directions in either the full open or full close positions. This feature allows for: 1. Verifying integrity of both seats. 2. Allow draining and flushing of the body center cavity 3. Prevention of downstream leakage to assure safety of downstream activities. Block and Bleed Procedure NEXTECH valves having the block and bleed feature are normally equipped with a 1/2 flanged vent port for attaching vent lines, and bleed valves (not supplied), or a 1/2 NPT vent fitting. Operate the valve to the full open or closed position as desired. Carefully open the valve attached to the 1/2 vent line, or NPT vent fitting to release body cavity pressure. CAUTION! Care should be taken to ensure that the exhaust is directed away fro personnel. Continuing venting until body cavity pressure reaches atmosphere. The length of time to vent the body will vary depending on the pressure, compressibility, and size of the valve. Body Flushing and Draining Draining can be accomplished by using the drain plug, if so equipped, at the bottom of the valve. CAUTION! NEVER remove the plug without verifying that the body cavity is not pressurized.

Flushing is merely a combination of the double block and bleed, and drain procedures. Once the body cavity as been de-pressurized and drained, the. flanged connection can be used for supplying the flushing media. Routine Maintenance Nextech I valves require no lubrication. These valves should provide years of trouble-free operation with very little maintenance. The self-cleaning ball will provide reliable leak-free performance. Preventive Maintenance The only preventative maintenance recommended is to periodically inspect the valve for leaks around the stem/gland and check for tightness of bolting between the body/end cap & body/stem retainer joints. Stem Packing Adjustment The live loaded stem packing system is designed to eliminate frequent adjustments. If leakage should occur in this area, the following procedures should be used. 1. Tighten each packing nut a quarter of a turn and check for leakage. 2. If leakage persists, increase torque to each packing nut by 10% increments until leakage stops. Do not exceed the specified values in EChart 1200 by more than 20%. CAUTION! Ensure that valve operation is satisfactory. Increased torque values are an indication that the packing is worn and may need replacement. Excessive tightening will cause an increase in valve stem torque. Body/End Cap and Body/Stem Retainer Joints Re-tightening of the bolting is allowed only when the line has been de-pressurized. Refer to EChart 1091 for maximum torque values. If leakage persists, the gaskets are worn or damaged and need replacement. Contact ValvTechnologies or your nearest representative for service instructions. NOTE: The use of Copper-Based or Nickel-Based Anti-Seize Grease for stud and bolt lubrication and Molyybdenum Disulfied Anti-Seize Grease for packing is recommended. IMPORTANT: For extreme applications, such as high cycles, or if solids or highly corrosive materials are present, more frequent inspections are recommended. Gear/Actuator Maintenance The gear lubrication should be checked every three months and replenished or replaced as needed. IMPORTANT: In the event that actuator maintenance is necessary, obtain the part number from the actuator nameplate and contact ValvTechnologies or representative. WARNING! Disassembly and repair of ValvTechnologies valve by unauthorized personnel may be hazardous and can also void the warranty. Contact ValvTechnologies or representative for any major repairs.

Table I: Troubleshooting Guides Symptom Possible Cause Actions Valve hard to operate Leakage through a closed ball Leakage through stem Body/Retainer Gasket Leaking 1. Foreign particles or debris in valve. 2. Gear or Actuator bolting loose. 3. Actuator or gear failure. 4. Stem or Drive sleeve key sheared. 1. Valve not fully closed. 2. Debris trapped in valve. 3. Damaged Ball or Seat. 1. Loose stem packing. 2. Worn packing. 1. Body nut/retainer bolt loose. 2. Damaged gaskets * Contact Factory or nearest representative. 1. Cycle and flush valve to remove debris. 2. Tighten bolting. 3. Replace or repair actuator. 4. Determine cause of shearing & correct/ replace keys 1. Close the valve fully. 2. Cycle and flush valve to remove debris. 3. Call Factory or nearest representative. 1. Tighten gland nuts. 2. Replace packing. * 1. Tighten body nut or retainer bolt 2. Replace gasket. * ENGINEERING CHART ECHART 1200 NEXTECH CHESTERTON 1601 PACKING TORQUE CHART Valve Pressure Class Packing Size Qty/Studs Packing Gland Torque 2 300#/600# 1.250 x 1.625 4/.375 60 in-lbs (5 ft-lbs) 900# 1.250 x 1.625 4/.375 72 in-lbs (6 ft-lbs) 3 300#/600# 1.500 x 1.875 4/.375 72 in-lbs (6 ft-lbs) 900# 2.000 x 2.375 4/.500 144 in-lbs (12 ft-lbs) 4 300#/600# 2.000 x 2.375 4/.500 132 in-lbs (11 ft-lbs) 900# 2.000 x 2.375 4/.500 144 in-lbs (12 ft-lbs) 6 300#/600# 2.500 x 3.000 4/.500 216 in-lbs (18 ft-lbs) 900# 2.500 x 3.000 4/.500 240 in-lbs (20 ft-lbs) 8 300#/600# 3.000 x 3.500 4/.625 312 in-lbs (26 ft-lbs) 900# 3.000 x 3.500 4/.625 348 in-lbs (29 ft-lbs) 10 300#/600# 3.500 x 4.000 4/.625 360 in-lbs (30 ft-lbs) 900# 3.500 x 4.000 4/.625 408 in-lbs (34 ft-lbs) 300# 3.500 x 4.000 4/.625 360 in-lbs (30 ft-lbs) 12 600# 4.000 x 4.500 4/.625 408 in-lbs (34 ft-lbs) 900# 4.000 x 4.500 4/.625 456 in-lbs (38 ft-lbs)

BOLT SIZE (INCHES) ECHART 1091 BODY BOLT TORQUE VALUES TORQUE (ft/lbs) B7 OR EQUAL B8M OR EQUAL Minimum Maximum Minimum Maximum 5/16 12 21.6 4 12 3/8 18 32.4 6 18 7/16 29 52.2 9 29 1/2 45 81.0 13 45 9/16 50 90.0 19 50 5/8 85 153.0 26 85 3/4 150 270.0 45 150 7/8 240 432.0 70 240 1 355 639.0 110 355 1-1/8 510 918.0 155 510 1-1/4 700 1260.0 210 700 1-3/8 950 1710.0 290 950 1-1/2 1250 2250.0 370 1250 1-5/8 1600 2880.0 480 1600 1-3/4 2060 3708.0 500 2060 1-7/8 2500 4500.0 750 2500 2 3000 5400.0 900 3000 3 10300 18540.0 3100 10350 3-1/2 16500 29700.0 5000 16650 Note: Torque values are based on Sweeney 505 (or Valvtechnologies, Inc. Engineering approved equivalent) lubricant on all threads and V nut faces. Without lube there is a risk of stripping the threads before reaching adequate bolt tension. ***In the event metal to metal contact is not made when maximum torque value is achieved, contact Engineering. Revision Number: Date: Description of change: 3 10/27/2010 1. Corrected reference to WHSEWI 235 2. Added EChart 1201 and EChart1091 3. Updated Rev # to 3. Prepared by: Christopher Lee Title: Engineer Signature: n/a Date: 25-Oct-10 Reviewed by: Craig Walther Title: Director of Quality Signature: (electronic via Adept) Date: 26-Oct-10 Reviewed by: Stephen Smith Title: Director of Engineering Signature: (electronic via Adept) Date: 25-Oct-10 Reviewed by: Art Schenau Title: VP of Operations Signature: (electronic via Adept) Date: 27-Oct-10

Nextech - Trunnion - Mounted Ball Valve Installation and Operations Maintenance Manual Corporate Offices & Manufacturing Headquarters Argentina / Chile / Peru China United Kingdom ValvTechnologies, Inc. Lima Beijing Stockton on Tees 5904 Bingle Road +51 1 628 1126 +86 10 65882188 +44 1642 882211 Houston, Texas 77092 U.S.A. peru@valv.com china@valv.com europe@valv.com Telephone +1 713 860 0400 Fax +1 713 860 0499 Brazil Chengdu Middle East sales@valv.com Sao Paulo +86 28 86317266 Dubai +55 12 3939 4522 china@valv.com +971 50 912 4052 To locate a distributor or satellite brazil@valv.com middle.east@valv.com office near you, visit us online at Shanghai www.valv.com +86 21 53839881 china@valv.com 2004-2014 ValvTechnologies. All rights reserved. 705_Nextech IOM_March 2014