INSTALLATION, OPERATION and MAINTENANCE MANUAL

Similar documents
Nextech. Trunnion - Mounted Ball Valve. Installation and Operations Maintenance Manual

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

WKM Model 320F Floating Ball Valve

WHEATLEY Series 500 Swing Check Valve

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

Installation, Operation and Maintenance Manual for Back Pressure Regulator

BUTTERFLY VALVES Series 800

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

FLANGED TWO-PIECE BALL VALVES

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

VALVES & MEASUREMENT

FLANGED TWO-PIECE BALL VALVES

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Engineering Data Sheet

TITAN FLOW CONTROL, INC.

FLANGED MULTI-PORT BALL VALVES

DelVal Flow Controls Private limited

INSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

INSTALLATION, OPERATION & MAINTENANCE MANUAL

WHEATLEY Series 822/820 Swing Check Valve

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

Installation & Operation Manual Proven Quality since 1892

ARGUS MODEL C PIG VALVE

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Bermad Pressure Reducing. Model: 42T

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

OPERATING AND MAINTENANCE MANUAL

WW-730. Pressure Sustaining/Relief Control Valve

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

MUELLER. Xp, & Lineseal 350 Butterfly Valves

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

Telefon (+45) Telefax (+45)

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

HAYWARD FLOW CONTROL FLV SERIES, PVC/CPVC FILTER VESSEL INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Operating instruction

Installation, operation & maintenance manual - original version

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

VALVE GLOBE CAM TS OF 11 DOC NO REV. NO DATE PAGE NO. maximum life. DESIGN CONDITION 1g of force in. property damage.

Combination Air Valve

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

MEGR-1627 Instruction Manual

Instruction Manual Pressure Relief Valve and Rupture Disc Chlorine or Sulfur Dioxide, Series 869

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

Eaton Filtration, LLC

Contents. 1. General information BROEN BALLOMAX Steel Ball Valves Approvals Quality Management...2

Model: 43T. Bermad Pressure Relief Valve

WW-720. Pressure Reducing Control Valve

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

1200B2 Series Service Regulators. Instruction Manual

Types 749B and R130 Changeover Manifolds

Design DSA Steam-Atomized Desuperheater

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Installation, Operation, and Maintenance Manual

PC3_ and PC4_ Pipeline Connectors

Pibiviesse High Performance Control Ball Valve

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Instruction Manual HAITIMA. 3-PCS Ball Valve 2012CD/2013CD. HIM-39 Version: C

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Instructions. Control Solution ICF 20-4, ICF 25-4, ICF ICF 40-4, ICF 20-6, ICF 25-6, ICF 32-6, ICF 40-6, Direction and position.

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

TITAN FLOW CONTROL, INC.

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

Types 95L and 95H Pressure Regulators

Manual Actuated Boiler Blowdown Valves

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

SECTION BUTTERFLY VALVES

WW-720. Pressure Reducing Control Valve

Installation Instructions, Pressure Regulator Series

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Installation / Operation / Maintenance Manual KLINGER Reflex Level Gauge Type R 25

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

TECHNICAL DATA. Page 1 of 12

KTM METALTITE BALL VALVES - FLOATING TYPE INSTALLATION AND OPERATION MANUAL

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

Atmospheric relief valve type 1100 Installation and maintenance instructions

1800C and 1800C-HC Series Service Regulators

Installation and Service Manual

Sempell High Pressure Forged Check Valves Forged steel, swing check and tilting disc configuration

RHPS Series PRV 6 User Manual

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

INSTALLATION & MAINTENANCE INSTRUCTION

Caution: Safety Precautions: Installation, Operation & Maintenance Manual. For Modentic Needle Valves with Threaded Ends

Eaton Filtration, LLC

lead water to the next level NEEDLE VALVES

Transcription:

INSTALLATION, OPERATION and MAINTENANCE MANUAL TRUNNION MOUNTED BALL VALVE NEXTECH I ValvTechnologies, Inc. 5904 Bingle Road Houston, Texas 77092 U.S.A. Email: sales@valv.com www.valv.com 705_Nextech IOM Page 1

This page intentionally left blank. Page 2

Trunnion Mounted Ball Valve Nextech I After ValvTechnologies NEXTECH valves are assembled and tested, the valves are left in the full open position and end protectors are installed. The valves are crated or boxed to prevent damage during shipment. Receiving and Preparation for Installation 1. Remove shipping protection and check that the serrations on flange faces are not damaged. 2. Inspect valve/actuator for transportation damage. 3. Inspect valve bore and remove any debris. 4. Cycle the valve and inspect the ball for coating damage. 5. Reinstall the end protectors immediately after inspection. IMPORTANT: Actuators are not to be mounted, removed, adjusted or reinstalled from the valve except by trained ValvTechnologies service technicians. Notify ValvTechnologies or nearest representative when such operations need to be performed. Storage The following measures should be taken when storing valves for short term: 1. Make sure the valve end connection covers remain in place during storage. 2. It is recommended that valves be stored indoors. If the valve has no actuator and will be stored outdoors, the exposed stem or drive sleeve should be covered to avoid accumulation of water and debris. For long term storage preservation, refer to WHSEWI 235. A copy of the document can be obtained from ValvTechnologies. Installation CAUTION: Ensure that the pipeline is fully clean before installing the valve in the line. Foreign matter and debris will cause damage to the ball and seat seal surfaces resulting in seat leakage during commissioning. Ensure during commissioning and pipeline flushing the valve is kept in the fully open position. Nextech valves are bi-directional and may be installed in horizontal (with the stem upwards) or vertical position with flow from either direction. It is not recommended to install the valve such that the actuator is underneath the valve. Dirt or debris from the pipeline could enter the body cavity and cause damage to the stem packing. 705_Nextech IOM Page 3

Trunnion-Mounted Ball Valve Nextech I During handling, lifting, or installing a valve, keep the valve in the full open position whenever possible. This will prevent foreign objects from damaging the ball. The end protectors should be kept in place until final installation to protect the end connection faces. Protect any fittings against damage from the lifting devices. IMPORTANT: NEVER use hand wheels, gearbox, actuator or any other protruding part of the valve as a support for lifting the valve. 1. The valve should be lifted such that the body and end cap support the load. The end connection necks are suitable places for attaching lifting slings. 2. If the valve is equipped with lifting lugs, these should be used for handling. NOTE: Lifting lugs, if provided, are attached to balance the weight. Never use just one lifting lug for lifting. Flanged End Valves 1. Don t attempt to correct pipeline misalignments with flange bolting. This will transfer piping stress to the valve. 2. Use only approved gaskets (not supplied). 3. The bolts and nuts used to bolt the valve into the line should be lubricated to obtain proper loading on the valve. 4. When tightening bolts, use the crisscross method and gradually tighten each nut, repeating several times, to ANSI or gasket manufactures specification. Excessive tightening can cause damage and/or leakage to the end flanges or body-to-body end joint. Weld End Valves NOTE: The following DOES NOT APPLY to valves manufactured and certified to the PED directive. 1. Use solvent to clean grease or dirt from the ball and/or bore of the valve. 2. Electric welding equipment is preferred. However, if only oxygenacetylene welding equipment is available, extreme caution should be taken to prevent excess welding temperature. The use of radiation shields is advised if heat damage to the actuator is a concern. 3. Care is to be taken to minimize weld slag and splatter within the valve bore. The ball should be in the Full Open position during welding. 4. Make sure the temperature of the body/seat area does not exceed 600 F. (Check with Tempil stick or thermal chalks.) 5. Avoid rapid application of excess welding material. IOM 010 Revision 2 January 14, 2008 Page 4

Trunnion Mounted Ball Valve Nextech I 6. Localized stress relief is acceptable. Do not furnace stress relieve without consulting Valvtechnologies Engineering. 7. Thoroughly flush the pipeline after welding to remove the weld slag and splatter, before cycling the valve. CAUTION: Valve insulation is prohibited during stress relieving. CAUTION: Never perform any welding with the ball in the closed position without pipe pups. NOTE: Welding must be done by qualified welders using approved ASME Code Section IX procedures. Operation Normal Operation NEXTECH metal-seated valves require no lubrication. ValvTechnologies NEXTECH I valves operate from full open to full close by a 90 turn of the stem. The valve closes in the clockwise direction. The keys on the stem or drive sleeve going into a gearbox are in-line with the bore of the valve and can be used to indicate ball position. IMPORTANT: Valves should be insulated when temperature differentials greater than 400 F (205 C) are expected. For gear operated valves, the gearbox Open Close adjustment has been done prior to shipment and must not be disturbed. Valve position is determined by arrows on top of the gear unit that indicate the OPEN or CLOSE positions. NOTE: Handwheel rotation in the clockwise direction (Looking from the handwheel end) closes the valve, and counter clockwise rotation opens the valve CAUTION: DO NOT apply extra force or leverage after the end stops of the gear unit have reached their final setting position. CAUTION: Intermediate positions of the valve should be avoided, as high velocities produced by the narrow opening will produce erosion of the seats and ball. 705_Nextech IOM Page 5

Trunnion-Mounted Ball Valve Nextech I For actuated valves, the actuators should be operated and maintained as per their manufacturer s written instructions. The actuators have OPEN and CLOSE indicators on the top of the unit. Limit switch and position indicator operation should be observed as the valve is cycled several times IMPORTANT: In the event that maintenance is necessary, obtain the part number from the actuator nameplate and contact ValvTechnologies or nearest representative. Block and Bleed Applications ValvTechnologies NEXTECH valves can be optionally fitted to provide double block and bleed capability of line pressurization. This means that body cavity pressure can be relieved to atmosphere while pressure is coming form both directions in either the full open or full close positions. This feature allows for: 1. Verifying integrity of both seats. 2. Allow draining and flushing of the body center cavity 3. Prevention of downstream leakage to assure safety of downstream activities. Block and Bleed Procedure NEXTECH valves having the block and bleed feature are normally equipped with a ½ flanged vent port for attaching vent lines, and bleed valves (not supplied), or a ½ NPT vent fitting. Operate the valve to the full open or closed position as desired. Carefully open the valve attached to the ½ vent line, or NPT vent fitting to release body cavity pressure. CAUTION: Care should be taken to ensure that the exhaust is directed away from personnel. Continuing venting until body cavity pressure reaches atmosphere. The length of time to vent the body will vary depending on the pressure, compressibility, and size of the valve. Body Flushing and Draining Draining can be accomplished by using the drain plug, if so equipped, at the bottom of the valve. CAUTION: NEVER remove the plug without verifying that the body cavity is not pressurized. IOM 010 Revision 2 January 14, 2008 Page 6

Trunnion Mounted Ball Valve Nextech I Flushing is merely a combination of the double block and bleed, and drain procedures. Once the body cavity as been de-pressurized and drained, the ½ flanged connection can be used for supplying the flushing media. Routine Maintenance Nextech I valves require no lubrication. These valves should provide years of trouble-free operation with very little maintenance. The self-cleaning ball will provide reliable leak-free performance. Preventive Maintenance The only preventative maintenance recommended is to periodically inspect the valve for leaks around the stem/gland and check for tightness of bolting between the body/end cap & body/stem retainer joints. Stem Packing Adjustment The live loaded stem packing system is designed to eliminate frequent adjustments. If leakage should occur in this area, the following procedures should be used. 1. Tighten each packing nut a quarter of a turn and check for leakage. 2. If leakage persists, increase torque to each packing nut by 10% increments until leakage stops. Do not exceed the specified values in EChart 1200 by more than 20%. CAUTION: Ensure that valve operation is satisfactory. Increased torque values are an indication that the packing is worn and may need replacement. Excessive tightening will cause an increase in valve stem torque. Body/End Cap and Body/Stem Retainer Joints Re-tightening of the bolting is allowed only when the line has been de-pressurized. Refer to EChart 1091 for maximum torque values. If leakage persists, the gaskets are worn or damaged and need replacement. Contact ValvTechnologies or your nearest representative for service instructions. NOTE: The use of Copper-Based or Nickel-Based Anti-Seize Grease for stud and bolt lubrication and Molyybdenum Disulfied Anti-Seize Grease for packing is recommended. 705_Nextech IOM Page 7

Trunnion-Mounted Ball Valve Nextech I IMPORTANT: For extreme applications, such as high cycles, or if solids or highly corrosive materials are present, more frequent inspections are recommended. Gear/Actuator Maintenance The gear lubrication should be checked every three months and replenished or replaced as needed. IMPORTANT: In the event that actuator maintenance is necessary, obtain the part number from the actuator nameplate and contact ValvTechnologies or representative. WARNING: Disassembly and repair of ValvTechnologies valve by unauthorized personnel may be hazardous and can also void the warranty. Contact ValvTechnologies or representative for any major repairs. Table I: Troubleshooting Guides Symptom Possible Cause Actions Valve hard to operate 1. Foreign particles or debris in valve. 2. Gear or Actuator bolting loose. 3. Actuator or gear failure. 4. Stem or Drive sleeve key sheared. 1. Cycle and flush valve to remove debris. 2. Tighten bolting. 3. Replace or repair actuator. 4. Determine cause of shearing & correct/replace keys Leakage through a closed ball Leakage through stem Body/Retainer Gasket Leaking 1. Valve not fully closed. 2. Debris trapped in valve. 3. Damaged Ball or Seat. 1. Loose stem packing. 2. Worn packing. 1. Body nut/retainer bolt loose. 2. Damaged gaskets 1. Close the valve fully. 2. Cycle and flush valve to remove debris. 3. Call Factory or nearest representative. 1. Tighten gland nuts. 2. Replace packing. * 1. Tighten body nut or retainer bolt 2. Replace gasket. * * Contact Factory or nearest representative. IOM 010 Revision 2 January 14, 2008 Page 8

Trunnion Mounted Ball Valve Nextech I Engineering Chart EChart 1200 NEXTECH CHESTERTON 1601 PACKING TORQUE CHART Valve Pressure Class Packing Size Qty/Studs Packing Gland Torque 2" 300#/600# 1.250 x 1.625 4/.375 60 in-lbs (5 ft-lbs) 900# 1.250 x 1.625 4/.375 72 in-lbs (6 ft-lbs) 3" 300#/600# 1.500 x 1.875 4/.375 72 in-lbs (6 ft-lbs) 900# 2.000 x 2.375 4/.500 144 in-lbs (12 ft-lbs) 4" 300#/600# 2.000 x 2.375 4/.500 132 in-lbs (11 ft-lbs) 900# 2.000 x 2.375 4/.500 144 in-lbs (12 ft-lbs) 6" 300#/600# 2.500 x 3.000 4/.500 216 in-lbs (18 ft-lbs) 900# 2.500 x 3.000 4/.500 240 in-lbs (20 ft-lbs) 8" 300#/600# 3.000 x 3.500 4/.625 312 in-lbs (26 ft-lbs) 900# 3.000 x 3.500 4/.625 348 in-lbs (29 ft-lbs) 10" 300#/600# 3.500 x 4.000 4/.625 360 in-lbs (30 ft-lbs) 900# 3.500 x 4.000 4/.625 408 in-lbs (34 ft-lbs) 300# 3.500 x 4.000 4/.625 360 in-lbs (30 ft-lbs) 12" 600# 4.000 x 4.500 4/.625 408 in-lbs (34 ft-lbs) 900# 4.000 x 4.500 4/.625 456 in-lbs (38 ft-lbs) 705_Nextech IOM Page 9

Trunnion-Mounted Ball Valve Nextech I ECHART 1091 BODY BOLT TORQUE VALUES TORQUE (ft/lbs) BOLT SIZE IN INCHES B7 OR EQUAL B8M OR EQUAL Minimum Maximum Minimum Maximum 5/16 12 21.6 4 12 3/8 18 32.4 6 18 7/16 29 52.2 9 29 1/2 45 81.0 13 45 9/16 50 90.0 19 50 5/8 85 153.0 26 85 3/4 150 270.0 45 150 7/8 240 432.0 70 240 1 355 639.0 110 355 1-1/8 510 918.0 155 510 1-1/4 700 1260.0 210 700 1-3/8 950 1710.0 290 950 1-1/2 1250 2250.0 370 1250 1-5/8 1600 2880.0 480 1600 1-3/4 2060 3708.0 500 2060 1-7/8 2500 4500.0 750 2500 2 3000 5400.0 900 3000 3 10300 18540.0 3100 10350 3-1/2 16500 29700.0 5000 16650 Note: Torque values are based on Sweeney 505 (or Valvtechnologies, Inc. Engineering approved equivalent) lubricant on all threads and V nut faces. Without lube there is a risk of stripping the threads before reaching adequate bolt tension. ***In the event metal to metal contact is not made when maximum torque value is achieved, contact Engineering. IOM 010 Revision 2 January 14, 2008 Page 10

Trunnion Mounted Ball Valve Nextech I Revision Date: Description of change: Number: 3 10/27/2010 1. Corrected reference to WHSEWI 235 2. Added EChart 1201 and EChart1091 3. Updated Rev # to 3. Prepared by: Christopher Lee Title: Engineer Signature: n/a Date: 25-Oct-10 Reviewed by: Craig Walther Signature: (electronic via Adept) Reviewed by: Stephen Smith Signature: (electronic via Adept) Reviewed by: Art Schenau Signature: (electronic via Adept) Title: Director of Quality Date: 26-Oct-10 Title: Director of Engineering Date: 25-Oct-10 Title: VP of Operations Date: 27-Oct-10 2013 ValvTechnologies, Inc. All rights reserved. 705_NexTech IOM. 705_Nextech IOM Page 11