Kildare National Roads Design Office. N81 Tallaght to Hollywood Cross NRI\~ National Roads Authority,;.~ tuj,,!il1 v.;; E:ilJ;u liisk!

Similar documents
Cork to Limerick Route Pre-Feasibility Study Update

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Douglas Land Use and Transportation Study

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

2. Context. Existing framework. The context. The challenge. Transport Strategy

Transportation Master Plan Advisory Task Force

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

TRANSPORT INFRASTRUCTURE IRELAND NATIONAL ROAD NETWORK INDICATORS March 2017

Launceston's Transport Futures. Greater travel options for the people of Launceston

Guidance on Minor Improvements to National Roads (Including Erratum No. 1)

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

City of Perth Cycle Plan 2029

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Chelmsford City Growth Package

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

9. Parking Supporting Statement

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

City of Homewood Transportation Plan

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Wicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

Living Streets response to the Draft London Plan

Regional Transportation Needs Within Southeastern Wisconsin

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

Technical note. 1. Introduction

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Design Workshops Summary of all Feedback January 2017

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Draft Central District Plan

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

M6 Junction 10 Public Consultation

Guildford Borough (Draft)

Speed Limit Policy Isle of Wight Council

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

North West Non-Technical Summary of the Transport Assessment September 2011

ENFIELD TOWN THE REVISED DESIGN

CHAPTER 7. Movement and Transport. Naas Town Development Plan

TRANSPORT AND MOVEMENT

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

National Planning Framework National Development Plan ( )

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Determining bicycle infrastructure preferences A case study of Dublin

Active Transportation Infrastructure Investment A Business Case

Nottingham Cycle City Frequently Asked Questions

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

GD 0043/18 ACTIVE TRAVEL STRATEGY

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Your views are important. Please fill in a form before you leave. Or alternatively

C.A.R.S. Project Design Report.

The Rower Traffic Management Scheme

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Appendix D Stage 1 Road Safety Audit

Chapter 5 Future Transportation

Service Business Plan

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Re: N71 Muckross Road Traffic Calming Scheme Part 8 and Section 38

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

Truck Climbing Lane Traffic Justification Report

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

SCHEME DESIGN AND ENGINEERING

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

Transportation Corridor Studies: Summary of Recommendations

CUERDEN TRANSPORT PROPOSALS

London Cycle Network Annual Report 2000

Maynooth Cycling Submission on North South Corridor

Bicycle Master Plan Goals, Strategies, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

North Coast Corridor:

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013

Access Management Regulations and Standards

South King County High-Capacity Transit Corridor Study

Transcription:

Kildare National Roads Design Office Scheme Feasibility Report NRI\~ National Roads Authority,;.~ tuj,,!il1 v.;; E:ilJ;u liisk!:: :~ Wicklow Co. Council South Dublin Co. Council Kildare Co. Council Revision 2 April 2008

Table of Contents 1. INTRODUCTION 2. POPULATION FIGURES 3. ROAD DEVELOPMENT POLICY 4. JOURNEY TIME ASSESSMENT 5. TRAFFIC VOLUMES 6. ACCIDENT DATA 7. SAFETY REVIEW REPORT 8. CONCLUSIONS & RECOMMENDATION 9. REFERENCES APPENDIX 1 - JOURNEY TIME ASSESSMENT REPORT APPENDIX 2 - TRAFFIC ASSESSMENT REPORT APPENDIX 3 - SAFETY REVIEW REPORT APPENDIX 4 - ACCIDENT DATA REPORT

1'18 J Tallaght to Hollywood Cross 1. INTRODUCTION The objective of this report is to establish the feasibility of upgrading the N81 between Tallaght and Hollywood Cross incorporating a bypass of the town of Blessington. The report includes information on Journey Times on the current N81 route, an analysis of the traffic volumes and accident data relating to the N81. The background to initiating the study from different policy documents and the population figures indicating the growth in the area are included in the study. All of the information gathered is analysed and recommendations are presented at the end of the study. The N81 runs from the junction with the N80 in Co. Carlow and terminates in Dublin City and is approximately 85km in length. The section currently under consideration in this report runs from Hollywood Cross to the Embankment in Saggart and is approximately 27km in length, see map 1. Blessington is the only town located directly along the N81 and is connected to Dublin by road only. Blessington is located adjacent to the Pollaphuca reservoir which is a popular tourist location as well as a Special Protection Area. As such any bypass would be restricted in its route to the east of the town. The road is characterised with a poor horizontal and vertical alignment. The route consists of a single lane carriageway without a hard strip or hard shoulder over lengths of it. The road has limited overtaking capacity and as a result platooning regularly occurs. In addition there are a number of commercial and aggregate industries along this road with slow moving HGYs. This road was identified in the National Roads Needs Study 1998 as needing a standard 2 lane carriageway as far as Blessington and a reduced 2 lane carriageway beyond. As previously outlined the road does not currently fulfil this requirement. The speed limit on the N8l is 100kph, reducing to 50kph and 60kph in the urban areas of Blessington and Brittas. See drawing NR0159/1l0/ l1 overleaf showing proposed study area.

2. POPULATION GROWTH The preliminary report of the 2006 Population Census highlighted that the Mid-East region (Kildare, Meath and Wicklow) had the highest population growth between the 2002 and 2006 population census. The population of the Mid East region increased by 15.1 %. Area 2002 Population 2006 Population % Change Blessington 3126 3992 27.7% Hollywood 639 672 5.2% Baltinglass no. 1 14685 17002 15.8% Rural Area Table 1 Population figures The Baltinglass no. I Rural Area encompasses a large part of the district that would make use of the N81 to travel to Dublin. Overall this area has seen a large population growth over the last 4 years. Current population growth estimates predict this increase will continue in the forthcoming years. 3. ROAD DEVELOPMENT POLICY A scheme to upgrade the N81 between Tallaght and Blessington has been identified both directly and indirectly in the following documentation. As part of the NRA's continued assessment of the road needs in Ireland, the scheme boundaries have been extended as far as Hollywood Cross. National Development Plan 2000-2006 "The strategy for national secondmy roads will concelltrate Oil routes which are of particular importance to economic and regional development. including links to tire strategic corridors. roads serving key ports. ailporls. tourist areas. industly and multipurpose roads. " "Among the routes on which improvements works will be carried out are:.. "Tallaght Blessington (N81) " National Development Plan 2007-2013 "Investment under the Economic Infrastructure Priority ofndp 2007-2013 is indicatively estimated at 54. 7 billion...... The key objectives under this Priority will be: To create a road network. in line with the timetable in Transport 21. that will see the completion of the major inter-urban routes and will upgrade finks generally between tire National Spatial Strategy Gateway Centres and improve tire non-national road network;.. Transport 21

"Transport 21 sets out to meet the challel/ges outlined above. The Government has agreed a total investment framework oj 34 billion over the period 2006 to 2015. This unprecedented level oj capital investment will be used to transjorm Ireland's transport system. In particular it will providefilllding to:" "bring about improvements in the rest oj the national road network, Jocusing particularly on the balanced regional development objectives oj the National Spatial Strategy alld on the needs identified in the National Roads Needs Study" National Road Needs Study 1998 "Each oj the routes on the National Secol/dmy network was examined to establish when the link wouldjall below level ojservice D. Similarly, the principal towns on the routes were examined to identifo bottle-necks. Economic evaluation was used to ascertain the most attractive capital investment retul'l1s and the results were subsequently used to rank the bypass needs on the National Secondmy Routes. " N81;N80 Junction to Blessington "This route only requires upgrading on the section between Blessington and Tallaght where a "standard two lane" road is necessmy during Phase I needs between Blessington and the N82 junction. " National Spatial Strategy for Ireland 2002-2020 "The National Spatial Strategy supports Dublin 's pivotal role in national economic success. It is essential Jor balanced regional development that the peljormance oj the Greater Dublin Area (Dublin City, and the surrounding 3 counties Kildare, Meath and Wicklow) be built upon and physically consolidated. " Towns with populations 1500-5000 -"Towns ojthis scale in the GDA are also generally located on or neal' the transportation corridors radiatingfrolll Dublin and are relatively close to the larger urban areas. While the primmy development centres will be the main Jocus Jor responding to fitllll'e growth in the GDA hinterland, these smaller towns caterjor local growth in residential, employment and sen,ice filllctions through enhancing the built environment, water services, public transport links and capacity Jor development in these centres. Accommodating sllch additional filllctions 1/IIISt however be balanced with protecting the character and quality oj these towns. Wicklow County Development Plan 2004-2010 "The location oj County Wicklow within the Greater Dublin Area and its close proximity to Dublin and international links, has resulted in development

pressure in particular within the north of the COllnty. The Plan, therefore seeks to encourage and facilitate the provision of infrastructure sen1ices to meet the demand for development and futllre population increases in an environmentally sustainable manner. " "The prill1my objective of policies relating to transport will facilitate the provision of proper road inji-astrllcture in a sustainable manner and the promotion of public and integrated transport networks, in order to ensure the sustainable and economic development of County Wicklow. " "Policy Tl: The Council will, in line with Government and National Roads Authority (NRA) policies, and in accordance with the "Roads Needs Study", published by the NRA and the National Development Plan, seek to bring national primmy and secondmj' roads up to the appropriate standards. " "Policy T4: The Council will seek to improve the road links between the national road network and the growth centres of County Wicklow in order to cater for anticipated additional traffic flows and to facilitate the economic development of these settlements. The co-operation of the Town Councils will be sought in the implementation of same where necessmy. " "The Council will provide for road improvements on the National Secondmy N8I road at Hempstown to Tinode and presen'e alternative road improvement lines and route corridors free of development" "Policy HL4: The Council will ensure that ally development proposal in the vicinity of, or affecting in any way a designated area, provides sufficient illformation to show how its proposals will impact upon the designated area, and will include proposals for appropriate amelioration. In all such cases, the Council shall consult with the National Paries and Wildlife Section of the Department of Environment, Heritage and Local Government. " Kildare County Development Plan 2005-2011 "Objectives (4) To improve the capacity of the road illji-astructure within COllnty Kildare in accordance with national/regional policy" "As part of the overall National Road development programme, it is an objective to carly Ollt a number of specific projects during the plan period: It is the policy of the Council: RP 11 To improve the section of the N8I that is contained in COl/nty Kildare" South Dublin County Development Plan "The county is strategically located at a number of important gateway corridors into the Capital City - N4, N7 and the N8I. These corridors will be

N81 TaUaght to Hollywood Cross examined (especially the N7, and the area adjoining Belgard Road), reimaged and re-developed to create a new urban landscape and provide high quality designed corridors within the county and gateway corridors to and /rom the Capital City. IntensifYing and densifj1ing the development within the built up area of tile County, will also be in the interests of sustainable development. " "It is an objective of the Council to initiate works on the roads listed in Table 13.6 as part of a six year programme. Designs have been prepared in respect of some of these proposals" "The Council may, at its discretion, introduce roads objective other than those listed in Table 13.6 at any time within the currency of the Plan. " Strategic Planning Guidelines for the Greater Dublin Area 1999 "Improved Transportation System. The existing transportation system of the Greater Dublin Area, including both public and private transport, is subject to vely heavy pressure. It is necessmy to implement measures to alleviate the existing difficulties, many ofwhicll are in planning or under construction, as well as a range of measures to facilitate filture development. " "Strategy for the Hinderlalld Area - Key Points... The existing and potential transportation corridors will be strengthened so as to improve links with the Metropolitan Area. " "There are no major plans for the N81 (DlIblin-Blessington-Baltinglass) " "Nothwithstanding the need to facilitate public transport, it has to be recognised that the private car will continue to play an important role ill the filtw e. This is especially so in the Hinterland Area, where the pattern and density of selllement and development limits the potential for public transport. 11 is also important to recognise the significance of the road system for the transportation of goods. " "Nevertheless, the towns (m the Hinterland Area) will require to be well linked to Dublin by good road and rail in/rast/"llcture. " "Afillldamentalfilllctioll of the transportation system, including both roads and public transport, in the Greater Dublin Area is the linking of the Hinterland and Metropolitan Areas. " Regional Planning Guidelines for the Greater Dublin Area 2004-2016 "lyiaintaining the distinction between the city and town components within the Greater Dublin Area as envisaged by the Strategic Planning Guidelines for the area, which focus on the metropolitan area, the hinterland and a number of other strategically placed towns as primmy or secondmy development centres within the hinterland. "

4. TRAFFIC VOLUMES Table 2 below shows the Average Annual Daily Traffic (AADT) recorded by the NRA at specific locations along the N81 route between Tallaght and Hollywood Cross. Traffic counts were carried out by KCC NRDO at these and other locations to enable analysis of traffic volume growth on this route. Heavy volumes of traffic were recorded between Saggart and Blessington. Traffic volumes reduced on the southern side of Blessington. The growth in this area is predicted to continue which will result in further journey time delays and inconvenience to road users. Refer to Appendix 2 of this report to see details of traffic counts carried out by KCC NRDO. RT590 RT600 RT610 RT620 RT630 Section 2000 2001 2002 2003 2004 AADT AADT AADT AADT AADT Brittas 8619 9144 9503 9067 9520 (23%) (17.3%) (17.25%) (19.6%) (17.3%) Kilbride 9143 9699 10079 11061 11646 (26%) (19.5%) (19.5%) (19.5%) (19.5%) Blessington 12318 13070 13581 14904 15692 (9%) (6.8%) (6.75%) (6.8%) (6.8%) Hollywood 4545 4824 5009 3544 3723 (13%) (9.8%) (9.75%) (10.6%) (9.8%) Table 2 NRA Traffic Volumes forn81 between Tallaght & Hollywood Cross 5. JOURNEY TIME ASSESSMENTS The target of the "National Roads Needs Study" was to ensure that no section of the National network falls below "Level of Service" (LOS) D. This LOS is defined as an inter-urban travel speed of 80kph. Appendix 1 of this report concludes that the average travel speed is 62kph. This means that the road is not providing LOS D. A key element of achieving the LOS D is to "eliminate urban bottlenecks by constructing bypasses". By constructing a bypass of Blessington and upgrading the road eliminating the speed restricted sections, free-flow conditions would be achieved which would save an average of 10 minutes per journey. Another strategy to decrease journey times would be to increase the overtaking distance on the carriageway. This would eliminate the possibility of "excessive platooning" which is characteristic of roads with a little opportunity for overtaking.

The reduction of journey times is one of the inputs into the Cost Benefit Analysis which is undertaken on all major projects. A reduction of 10 minutes per journey over the design life of the road would lead to a significant cost benefit for the scheme. 6. ACCIDENT DATA Appendix 4 of this report details the accident data relating to this stretch of the N81. As can be seen from this report there has been a total of 169 accidents on this road between 1996 and 2004. The overall accident data is presented in Table 3. Type Number Percentage Fatal 12 7% Serious 33 20% Minor 124 73% Table 3 ACCIdent Data Several trends develop when we analyse the accident data provided. The accidents on the road generally occur in dry weather conditions and good visibility. The road conditions are fairly evenly divided between wet and dry surface conditions. All of these trends are consistent with data for national routes throughout Ireland. The primary collision types for the N8 1 appear to be single vehicle accidents and head on collisions. Throughout our analysis of the 6 sections of the carriageway the number of these types of accidents is much higher than the national figures. This is as a result of a number of factors which include the poor vertical and horizontal alignment of the N81. In many cases the accidents occur on what are recorded as straight sections of the carriageway, in fact many of the straight sections of the N8 1 contain hollows or dips in the road which obscure oncoming traffic from view. The analysis also showed a higher number of rear end shunts. There are a number of junctions on the N8 1 many of which link up with each other. The presence of these junctions increases vulnerability of road users who are turning right to rear end shunts. This problem is exacerbated by the fact that there is insufficient space to pass on the inside at many of these junctions. In addition the approach to the main carriageway can be deceptive from the minor road and there appears to be a number of rear end shunts from traffic sitting at these junctions. These accidents represent a significant cost to the economy, the largest of which is the loss of life and permanent injuries caused. The removal of the road hazards and reduced congestion envisaged by this scheme would significantly reduce the number of accidents on the road. Again this would lead to a significant benefit in the cost benefit analysis report. 7. SAFETY REVIEW A Safety Review of the route was commissioned as part of this feasibility study; this report can be located in Appendix 3. The report assessed the road in 6 different sections. It consisted of a desk top review ofthe accident history of the road and site

inspection of the current road condition & also comprised of a drive through of the road in daytime & nightime conditions. The report identified a number of different sections that are in need of improvement in order to reduce the number of accidents. The need for widening of several sections of the road was highlighted as was the need to improve the sightlines at many of the junctions. The report has also indicated that much of the improvements can be undertaken without the need to acquire large amounts of land. As this road is situated within the "commuter belt" area of Dublin, the current situation is likely to continue to deteriorate with higher numbers of people using the road and increased risks associated with that to vulnerable road users. 8_ CONCLUSIONS & RECOMMENDATION This Report set out to determine the need for an upgrade of the N8l between Tallaght and Hollywood Cross. Under the definitions of journey times, traffic volumes, road safety, this report has highlighted the deficiencies of the existing road network and has highlighted the potential benefits of an upgrade if it were constructed. In summary, this report has shown tbat; Improvements to the N81 between Tallaght and Blessington is a stated objective of Local and National policy documents including the National Development Plan 2000-2006. This road was identified in the National Roads Needs Study 1998 as needing a standard 2 lane carriageway as far as Blessington and a reduced 2 lane carriageway beyond. As previously outlined the road does not currently fulfil this requirement. Recent census figures have shown that the population of Blessington, Baltinglass, Hollywood, Brittas and their immediate environs is increasing. A Journey Time Assessment along the N81 from Tallaght to Hollywood Cross, which includes 100kmlh sections, has shown that the average speed is 62km1h.The target of the "National Roads Needs Study" was to ensure that no section of the National network falls below "Level of Service" (LOS) D. This LOS is defined as an inter-urban travel speed of 80kph. This report concludes that the average travel speed is 62kph. This means that the road is not providing LOS D. A key element of achieving the LOS D is to "eliminate urban bottlenecks by constructing bypasses". By constructing a bypass of Blessington and upgrading the road eliminating the speed restricted sections, free-flow conditions would be achieved which would save an average of 10 minutes per journey. Accidents represent a significant cost to the economy, the largest of which is the loss oflife and permanent injuries caused. The removal of the road hazards and reduced congestion envisaged by this scheme would significantly

reduce the number of accidents on the road. Again this would lead to a significant benefit in the cost benefit analysis report. A safety review has highlighted deficiencies in the existing N81 infrastmcture and recommends improvements that should be made to improve road safety. The provision of a new alignment would eliminate these safety issues. The traffic counts carried out by Kildare National Road Design Office have shown that the AADT for the N81 is in excess of 12,000 north of Blessington and an AADT of 7,000 to the south of Blessington. As these AADT figures are likely to increase further with rising population and development in both Baltinglass, Blessington and their environs, table 4 TD 9/07 Volume 6 of the NRA Design Manual for Roads and Bridges would indicate that a category Type 3 Dual or above is required north of Blessington and a standard single to the south of Blessington. Urban bypasses are generally regarded as a positive infrastmctural improvement, diverting through-traffic away from town centres, relieving traffic congestion and reducing journey times. Research into economic effects on bypassed towns suggests that, after an initial period of adjustment following the opening of the bypass, new shopping and community patterns become established. This can contribute to a more attractive shopping and living environment, which is reflected in increased revenue. In the absence of a definitive route, it is not possible at this early stage to prepare a detailed cost-estimate for the scheme. Taking the foregoing information into account, it can be concluded that the provision of an upgrade to type 3 or above between Tallaght and Blessington and provision of standard single between Blessington and Hollywood Cross is feasible. It is therefore recommended that the findings of this Report be approved by the National roads Authority and that the NRA approval be granted to progress the Scheme to Phases 2 and 3 of the development, namely the Constraints Study and Route Selection Phases.

9_REFERENCES National Development Plan 2000-2006 National Development Plan 2007-2013 Transport 21 National Road Needs Stlldy 1998 National Spatial Strategy for Ireland 2002-2020 Wicklow COllnty Development Plan 2004-2010 SOlltil Dublin County Development Plan Kildare County Council Development Plan Strategic Planning Guidelines for the Greater Dublin Area 1999 Regional Planning Guidelinesfor th e Greater Dublin Area 2004-2016 www.nra.ie National Roads Authority website. www.cso.ie Central Statisitics Office website.