A unique industrial property near downtown Chicago offering available space for lease or redevelopment

Similar documents
Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

NORTH SEATTLE SUBJECT PROPERTY DEVELOPMENT SITE. Dane Erickson TH AVE NE SEATTLE, WA 98125

S T A T I O N A R E A P L A N

The Top Five Minor League Baseball Parks*

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

Two Location Entertainment Venue Opportunity

Clear Creek Business Park Highway 51 at I-485, Charlotte, NC

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Appendix A-1: Purpose and Need Statement

Arnold Hinojosa

Public Meeting #1 January 30, 2018

Michael A. Werthmann, PE, PTOE Principal

The following is submitted together with the plans and application for the staff and plan commission consideration of approval.

Central Harlem Avenue Corridor Study

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Available Eastside Industrial Properties

D O W N T O W N B A S E B A L L

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

SELF-STORAGE HIGHLIGHTS SALE PRICE: $4,200,000. FOR SALE SELF-STORAGE FACILITY 8131 E Main St. Marshall, VA

TRANSPORTATION TRAINING TOPICS. April 6, 2010

ENTITLEMENT MODIFICATION

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Comprehensive Collection of Stakeholder Alternatives by Mode

Final Study Recommendations AMES TRANSIT FEASIBILITY STUDY. For Public Review and Comment. October Ames Transit Feasibility Study

LEASE 387 BLUEWATER ROAD - ATLANTIC ACRES BUSINESS PARK BEDFORD, NS MULTI-TENANT INDUSTRIAL 2,150 SF PHASE 1 BLUEWATER BUSINESS PARK

Commercial Real Estate For Sale and Lease TOWN ADDRESS SIZE

Chapter 5 Future Transportation

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

Midtown Corridor Alternatives Analysis

FIRST AMENDMENT TO METRO NORTH CROSSING TAX INCREMENT FINANCING PLAN

Regional Commercial District Summary of Allowable Uses

Pre-Application Meeting Request Form

Fulton Market Streetscape

TRANSPORTATION & MOBILITY

CFI TEAM AVAILABLE PROPERTIES

See Figure 38, Existing Nonmotorized Connections.

Equestrian Estate. Property Features. For Sale - $2,900, Woodbrook Way, Fountain, NC

SPRINGFIELD REVITALIZATION REPORT

CFI TEAM AVAILABLE PROPERTIES

3105 Alderwood Mall Blvd, Lynnwood, WA FOR SALE PAUL SLEETH th Street SW. Alderwood Mall Parkway

Appendix A-2: Screen 1 Alternatives Report

Elmhurst Metra Station. Public Hearing Wednesday - November 30, 2016

Norfolk Tide LRT System Weaving Transit in Downtown Norfolk

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

Strategies to keep people and goods moving in and through Seattle

Existing Transportation System

For lease Speedway Commerce Center I

Stillwater Armory 107 Chestnut Street East STILLWATER, MN

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

New Park Avenue Corridor West Hartford

USER PURCHASE OR INVESTMENT OPPORTUNITY *

BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY 01/17/2019

Town Hall Meeting. June 13, 2018 PianoForte 1335 S. Michigan Ave.

Michael A. Werthmann, PE, PTOE Principal Luay R. Aboona, PE Principal. DATE: February 22, Revised April 30, 2012

DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING. Driving Directions. Page. 14

For lease Speedway Commerce Center I

Bus Rapid Transit Plans

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

Dolphin Station Park & Ride to be done by March

SARASOTA COUNTY GOVERNMENT Parks and Recreation

Compliance with Section 18-52(4) City of Thornton Development Code

THIRD&GRAND. Public Workshop #1. Transportation Hub Area Plan. June 12, 2013

DeLand. DeBary. Sanford/SR 46. Lake Mary. Longwood Altamonte Springs. Maitland. Winter Park/Park Avenue

City of Rolling Hills Equestrian Facility Guidelines

ARENA COMMERCE CENTER

Streetscape: Core Shopping District

Ellensburg CENTRALLY LOCATED

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Site Analysis and Parti Development

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

This chapter describes the proposed circulation system and transportation alternatives associated with

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

2017 Independence Band Tournament Director s Packet

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

17374 US ROUTE 694 OTTAWA, OHIO 45875

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

Comprehensive Report. Chicago Department of Transportation. Cambridge Systematics, Inc. URS O-H Community Partners EJM Engineering MKC Associates

SOLANA 101 MIXED USE PROJECT 1.91 ACRES

PRIME ANDERSONVILLE RETAIL FOR LEASE

REACTIVATION AND RIPARIAN RESTORATION PROJECT THREE CREEKS CONFLUENCE OPEN SPACE: PRELIMINARY DESIGN CONCEPT #1 J O R D A N R I V E R 900 WEST

THE MILLWORKS ON CHARLOTTE A CUTTING EDGE ENVIRONMENT 195,000 RSF CREATIVE MIXED USE THE MILLWORKS ON CHARLOTTE OAKPOINT REAL ESTATE 1

Public Meeting #2 May 18, 2011 Comment Summary by Category

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

Pullman National Monument. TAC/CAC August 22, 2016

The Public Safety Complex Southampton MA. a critical time

Existing Conditions. Background Document Review. Bicycle and Pedestrian Connectivity Master Plan

DISCUSSION AND RECOMMENDATION ON OPTIONS FOR THE CREATION OF A COMMUNITY DEVELOPMENT AREA IN THE SUGAR HOUSE NEIGHBORHOOD

ARENA COMMERCE CENTER

RETAIL BUILDING AT NW 36TH STREET

Stakeholder Meeting Handouts. January 2013

WHAT S NEXT? SAN FRANCISCO S MAJOR DEVELOPMENT AND INFRASTRUCTURE PROJECTS

SEATTLE CENTER SKATEPARK RELOCATION

Existing Transportation System

Highway 217 Corridor Study. Phase I Overview Report

Business Park District Summary of Allowable Uses

Master's College Construction Summary

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Goodman Commerce Center Eastvale Adjacent to I-15 between Cantu-Galleano Ranch Road and Bellegrave Avenue. +Marks. The Spot

Webinar- Importance of Multi- Modal Transit Connections and Fare Policy for Regional Transit Mobility & Equity

FOR LEASE SHOPPES AT VALLE GREENE. Fairborn, Ohio WELCOME TO THE REGION WE KNOW

Transcription:

IIT S State Street E 41st Street E 42nd Street S Wabash Ave A unique industrial property near downtown Chicago offering available space for lease or redevelopment www.bronzevilleindustrial.com 4131 South State Street

The Property Bronzeville Industrial Center offers an industrial space opportunity in Chicago s Bronzeville neighborhood. Industrial space is available for lease in several single to multi-story vintage loft structures. The entire 4.34-acre site is available for sale, as a redevelopment project. Concept plans depict maximizing coverage on the site with a new 92,360 s.f. building. The property was operated as a commercial dairy by the historic Bowman Dairy Company. It is now owned and operated by an auction company that has maintained portions of the building as functional office and warehouse space. 1

Location DOWNTOWN CHICAGO Bronzeville Industrial Center is located just 4 miles south of the center of Downtown Chicago on State Street between 41st and 42nd Streets in Chicago Bronzeville neighborhood. The unique location offers users quick access to Downtown via multiple access points to Interstate 90/94 (Dan Ryan Expressway) and multiple alternative routes on surface streets. IIT BRONZEVILLE Bronzeville is home to several accredited institutions. The Illinois Institute of Technology (IIT) campus is less than four blocks north. The Chicago White Sox stadium and Chicago Police Headquarters are close by. Additionally, Metra operates a maintenance facility for their fleet of commuter trains nearby. The site is widely served by public transportation. Access to Red Line and Green Line CTA are close by. CTA bus service is available in front of the property on State Street. Located in the pro-business 3rd Ward. Pat Dowell is the Alderman. N 2

All Parcels Parcels ABCD For Sale or Lease +/-4.34-acre redevelopment opportunity 4131 S. State Street The entire +/-4.34-acre property is offered for sale. This scenario contemplates demolition of existing structures and redeveloping the site with construction of a 92,360sf Class A, pre-cast warehouse/manufacturing facility. As inventory of sites with comparable access to Downtown Chicago is extremely rare, this scenario offers potential user/owners being displaced from other areas of the City of Chicago an opportunity to develop and own their own facility. PROJECT DATA Site area Gross Total Building footprint Building use Warehouse Office 4.34 acres 202,495 s.f. 92,360 s.f. 83,124 s.f. 9,236 s.f. Coverage Gross 42% Net 42% Parking required Warehouse 1/1000 s.f. 83 stalls Office 1/500 s.f. 18 stalls Total 102 stalls Parking provided Auto Required accessible 78 stalls 4 stalls D A Truck docks Dock-high doors 25 C B 3

Parcel A Parcel A For Sale or Lease +/-12,500 s.f. Vehicle Maintenance/Service Facility with +/-1 acre Exterior Land Site 4100 S. Wabash Avenue SPECIFICATIONS Building Size +/-12,500 s.f. Land Size +/-1 acre Clear Height 16 6 5 bays with (1) 13.5 W x 12 H overhead doors (4) 10 W x 14 H (north facing) (4) bays 75 deep (1) wash bay 50 deep 1 overhead door 14 W x 14 H (east facing to Wabash Avenue) Underground diesel tank Portions of clear space Functional vintage space Office areas to suit Unique availability of multi bay vehicle maintenance space Clear space offers flex for a wide variety of uses 4 D C A B

Parcel B Parcel B For Sale or Lease +/-65,000 s.f. 2-story Industrial Building 4130 S. Wabash Avenue SPECIFICATIONS Building Size +/-65,000 s.f. # of stories 2 Typical floor +/-32,500 s.f. Clear Height 14-16 Land Size +/-1.14 acres Zoning M1-2 Year Built 1932 Expansive interior truck level loading dock Portions of clear space Functional vintage space Office areas to suit Well-maintained D C A B 5

Parcel C Parcel C For Sale or Lease +/-80,000 s.f. Industrial Building 4131 S. State Street SPECIFICATIONS Building Size +/-80,000 s.f. # of stories 1, partial 2 Clear Height 14-16 Land Size +/-1.41 acre Zoning M1-2 Year Built 1920 One exterior truck level loading dock One grade-level overhead door Vintage masonry building Functional vintage space Existing office areas Well-maintained 21,000 vehicles per day on State Street D A 6 C B

Parcel D Parcel D For Sale or Lease +/-35,000 s.f. (+/-0.8 acre) Land Site 4101 S. State Street SPECIFICATIONS Land Size Zoning C1-3 Condition Ideal uses: Truck storage Exterior storage Retail redevelopment +/-35,000 s.f. +/-0.8 acre Crushed gravel Fenced/gated D C A B 7

Notes: 8

dustrial property near downtown Chicago bronzevilleindustrial.com vailable space for lease or redevelopment www.bronzevilleindustrial.com 4131 South State Street +