FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Similar documents
FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Alamo RMA VRF Project Update June 2016

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

Factors that Affect Fixed-Route Ridership Frequency Connections and accessibility Travel time Travel cost Service area coverage Reliability

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Comprehensive Collection of Stakeholder Alternatives by Mode

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

APPENDIX D COST SUMMARY TABLES

STATION #3 INITIAL ALTERNATIVES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

TRANSPORTATION TRAINING TOPICS. April 6, 2010

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

DRAFT INVESTMENT CORRIDORS

Regional Transportation Needs Within Southeastern Wisconsin

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Short and Long Term Needs

P E D E S T R I A N M O B I L I T Y A D V I S O R Y C O M M I T T E E

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

Applications for Funding

Chapter 5 Future Transportation

Proposed Action, Purpose and Need Technical Memorandum

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

INDEX. Geometric Design Guide for Canadian Roads INDEX

This page intentionally left blank.

Hennepin County Transportation Department

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Roadway Project Recommendations:

DEKALB COUNTY. 22. Priority Projects for DeKalb County

I-10 AT SCENIC LOOP RD. Open House

Performance-Based Planning for Safety in a Vision Zero World. AMPO September 27, 2018

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Greater Harmony Hills Neighborhood Association Walkable Community Workshop Report June 30, 2012

TRANSPORTATION & MOBILITY

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

San Tomas Expressway

Clackamas County Comprehensive Plan

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

Prepared for. Volume 2: Developing Vision Prepared by. Phase 2 Stakeholder Involvement Summary. with RJ RIVERA Associates, Inc.

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Appendix B. Summary of Public Comments Tri County Health Department Comments

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

Proposed Project I 35 from Denton to Cooke County Line

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Basalt Creek Transportation Refinement Plan Recommendations

2012 PRIORITY TRANSPORTATION PROJECTS

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

TRANSPORTATION & CAPITAL IMPROVEMENTS

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

FM 471. Open House Public Meeting FM 471

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Roadway Design Manual

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Sellwood Bridge Project Open House!

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

KEARNY MESA COMMUNITY PLAN UPDATE

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Bicycling in the Alamo Region

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

ACTIVE TRANSPORTATION

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

San Jose Transportation Policy

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Active Transportation Facility Glossary

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Project Description Form 8EE

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

CHAPTER 1 INTRODUCTION

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Preliminary Engineering Study

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

2019 Federal Transportation Improvement Program

TABLE OF CONTENTS. Executive Summary

2040 Long Range Plan Projects Draft October 2011

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Transcription:

-2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions Pgm - 5303.1 0915-00-197 AAMPO Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AAMPO Alamo Area Commute Solutions Pgm - 5103.0 0915-12-546 AAMPO Alamo/Commerce/Losoya Commerce Market $0 Intersection Close Alamo Street to vehicle traffic 5423.0 0000-00-000 CoSA Alazan Creek Hike and Bike Lombrano Street Laredo Street $6,000,000 Trail Extend the Alazan Creek section of the Greenway Trail System 4977.0 0915-12-595 SARA Blanco Road West Oak Estates Borgfeld Rd $14,661,235 Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, 5317.0 0915-12-585 curbs and drainage ARMA Broadway Burr Road IH 35 $14,000,000 Roadway rehabilitation and complete streets improvements 5313.0 0016-08-034 Broadway Houston Street Hildebrand $0 Reduce from 6 lanes with CTL to 4 lanes with CTL, bike acc and sidewalks 5412.0 0000-00-000 CoSA Bulverde Road Butterleigh Road North of Quiet Meadow Street $0 Expand from 2 travel lanes and CTL to 4 travel lanes and CTL 5408.0 0000-00-000 CoSA Bulverde Road Marshall Road Wilderness Oak $8,097,480 Reconstruct and widen to 4 lanes with shoulder, pedestrian ramps, curb, bridge 3988.0 0915-12-509 construction and drainage improvements ARMA Cibolo Parkway FM 1103-Weil Road IH 10 E $125,000,000 Construct Cibolo Parkway toll road on new location within the City of Cibolo 5406.0 0915-46-047 Cibolo 81

-2022 Transportation Improvement Program Project Number Commerce Street Frio Colorado $0 Reconstruct roadway, add CTL, bike lanes and sidewalks 5417.0 0000-00-000 CoSA Commerce Street St. Mary's Street Santa Rosa Street $0 Reduce from 4 travel lanes to 3 travel lanes with sidewalks 5413.0 0000-00-000 CoSA Converse Greenway Park Converse Park North FM 78 $1,382,725 Construct multi use path 4972.0 0915-12-594 Converse Crestway Road Kitty Hawk Rd FM 1976 $7,791,571 Widen to provide operational improvements including bike lanes; construct 6 ft. sidewalk 5318.0 0915-12-584 BxCo DeZavala Road IH 10 Lockhill Selma $0 Widen roadway, add CTL, bike lanes and sidewalks 5418.0 0000-00-000 CoSA E. Aviation Blvd. Houston Drive Aztec Way $8,632,561 Widen to provide operational improvements, bike lanes, sidewalks and drainage 5325.0 0915-12-578 UC Evans Road Bulverde Road TPC Parkway/Dusty Canyon Expand from 2 to 4 lanes with operational and drainage improvements including curb and 5432.0 0000-00-000 sidewalk BC Evans Road TPC Parkway/Dusty Canyon Hanging Oak Expand from 2 to 4 lanes with operational and drainage improvements 5433.0 0000-00-000 BC FM 1103 Comal C/L Rodeo Way $22,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4971.0 1268-02-027 FM 1103 IH 35 Guadalupe County Line $1,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4970.0 1268-01-013 FM 1516 FM 78 IH 10 $23,500,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5379.0 1477-01-043 FM 1560 Galm/Schaenfield FM 471 $12,100,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5311.0 2230-01-020 sidewalks FM 2252 at Evans Road. $7,500,000 Construct intersection operational improvements, including widening of Cibolo Creek 5324.0 1433-01-029 bridge FM 2252 Bexar/Comal County Line FM 3009 $21,700,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 9115.0 1433-02-044 and sidewalk 82

-2022 Transportation Improvement Program Project Number FM 2252 Evans Road Comal/Bexar County Line $500,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 5329.0 1433-01-028 and sidewalk FM 471 Medina County Line SH 211 $375,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5378.0 0849-02-045 FM 471 Old FM 471 Medina County Line $21,000,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5377.0 0849-01-055 FM 725 Comal/Guadalupe County Line Zipp Rd $10,600,000 Expand from 2 to 4 lanes with median, sidewalks and bike lanes 5308.0 0215-09-029 Foster Road IH 10 FM 1346 Expand from 2 to 4 lanes with operational and drainage improvements 5546.0 0000-00-000 BC Fredericksburg Road N. Flores Woodlawn $0 Reduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide 5407.0 0000-00-000 sidewalks CoSA Galm Road Ph III Culebra Road Government Canyon State Park $7,323,351 Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities 5105.0 0915-12-544 BxCo Harry Wurzbach at Austin Highway. $17,177,000 Construct entrance & exit ramps between Harry Wurzbach and Austin Highway 5110.0 0915-12-550 CoSA Huebner Creek Hike/Bike Trail SH 16 (Bandera Road) bridge Crystal Hills Park $933,000 Construction of a hike and bike trail along Huebner Creek 3992.0 0915-12-514 LV IH 10 Cascade Caverns/Scenic Loop Kendall/Bexar County Line $20,000,000 Reconfigure ramps and widen frontage road to convert to one way operation 5403.0 0072-06-074 IH 10 Graytown Rd Guadalupe/Bexar County Line $154,000,000 Expand from 4 lane to 6 lane expressway 5396.0 0025-02-215 IH 10 Loop 1604 Graytown Rd $55,000,000 Expand from 4 lane to 6 lane expressway 5552.0 0025-02-219 IH 10 US 90A SH 130 $200,000,000 Expand from 4 lane to 6 lane expressway 5385.0 0535-01-074 IH 35 1.2 Miles South of FM 306 FM 306 $12,000,000 Ramp revisions, intersection and frontage road operational improvements 5550.0 0016-04-116 83

-2022 Transportation Improvement Program Project Number IH 35 at FM 725 - $6,000,000 Intersection operational improvements 5553.0 0016-05-120 IH 35 Bexar/Guadalupe County Line FM 3009 $75,000,000 Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Sprcial Use 4013.0 0016-06-047 lanes IH 35 FM 2252 Schwab Road $25,000,000 Ramp revisions, intersection and frontage road operational improvements 5548.0 0016-05-119 IH 35 FM 306 Hays/Comal County Line $63,000,000 Ramp revisions, intersection and frontage road operational improvements and convert 5551.0 0016-04-117 fromtage road to one way operation IH 35 Hays County Line 0.5 Mi S. of Hays County Line $1,200,000 Revise ramps and convert frontage roads from two way to one way operation 5339.0 0016-04-113 IH 35 IH 410 N Guadalupe/Bexar County Line $645,000,000 Expand from 8 ln to 14 ln expy - add 6 new express lanes - incl 2 HOV-special use lns & 3477.0 0016-07-113 conns @ IH 410N & LP 1604 ARMA IH 37 LP 13 IH 410 $2,900,000 Construction of a partial frontage road, ramps, and intersection improvements 4969.0 0073-08-183 IH 410 Old Pearsall Road Valley Hi Drive $8,100,000 Operational improvements, including ramp revisions and intersection improvements 5542.0 0521-05-148 Ingram Road Potranco Road Ingram Road Dead End $0 Construct road extension on new alignment with bike acc and sidewalks 5419.0 0000-00-000 CoSA Jones Street at Camden and St. Mary's Streets $0 Construct roundabout 5424.0 0000-00-000 CoSA Judson Road Independence IH 35 $1,000,000 Construct sidewalk along west side of Judson Road 5428.0 0915-12-603 CoSA Loop 1604 at FM 2696 - Blanco Road. $43,000,000 Intersection operational improvements 5332.0 2452-02-117 Loop 1604 Macdona-Lacoste Rd US 90 W $40,000,000 Expand from 2 lanes to 4 lane divided 9110.2 2452-01-066 Loop 1604 SH 16 US 281 $368,300,000 Expand from 4 to 10 lane expressway - including 2 HOV-special purpose lanes & Phase I 3913.0 2452-02-083 Direct Connectors at IH 10 W 84

-2022 Transportation Improvement Program Project Number Loop 1604 US 281 Redland Road $30,000,000 Expand from 4 to 10 lane expressway - including 2 HOV-special purpose lanes 3786.0 2452-03-113 Loop 410 at IH 10 E. $100,000,000 Construct direct connectors: Phase 1 - Priority Connectors 5371.0 0521-06-138 Loop 410 at SH 151 Interchange $0 Reconstruct interchange - Phase 2 5373.0 0521-04-275 Loop 410 at US 281/San Pedro. $70,000,000 Interchange improvements 5376.0 0521-04-285 Loop 410 Ingram Rd US 90 $100,000,000 Expand from 6 & 8 to 8 & 10 lane expressway - add 2 additional lanes; reconstruct SH 5372.0 0521-04-204 151 interchange - Phase 2 Loop 410 SH 151 US 90 $0 Expand from 6 lane to 8 lane expressway 5374.0 0521-04-279 Mobility Corridor Planning Various. $1,000,000 Multimodal planning study on one arterial to accommodate travel modes including higher 5545.1 0915-12-609 capacity transit CoSA Mobility Corridor Planning Various. $3,000,000 Multimodal planning study on three arterials to accommodate travel modes including 5545.2 0915-12-611 higher capacity transit CoSA New Braunfels Pedestrian On San Antonio Street, Walnut Avenue, and McQueeney Road and Seele Elementary $1,516,711 Connectivity Construct sidewalks, ramps & other pedestrian related infrastructure 4973.0 0915-17-066 New Braunfels North Main Avenue & Soledad Pecan Street Navarro Street $0 Street Reduce from 7 travel lanes to 4 lanes with CTL, bike lanes and sidewalks 5414.0 0000-00-000 CoSA North New Braunfels Avenue E. Houston Street Burleson $0 Reduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks 5409.0 0000-00-000 CoSA NW Military Highway Lp 1604 Huebner Road $6,500,000 Construct 2 way left turn lane, bike lanes and sidewalks 5323.0 0658-01-045 NW Military Highway Shavano Ranch Road Lp 1604 $7,500,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5310.0 0658-01-044 sidewalks Old FM 471 Talley Road FM 471 Add continuous left turn lane with operational and drainage improvements including curb 5429.0 0000-00-000 and sidewalk BC 85

-2022 Transportation Improvement Program Project Number Presa Street West Boyer Street SE Military Drive (Loop 13) $10,000,000 Bike and Pedestrian Corridor enhancements to implement Complete Streets 5434.0 0915-12-604 CoSA Prue Road Babcock Road Laureate Drive $0 Expand from 2 to 4 lanes with CTL, Bike lanes and sidewalks 5420.0 0000-00-000 CoSA Quintana Road Harmon Avenue McKenna Avenue $7,800,000 Rehab and realign roadway, intersection and flood control improvements 4005.0 0915-12-520 Port SA Rapid Transit Corridor Study Rapid Transit Corridor Study. $0 Rapid Tranit Corridor Study 3768.1 0915-00-172 AAMPO Rapid Transit Corridor Study Rapid Transit Corridor Study. $10,000,000 Rapid Transit Corridor Study 3768.3 0915-12-612 VIA Rapid Transit Corridor Study Rapid Transit Corridor Study. $0 Rapid Transit Corridor Study - 3768.4 0915-12-613 VIA Rittiman Road IH 35 Castle Cross Drive $0 Extend right turn lane from Rittiman to IH 35 5410.0 0000-00-000 CoSA Rocket Lane E. Norris Drive Loop 1604 $5,430,481 Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike 5319.0 0915-12-582 lanes Converse Roosevelt Avenue Bike & Ped.. $2,000,000 Improvements Construct bicycle and pedestrian bridge 5536.2 0253-06-037 CoSA Rudeloff Road SH 46 Huber Road $6,316,658 Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities 5322.0 0915-46-045 Seguin San Antonio Region Safety Service Patrol 5544.1 5544.2 Various locations within Bexar, Comal and Kendall Counties $2,500,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-212 Counties- San Antonio Region Safety Service Patrol 5544.3 Various locations within Bexar, Comal and Kendall Counties $4,500,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-213 Counties- San Antonio Region Safety Service Patrol 5544.4 Various locations within Bexar, Comal and Kendall Counties $4,500,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-214 Counties- San Antonio Region Safety Service Patrol Various locations within Bexar, Comal and Kendall Counties $2,000,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-215 Counties- 86

-2022 Transportation Improvement Program Project Number San Pedro Various locations along San Pedro. $1,000,000 Construct sidewalks and pedestrian infrastructure 5536.1 0915-12-610 CoSA Santa Rosa Street Cesar Chavez Blvd Martin Street $0 Reduce from 6 lanes with CTL to 4 lanes with CTL, bike acc and sidewalks 5415.0 0000-00-000 CoSA Schertz Pedestrian and Bike Woodland Oaks Drive, Savannah Drive, a Live Oak Road and off road trail $1,158,266 Improvements Construct sidewalks, bike lanes and off-road trail 4975.0 0915-46-050 Schertz SH 151 LP 1604 IH 410 $80,000,000 Expand from 4 lane to 6 lane expressway 5382.0 3508-01-029 SH 211 (TX Research Pkwy) Bexar CL, 2.0 MI S of FM 471, N FM 471 (Culebra Rd) $4,400,000 Construct two lane rural highway on new location 3152.0 3544-03-002 BxCo SH 211 (TX Research Pkwy) Bexar C/L, 2.9 MI N of FM 1957, N Bexar C/L, 4.5 MI N of FM 1957 $4,100,000 Construct two lane rural highway on new location 3155.0 3544-06-001 BxCo SH 211 (TX Research Pkwy) FM 1957 (Potranco Rd), N 2.9 Mi Medina County Line $7,000,000 Construct two lane rural highway on new location 3153.0 3544-04-002 BxCo SH 211 (TX Research Pkwy) Medina Co. Line, 4.5 Mi N of FM 1957, N Medina Co. Line, 2.0 Mi S of FM 471 $2,600,000 Construct two lane rural highway on new location 3154.0 3544-05-001 BxCo SH 46 Farhills Dr US 281 $26,000,000 Expand from 2 lanes to 6 lanes with raised median or CLTL 9114.1 0215-07-027 SH 46 US 281 Bentwood Dr $14,000,000 Expand from 2 lanes to 6 lanes with raised median or CLTL 9114.2 0215-01-044 SL 1604 IH 10 E. Martinez Creek $20,000,000 Expand from 2 lanes to 4 lanes divided 5549.0 2452-04-016 SL 337 at River Road. $10,400,000 Construct grade separation 5543.0 0216-01-057 Smart Signal Upgrade Various locations in Comal and Bexar Counties $1,617,950 Install advanced signal controllers, networking equipment and control software for traffic 5539.3 0915-00-211 signals Smart Signal Upgrade Various locations in New Braunfels. $200,000 Purchase of control software for traffic signals 5539.1 0915-17-068 New Braunfels 87

-2022 Transportation Improvement Program Project Number Smart Signal Upgrade Various locations in New Braunfels. $200,000 Install advanced signal controllers, networking equipment and control software for traffic 5539.2 0915-17-069 signals New Braunfels South Alamo Street Market Street Cesar Chavez Blvd $0 Reduce from 6 lanes with CTL to 4 lanes with CTL, bike acc and sidewalks 5416.0 0000-00-000 CoSA St. Mary's Street at Navarro and Nueva Streets $0 Construct roundabout 5422.0 0000-00-000 CoSA Talley Road Old Talley Road FM 471 Expand from 2 to 4 lanes with operational and drainage improvements including curb and 5430.0 0000-00-000 sidewalk BC Talley Road FM 1957 Wiseman Blvd Expand from 2 to 4 lanes with operational and drainage improvements including curb and 5431.0 0000-00-000 sidewalk BC Talley Road Wiseman Blvd. Tamaron Pass $20,917,924 Widen to provide operational improvements including a continuous left turn lane; 5304.0 0915-12-581 construct 10 ft. shared use path BxCo Thousand Oaks Drive Wetmore Perrin Beitel $0 5411.0 0000-00-000 CoSA VA In City of San Antonio. $2,000,000 Construct citywide pedestrian and bicycle improvements 5305.0 0915-12-579 CoSA VA In City of San Antonio. $1,500,000 Intelligent Transportation System - Enhancements 5306.0 0915-12-580 CoSA VA In City of San Antonio. $1,500,000 Intelligent Transportation Systems - Enhancements; Upgrade Traffic Signal Controllers 5425.0 0915-12-601 CoSA VA In San Antonio at TransGuide Center $4,000,000 Upgrade TransGuide Facility 5426.0 0915-12-602 VA Various locations on the state roadway s. $7,073,444 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.3 0915-12-576 Walnut Springs Trail Extension Project 4976.0 Vaughan Bridge Max Starcke Park East $2,801,246 Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and 0915-46-046 below grade crossing Seguin Watson Road FM 2790 (Somerset Road) 0.62 Miles East to Watson Road $4,886,116 Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian 5106.0 0915-12-562 amenities BxCo 88

-2022 Transportation Improvement Program Project Number West Military Drive & Ingram W. Military Dead End Potranco Road $0 Road Connectors Construct road extension on new alignment with bike acc and sidewalks 5421.0 0000-00-000 CoSA Wurzbach Parkway Lockhill Selma Road FM 1535-NW Military $9,000,000 Expand 4 to 6 lanes and Intersection operational improvements 5315.3 7774-01-001 Zarzamora Street Fredericksburg Road Loop 13 $5,000,000 Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS 4974.0 0915-12-596 CoSA 89