-2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions Pgm - 5303.1 0915-00-197 AAMPO Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AAMPO Alamo Area Commute Solutions Pgm - 5103.0 0915-12-546 AAMPO Alamo/Commerce/Losoya Commerce Market $0 Intersection Close Alamo Street to vehicle traffic 5423.0 0000-00-000 CoSA Alazan Creek Hike and Bike Lombrano Street Laredo Street $6,000,000 Trail Extend the Alazan Creek section of the Greenway Trail System 4977.0 0915-12-595 SARA Blanco Road West Oak Estates Borgfeld Rd $14,661,235 Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, 5317.0 0915-12-585 curbs and drainage ARMA Broadway Burr Road IH 35 $14,000,000 Roadway rehabilitation and complete streets improvements 5313.0 0016-08-034 Broadway Houston Street Hildebrand $0 Reduce from 6 lanes with CTL to 4 lanes with CTL, bike acc and sidewalks 5412.0 0000-00-000 CoSA Bulverde Road Butterleigh Road North of Quiet Meadow Street $0 Expand from 2 travel lanes and CTL to 4 travel lanes and CTL 5408.0 0000-00-000 CoSA Bulverde Road Marshall Road Wilderness Oak $8,097,480 Reconstruct and widen to 4 lanes with shoulder, pedestrian ramps, curb, bridge 3988.0 0915-12-509 construction and drainage improvements ARMA Cibolo Parkway FM 1103-Weil Road IH 10 E $125,000,000 Construct Cibolo Parkway toll road on new location within the City of Cibolo 5406.0 0915-46-047 Cibolo 81
-2022 Transportation Improvement Program Project Number Commerce Street Frio Colorado $0 Reconstruct roadway, add CTL, bike lanes and sidewalks 5417.0 0000-00-000 CoSA Commerce Street St. Mary's Street Santa Rosa Street $0 Reduce from 4 travel lanes to 3 travel lanes with sidewalks 5413.0 0000-00-000 CoSA Converse Greenway Park Converse Park North FM 78 $1,382,725 Construct multi use path 4972.0 0915-12-594 Converse Crestway Road Kitty Hawk Rd FM 1976 $7,791,571 Widen to provide operational improvements including bike lanes; construct 6 ft. sidewalk 5318.0 0915-12-584 BxCo DeZavala Road IH 10 Lockhill Selma $0 Widen roadway, add CTL, bike lanes and sidewalks 5418.0 0000-00-000 CoSA E. Aviation Blvd. Houston Drive Aztec Way $8,632,561 Widen to provide operational improvements, bike lanes, sidewalks and drainage 5325.0 0915-12-578 UC Evans Road Bulverde Road TPC Parkway/Dusty Canyon Expand from 2 to 4 lanes with operational and drainage improvements including curb and 5432.0 0000-00-000 sidewalk BC Evans Road TPC Parkway/Dusty Canyon Hanging Oak Expand from 2 to 4 lanes with operational and drainage improvements 5433.0 0000-00-000 BC FM 1103 Comal C/L Rodeo Way $22,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4971.0 1268-02-027 FM 1103 IH 35 Guadalupe County Line $1,500,000 Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes 4970.0 1268-01-013 FM 1516 FM 78 IH 10 $23,500,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5379.0 1477-01-043 FM 1560 Galm/Schaenfield FM 471 $12,100,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5311.0 2230-01-020 sidewalks FM 2252 at Evans Road. $7,500,000 Construct intersection operational improvements, including widening of Cibolo Creek 5324.0 1433-01-029 bridge FM 2252 Bexar/Comal County Line FM 3009 $21,700,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 9115.0 1433-02-044 and sidewalk 82
-2022 Transportation Improvement Program Project Number FM 2252 Evans Road Comal/Bexar County Line $500,000 Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes 5329.0 1433-01-028 and sidewalk FM 471 Medina County Line SH 211 $375,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5378.0 0849-02-045 FM 471 Old FM 471 Medina County Line $21,000,000 Expand 2 to 4 lane divided with bike lanes and sidewalks 5377.0 0849-01-055 FM 725 Comal/Guadalupe County Line Zipp Rd $10,600,000 Expand from 2 to 4 lanes with median, sidewalks and bike lanes 5308.0 0215-09-029 Foster Road IH 10 FM 1346 Expand from 2 to 4 lanes with operational and drainage improvements 5546.0 0000-00-000 BC Fredericksburg Road N. Flores Woodlawn $0 Reduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide 5407.0 0000-00-000 sidewalks CoSA Galm Road Ph III Culebra Road Government Canyon State Park $7,323,351 Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities 5105.0 0915-12-544 BxCo Harry Wurzbach at Austin Highway. $17,177,000 Construct entrance & exit ramps between Harry Wurzbach and Austin Highway 5110.0 0915-12-550 CoSA Huebner Creek Hike/Bike Trail SH 16 (Bandera Road) bridge Crystal Hills Park $933,000 Construction of a hike and bike trail along Huebner Creek 3992.0 0915-12-514 LV IH 10 Cascade Caverns/Scenic Loop Kendall/Bexar County Line $20,000,000 Reconfigure ramps and widen frontage road to convert to one way operation 5403.0 0072-06-074 IH 10 Graytown Rd Guadalupe/Bexar County Line $154,000,000 Expand from 4 lane to 6 lane expressway 5396.0 0025-02-215 IH 10 Loop 1604 Graytown Rd $55,000,000 Expand from 4 lane to 6 lane expressway 5552.0 0025-02-219 IH 10 US 90A SH 130 $200,000,000 Expand from 4 lane to 6 lane expressway 5385.0 0535-01-074 IH 35 1.2 Miles South of FM 306 FM 306 $12,000,000 Ramp revisions, intersection and frontage road operational improvements 5550.0 0016-04-116 83
-2022 Transportation Improvement Program Project Number IH 35 at FM 725 - $6,000,000 Intersection operational improvements 5553.0 0016-05-120 IH 35 Bexar/Guadalupe County Line FM 3009 $75,000,000 Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Sprcial Use 4013.0 0016-06-047 lanes IH 35 FM 2252 Schwab Road $25,000,000 Ramp revisions, intersection and frontage road operational improvements 5548.0 0016-05-119 IH 35 FM 306 Hays/Comal County Line $63,000,000 Ramp revisions, intersection and frontage road operational improvements and convert 5551.0 0016-04-117 fromtage road to one way operation IH 35 Hays County Line 0.5 Mi S. of Hays County Line $1,200,000 Revise ramps and convert frontage roads from two way to one way operation 5339.0 0016-04-113 IH 35 IH 410 N Guadalupe/Bexar County Line $645,000,000 Expand from 8 ln to 14 ln expy - add 6 new express lanes - incl 2 HOV-special use lns & 3477.0 0016-07-113 conns @ IH 410N & LP 1604 ARMA IH 37 LP 13 IH 410 $2,900,000 Construction of a partial frontage road, ramps, and intersection improvements 4969.0 0073-08-183 IH 410 Old Pearsall Road Valley Hi Drive $8,100,000 Operational improvements, including ramp revisions and intersection improvements 5542.0 0521-05-148 Ingram Road Potranco Road Ingram Road Dead End $0 Construct road extension on new alignment with bike acc and sidewalks 5419.0 0000-00-000 CoSA Jones Street at Camden and St. Mary's Streets $0 Construct roundabout 5424.0 0000-00-000 CoSA Judson Road Independence IH 35 $1,000,000 Construct sidewalk along west side of Judson Road 5428.0 0915-12-603 CoSA Loop 1604 at FM 2696 - Blanco Road. $43,000,000 Intersection operational improvements 5332.0 2452-02-117 Loop 1604 Macdona-Lacoste Rd US 90 W $40,000,000 Expand from 2 lanes to 4 lane divided 9110.2 2452-01-066 Loop 1604 SH 16 US 281 $368,300,000 Expand from 4 to 10 lane expressway - including 2 HOV-special purpose lanes & Phase I 3913.0 2452-02-083 Direct Connectors at IH 10 W 84
-2022 Transportation Improvement Program Project Number Loop 1604 US 281 Redland Road $30,000,000 Expand from 4 to 10 lane expressway - including 2 HOV-special purpose lanes 3786.0 2452-03-113 Loop 410 at IH 10 E. $100,000,000 Construct direct connectors: Phase 1 - Priority Connectors 5371.0 0521-06-138 Loop 410 at SH 151 Interchange $0 Reconstruct interchange - Phase 2 5373.0 0521-04-275 Loop 410 at US 281/San Pedro. $70,000,000 Interchange improvements 5376.0 0521-04-285 Loop 410 Ingram Rd US 90 $100,000,000 Expand from 6 & 8 to 8 & 10 lane expressway - add 2 additional lanes; reconstruct SH 5372.0 0521-04-204 151 interchange - Phase 2 Loop 410 SH 151 US 90 $0 Expand from 6 lane to 8 lane expressway 5374.0 0521-04-279 Mobility Corridor Planning Various. $1,000,000 Multimodal planning study on one arterial to accommodate travel modes including higher 5545.1 0915-12-609 capacity transit CoSA Mobility Corridor Planning Various. $3,000,000 Multimodal planning study on three arterials to accommodate travel modes including 5545.2 0915-12-611 higher capacity transit CoSA New Braunfels Pedestrian On San Antonio Street, Walnut Avenue, and McQueeney Road and Seele Elementary $1,516,711 Connectivity Construct sidewalks, ramps & other pedestrian related infrastructure 4973.0 0915-17-066 New Braunfels North Main Avenue & Soledad Pecan Street Navarro Street $0 Street Reduce from 7 travel lanes to 4 lanes with CTL, bike lanes and sidewalks 5414.0 0000-00-000 CoSA North New Braunfels Avenue E. Houston Street Burleson $0 Reduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks 5409.0 0000-00-000 CoSA NW Military Highway Lp 1604 Huebner Road $6,500,000 Construct 2 way left turn lane, bike lanes and sidewalks 5323.0 0658-01-045 NW Military Highway Shavano Ranch Road Lp 1604 $7,500,000 Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and 5310.0 0658-01-044 sidewalks Old FM 471 Talley Road FM 471 Add continuous left turn lane with operational and drainage improvements including curb 5429.0 0000-00-000 and sidewalk BC 85
-2022 Transportation Improvement Program Project Number Presa Street West Boyer Street SE Military Drive (Loop 13) $10,000,000 Bike and Pedestrian Corridor enhancements to implement Complete Streets 5434.0 0915-12-604 CoSA Prue Road Babcock Road Laureate Drive $0 Expand from 2 to 4 lanes with CTL, Bike lanes and sidewalks 5420.0 0000-00-000 CoSA Quintana Road Harmon Avenue McKenna Avenue $7,800,000 Rehab and realign roadway, intersection and flood control improvements 4005.0 0915-12-520 Port SA Rapid Transit Corridor Study Rapid Transit Corridor Study. $0 Rapid Tranit Corridor Study 3768.1 0915-00-172 AAMPO Rapid Transit Corridor Study Rapid Transit Corridor Study. $10,000,000 Rapid Transit Corridor Study 3768.3 0915-12-612 VIA Rapid Transit Corridor Study Rapid Transit Corridor Study. $0 Rapid Transit Corridor Study - 3768.4 0915-12-613 VIA Rittiman Road IH 35 Castle Cross Drive $0 Extend right turn lane from Rittiman to IH 35 5410.0 0000-00-000 CoSA Rocket Lane E. Norris Drive Loop 1604 $5,430,481 Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike 5319.0 0915-12-582 lanes Converse Roosevelt Avenue Bike & Ped.. $2,000,000 Improvements Construct bicycle and pedestrian bridge 5536.2 0253-06-037 CoSA Rudeloff Road SH 46 Huber Road $6,316,658 Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities 5322.0 0915-46-045 Seguin San Antonio Region Safety Service Patrol 5544.1 5544.2 Various locations within Bexar, Comal and Kendall Counties $2,500,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-212 Counties- San Antonio Region Safety Service Patrol 5544.3 Various locations within Bexar, Comal and Kendall Counties $4,500,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-213 Counties- San Antonio Region Safety Service Patrol 5544.4 Various locations within Bexar, Comal and Kendall Counties $4,500,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-214 Counties- San Antonio Region Safety Service Patrol Various locations within Bexar, Comal and Kendall Counties $2,000,000 Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall 0915-00-215 Counties- 86
-2022 Transportation Improvement Program Project Number San Pedro Various locations along San Pedro. $1,000,000 Construct sidewalks and pedestrian infrastructure 5536.1 0915-12-610 CoSA Santa Rosa Street Cesar Chavez Blvd Martin Street $0 Reduce from 6 lanes with CTL to 4 lanes with CTL, bike acc and sidewalks 5415.0 0000-00-000 CoSA Schertz Pedestrian and Bike Woodland Oaks Drive, Savannah Drive, a Live Oak Road and off road trail $1,158,266 Improvements Construct sidewalks, bike lanes and off-road trail 4975.0 0915-46-050 Schertz SH 151 LP 1604 IH 410 $80,000,000 Expand from 4 lane to 6 lane expressway 5382.0 3508-01-029 SH 211 (TX Research Pkwy) Bexar CL, 2.0 MI S of FM 471, N FM 471 (Culebra Rd) $4,400,000 Construct two lane rural highway on new location 3152.0 3544-03-002 BxCo SH 211 (TX Research Pkwy) Bexar C/L, 2.9 MI N of FM 1957, N Bexar C/L, 4.5 MI N of FM 1957 $4,100,000 Construct two lane rural highway on new location 3155.0 3544-06-001 BxCo SH 211 (TX Research Pkwy) FM 1957 (Potranco Rd), N 2.9 Mi Medina County Line $7,000,000 Construct two lane rural highway on new location 3153.0 3544-04-002 BxCo SH 211 (TX Research Pkwy) Medina Co. Line, 4.5 Mi N of FM 1957, N Medina Co. Line, 2.0 Mi S of FM 471 $2,600,000 Construct two lane rural highway on new location 3154.0 3544-05-001 BxCo SH 46 Farhills Dr US 281 $26,000,000 Expand from 2 lanes to 6 lanes with raised median or CLTL 9114.1 0215-07-027 SH 46 US 281 Bentwood Dr $14,000,000 Expand from 2 lanes to 6 lanes with raised median or CLTL 9114.2 0215-01-044 SL 1604 IH 10 E. Martinez Creek $20,000,000 Expand from 2 lanes to 4 lanes divided 5549.0 2452-04-016 SL 337 at River Road. $10,400,000 Construct grade separation 5543.0 0216-01-057 Smart Signal Upgrade Various locations in Comal and Bexar Counties $1,617,950 Install advanced signal controllers, networking equipment and control software for traffic 5539.3 0915-00-211 signals Smart Signal Upgrade Various locations in New Braunfels. $200,000 Purchase of control software for traffic signals 5539.1 0915-17-068 New Braunfels 87
-2022 Transportation Improvement Program Project Number Smart Signal Upgrade Various locations in New Braunfels. $200,000 Install advanced signal controllers, networking equipment and control software for traffic 5539.2 0915-17-069 signals New Braunfels South Alamo Street Market Street Cesar Chavez Blvd $0 Reduce from 6 lanes with CTL to 4 lanes with CTL, bike acc and sidewalks 5416.0 0000-00-000 CoSA St. Mary's Street at Navarro and Nueva Streets $0 Construct roundabout 5422.0 0000-00-000 CoSA Talley Road Old Talley Road FM 471 Expand from 2 to 4 lanes with operational and drainage improvements including curb and 5430.0 0000-00-000 sidewalk BC Talley Road FM 1957 Wiseman Blvd Expand from 2 to 4 lanes with operational and drainage improvements including curb and 5431.0 0000-00-000 sidewalk BC Talley Road Wiseman Blvd. Tamaron Pass $20,917,924 Widen to provide operational improvements including a continuous left turn lane; 5304.0 0915-12-581 construct 10 ft. shared use path BxCo Thousand Oaks Drive Wetmore Perrin Beitel $0 5411.0 0000-00-000 CoSA VA In City of San Antonio. $2,000,000 Construct citywide pedestrian and bicycle improvements 5305.0 0915-12-579 CoSA VA In City of San Antonio. $1,500,000 Intelligent Transportation System - Enhancements 5306.0 0915-12-580 CoSA VA In City of San Antonio. $1,500,000 Intelligent Transportation Systems - Enhancements; Upgrade Traffic Signal Controllers 5425.0 0915-12-601 CoSA VA In San Antonio at TransGuide Center $4,000,000 Upgrade TransGuide Facility 5426.0 0915-12-602 VA Various locations on the state roadway s. $7,073,444 Construct curb ramps, sidewalks and other pedestrian related infrastructure 5316.3 0915-12-576 Walnut Springs Trail Extension Project 4976.0 Vaughan Bridge Max Starcke Park East $2,801,246 Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and 0915-46-046 below grade crossing Seguin Watson Road FM 2790 (Somerset Road) 0.62 Miles East to Watson Road $4,886,116 Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian 5106.0 0915-12-562 amenities BxCo 88
-2022 Transportation Improvement Program Project Number West Military Drive & Ingram W. Military Dead End Potranco Road $0 Road Connectors Construct road extension on new alignment with bike acc and sidewalks 5421.0 0000-00-000 CoSA Wurzbach Parkway Lockhill Selma Road FM 1535-NW Military $9,000,000 Expand 4 to 6 lanes and Intersection operational improvements 5315.3 7774-01-001 Zarzamora Street Fredericksburg Road Loop 13 $5,000,000 Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS 4974.0 0915-12-596 CoSA 89