Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Similar documents
THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

LRS(H)4 Pressure-Reducing Regulator User Manual

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

RS(H)20, 25 USER MANUAL

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Sanitary Vent SECTION I

INSTALLATION & MAINTENANCE INSTRUCTION

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

THE HF-210 SERIES. Operating and Service Manual. Series includes all variants of HF-210/211. Issue A October 2014 *Section 6.

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

Installation, Operation and Maintenance Manual for Back Pressure Regulator

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

OPERATING AND MAINTENANCE MANUAL

LIQUIP DRYBREAK COUPLER. API800 Series MAINTENANCE INSTRUCTIONS

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Gauge Hatch SECTION I SECTION II

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Maintenance and Repair. AirHawk II Air Mask. Second Stage Regulator. Order No.: /02 Prnt. Spec (I) MSAsafety.

Hydraulic Piston Accumulators

WW-720. Pressure Reducing Control Valve

Product Information News September 26, 2003

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

3/8" Dr. Air Butterfly Impact Wrench

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

MAINTENANCE PROCEDURE FOR X 650

BUTTERFLY VALVES Series 800

LIQUIP DRYBREAK COUPLER. LYNX Series MAINTENANCE INSTRUCTIONS

Halsey Taylor Owners Manual STOP!

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

WW-730. Pressure Sustaining/Relief Control Valve

FLANGED MULTI-PORT BALL VALVES

Helium-Oxygen Blender

WW-720. Pressure Reducing Control Valve

Booster Pump PB4-60 Replacement Kits

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

Installation, Operation, and Maintenance Manual

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

RD(H)20/25 Pressure-Reducing Regulator User Manual

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

Bermad Pressure Reducing. Model: 42T

FLANGED TWO-PIECE BALL VALVES

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

ARGUS MODEL C PIG VALVE

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

SCUBAPRO Repair Guide. S600-S550 Second Stages

Threaded Closures Installation, Operation & Maintenance

FLANGED TWO-PIECE BALL VALVES

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

Model Secure-Gard Pilot Operated Vent Valve SECTION II. Remove all packing material inside and outside of the valve prior to installation.

Float Operated Level Controllers

Installation, Operation, and Maintenance Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

TABLE OF CONTENTS SAFETY FIRST!...3 BASIC OPERATION...4 ADJUSTMENTS...5. Cocking Pressure...5. Three-Way Valve Adjustment...6

Air Mask Low/High Pressure

WHEATLEY Series 500 Swing Check Valve

DelVal Flow Controls Private limited

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

1305 Series Pressure Reducing Regulators

Type CT88 Backpressure Regulator

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

TECHNICAL DATA CAUTION

Disassembling and assembling APP and APP 16-22

Installation Instructions

Air-Oxygen Blender. Service Manual. Model No. PM5200 Series PM5300 Series (shown)

APP pumps APP and APP Disassembling and assembling

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Model Pressure Vacuum Thief Hatch & Combo. Gauge Hatch SECTION I

DBML-60/80 Squeeze Tool

Model VR6 System. Installation, Operation & Maintenance

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Mounting and Operating Instructions EB 8546 EN. Type 4708 Supply Pressure Regulators. Translation of original instructions. Type Type

Installation Procedure for your Disco Double Kit, by Airgun Lab, LLC.

1.0 - OPENING AND CLOSING THE DOOR

Pressure Dump Valve Service Kit for Series 3000 Units

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

INSTALLATION, OPERATION & MAINTENANCE MANUAL

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

HP-104 & HP-106 Tapping Machine OPERATIONS MANUAL

Jacuzzi. J-CQ420 Cartridge Filter Installation and Operating Instructions

Anti-flood device Model B-1

Freedom8 ShoeBox Compressor Manual

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

Anderson Greenwood Series 400 Diaphragm Pilot Operated Safety Relief Valves. Installation and Maintenance Instructions for

Operation Manual. PEGAS NovoTap, PEGAS NovoTap+

Types S100K and S102K Pressure Regulators

Operating instruction

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

Transcription:

REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1 Adjustment..........................2 Special Precautions....................1 Maintenance.........................2 Appendix...........................6 NOTE: The following drawings form a part of this Instruction: Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: 041-00017, 041-00307, & 042-00308 Scope These instructions give procedures for installing, adjusting and servicing the 411B models of RedQ Powreactor Air Dome Regulator, with extremely loaded dome, balancing valve, and either internal or external sensing. Powreactors may be supplied in various end connection types and sizes, valve orifice sizes, and materials, to suit service requirements. General Description (Refer to Assembly Drawing) The RedQ Powreactor Pressure Reducing Regulator is designed to maintain as constant reduced or delivered fluid pressure in a line or closed vessel where inlet pressure or flow volume may vary. It is a balanced pressure type of regulator which is actuated by static has pressure in a sealed dome. There is a flexible diaphragm between the sealed dome and the outlet line fluid. When outlet line pressure drops below dome pressure, the diaphragm moves out slightly, and pushes the main valve open. This allows inlet line gas to flow through the valve until outlet line pressure builds up enough to balance the dome pressure. Then the diaphragm moves back to throttle of close the main so that dome and outlet pressure always remain in balance. Any chance in dome pressure causes a corresponding change in outlet line pressure. When the dome is completely vented, the main valve shuts off bubble tight. RedQ Powreactors may be used in either gas or liquid systems, but the dome must always be loaded with air or other gas. Special Precautions for High Pressure Installations A. DOME LOADING Turn all manual valves slowly and smoothly. Sudden admission of high pressure gas can create very high gas temperature. When the gas is air or other oxidizing agent, heat may cause oil and plastics to ignite. Slow changes of pressure allow heat to be dissipated, so temperatures remain at safe levels. Installation A. SENSING CONNECTION Regulator is normally shipped with plugs arranged for internal sensing of downstream pressure. If external sensing is desired, prepare regulator as follows: (refer to assembly drawing) 1. Remove internal control plug from external sensing port. 2. Be sure o-rings are mounted on external control adapter. 3. Screw external control adapter in body external sensing port, using wrench shown in Table I.

4. Connect external sensing line from its port to the downstream line at the point where pressure response is desired, using the correct connection type and size. Refer to Assembly Drawing. Use wrench and torque as required by connection fitting. B. REGULATOR MOUNTING (Refer to installation diagram, Figure 2) 1. Note the downstream pressure gage should be readable from dome loading controls. Installation of RedQ Powreactor in a horizontal section of the line, with dome uppermost, is recommended. 2. Before mounting regulator, blow down or flush supply line thoroughly, to eliminate any loose dirt. 3. Replacement of trim parts is effected through removal of body plug. Sufficient clearance should be provided to accomplish this. CAUTION: Do not clamp on body plug when installing end connections. C. DOME CONNECTION 1. Connect dome to a source at a pressure higher than the desired regulated downstream pressure, through a suitable dome loading control device. If line fluid is gas, inlet line may be used to load dome. 2. Since the dome is sealed after loading, a rise or fall in temperature will cause corresponding change in sealed dome pressure and therefore also in outlet pressure. Outlet will return to original setting when temperature returns to original level. NOTE: If RedQ Hand Loader (small volume reducing and relief regulator) is used as the dome loading control device, these temperature changes are compensated automatically. Adjustment To put the RedQ Powreactor Regulator into operation after it has been installed, load the dome with a gas pressure which will result in the desired outlet pressure. NOTE: Actual pressure inside the air dome will be slightly higher than desired outlet pressure, due to resistance of valve springs. A. PROCEDURE USING REDQ HAND LOADER 1. Turn loader handwheel counterclockwise to its limit. This vents dome. 2. Admit line pressure to inlet port of Powreactor and adjust outlet stop valve to allow a small flow. 3. Slowly turn Loader handwheel clockwise until outlet pressure gage shows desired pressure in the outlet line. 4. Slowly open stop valve to wide open position. No other adjustment is necessary, and any temperature variation will be automatically compensated by the RedQ Hand Loader. B. PROCEDURE USING LOADING MANIFOLD OR OTHER DEVICE 1. Close dome loading line and vent dome. 2. Admit line pressure to inlet port of Powreactor and adjust outlet stop valve to allow small flow to outlet line. 3. Admit gas pressure to dome loading line. 4. Slowly open dome loading line, watching outlet pressure gage as it indicated pressure being established in the outlet line. 5. When the desired outlet pressure is reached in the outlet line, as shown on the outlet pressure gage, close dome loading line. 6. Slowly open outlet stop valve to wide open position. Powreactor is not operating in the line. Maintenance (Refer to Assembly Drawing to identify parts) If outlet pressure deviated from original setting, correct as follows: A. RISE IN OUTLET PRESSURE 1. Check temperature. A rise in ambient temperature after dome is set will cause a rise in outlet pressure. Outlet will return to original setting when temperature returns to original level. (See Installation section, Para. C-2.) 2. Check for dirt in valve and regulating mechanism: a. Slowly open outlet line so as to increase flow through regulator. b. Slowly return to normal flow. c. Outlet gage should show return to original setting. 3. Check loading mechanism for malfunction. 4. If outlet continues to rise, close inlet stop valve 2

and check for leaks in Powreactor valve. Follow directions for disassembly, Adjustment section, C.-4. B. DROP IN OUTLET PRESSURE 1. Check ambient temperature. A drop in temperature after dome is set will cause a drop in outlet pressure. Outlet will return to original setting when temperature returns to original level. (See Installation section, C.2.) 2. Check for leak in dome venting system: a. Use bubble fluid on valve of the loading device. b. If leaks appear, vent dome, inspect vent valves and replace if necessary. c. Re-set dome to get proper outlet pressure, per Adjustment section. d. Be sure dome vent valve is securely closed. e. Outlet pressure gage should show outlet pressure holding steady. 3. If Powreactor is set up for external sensing, check for obstruction in sensing line. 4. If outlet continues to fall off, check for damage to Powreactor diaphragm. Follow directions for disassembly, Adjustment section, C.7). C. REPLACEMENT OF PARTS Order spares and replacement parts by part number and name, as shown on the applicable Assembly Drawing and Parts List; or give serial number of the regulator involved and names of parts required. To replace damaged parts, the Powreactor regulator need not be removed from the line, but inlet and outlet stop valves must be closed tightly, and pressure released from dome and line. Disassembly procedure is similar for all M-13955 Powreactors. Refer to Table I to find wrench sizes, special tools, and assembly torques. Refer to Assembly Drawing for identification of parts. 1. Close inlet stop valve. This traps pressure on inlet side of regulator. 2. Open outlet blowdown valve (if any) or leave outlet stop valve open, so that trapped inlet pressure will be vented and all pressure released from Powreactor body. 3. Vent dome as follows: a. On Powreactor using RedQ Hand Loader, turn Loader handwheel counterclockwise to its limit, and remove dome connecting line. b. On Powreactors using other loading device, release gas pressure from device, open dome vent valve, and then remove loading device from dome port. 4. Disassemble Powreactor valve as follows: a. With all pressure vented from regulator, remove nuts and washers from body plug flange, using hex wrench per Table I. The following valve parts are not free: Body plug flange Valve Seat Body Plug Pushrod Valve Springs (2) Crush ring Valve unit Valve seat bushing b. If valve parts do not fall out freely, use a wood or brass rod or wire hook to work them lose. Use puller tool per Table I to remove valve seat. c. O-rings, seals, crush ring, and back-up rings may be removed for cleaning and inspection. Studs may be removed, if desired. CAUTION: If non-metal parts are to be re-sued, handle with extreme care. Cuts, scratched, or over-stretching will cause leaks. d. Disassemble balanced valve unit by unscrewing head from body, using special wrenches shown in Table I. 5. Clean and inspect valve parts as follows: a. Wipe metal seating surfaces with petroleum solvent. Wipe non-metal parts with soft paper or cloth. b. Inspect all parts for damage which impair sealing or smooth operation. c. Replace defective parts. No adjustment or fitting is required to install RedQ replacement spares. d. Lubricate threads. NOTE: If hydrocarbons are allowed in the system, use Alpha Molykote Type G grease. If fluorocarbons are required, use Kel_F 90 or Fluorolube LG-160 grease, or Fluorolube FS-5 oil. For other restrictions on lubricants, refer to specifications for the system. 3

6. Reassemble valve as follows: a. If body studs were removed, replace. Screw in to full thread engagement, hand tight. b. Replace o-rings, crush ring, and back-up rings, oriented as shown on Assembly Drawing. c. Special tool per Table I is required to install channel-section ring seal in body plug. i. Be sure body plug, seal, and o-ring are clean, lubricated, and free from rough spots, slivers or burrs. ii. Fit o-ring to internal groove of body plug. Be sure it is straight and free from twists. iii. Carefully collapse valve seal radially with fingers just enough so it will go into body plug. This creates a stand-off section of the seal ring, as shown in Figure 1. "STAND-OFF" SECTION FIGURE 1 - Seal Collapsed, with Stand-off Section iv. Position collapse seal over o-ring groove in body plug and release it. Seal should spring back to its nearly circular shape as o-ring will allow. v. Where seal is in contact with o-ring, be sure seal edges have entered groove properly, around o-rings. vi. Press seal firmly against o-ring with fingers so as to reduce stand-off section to a minimum. vii. Lubricate small end of fitting mandrel per Table I and enter it into valve seal so that the gap or open side of the mandrel accommodates the stand-off section of the seal ring. viii. Push mandrel into seal until seal is expanded to maximum bore size. Seal should now have almost full circular shape. ix. Push seal further outward with fingers, or rotate mandrel inside body plug, to get fully circular bore inside seal. x. Withdraw mandrel and examine seal and o-ring to be sure they are properly seated in body plug groove. xi. Lubricate valve body and carefully push, rotate, and work it through assembled seal. xii. Withdraw valve and again examine seal. xiii. If there is any doubt as to the quantity of the seal assembly, pull out and replace. d. Reassemble valve unit, using torque and special wrenches as shown in Table I. e. Replace valve seat in body recess. O-ring will hold it in place during reassembly of valve. f. Replace crush ring over body plug. g. Seat valve seat bushing over crush ring on body plug. h. Place two concentric springs inside valve. Insert valve through bushing and seal, into body plug. i. Place solid end of pushrod in recess in top of valve head. j. Insert body plug and valve subassembly up into body, oriented so that one finger of valve seat bushing will line up with inlet port as shown on Assembly Drawing. k. Push up so that pushrod slides up through hole in body plate and its drilled end received guide pin at the top. l. Replace body plug flange over studs and secure with nuts and washers. m. Tighten nuts using wrench and torque per Table I. 7. Disassemble Powreactor dome parts, or convert internal/external sensing as follows: a. Be sure dome and line are vented as directed in Maintenance section, C.3. Disconnect dome loading accessories. b. Remove dome nuts and washers using wrench size given in Table I. c. Lift dome off dome plate and remove o-ring. 4

d. Lift dome plate off diaphragm. Do not damage dowel pin. Studs may be removed for ease of access, if desired. e. Remove diaphragm, diaphragm plate and guide pin. f. Lift off body plate and o-ring. Pushrod guide (plastic insert) in body plate may be replaced if damaged, but normally need not be removed. Valve pushrod may be lifted out to avoid damaging it. 8. Clean and inspect as follows: a. Wipe metal clamping surfaces with petroleum solvent. Wipe non-metal parts with soft paper or cloth. b. Inspect parts for damage which might impair sealing. c. If pushrod guide (plastic insert) was removed from body plate, replace it. d. Replace defective parts. No adjustment or fitting is required to install RedQ spares. e. Lubricate threads as in Maintenance, C.5.d. 9. Reassemble dome parts as follows: a. If studs were removed, replace them. Screw in to full thread engagement, hand tight. b. Replace body plate o-ring and body plate over studs. Replace pushrod through body plate, making sure that solid end seats properly in top of valve head. c. Replace guide pin in diaphragm plate and insert pin in top of pushrod, so plate rests on top of pushrod. d. Fit diaphragm into recess in dome plate. e. Replace dome plate with diaphragm, dome o-ring, and dome, over studs. f. Replace washers and nuts on studs, finger tight. g. Tighten nuts evenly all around using wrench and torque shown in Table I. This completes replacement of parts on Powreactor Model 411B. Regulator is ready to be put back in operation as directed in the Adjustment section. Figure 2 - Suggested Installation UPSTREAM PRESSURE GAGE REDQ MODEL 15L HAND LOADER OR OTHER DEVICE EXTERNAL SENSING LINE DOWNSTREAM PRESSURE GAGE STRAINER (IF USED) UPSTREAM STOP VALVE UNION UNION DOWNSTREAM STOP VALVE BYPASS VALVE (NORMALLY OPEN) POWREACTOR MODEL BYPASS VALVE (NORMALLY CLOSED) 5

TABLE 1 - Tolls & Assembly Torque for 411B Powreactors ITEM PART NAME PART NO. OR SIZE ASSEMBLY TORQUE FT-LB 15 Dome nut 010-00705 270 1-1/4 hex 19 Dome loading plug 035-16001 - (shipping seal) 68 Ext. control plug 035-16001 - 1 hex 20 Internal control plug 035-40001 150 1-7/8 hex 30 Valve head/body 145-02404 40 57, head 041-00018 58, body 041-0017 31 Valve Seat 146-02401 - Puller tool 042-00308 36 Valve Seal 025-02406 - Fitting Mandrel 042-00307 37 External control 149-70006 150 adapter 1-7/8 hex 47 12886 150 Body plug nut 15/16 hex Appendix Assembly Drawing................. W-411B-A01, or as applicable Parts List......................... W-411B-A01-1, or as applicable Special tools:......................, valve head, 041-00018, valve body, 041-00017 Mandrel, valve seal, 042-00307 Puller, valve seat, 042-00308 RedQ Dresser, Inc. 2822 S. 1030 W. Salt Lake City, Utah 84119 Phone: 801.487.2225 Fax: 801.487.2587 www.redqregulators.com 2008 Dresser, Inc. RedQ is a trademark of Dresser, Inc. www.dresser.com W-411B-BOO-1 4.08