APPENDIX I TRANSIT TRAVEL TIME SAVINGS

Similar documents
APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

1. Provide a dedicated westbound approach bus lane at the intersection;

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

EXECUTIVE SUMMARY. Page 1 of 6

DUNBOW ROAD FUNCTIONAL PLANNING

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

Figure 1: Vicinity Map of the Study Area

TRAFFIC ASSESSMENT River Edge Colorado

Operational Comparison of Transit Signal Priority Strategies

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

DRAFT. Memo. Range of the Alternatives Considered in the EIS

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Highway 111 Corridor Study

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Noise Assessment Technical Memorandum. City of Mississauga Rathburn Road Transit Priority Measures Transit Project Assessment Process

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

4.0 TRANSPORTATION SYSTEMS

Traffic Study North Shore School District 112

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria:

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Having held a public hearing, that Council approve:

Paris on the Grand Residential Development TIS Response to City of Brant Comments APPROACH LEFT MOE LEFT THROUGH RIGHT

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Henderson Avenue Mixed-Use Development

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

APPENDIX E Evaluation of Improvement Alternatives

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Kanata North Catholic Elementary School

MEMORANDUM. Our project study area included the following locations:

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

19 July 2016 OUR REF:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

TECHNICAL MEMORANDUM

Bus Rapid Transit (BRT) Project Preliminary Design and CEAA Submission. Excerpts From Traffic Impact Analysis BRT East. Mississauga, Ontario

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Chapter 4 Traffic Analysis

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

WASHINGTON CITY TELEGRAPH ROAD & GREEN SPRINGS DRIVE INTERSECTION STUDY

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

Gateway Transportation Study

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Corporation of the Town of Oakville. December 16, 2013

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

Appendix D: Concept Screening

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

3.2.2 Proposed Road Network within Phase 1B Lands

US-6 Spanish Fork Fact Finding Study. December 2017

Truck Climbing Lane Traffic Justification Report

TRAFFIC IMPACT ANALYSIS

TRANSPORTATION IMPACT STUDY

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

Shockoe Bottom Preliminary Traffic and Parking Analysis

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Road Conversion Study Plumas Street

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited

Preliminary Transportation Analysis

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

Sixth Line Development - Transit Facilities Plan

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

Simons Run Corridor Study

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Transcription:

APPENDIX I TRANSIT TRAVEL TIME SAVINGS

McCORMICK RANKIN CORPORATION 1145 Hunt Club Road, suite 300 Ottawa, Ontario, K1V 0Y3 Tel: (613)736-7200 Fax: (613) 736-8710 E-mail: mrc@mrc.ca Website: www.mrc.ca TO: Rob Hunton FROM: Ian Borsuk DATE: July 21, 2010 OUR FILE: 7499 West Transitway (Bayshore to Moodie) SUBJECT: Transit Travel Time Benefits 2021 and 2031 Planning Horizon Table of Contents 1.0 INTRODUCTION...2 2.0 ALTERNATIVE TRANSITWAY CONFIGURATIONS...2 3.0 TRAVEL TIME SAVINGS...2 3.1. TRAVEL TIME SAVINGS DUE TO PHYSICAL DESIGN...3 3.2. TRAVEL TIME SAVINGS DUE TO CONGESTION AND SIGNAL DELAY...4 3.3. TOTAL TRAVEL TIME SAVINGS...5 4.0 CONCLUSION...6 APPENDIX A TRAVEL TIME CALCULATIONS APPENDIX B SYNCHRO TM LEVEL OF SERVICE CALCULATION SHEETS (EXISTING VOLUMES, OPTIMIZED)

Date: July 21, 2010 Page 2 1.0 Introduction The purpose of this memo is to document the forecast transit travel times for alternative configurations of the proposed West Transitway extension from Bayshore Station to Moodie Drive. The analysis considers the alternative geometry, average transit operational speed, as well as signal and congestion delays at the at-grade intersections. The analysis is based on traffic and transit volumes that have been forecasted for the 2031 and 2021 planning horizon as documented in the MEMO titled Traffic Analysis 2031 planning horizon & 2021 Interim Year. Existing traffic and transit conditions have been documented previously in a MEMO titled West Transitway Existing Transit and Transportation Review dated February 18, 2010. 2.0 Alternative Transitway Configurations It is proposed for the West Transitway extension project, that the Transitway be located on the north side of Highway 417. This analysis considers the alternative intersection configurations of the Transitway with Holly Acres Road and with Moodie Drive. The do-nothing alternative is also considered with 2031 traffic and transit volumes in order to compare the forecast travel times. Two alternatives are considered where the Transitway intersects Holly Acres Road; atgrade or grade separated. At Moodie Drive there are three alternatives considered; an at grade intersection, a grade separation, or a partial grade separation where eastbound buses are at-grade while westbound buses are grade separated. The following table summarizes the combination of alternatives being considered: Table 1: Alternative Transitway Configurations Alternative Intersection Configuration Holly Acres Moodie Drive 1 Do Nothing Do Nothing 2 At Grade At Grade 3 At Grade Partially Separated 4 At Grade Grade Separated 5 Grade Separated At Grade 6 Grade Separated Partially Separated 7 Grade Separated Grade Separated 3.0 Travel Time Savings Changes in travel time are due to two primary factors; changes in the physical design of the facility (such as length), and changes in signal and congestion delay. Both of these elements are discussed in the sections below. The analysis assumes that station dwell

Date: July 21, 2010 Page 3 times are constant in all alternatives and are therefore not included in the overall travel time comparison. 3.1. Travel Time Savings Due to Physical Design Relocating the eastbound Transitway to the north side of the highway between Moodie Drive and Holly Acres Road, results in a shorter route length than the Do nothing alternative. Various Transitway configurations may also allow buses to travel at higher average operational speeds. Without considering signal and congestion delay, an at-grade intersection results in lower average operational speeds than the grade separated alternatives. The following two tables present the travel time based on the physical design of the facility only. Table 2: Eastbound from Eagleson Road to Bayshore Station Alternative Intersection Length Travel Time Holly Acres Moodie Meters min:sec 1 Do Nothing Do Nothing 7365 6:51 2 At Grade At Grade 7178 6:51 3 At Grade Partially Separated 7161 7:05 4 At Grade Grade Separated 6901 6:16 5 Grade Separated At Grade 7178 6:50 6 Grade Separated Partially Separated 7161 6:37 7 Grade Separated Grade Separated 6901 6:02 Table 3: Westbound from Bayshore Station to Eagleson Road Alternative Notes: Intersection Length Travel Time Holly Acres Moodie Meters min:sec 1 Do Nothing Do Nothing 6625 6:05 2 At Grade At Grade 6625 6:05 3 At Grade Partially Separated 6625 6:05 4 At Grade Grade Separated 6625 6:05 5 Grade Separated At Grade 6625 5:50 6 Grade Separated Partially Separated 6625 5:50 7 Grade Separated Grade Separated 6625 5:50 1. Acceleration and deceleration rates assumed to be constant ( a = 1 m/s^2, d=1.2 m/s^2) 2. Effects due to profile grades not factored in the calculations 3. Does not consider station dwell times, signal delay, or congestion delay Providing grade separations at both Holly Acres and Moodie Drive with the Transitway results in an eastbound travel time savings of approximately 50 seconds compared with the do-nothing scenario without considering the effects of highway congestion or signal delay at intersections.

Date: July 21, 2010 Page 4 There is no significant change to the length of the route for westbound buses therefore the savings would be only 15 seconds due to the design elements of the facility. 3.2. Travel Time Savings Due to Congestion and Signal Delay The MEMO titled Traffic Analysis 2031 planning horizon & 2021 Interim Year documented the intersection Level of Service (LOS) for the various configurations at Holly Acres Road and Moodie Drive for the 2031 planning horizon. The analysis considers the forecasted traffic and transit volumes, as well as the intersection geometry to determine appropriate signal timings. The existing traffic and transit volumes identified as part of the West Transitway Existing Transit and Transportation Review were used with optimized signal timings to help understand the benefits of each alternative. Optimized signal times were determined using Synchro to balances delays in all directions in order to compare with optimized 2021 and 2031 results (Appendix B). The delay identified for the Transitway approaches were identified and are used in this analysis. The following tables present the eastbound and westbound signal and congestion delays for each alternative. Table 4: Eastbound Transitway Average Signal and Congestion Delay (seconds) Intersection Alternative Existing 2021 2031 AM PM AM PM AM PM Holly Acres Do Nothing 31 33 61 40 65 45 Holly Acres At-grade 21 18 30 25 40 29 Holly Acres Grade Separated No Signal & Congestion Delay Moodie Do Nothing 28 27 25 35 19 34 Moodie At-grade 85 77 98 72 65.8 18.9 Moodie Partially Separated 24 61 26 61 3.5 1.4 Moodie Grade Separated No Signal & Congestion Delay Note: Delay identified at Moodie Drive includes both ramp intersections North and South of Highway 417 Table 5: Westbound Transitway Average Signal and Congestion Delay (seconds) Intersection Alternative Existing 2021 2031 AM PM AM PM AM PM Holly Acres Do Nothing 34 28 47 36 81 47 Holly Acres At-grade 12 10 18 13 23 17 Holly Acres Grade Separated No Signal & Congestion Delay Moodie Do Nothing 26 25 38 28 34 31 Moodie At-grade 73 142 119 124 168 214 Moodie Partially Separated No Signal & Congestion Delay Moodie Grade Separated No Signal & Congestion Delay Note: Delay identified at Moodie Drive includes both ramp intersections North and South of Highway 417

Date: July 21, 2010 Page 5 3.3. Total Travel Time Savings Considering both the savings due to the revised physical design as well as the signal and congestion delay, the total average transit travel time savings between alternatives were determined. The following tables present the total travel times between Eagleson Road and Bayshore Station for eastbound and westbound buses considering the existing, 2021 and 2031 transit and traffic volumes. Station dwell times remain the same between alternatives and are therefore not included in the analysis. Table 6: Total Eastbound Transitway Average Travel Time (min:sec) Holly Acres Moodie Existing 2021 2031 AM PM AM PM AM PM Existing Existing 7:50 7:50 8:16 8:06 8:15 8:10 At Grade At Grade 8:51 8:40 9:12 8:41 8:50 7:53 At Grade Partial 7:36 8:09 7:46 8:17 7:34 7:21 At Grade Separated 6:37 6:33 6:45 6:40 6:16 6:16 Separated At Grade 8:36 8:25 8:57 8:26 8:35 7:38 Separated Partial 7:22 7:55 7:32 8:03 7:20 7:07 Separated Separated 6:02 6:02 6:02 6:02 6:02 6:02 Note: Does not include dwell time at stations Table 7: Total Westbound Transitway Average Travel Time (min:sec) Holly Acres Moodie Existing 2021 2031 AM PM AM PM AM PM Existing Existing 7:04 6:57 7:29 7:08 8:00 7:23 At Grade At Grade 7:29 8:37 8:21 8:22 9:15 9:56 At Grade Partial 6:16 6:14 6:22 6:18 6:27 6:22 At Grade Separated 6:16 6:14 6:22 6:18 6:05 6:05 Separated At Grade 7:14 8:22 8:06 8:07 9:00 9:41 Separated Partial 6:01 5:59 6:07 6:03 6:12 6:07 Separated Separated 5:50 5:50 5:50 5:50 5:50 5:50 Note: Does not include dwell time at stations The above tables indicate that the existing transit services will experience increasing delays as traffic volumes increase at the signalized intersections. It is important to note that the identified travel times do not include the additional congestion delays on Highway 417 which would impact the transit service due to the existing operations in mixed traffic lanes. As highway congestion increases, the transit service would also experience more delays and overall service reliability would be impacted. An objective of the west Transitway extension between Bayshore and Moodie Drive is to provide an exclusive facility so that buses would not be impacted by highway traffic and thereby increasing overall bus service reliability. A Transitway alignment that is fully grade-separated from vehicular traffic at both Holly Acres Road and Moodie Drive has the potential of reducing the eastbound transit travel times by approximately 2 minutes in the AM peak period compared to the existing

Date: July 21, 2010 Page 6 intersection configuration in 2031. In the PM, the westbound travel time savings would be approximately 1.5 minutes. 4.0 Conclusion The at-grade intersection of the Transitway at Holly Acres Road operates with acceptable reliability and minimal delays to transit. The geometry and signal timings results in decreased delay compared to the existing configuration. A grade separated alternative allows for higher average operating speeds and eliminates the signal delay at the intersection. While the traffic analysis indicates that the at-grade crossing of the Transitway at Holly Acres could accommodate the forecast volumes, issues such as construction staging and vibration have been identified which has led to the recommendation of grade separation at this intersection. The at-grade intersection of the Transitway at Moodie Drive will not accommodate the forecast 2031 traffic and transit volumes at acceptable Levels of Service. An at-grade configuration would reach capacity during the PM for the existing volumes due to the need to introduce a separate Transitway signal phase and associated greentime. With appropriate monitoring and adjustment to signal timings, the at-grade intersection would offer adequate Levels of Service for the 2021 planning horizon at which point the additional delays and queues become unmanageable. The partial and fully grade separated alternatives of the Transitway at Moodie Drive minimize the westbound transit service delays. A partial grade separated solution will therefore need to be in place to adequately serve the forecast transit and traffic volumes for the 2021 planning horizon. The changes in travel times are summarized as follows: Opening Day: At-grade at Moodie Drive o AM Eastbound buses: 0:46 longer than existing o PM Westbound buses: 1:25 longer than existing Interim 2021: Partially separated at Moodie Drive o AM Eastbound buses: 0:44 shorter than Do Nothing o PM Westbound buses: 1:05 shorter than Do Nothing Ultimate 2031: Fully grade-separated at Moodie Drive o AM Eastbound buses: 2:13 shorter than Do Nothing o PM Westbound buses: 1:33 shorter than Do Nothing The fully grade separated alternative can only be operated once the Transitway is extended further west from Moodie Drive to Eagleson Road. The analysis shows that the interim Partially Separated configuration can operate adequately until the end of the 2031 planning horizon.

Date: July 21, 2010 Appendix A Travel Time Calculations 2021 Signal Delay 2031 Signal Delay Travel Time Savings Due to Physical Design o Existing Configuration Do Nothing o Holly Acres at-grade, Moodie at-grade o Holly Acres grade-separated, Moodie at-grade o Holly Acres at-grade, Moodie partially-separated o Holly Acres grade-separated, Moodie partially-separated o Holly Acres at-grade, Moodie grade-separated o Holly Acres grade-separated, Moodie grade-separated

Date: July 21, 2010 Appendix B Synchro TM Level of Service Calculation Sheets (Existing 2009 Volumes, Optimized Timings) 2009 Holly Acres o Existing configuration optimized signal timings (AM/PM) o At-grade (AM/PM) 2009 Moodie Drive o Existing configuration optimized signal timings (AM/PM) o At-grade (AM/PM) o Partially-separated (AM/PM) Note: The Synchro LOS calculations for the existing volumes with existing signal timings are included as part of the West Transitway Existing Transit and Transportation Review dated February 2010. Synchro calculations for the 2021 and 2031 planning horizons are included as part of the Traffic Analysis 2031 Planning Horizon & 2021 Interim Year dated July 2010.