SOP GEN-007I Energy Isolation

Similar documents
Facilities Management

Gettysburg College. Energy Control Program

LOCKOUT/TAGOUT PLAN August 2015

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

Lockout/Tagout - Control of Hazardous Energy Program

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

Lockout/Tagout Program Occupation Safety & Health Standards for General Industry 29 CFR

OKLAHOMA CITY COMMUNITY COLLEGE CONTROL OF HAZARDOUS ENERGY PROGRAM. Environmental Health and Safety. Established:

University of Vermont Department of Physical Plant Burlington, Vermont

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

THE UNIVERSITY OF NORTH CAROLINA

LO/TO LOCKOUT/TAGOUT PROGRAM

Hazardous Energy Control (Lockout-Tagout)

Lockout / Tag out Program

LOCKOUT/TAGOUT PROGRAM

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

Lockout Tagout Policy

H. Control of Hazardous Energy: Lockout/Tag Out

Control of Hazardous Energy Lockout / Tagout Program

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

MARIPOSA COUNTY LOCKOUT/TAGOUT PROGRAM

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

DuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)

DRAFT LOCKOUT/TAG OUT PROGRAM (CONTROL OF HAZARDOUS ENERGY)

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

PRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

Control of Hazardous Energy. Environmental Health and Safety

Management Plan for Lockout Tagout (LOTO) ISD #535

WESTERN CONNECTICUT STATE UNIVERSITY LOCKOUT/TAGOUT PROCEDURE S-107

Lockout / Tagout Program OSHA 29 CFR

Lockout/Tagout Safety Policy

Lockout/Tagout - Energy Control Program

Lockout Tagout Program

Lockout/Tagout Program

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

Control of Hazardous Energy Program (Lockout/Tagout)

University of Arkansas Office of Environmental Health and Safety

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) PROGRAM

230-LOCKOUT/TAGOUT PROGRAM

Page: 7/15/2009. Energy control procedures Use of lockout/tagout equipment to ensure safe work practices.

LOCKOUT/TAGOUT POLICY

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Lock Out - Tag Out Safety Program

MCW s Control of Hazardous Energy Program

LOCKOUT/TAGOUT PROGRAM

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

LOCKOUT-TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

Lockout/Tagout Program

SOP GEN-007X Crane and Winch Operations

UCHC Lockout/Tagout Policy (4/09)

THE OSHA LOCK-OUT/TAG-OUT STANDARD

Sample Written Program for The Control of Hazardous Energy (Lockout/Tagout)

Lockout Tagout Program

LOCKOUT / TAGOUT PROGRAM

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Health, Safety, Security and Environment

Product Information Report Lockout/Tagout Hazardous Energy Control

ILLINOIS INSTITUTE OF TECHNOLOGY SAFETY COMMITTEE

2523-LDG-E. Leader s Guide

RiskTopics. Lockout/Tagout October 2017

Lock Out/Tag Out Control of Hazardous Energy

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

PROGRAM: Control of Hazardous Energy (LOCKOUT) Chapter 5

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

CITY OF NEW LONDON LOCKOUT/TAGOUT PROGRAM

Lockout/Tagout Training Overview. Safety Fest 2013

Isolation and Lockout

University of Illinois at Chicago. Control of Hazardous Energy Program (Lockout/Tagout)

This session covers the safety procedure known as lockout/tagout, which is required by Occupational Safety and Health Administration (OSHA) in its

Control of Hazardous Energy Program (LOTO)

Lockout / Tagout Program. The Control of Hazardous Energy. Environmental Health and Safety Office

Control of Hazardous Energy (Lockout/Tag-out) 29 CFR

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

Environmental Health & Safety

Lockout/Tagout. Page. Introduction. Purpose. 2 Background. 2 Who s Covered?... 3 Responsibilities. 3 Explanation of Key Terms. 4.

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

Environmental Health and Safety (EH&S) Revision Date: Initial. Prepared by: EH&S and Facility Management and Campus Services (FMS)

Lockout / Tagout Safety Program

CONTROL OF HAZARDOUS ENERGY

2. The purpose of this program is to achieve the following objectives:

LOCKOUT/TAGOUT PROGRAM

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Lockout/Tagout Manual

LOCKOUT TAGOUT. Methods and Sample Procedures

Lockout/Energy Control

Health and Fire Safety Review 2/15

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

E2.14 Control of Hazardous Energy. Effective Date: 03/01/2018

Hazardous Energy Lockout Standard. Safety Resources

ANNUAL IDOL COMPLIANCE TRAINING

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

EM Section 12. Control of Hazardous Energy (Lockout/Tagout)

Hazardous Energy Program Lockout/Tagout

Lockout/Tagout Program

Transcription:

Page 1 of 6 1.0 Introduction 2.0 Reference 3.0 Scope 4.0 Procedures 5.0 Permit SOP GEN-007I Revision/ Review Log Revision Date Approved by Reviewed by Revision Details/ Proposal Notes 11 January 2010 HSE Manager: Sue McDonald Revision #5 15 October 2010 Revision #6 10 December 2010 Revision #7 03 May 2012 Revision #8 HSE Manager: Russell Putt Port Captain: Capt. Pat Fallwell HSE Manager Designee: Dr. Jim Brooks Dr. Roger Fay Capt. Pat Fallwell Changed to electronic format New Special Permit formschanges suggested by crews; new JSA form added All permits require two signature to be valid 03 July 2014 Revision #9 Pete Tatro Pete Tatro Reference to combination locks removed

Page 2 of 6

Page 3 of 6 1.0 Introduction An energy isolation procedure is designed to prevent injuries and deaths caused by accidental start up of machinery and equipment during maintenance or servicing. An energy isolation procedure requires that hazardous energy sources be isolated and rendered inoperative before maintenance or servicing work begins. These energy sources include electrical, pneumatic, hydraulic, mechanical, thermal, chemical and the force of gravity. Hazard tags and locks are used to identify and isolate equipment that may cause injury or damage if operated during installation or maintenance. Anyone who operates a valve, switch or device with a lock or tag will be removed from the site immediately and is subject to disciplinary action. All electrical, mechanical, hydraulic, and pneumatic systems including secondary power supplies need to be isolated prior to work commencing. All electrical lines must be locked and tagged. Machinery needs to be not only turned off, but disengaged or deenergized. There is still electrical energy at a switch and a short or someone inadvertently turning on the machine may start it running. It is imperative that the machinery/equipment is tested to verify that it has been de-energized. The Master has the overall responsibility to ensure that an energy isolation system is in place on TDI vessels. The Chief Engineer is responsible for monitoring the energy isolation system. 2.0 References 29 CFR 1910.147 3.0 Scope In order to isolate and render inoperative an energy source, it is important to survey the equipment first. An individual who is thoroughly familiar with its operation and associated hazards should conduct the survey. The initial survey should identify all energy sources impacted by work effort through physical inspections and examination of drawings or manuals. Locate and mark the places and means of disconnections (either lock or tag). Once identified, locks and/or tags must be applied. During the survey an energy-isolating device must be locked in place or labeled with a tag warning against start-up of the equipment. Person(s) working on equipment shall apply a lock or tag to each energy-isolating device. For complex equipment with many energy sources a group lockout may be done. After locks/tags are applied an attempt to re-start the equipment without the

Page 4 of 6 possibility of injury must be made to verify that equipment cannot be restarted before servicing begins. Prior to beginning the work, the energy isolations must be evaluated by a supervisor or individual thoroughly familiar with operation. After servicing, each person who placed a lock or tag must remove it before the equipment is started. The equipment/machinery must be inspected by a second party prior to reenergizing. A lockout involves the placement of a lockout device or tag on an energy-isolating device so that the energy isolating device and the equipment being controlled cannot be operated until the lockout device or tag is removed. A lockout device utilizes a key type lock to hold an energy-isolating device in the safe position and prevent the energizing of a machine or equipment inadvertently. Tag-out involves the placement of a tag-out device on an energy-isolating device to indicate that the energy isolating device and the equipment being controlled may not be operated until the tag-out device is removed. A tag-out device is a prominent warning device, such as a tag with a means of attachment, which can be securely fastened to an energy isolating device in accordance with an established procedure to indicate that the energy isolating device and the equipment being controlled may not be operated until the tag-out device is removed. If an energy-isolating device is not capable of being locked out, then a tag-out procedure will be used. However, a lock is considered to be a safer mechanism for securing machinery/equipment. Blocks may also be used as a safety device to prevent accidental re-starts of equipment. Blocks should be placed under any equipment that might inadvertently move by sliding, falling, or rolling. Another type of block is a blind. A blind is a metal disk that is places in a pipe to ensure that air, steam or other substance is not released so that the stored energy will not result in inadvertent movement. 4.0 Procedures The Chief Engineer has the primary responsibility for the proper lockout of equipment and/or circuits. Anyone involved in a lockout/tag-out procedure will identify all energy isolating devices and switches that are in the pathway of what will be involved in a lockout/tag-out. More than one energy source may be involved. Prior to a lockout that individual must have permission from the Chief Engineer. Prior to initiating an energy isolation using a lock the following steps must be followed: Notify all affected employees that a lockout is necessary. Fill out an energy isolation permit.

Page 5 of 6 Notify the bridge and engineering prior to initiating an energy isolation protocol. After obtaining approval from the Chief Engineer, shut down the equipment subject to energy isolation by following normal shut down procedures. Personnel are issued suitable locks/tags with suitable identification. If more than one employee works on the equipment, a lockout adaptor suitable for the installation of several locks must be used, enabling all workers to lock out the machine with their individual locks. Ensure that equipment is not in use prior to shutting it down. Shut or operate any switches, valves or other energy isolating devices so that all energy sources are disconnected or isolated from the equipment and/or circuits; stored energy such as in capacitors, springs, moving parts, air, gas, steam, or water pressure must be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down etc. If the switches are in a metal box, the box must be locked out. If controls are in a metal-covered box, a common hasp can be welded or riveted to the door, along with a lock stable. Fuse boxes may also be locked in this manner. Electrical circuits must be checked by a qualified person with proper and calibrated electrical testing equipment. Lockout the energy devices. Verify that energy devices are disconnected by ensuring that the equipment does not operate when switched on or circuits are not carrying any voltage. Once the equipment is safely locked out then work may commence. When servicing is complete, check the equipment and/or circuits when there is no possibility of injury. When the equipment and/or circuits are clear, remove all locks and the equipment and/or circuit may be used. Locks are not removed by anyone other than the individual who placed the lock unless they are given the authority to do so. Prior to initiating an energy isolation using a tag the following steps must be followed: Notify all affected employees that energy isolation is necessary. Fill out an energy isolation permit. Notify the bridge and engineering prior to initiating an energy isolation protocol. After obtaining approval from the Chief Engineer, shut down the equipment subject to energy isolation by following normal shut down procedures. Personnel are issued suitable tags and identified. The date and time of the tag was put into place shall be listed. Tags should be capable of handling 50 pounds of pull.

Page 6 of 6 Each tag shall have the name and contact information of the employee who locked/ tagged the device. Verify that energy devices are disconnected by ensuring that the equipment does not operate when switch on or circuits is not carrying any voltage when there is no possibility of injury prior to servicing. The equipment is now safely tagged out and work may commence. When servicing is complete, check the equipment and/or circuits when there is no possibility of injury. When the equipment and/or circuits are clear, remove all tags and the equipment and/or circuit may be used. Tags are not removed by anyone other than the individual who placed the tag unless they are given the authority to do so. Tags are only used once; they are not reusable. Any individual performing servicing work on machine/equipment that may require an energy isolation procedure will be qualified in that type of work and lockout/tag-out procedures. All other employees whose work operations are or may be in an area where energy control procedure may be utilized will be instructed about the procedure and about the prohibition of attempting to restart or reenergize equipment that is locked out or tagged out. 5.0 Permit All permits require two signatures in order to be valid. No one may write their own permit without notifying and obtaining the signature of a second party. Before work begins, an permit must be filled out by the crewman doing the work and signed by the Chief Engineer. The SMM Forms Only page on the ship web pages contains the permit. It is required that a copy of the work permit be posted at the site where the work is being done. Therefore, after the Chief Engineer signs the permit, make a copy to post at the work site and file the original on the bridge. The Chief Engineer is responsible for entering the permit as a work order in NS5 and writing the work order number on the signed permit.