Emergency Response Support Signage on Multi-Use Trails Plan

Similar documents
Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Appendix F: Wayfinding Protocol and Best Practices

Parks, Open Space, Trails and Recreation Master Plan

TABLE OF CONTENTS. Executive Summary

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Appendix C. Bicycle Route Signage

Planning Suburban Bike Networks

Small Town & Rural Multimodal Networks

Austell Road Access Management Plan Public Meeting February 17, 2009

Prince George s County plans, policies, and projects

DUPAGE COUNTY ON-ROAD BICYCLE CONNECTION GUIDELINES

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

MUTCD Part 6: Temporary Traffic Control

Off-road Trails. Guidance

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

City of Dallas Standards and Guidelines for Traffic Control and Safety Treatments at Trail-Road Crossings

NJDOT Complete Streets Checklist

City of Saline. Complete Streets Ordinance

MASTER BICYCLE AND PEDESTRIAN PLAN

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Leveraging Active Transportation & Recreation for Economic Development in Rural VT Vermont Bike Walk Summit

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Safe Streets. City of Lake Forest Park. March 21, 2017

Appendix 3 Roadway and Bike/Ped Design Standards

Arlington s Master Transportation Plan

This page intentionally left blank.

What's in the 2012 California MUTCD for Pedestrians, Bicyclists, and School Areas?

South Carolina Department of Transportation. Engineering Directive

CONNECTING PEOPLE TO PLACES

Highway 111 Corridor Study

Bicyclist Signing Guidelines

Military Road Safety Improvements

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Carbondale to Murphysboro Bike Route JACKSON COUNTY

Bicycling Routes on Provincial Roads Policy

Regional Trails Corridor Assessment

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

Cycle Track Design Best Practices Cycle Track Sections

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

Chapter 6: Along the Street

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Construction Newsletter No. 32 October 14, 2016 On-Going

(This page left intentionally blank)

Bicycle Boulevards and Neighborhood Greenways

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Color your stress away

Appendix D. City of Fort Collins Bicycle Wayfinding System Guidance. Appendix D: Bicycle Wayfinding System Guidance Final Draft 11/20/2014 1

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Construction Specifications Manual

Tonight is for you. Learn everything you can. Share all your ideas.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Bicycle Facilities Planning

BIKE PLAN CONTENTS GATEWAY

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Potential Bicycle Facility on Bayou Street Mobile, Alabama

March 2008 FINAL DRAFT. Supplemental Bikeway Design Guidelines

Chapter 2: Standards for Access, Non-Motorized, and Transit

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

Bases, Ballasts, and Paving

May 4, Dear Mr. Thomas and Mr. Snyder,

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Transportation Planning Division

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Terwillegar Drive Expressway Draft Concept Plan

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

This page intentionally left blank.

Solana Beach Comprehensive Active Transportation Strategy (CATS)

5 CIRCULATION AND STREET DESIGN

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Route 47 (North Main Street) Reconstruction

What Is a Complete Street?

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

TRAFFIC IMPACT ANALYSIS

and Rural Multimodal Networks 2017 ALTA PLANNING + DESIGN

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Downtown Davidson Pedestrian and Bicycle Safety Plan

Fairfax County Bicycle Program

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

5. RUNNINGWAY GUIDELINES

MASTER BICYCLE AND PEDESTRIAN PLAN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. Existing 10' sidepath Existing 10' sidepath MATCH LINE. Project Number: 310. Drawing Number: 1/1

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

CTH M Reconstruction

Engineering - Bicycle and Pedestrian

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

General Design Factors

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Roosevelt Estates Neighborhood Improvements

Transcription:

DRAFT ( ) Emergency Response Support Signage on Multi-Use Trails Plan Prepared for: SATS Multi-Use Trails Jurisdictions Committee

Table of Contents Introduction... 3 Mileage Markers... 4 Rest Stop Identifiers... 5 Street Name Signs... 5 FACILITY TYPE DEFINITIONS On-road facility A bicycle accommodation that is on the road pavement such as a bike lane or shared use lane. Sidepath A wide sidewalk or path for bicyclists and pedestrians that runs parallel to a roadway and is in the public right-of-way. Trail An off-road facility for bicyclists and pedestrians located on a separate right-of-way. A trail may include minimal travel on off-trail facilities such as the Junction Circle sidepath and short stretch of Pedigo Lane used as part of the Interurban Trail. 2

INTRODUCTION The SATS Multi-Use Trails Jurisdictions Committee has created this plan to address the need for quick and efficient response to emergency situations on the multi-use trails in Sangamon County. Over the years there have been incidents on the trails when locating and reaching the emergency site has been a challenge for emergency responders. Many times trail users do not know how to identify where they are on a trail or even the name of the trail they are on, so when calling 9-1-1 they cannot provide accurate information on their location. The approach taken in this plan is to integrate the enhancement of trail usage with the ability of users to pinpoint their location on the trails. This includes adding three elements to the trail system. Posting of mileage markers every one-half mile along the trails using color-coded symbols that are unique to each trail. The zero point would be at one end of the trail only. Providing identifiers at rest stops along each trail. Posting street name signs at all road crossings. Additionally, maps that show mileage marker location, rest stop location, and trail access points will be provided to the Sangamon County 9-1-1 Office. Short trails used as connectors in the Multi-Use Trails Bicycle Network will not contain mileage markers but will be named and the name will be posted at each end of the trail. Two such trails are currently built: Stuart Park-Sangamon Valley Trail Connector Ash Street-Stanford Avenue Connector (to be completed in 2016) Although on-road and sidepath routes to connect trails have been identified as part of the Multi-Use Trails Bicycle Network, any on-road or sidepath connectors between trails will not be measured in connection with multi-use trail mileage or signed with mileage markers. These locations are visible from the road and it is believed that anyone riding between trails would use building addresses and street names or other visible clues to identify their location for emergency response purposes. However, any sidepath or on-road corridor identified as part of a specific multi-use trail will be included in mileage measurement and signage on the trail. For example: the Interurban Trail includes a sidepath along Junction Circle and uses part of Pedigo Lane. These will both be included in total trail mileage measurement and signage. All signage references in this plan are to the 2009 Edition of the Manual on Uniform Traffic Control Devices (MUTCD). 3

MILEAGE MARKERS Mileage markers will be placed at ½ mile intervals with mileage calculation starting at one end of the multi-use trail. The mileage shown on the markers will be the same on each side of the markers. The mileage marker used will be from Part 9 of the MUTCD manual, D10-1a which will be placed on D4-3 with a color-coded circle containing the initials of the trail as shown below. Example of color-coded symbol to be included on top of mileage post Mileage Marker Example TRAIL NAME TRAIL INITIALS IN WHITE TRAIL COLOR * TRAIL ZERO MARKER Interurban Trail IT Blue West end of Park Street parking lot (same point as Wabash Trail) Lost Bridge Trail LBT Yellow Trail start at east end of IDOT parking lot Sangamon Valley Trail SVT Brown Bunker Hill Road (until trail is extended south) Wabash Trail WT Black Trail start at west end of Park Street parking lot * Colors were selected to be discernible to people who are color-blind. 4

Connector trails will be identified with the following type of sign from Figure 2M-2 in Part 21 of the MUTCD Manual as shown below. From MUTCD Trail Connector Sign Example REST STOP IDENTIFIERS Each rest stop on the trail (bench or picnic table) will have an identifying sign that includes the trail color-coded symbol and rest stop mileage (mileage will be determined based on placement of the sign). Rest stops off the trail, such as in parks or at trailheads or other parking lots, will not have rest stop identifiers. The sign used will be the same as mileage markers but will include Rest Stop as shown below. STREET NAME SIGNS Rest Stop Identifier Example At each road crossing a street name sign will be posted to orient users on the trail unless there is already a street name sign on the roadway visible from the trail. The street name sign used on the trail will be from Part 9 of the MUTCD manual, D3-1 as shown below. 5