Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Similar documents
6060 North Central Expressway Mixed-Use Site Dallas, Texas

Henderson Avenue Mixed-Use Development

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Multifamily Development on Preston Road at Northwest Highway in Dallas, Texas

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Chapter 4 Traffic Analysis

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

King Soopers #116 Thornton, Colorado

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

Shockoe Bottom Preliminary Traffic and Parking Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Traffic Impact Statement

Transportation Impact Study for Abington Terrace

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

TRAFFIC IMPACT ANALYSIS

List of Exhibits...ii

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

THIS PAGE LEFT BLANK INTENTIONALLY

Harrah s Station Square Casino

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

EXECUTIVE SUMMARY. Page 1 of 6

TABLE TRAFFIC ANALYSIS SCENARIOS

Marina Loft (DRC 51-R-12)

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

2. Existing Conditions

TRAFFIC ASSESSMENT River Edge Colorado

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Design Traffic Technical Memorandum

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Traffic Impact Study for Rolling Ridge Redevelopment

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Atlanta Braves Stadium and Mixed- Use Development

FINAL Albertville Business Park AUAR Update Traffic Study

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

5.3 TRAFFIC, CIRCULATION AND PARKING

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

Road Conversion Study Plumas Street

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

REDEVELOPMENT TRAFFIC IMPACT STUDY

Queensgate Drive Corridor Traffic Study

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Glenn Avenue Corridor Traffic Operational Evaluation

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

ALLEY 24 TRAFFIC STUDY

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Grant Avenue Streetscape

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Highway 111 Corridor Study

Corporation of the Town of Oakville. December 16, 2013

Traffic Study North Shore School District 112

Gateway Transportation Study

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

APPENDIXB. Traffic Operations Technical Memorandum

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Chapter 16: Traffic and Parking A. INTRODUCTION

DUNBOW ROAD FUNCTIONAL PLANNING

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

3.9 - Transportation and Traffic

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Los Coyotes Country Club Development Plan Traffic Impact Analysis

Figure 1: Vicinity Map of the Study Area

August 30, Don Grigsby Travis County Transportation.and Natural Resources 411 West 13th Street, 9th Floor Austin, TX 78701

Patuxent Green Golf Course

THE LANDMARK AT TALBOT PARK

Memorandum Pershing Road Suite 400 Kansas City, MO Tel Fax

Troutbeck Farm Development

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California


QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Truck Climbing Lane Traffic Justification Report

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

Transcription:

Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928

Traffic Impact Analysis Texas Odyssey Dallas, Texas P R E L I M I N A R Y FOR REVIEW ONLY Not for construction or permit purposes. Engineer SCOT A. JOHNSON P.E. No. 92615 Date 05/23/2018 Prepared by: Kimley-Horn and Associates, Inc. 13455 Noel Road, Two Galleria Tower, Suite 700 Dallas, Texas 75240 Registered Firm F-928 Contact: Mark Goode, P.E. Scot Johnson, P.E., PTOE Christian DeLuca, EIT Jake Halter, EIT 972-770-1300 May 23, 2018

Page i TABLE OF CONTENTS EXECUTIVE SUMMARY... iii I. INTRODUCTION... 1 A. PURPOSE... 1 B. METHODOLOGY... 1 II. EXISTING AND FUTURE AREA CONDITIONS... 4 A. ROADWAY CHARACTERISTICS... 4 B. EXISTING STUDY AREA... 5 C. PROPOSED SITE IMPROVEMENTS... 5 D. EXISTING TRAFFIC VOLUMES... 6 III. PROJECT TRAFFIC CHARACTERISTICS... 9 A. SITE-GENERATED TRAFFIC... 9 B. TRIP DISTRIBUTION AND ASSIGNMENT... 10 C. OTHER DEVELOPMENT TRAFFIC MODELLING... 11 D. DEVELOPMENT OF 2020 BACKGROUND TRAFFIC... 11 E. DEVELOPMENT OF 2020 TOTAL TRAFFIC... 11 F. DEVELOPMENT OF 2025 BACKGROUND... 11 G. DEVELOPMENT OF 2025 TOTAL TRAFFIC... 11 IV.TRAFFIC OPERATIONS ANALYSIS... 18 A. ANALYSIS METHODOLOGY... 18 B. ANALYSIS RESULTS... 19 C. 2018 EXISTING TRAFFIC OPERATIONS... 22 D. 2020 BACKGROUND TRAFFIC OPERATIONS... 22 E. 2020 BACKGROUND PLUS SITE-GENERATED TRAFFIC OPERATIONS... 22 F. 2025 BACKGROUND TRAFFIC OPERATIONS... 23 G. 2025 BACKGROUND PLUS SITE-GENERATED TRAFFIC OPERATIONS... 23 H. LINK VOLUME ANALYSIS... 24 V. MITIGATION ANALYSIS... 26 A. LANE GEOMETRY CORINTH STREET AND LAMAR STREET... 26 B. SIGNAL RETIMING RIVERFRONT BOULEVARD AND CORINTH STREET... 27 VI.CONCLUSIONS AND RECOMMENDATIONS... 28

Page ii LIST OF EXHIBITS EXHIBIT 1: VICINITY MAP... 2 EXHIBIT 2: CONCEPTUAL SITE PLAN... 3 EXHIBIT 3: LANE ASSIGNMENTS AND INTERSECTION CONTROL... 7 EXHIBIT 4: 2018 EXISTING TRAFFIC VOLUMES... 8 EXHIBIT 5: TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT... 12 EXHIBIT 6: SITE-GENERATED TRAFFIC VOLUMES... 13 EXHIBIT 7: 2020 BACKGROUND TRAFFIC VOLUMES... 14 EXHIBIT 8: 2020 BACKGROUND PLUS-SITE GENERATED TRAFFIC VOLUME... 15 EXHIBIT 9: 2025 BACKGROUND TRAFFIC VOLUMES... 16 EXHIBIT 10: 2025 BACKGROUND PLUS-SITE GENERATED TRAFFIC VOLUME... 17 LIST OF TABLES TABLE 1 TRIP GENERATION TEXAS ODYSSEY... 9 TABLE 2 TOTAL TRIP GENERATION... 10 TABLE 3 LEVEL OF SERVICE DEFINITIONS... 18 TABLE 4 TRAFFIC OPERATIONAL RESULTS WEEKEND PEAK HOUR... 20 TABLE 5 TRAFFIC OPERATIONAL RESULTS WEEKDAY PM PEAK HOUR... 21 TABLE 6 LINK OPERATIONAL RESULTS... 25 TABLE 7 MITIGATION ANALYSIS RESULTS CORINTH STREET AND LAMAR ST... 26 TABLE 8 MITIGATION ANALYSIS RESULTS RIVERFRONT BOULEVARD AND CORINTH ST... 27

Page iii EXECUTIVE SUMMARY The proposed Texas Odyssey development is located between the Trinity River and downtown Dallas. It s entry points are on the south side of Riverfront Boulevard between Cadiz Street and Corinth Street. This study is intended to identify traffic generation characteristics, identify potential traffic related impacts on the local street system, and to develop mitigation measures required for identified impacts. The site as proposed will replace the vacant lot with a 600-foot Ferris wheel with 27 capsules soon to be known as the Eye-of- Texas. The lot will also house 60,000 SF of retail space for the Ferris wheel riders and 20,000 SF of restaurant, most of which will be accessory uses for the Ferris wheel and will not independently attract vehicle traffic. The following existing intersections were selected to be part of this study: Cadiz Street @ Griffin Street Cadiz Street @ Lamar Street Cadiz Street @ Hotel Street Cadiz Street @ Riverfront Boulevard Riverfront Boulevard @ Corinth Street Corinth Street @ Cockrell Avenue Corinth Street @ Lamar Street Lamar Street @ Cockrell Avenue Riverfront Boulevard @ I-35E South On-Ramp Riverfront Boulevard @ I-35E South/30 East Off-Ramp The analysis also included the following proposed driveways: Drive 1, which is a full-access driveway to Riverfront Boulevard; Drive 2, is restricted to right-in/right-out movements onto Riverfront Boulevard; Drive 3, which is a full-access driveway to Turtle Creek Boulevard; In this report, Drive 1 is a full access driveway that will be constructed primarily for the inbound movement, Drive 1 and Drive 2 will also serve as a pick-up/drop-off loop for the site. Drive 2 is a right-in/right-out driveway. Drive 3 will primarily serve the site parking garage and will have the most amount of site-generated traffic. Traffic operations were analyzed at the study intersections for existing volumes, 2020 and 2025 background traffic volumes, and 2020 and 2025 background plus site-generated traffic volumes. The future years correspond to the expected buildout year of the site and a key future study year. Conditions were analyzed for the typical weekend and PM peak hours. The background traffic conditions included existing traffic with compound growth rates, plus explicit modeling of the following development in 2025: The Texas Central Bullet Train Dallas train station, a large development located on the north side of Riverfront Boulevard, east of Cadiz Street.

Page iv At full capacity, the proposed Texas Odyssey development is expected to generate approximately 585 new weekend peak hour one-way trips and 662 new weekday PM peak hour one-way trips. The distribution of the site-generated traffic volumes onto the street system was based on the surrounding roadway network, existing traffic patterns, and the project's proposed access locations. Based on the analysis presented in this report, the proposed Texas Odyssey development, can be successfully incorporated into the surrounding roadway network. The proposed site driveways provide an acceptable level of access for the development. The site-generated traffic does not significantly affect the existing vehicle traffic operations. The northbound approach of the intersection of Corinth Street and Lamar Street is approximately 40 wide with one left turn lane, 2 through lanes, and one through-right shared lane. The intersection has a heavy right-turning movement, whereas it has a relatively light through movement. The right turning movement has an excessive delay due to having only one lane to turn from and competing with through vehicles for position in the shared lane. It is recommended that the intersection be reconfigured to dedicate the through-right turn lane as a right-turn only lane and the adjacent through lane as a through-right shared lane to accommodate the heavy right turn movement. The following site roadway improvements are recommended to provide reasonable access to and from the site: On Riverfront Boulevard at Drive 1 (the western driveway): 1. Construct a westbound left-turn lane. 2. Construct an eastbound right-turn lane to prevent the right-hook conflict between bicyclists in the bike lane and right-turning vehicles. On Riverfront Boulevard at Drive 2 (the central driveway): 1. Construct an eastbound right-turn lane to prevent the right-hook conflict between bicyclists in the bike lane and right-turning vehicles. On Riverfront Boulevard at Drive 3 (the eastern driveway): 1. Construct a westbound left-turn lane. 2. Construct an eastbound right-turn lane to prevent the right-hook conflict between bicyclists in the bike lane and right-turning vehicles.

Page 1 I. INTRODUCTION A. Purpose Kimley-Horn was retained to conduct a Traffic Impact Analysis (TIA) of future traffic conditions associated with the development of the Texas Odyssey (Eye-of-Texas) site located on the southside of Riverfront Boulevard between Cadiz Street and Corinth Street. A site vicinity map is provided as Exhibit 1. Exhibit 2 shows the proposed conceptual site plan. This study is intended to identify traffic generation characteristics, identify potential traffic related impacts on the local street system, and to develop mitigation measures required for identified impacts. B. Methodology Traffic operations were analyzed at the study intersections for Weekend (Saturday) and Weekday PM peak hours for the following scenarios. 2018 existing traffic 2020 background traffic 2020 background plus site traffic 2025 background traffic 2025 background plus site traffic The capacity analyses were conducted using the Synchro TM software package and its Highway Capacity Manual reports for both signalized and unsignalized intersections.

SITE EXHIBIT 1 Vicinity Map EOT - Dallas, Texas LEGEND: = Study Intersection North Not To Scale

EXHIBIT 2 Conceptual Site Plan EOT - Dallas, Texas North Not To Scale

Page 4 II. EXISTING AND FUTURE AREA CONDITIONS A. Roadway Characteristics The following signalized intersections were evaluated as part of this study: Cadiz Street @ Griffin Street Cadiz Street @ Lamar Street Cadiz Street @ Hotel Street Cadiz Street @ Riverfront Boulevard Riverfront Boulevard @ Corinth Street Corinth Street @ Cockrell Avenue Corinth Street @ Lamar Street The following unsignalized intersections were evaluated as part of this study: Lamar Street @ Cockrell Avenue Riverfront Boulevard @ I-35E South On-Ramp Riverfront Boulevard @ I-35E South/30 East Off-Ramp The major study area roadways are described below. Riverfront Boulevard is a four-lane divided road that runs southeast-northwest parallel to the Trinity River near the site with bike lanes on the outer edge of the travel lanes in either direction. In the project vicinity, Riverfront Boulevard has intersections with Corinth Street, Dearborn Street, Cadiz Street, the I-35E on- and off-ramps, and various commercial driveways. On the City of Dallas Thoroughfare Plan, Riverfront Boulevard is classified as a six-lane Principal Arterial (SPCL 6D). The speed limit near the site is posted at 35 mph. Corinth Street is a four-lane undivided road that runs northeast-southwest from the Oak Cliff area across the Trinity River into the Cedars area. In the project vicinity, Corinth Street has intersections with Riverfront Boulevard, Austin Street, Cockrell Avenue, Lamar Street, and various commercial driveways. On the City of Dallas Thoroughfare Plan, Corinth Street is classified as a four-lane Principal Arterial (S-4-D). The speed limit near the site is assumed to be 30 mph. Cadiz Street is a variable width, undivided road that runs northeast-southwest from I- 35E, on the north side of the Trinity, to the downtown area. In the project vicinity, Cadiz Street has intersections with Riverfront Boulevard, Lamar Street, Griffin Street, and various commercial driveways before crossing over I-30 into downtown. On the City of Dallas Thoroughfare Plan, Cadiz Street is classified as a central business district (CBD) road. CBD roads are only classified by being either one-way or two-way. South of riverfront Boulevard, Cadiz Street is one-way northbound. Between Riverfront Boulevard

Page 5 and Lamar Street, Cadiz Street is two-way. North of Lamar Street, Cadiz Street is oneway northbound. The speed limit near the site is posted at 30 mph. Lamar Street is a five-lane undivided road that runs southeast-northwest from South Dallas to downtown. There is a two-way left-turn lane running the length of Lamar Street. In the project vicinity, Lamar Street has intersections with Corinth Street, Cockrell Avenue, Cadiz Street, various local streets, and an assortment of commercial driveways. On the City of Dallas Thoroughfare Plan, Lamar Street is classified as a five-lane Principal Arterial (SPCL 5U). The speed limit near the site is posted at 30 mph. Griffin Street is a six-lane divided road that runs from downtown to the Cedars area. In the project vicinity, Griffin Street intersects Cadiz Street. On the City of Dallas Thoroughfare Plan, Griffin Street is designated as CBD road. East of Cadiz Street, Griffin Street is not classified. West of Cadiz Street, Griffin Street is classified as a twoway CBD road. The speed limit near the site is assumed to be 30 mph. Cockrell Avenue is a wide, two-lane undivided road that runs southeast-northwest through the Cedars area. Cockrell Avenue intersects Lamar Street and Corinth Street among other local streets and commercial driveways. On the City of Dallas Thoroughfare Plan, Cockrell Avenue is not classified. The speed limit near the site is assumed to be 30 mph. Hotel Street is a four-lane undivided road that runs from Reunion Tower to Cadiz Street. On the City of Dallas Thoroughfare Plan, Hotel Street is classified as a two-way CBD road. The speed limit near the site is assumed to be 30 mph. Exhibit 3 illustrates the existing intersection geometry used for the traffic analysis. B. Existing Study Area The property is located within PD 800. The property is currently undeveloped. C. Proposed Site Improvements The site as proposed will include a 27-Capsule Ferris Wheel; 60,000 SF of retail, which is exclusively intended for Ferris Wheel riders; and 20,000 SF of quality restaurant. The site would have access via a total of four driveways, but the westernmost driveway for the site is not open to site traffic and was not modelled in this analysis. The three driveways to be modeled in this analysis are as follows: Drive 1 would be a full-access driveway to Riverfront Boulevard approximately a quarter of a mile west of the intersection of Riverfront Boulevard and Corinth Street at an existing median opening. The median opening is the fourth from Corinth Street. One lane will be constructed for the inbound movement, and two lanes will be constructed for

Page 6 the outbound movement. Drive 1 and Drive 2 will also serve as a pick-up/drop-off loop for the site. Drive 1 will be designated for mainly the inbound pick-up/drop-off traffic and Drive 2 will be designated for mainly the outbound pick-up/drop-off traffic. An eastbound right-turn lane is recommended to be constructed to separate right-turning vehicles from bicyclists in the bike lane. A westbound left-turn is recommended to be constructed as well. Drive 2 would be a right-in/right-out driveway to Riverfront Boulevard approximately 300 feet east of the intersection of Riverfront Boulevard and Drive 1. One lane will be constructed for the inbound movement, and one lane will be constructed for the outbound movement. Drive 2 will be designated for mainly the outbound pick-up/drop-off traffic (see Drive 1 description). An eastbound right-turn lane is recommended to be constructed to separate right-turning vehicles from bicyclists in the bike lane. Drive 3 would be a full-access driveway to Riverfront Boulevard approximately 1,000 feet west of the intersection of Riverfront Boulevard and Corinth Street at an existing median opening. The median opening is the third from Corinth Street. One lane will be constructed for the inbound movement, and two lanes will be constructed for the outbound movement. Drive 3 will primarily serve the site parking garage. An eastbound right-turn lane is recommended to be constructed to separate right-turning vehicles from bicyclists in the bike lane. A westbound left-turn is recommended to be constructed as well. Intersection sight distance at the proposed driveways are acceptable, with each on flat and relatively straight segments of their respective roadway. D. Existing Traffic Volumes 24-hour machine counts were collected near the site on Riverfront Boulevard, Cadiz Street, and Corinth Street. Exhibit 4 shows the existing weekday AM and PM peak hour traffic volumes. The raw count sheets are provided in the Appendix, as well as a comparison between the 24-hour volumes collected and previous 24-hour counts. The 24-hour count showed the daily volume on the roadway link as follows: Riverfront Boulevard: 14,814 vehicles per day (vpd) Cadiz Street: 10,885 vpd Corinth Street (between Riverfront Boulevard and Austin Street): 16,419 vpd Corinth Street (south of Riverfront Boulevard): 14,715 vpd

Cadiz St Lamar St Griffen St Cockrell Ave Lamar St Hotel St ONE WAY I-35E Fwy I-35E & I-30 Fwy ONE WAY STOP STOP STOP STOP STOP STOP Riverfront Blvd EXHIBIT 3 Lane Assignment and Intersection Control EOT - Dallas, Texas LEGEND: = Signalized = Turn Bay STOP Intersection = Stop-Controlled = Driveway Lanes or Approach Off-Site Improvements = Travel Lane TWLTL = Two-Way Left Turn Lane Drive 1 Drive 2 Drive 3 Corinth St North Not To Scale

Griffen St Lamar St Cadiz St 18 143 50 46 (43) (57) (396) (75) 215 (145) 30 (191) 11 (7) 78 (89) 18 (61) 166 (506) 156 106 33 43 (110) 190 (10) (37) (349) (556) 122 (697) 25 168 164 (30) (217) (314) 41 185 2 (12) (212) (8) 3 (0) 27 743 11 8 (0) 2 (11) (1) (604) (1) 1 (0) 16 (22) 17 (16) 17 (25) 8 (1) 6 (2) 9 (2) 8 161 12 3 (0) 23 773 31 41 13 156 97 (90) (1) (558) (135) 101 (141) (23) (940) (47) (43) (14) (112) 131 (147) 117 (140) 44 (49) 142 (448) 48 170 133 59 (149) (39) (357) (257) ONE WAY Lamar St Cockrell Ave 31 270 (16) (171) ONE WAY I-35E Fwy I-35E & I-30 Fwy Hotel St 8 (6) 23 (10) 81 579 (13) (309) 157 46 42 (39) 104 60 (255) (54) 294 (281) 121 287 8 11 (70) 201 (182) (73) (119) (131) (647) (5) 4 (21) 580 (653) 638 (766) 4 (3) 132 (438) 141 (354) 349 (1166) 195 195 72 196 (537) 440 (1493) 424 (1495) (222) (233) (72) 4 (40) 119 222 9 205 (663) (124) (397) (8) Riverfront Blvd EXHIBIT 4 2018 Existing Traffic Volumes EOT - Dallas, Texas LEGEND: X (Y) X = Weekend Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Corinth St North Not To Scale

Page 9 III. PROJECT TRAFFIC CHARACTERISTICS A. Site-Generated Traffic Site-generated traffic estimates are determined through a process known as trip generation. Typically, rates and equations are applied to the proposed land use to estimate traffic generated by the development during a specific time interval. The acknowledged source for trip generation rates is the 10th edition of Trip Generation Manual published by the Institute of Transportation Engineers (ITE). The trips indicated are actually one-way trips or trip ends, where one vehicle entering and exiting the site is counted as one inbound trip and one outbound trip. ITE establishes trip rates from multiple nationwide studies, however ITE does not publish every land-use development possible. For example, the development of this site is unique being that there are only a few of these large Ferris wheels currently operating worldwide. Therefore, ITE cannot be used for the Texas Odyssey Ferris wheel development. The retail and restaurant landuse on the site will use ITE trip generation rates. The trip generation for the Texas Odyssey is calculated based on capacity data for the ride. The capacity per hour is 1,194 persons and is assumed to be full during our study peak hours. The trip generation used 2.5 persons per vehicle entering and exiting the site. The 2.5 persons per vehicles also accounts for the large number of people arriving by shuttles and busses. This assumption is common for events, including concerts and sporting games Table 1 shows the assumptions and trip generation for the Texas Odyssey. Table 1 Trip Generation Texas Odyssey Assumptions # Wheel Capsules 27 Capsule Capacity 28 Wheel Max Capacity 756 Rotations Per Hour (38 min rotation) 1.58 Wheel Capacity Per Hour 1194 Persons per Vehicle 2.50 Peak Hour Vehicle Trips 478 Reductions to the base trip generation estimates are sometimes applied due to internal capture. Internal capture is the tendency for customers or tenants to visit several parts of the mixed-use development in one trip, but be counted twice in the trip generation since the formulae assume the residential, hotel, and office developments are isolated.

Page 10 Internal capture reduces the number of trips leaving the site, and results in a projection of internal trips and external trips. The retail land-use on-site for this development is specific to the Ferris wheel and intended solely for its riders. This area also includes a large square footage dedicated to education related to the wheel. The trips to the retail portion of the site will be entirely internal trips. The restaurant located on site is developed with the purpose of attracting both the Texas Odyssey riders and the general public, the internal capture for the restaurant is assumed to be 50%. No reductions were taken for pass-by trips or multimodal use. Table 2 shows the resulting weekday daily, weekend peak hour and weekday PM peak hour trip generation for the proposed development, showing new external trips. Table 2 Total Trip Generation ITE Code Daily One-Way Saturday Peak Hour Midweek PM Peak Hour Land Uses Amount Units One-Way Trips One-Way Trips Trips IN OUT TOTAL IN OUT TOTAL Texas Odyssey 27 Caps - 7,576 239 239 478 239 239 478 Retail/Shopping Center 60,000 SF 820 2,265 140 130 270 126 126 253 Quality Restaurant 20,000 SF 931 1,677 126 88 214 105 51 156 Development Totals Raw Trip Generation Total: 11,518 505 456 962 470 416 886 Internal Capture Total: 3,104 204 173 377 179 152 331 Total Net New External Vehicle Trips: 8,415 302 283 585 291 264 556 Trip Generation rates based on ITE's Trip Generation Manual, 10th Edition. Internal Capture procedure from ITE Trip Generation Handbook, 3rd Edition (2014). B. Trip Distribution and Assignment The distribution of the site-generated traffic volumes into and out of the site driveways and onto the street system was based on the area street system characteristics, existing traffic patterns, relative residential density, and the locations of the proposed driveway access to/from the site. The corresponding inbound and outbound traffic assignment, where the directional distribution is applied using the most probable paths to and from the site, can be found in Exhibit 5. Exhibit 6 shows the resulting site-generated weekend and weekday PM peak hour turning movements after multiplying the new external trip generation for each phase by the respective traffic assignment percentages.

Page 11 C. Other Development Traffic Modelling Using the same procedure as was used to develop the Texas Odyssey site-generated traffic and distribute that traffic on the roadway network, traffic was developed and distributed for the Texas Bullet Train Dallas station as well. The trip generation for the Texas Bullet Train was estimated based on the 2026 trip estimate published by Texas Central. The background trips added during peak hour for the station was 913 one-way trips. The distribution and volumes for this development can be found in the Appendix. D. Development of 2020 Background Traffic In order to obtain 2020 background traffic, the existing traffic counts and historic counts near the site were compared to find expected growth trends within the study area. Based on the recent growth in the area, an annual growth rate of 1% was assumed for the background traffic through 2020. To calculate the 2020 background traffic, the existing 2018 traffic counts were grown by 1% annually for two years. The resulting 2020 background weekend and PM peak hour traffic volumes are shown in Exhibit 7. E. Development of 2020 Total Traffic Site traffic volumes were added to the background volumes to represent the estimated total (background plus site-generated) traffic conditions for the 2020 study year after completion of the proposed development. Exhibit 8 shows the resulting 2020 weekend and PM peak hour total traffic volumes. F. Development of 2025 Background The background and total traffic volumes in the 2025 study year were calculated in a similar manner to the 2020 traffic volumes by adding five years of 1% growth over the 2020 background volumes. The 2025 background traffic, unlike the 2020 background, includes the trips from the Texas Bullet Train Dallas train station. Exhibit 9 shows the resulting 2025 weekend and PM peak hour background traffic volumes. G. Development of 2025 Total Traffic Total traffic volumes in the 2025 study year were calculated in a similar manner to the 2020 total traffic volumes and Exhibit 10 shows the resulting 2025 weekend and PM peak hour total traffic volumes after the addition of the site-generated traffic.

Cadiz St 10% 10% Lamar St Griffen St (10%) (10%) (5%) (5%) (5%) ONE WAY 20% Cockrell Ave (20%) Lamar St 10% (5%) (15%) 10% Hotel St ONE WAY I-35E Fwy I-35E & I-30 Fwy 10% (5%) (20%) (25%) 20% (40%) (15%) 25% (50%) 5% 20% (25%) (40%) 5% 5% (50%) 25% 35% 15% 50% 40% (5%) (20%) 10% 10% 20% (15%) 10% (5%) 40% (50%) (30%) 10% (15%) Riverfront Blvd EXHIBIT 5 Trip Distribution and Traffic Assignment EOT - Dallas, Texas LEGEND: X% (Y%) X% = Percentage of Inbound Site-Generated Traffic (Y%) = Percentage of Outbound Site-Generated Traffic Drive 1 Drive 2 Drive 3 Corinth St North Not To Scale

Griffen St Lamar St Cadiz St 0 30 0 0 (0) (0) (29) (0) 0 (0) 30 (29) 0 (0) 0 (0) 0 (0) 0 (0) 0 28 28 0 (0) 0 (0) (0) (26) (26) 0 (0) 14 14 14 (13) (13) (13) 0 0 0 (0) (0) (0) 0 (0) 0 60 0 0 (0) 0 (0) (0) (58) (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 0 0 0 (0) 0 57 0 0 0 0 0 (0) (0) (0) (0) 0 (0) (0) (53) (0) (0) (0) (0) 0 (0) 0 (0) 0 (0) 0 (0) 14 42 0 30 (29) (13) (40) (0) ONE WAY Lamar St Cockrell Ave 0 30 (0) (29) ONE WAY I-35E Fwy I-35E & I-30 Fwy Hotel St 0 (0) 30 (29) 14 57 (13) (53) 0 60 71 (66) 0 75 (0) (58) 113 (106) 60 0 0 0 (0) 42 (40) (0) (73) 141 (132) 15 (15) (58) (0) (0) 0 (0) 71 (66) 113 (106) 15 (15) 156 (147) 75 (73) 0 (0) 0 (0) 0 (0) 106 (102) 0 0 45 151 (146) 121 (117) 14 (13) 57 (53) 30 (29) 30 (29) (0) (0) (44) 60 (58) 42 0 30 (29) 14 121 (117) 141 85 0 (0) 30 0 0 (40) (0) (13) (132) (79) 42 (40) (29) (0) (0) Riverfront Blvd EXHIBIT 6 Site-Generated Traffic Volumes EOT - Dallas, Texas LEGEND: X (Y) X = Weekend Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Drive 1 Drive 2 Drive 3 Corinth St North Not To Scale

Griffen St Lamar St Cadiz St 18 146 51 47 (44) (58) (404) (77) 219 (148) 31 (195) 11 (7) 80 (91) 18 (62) 169 (516) 159 108 34 44 (112) 194 (10) (38) (356) (567) 124 (711) 26 171 167 (31) (221) (320) 42 189 2 (12) (216) (8) 3 (0) 28 758 11 8 (0) 2 (11) (1) (616) (1) 1 (0) 16 (22) 17 (16) 17 (26) 8 (1) 6 (2) 9 (2) 8 164 12 3 (0) 23 789 32 42 13 159 99 (92) (1) (569) (138) 103 (144) (23) (959) (48) (44) (14) (114) 134 (150) 119 (143) 45 (50) 145 (457) 49 173 136 60 (152) (40) (364) (262) ONE WAY Lamar St Cockrell Ave 32 275 (16) (174) ONE WAY I-35E Fwy I-35E & I-30 Fwy Hotel St 8 (6) 23 (10) 83 591 (13) (315) 160 47 43 (40) 106 61 (260) (55) 300 (287) 123 293 8 11 (71) 205 (186) (74) (121) (134) (660) (5) 4 (21) 592 (666) 651 (781) 4 (3) 135 (447) 144 (361) 356 (1189) 199 199 73 200 (548) 449 (1523) 433 (1525) (226) (238) (73) 4 (41) 121 226 9 209 (676) (126) (405) (8) Riverfront Blvd EXHIBIT 7 2020 Background Traffic Volumes EOT - Dallas, Texas LEGEND: X (Y) X = Weekend Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Corinth St North Not To Scale

Griffen St Lamar St Cadiz St 18 176 51 47 (44) (58) (433) (77) 219 (148) 61 (224) 11 (7) 80 (91) 18 (62) 169 (516) 159 136 62 44 (112) 194 (10) (38) (382) (593) 124 (711) 40 185 181 (44) (234) (333) 42 189 2 (12) (216) (8) 3 (0) 28 818 11 8 (0) 2 (11) (1) (674) (1) 1 (0) 16 (22) 17 (16) 17 (26) 8 (1) 6 (2) 9 (2) 8 164 12 3 (0) 23 846 32 42 13 159 99 (92) (1) (569) (138) 103 (144) (23) (1012) (48) (44) (14) (114) 134 (150) 119 (143) 45 (50) 145 (457) 63 215 136 90 (181) (53) (404) (262) ONE WAY Lamar St Cockrell Ave 32 305 (16) (203) ONE WAY I-35E Fwy I-35E & I-30 Fwy Hotel St 8 (6) 53 (39) 97 648 (26) (368) 160 107 114 (106) 106 136 (260) (113) 413 (393) 183 293 8 11 (71) 247 (226) (74) (194) 800 (474) 674 (357) (192) (660) (5) 4 (21) 663 (732) 764 (887) 15 (15) 815 (489) 75 (73) 4 (3) 135 (447) 144 (361) 462 (1291) 199 199 118 627 (1421) 597 (1392) 490 (1288) 257 (601) 479 (1552) 463 (1554) (226) (238) (117) 60 (58) 42 0 30 (29) 14 121 (117) 141 85 4 (41) 151 226 9 (40) (0) (13) (132) (79) 251 (716) (155) (405) (8) Riverfront Blvd EXHIBIT 8 2020 Background Plus Site-Generated Traffic Volumes EOT - Dallas, Texas LEGEND: X (Y) X = Weekend Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Drive 1 Drive 2 Drive 3 Corinth St North Not To Scale

Griffen St Lamar St Cadiz St 65 153 54 49 (46) (107) (424) (80) 276 (201) 32 (205) 12 (7) 84 (95) 65 (111) 224 (588) 167 114 35 46 (118) 204 (11) (40) (374) (596) 131 (747) 50 203 199 (55) (255) (359) 44 198 2 (13) (227) (9) 3 (0) 29 796 12 9 (0) 93 (103) (1) (647) (1) 1 (0) 17 (24) 18 (17) 18 (27) 100 (92) 6 (2) 10 (2) 9 172 13 3 (0) 25 828 33 44 14 167 104 (96) (1) (598) (145) 108 (151) (25) (1007) (50) (46) (15) (120) 140 (157) 125 (150) 47 (52) 152 (480) 74 250 142 109 (206) (65) (450) (275) ONE WAY Lamar St Cockrell Ave 33 335 (17) (229) ONE WAY I-35E Fwy I-35E & I-30 Fwy Hotel St 9 (6) 71 (57) 110 780 (37) (491) 328 49 159 (156) 111 178 (433) (58) 498 (484) 130 307 9 12 (75) 283 (263) (78) (241) (140) (693) (5) 4 (22) 735 (813) 866 (1003) 4 (3) 141 (469) 151 (379) 534 (1409) 209 277 77 210 (575) 517 (1645) 500 (1647) (238) (318) (77) 4 (43) 173 238 10 266 (756) (179) (425) (9) Riverfront Blvd EXHIBIT 9 2025 Background Traffic Volumes EOT - Dallas, Texas LEGEND: X (Y) X = Weekend Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Corinth St North Not To Scale

Griffen St Lamar St Cadiz St 65 183 54 49 (46) (107) (453) (80) 276 (201) 62 (234) 12 (7) 84 (95) 65 (111) 224 (588) 167 142 63 46 (118) 204 (11) (40) (400) (622) 131 (747) 64 217 213 (68) (268) (372) 44 198 2 (13) (227) (9) 3 (0) 29 856 12 9 (0) 93 (103) (1) (705) (1) 1 (0) 17 (24) 18 (17) 18 (27) 100 (92) 6 (2) 10 (2) 9 172 13 3 (0) 25 885 33 44 14 167 104 (96) (1) (598) (145) 108 (151) (25) (1060) (50) (46) (15) (120) 140 (157) 125 (150) 47 (52) 152 (480) 88 292 142 139 (235) (78) (490) (275) ONE WAY Lamar St Cockrell Ave 33 365 (17) (258) ONE WAY I-35E Fwy I-35E & I-30 Fwy Hotel St 9 (6) 101 (86) 124 837 (50) (544) 328 109 230 (222) 111 253 (433) (116) 611 (590) 190 307 9 12 (75) 325 (303) (78) (314) 879 (537) 753 (420) (198) (693) (5) 4 (22) 806 (879) 979 (1109) 15 (15) 894 (552) 75 (73) 4 (3) 141 (469) 151 (379) 640 (1511) 209 277 122 697 (1531) 667 (1502) 560 (1398) 267 (628) 547 (1674) 530 (1676) (238) (318) (121) 60 (58) 42 0 30 (29) 14 121 (117) 141 85 4 (43) 203 238 10 (40) (0) (13) (132) (79) 308 (796) (208) (425) (9) Riverfront Blvd EXHIBIT 10 2025 Background Plus Site-Generated Traffic Volumes EOT - Dallas, Texas LEGEND: X (Y) X = Weekend Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Drive 1 Drive 2 Drive 3 Corinth St North Not To Scale

Page 18 IV. TRAFFIC OPERATIONS ANALYSIS Kimley-Horn conducted a traffic operations analysis to determine potential capacity deficiencies in the 2018, 2020 and 2025 study years at the study intersections. The acknowledged source for determining overall capacity is the current edition of the Highway Capacity Manual. A. Analysis Methodology Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term describing operating conditions a driver will experience while traveling on a particular street or highway during a specific time interval. It ranges from A (very little delay) to F (long delays and congestion). Table 3 shows the definition of level of service for signalized and unsignalized intersections. Level of Service Table 3 Level of Service Definitions Signalized Intersection Unsignalized Intersection Average Total Delay Average Total Delay (sec/veh) (sec/veh) A 10 10 B >10 and 20 >10 and 15 C >20 and 35 >15 and 25 D >35 and 55 >25 and 35 E >55 and 80 >35 and 50 F >80 >50 Definitions provided from the Highway Capacity Manual, Special Report 209, Transportation Research Board, 2010. Study area intersections were analyzed based on average total delay analysis for signalized and unsignalized intersections. For the unsignalized analysis, the level of service (LOS) for a two-way stop-controlled intersection is defined for each movement. Unlike signalized intersections which define LOS for each approach and for the intersection as a whole, LOS for two-way stop-controlled intersections is not defined as a whole. Signal timings for the signalized intersections are taken from timings provided by the City that are currently implemented today. In the future scenarios, timing adjustments were made to accommodate changes in traffic volumes due to background growth and site traffic, replicating how City staff will periodically review signal operations in the future. Calculations for the level of service at the key intersections identified for study are provided in the Appendix. The analyses assumed the lane geometry and intersection control shown in Exhibit 3.

Page 19 B. Analysis Results Table 4 and Table 5 show the intersection operational results for the weekend and PM peak hours, respectively.

Page 20 INTERSECTION Cadiz St @ Griffin St Cadiz St @ Lamar St Cadiz St @ Hotel St Cadiz St @ Riverfront Blvd Riverfront Blvd @ Corinth St Corinth St @ Cockrell Ave Corinth St @ Lamar St Riverfront Blvd @ 35E South/30 East Off-Ramp Lamar St @ Cockrell Ave Riverfront @ Drive 1 Riverfront @ Drive 2 Riverfront @ Drive 3 APPROACH Table 4 Traffic Operational Results Weekend Peak Hour DELAY (SEC/VEH) LOS DELAY (SEC/VEH) LOS DELAY (SEC/VEH) LOS DELAY (SEC/VEH) LOS DELAY (SEC/VEH) EB 5.2 A 5.2 A 5.2 A 5.3 A 5.6 A WB 5.0 A 5.0 A 5.0 A 5.1 A 5.4 A NB 16.1 B 16.1 B 16.3 B 16.5 B 16.3 B Overall 11.5 B 11.6 B 12.0 B 12.2 B 12.5 B EB 18.9 B 19.2 B 21.0 C 23.1 C 24.8 C WB 18.3 B 18.6 B 20.3 C 22.3 C 23.9 C NB 53.6 D 53.8 D 54.9 D 56.0 E 56.5 E SB 56.7 E 57.4 E 61.5 E 66.2 E 71.0 E Overall 36.2 D 36.5 D 38.8 D 41.2 D 43.1 D EB 36.6 D 36.6 D 37.6 D 38.9 D 43.5 D NB 2.0 A 2.0 A 2.5 A 2.9 A 3.1 A SB 3.8 A 3.9 A 4.7 A 5.1 A 5.4 A Overall 3.6 A 3.6 A 5.0 A 5.6 A 6.8 A EB 3.5 A 9.8 A 10.3 B 10.7 B 11.3 B WB 9.9 A 19.2 B 19.8 B 20.4 C 21.3 C NB 67.7 E 43.2 D 43.7 D 44.5 D 45.1 D SB 70.9 E 40.9 D 49.7 D 42.6 D 53.6 D Overall 34.2 C 26.6 C 27.5 C 27.2 C 29.1 C EB 36.2 D 36.1 D 37.3 D 36.1 D 38.0 D WB 29.2 C 29.1 C 28.1 C 29.4 C 28.6 C NB 5.6 A 5.7 A 7.6 A 6.3 A 8.2 A SB 11.0 B 11.2 B 14.2 B 12.5 B 15.6 B Overall 18.3 B 18.3 B 21.0 C 19.1 B 21.9 C EB 10.9 B 10.9 B 10.9 B 11.0 B 11.0 B WB 11.0 B 11.1 B 11.1 B 11.4 B 11.4 B NB 15.3 B 15.6 B 16.6 B 16.4 B 17.6 B SB 12.7 B 12.9 B 13.5 B 13.2 B 13.9 B Overall 13.8 B 14.0 B 14.8 B 14.6 B 15.4 B EB 24.0 C 24.2 C 25.2 C 24.1 C 25.6 C WB 22.0 C 22.1 C 21.6 C 24.3 C 24.0 C NB 11.6 B 11.6 B 12.5 B 12.4 B 12.7 B SB 13.5 B 13.5 B 14.5 B 14.7 B 14.9 B Overall 18.5 B 18.6 B 18.8 B 19.8 B 20.0 B SB 10.6 B 10.6 B 11.4 B 12.1 B 14.0 B Overall 1.4 A 1.4 A 1.9 A 2.1 A 2.7 A EB 11.0 B 11.1 B 11.1 B 14.7 B 14.7 B WB 10.9 B 11.0 B 11.0 B 14.9 B 14.9 B Overall 1.5 A 1.5 A 1.5 A 5.4 A 5.4 A NB - - - - 16.1 C - - 17.3 C Overall - - - - 0.5 A - - 0.5 A NB - - - - 10.6 B - - 11.0 B Overall - - - - 0.1 A - - 0.5 A NB - - - - 17.2 C - - 18.9 C Overall - - - - 2.9 A - - 2.9 A Stop-Controlled Approach - No movements in Time Period 2020 2025 2018 2020 2025 Background Background Background Background Background plus Site plus Site Traffic Traffic Traffic Traffic Traffic Weekend PH Weekend PH Weekend PH Weekend PH Weekend PH Signalized Unsignalized LOS

Page 21 INTERSECTION Cadiz St @ Griffin St Cadiz St @ Lamar St Cadiz St @ Hotel St Cadiz St @ Riverfront Blvd Riverfront Blvd @ Corinth St Corinth St @ Cockrell Ave Corinth St @ Lamar St Riverfront Blvd @ 35E South/30 East Off-Ramp Lamar St @ Cockrell Ave Riverfront @ Drive 1 Riverfront @ Drive 2 Riverfront @ Drive 3 Table 5 Traffic Operational Results Weekday PM Peak Hour APPROACH 2018 Background Traffic DELAY (SEC/VEH) LOS DELAY (SEC/VEH) LOS DELAY (SEC/VEH) LOS DELAY (SEC/VEH) LOS DELAY (SEC/VEH) EB 12.4 B 12.4 B 12.4 B 12.5 B 12.5 B WB 10.5 B 10.5 B 10.5 B 10.5 B 10.5 B NB 20.0 B 20.2 C 20.5 C 21.3 C 21.7 C Overall 15.2 B 15.3 B 15.5 B 16.0 B 16.3 B EB 30.8 C 31.6 C 33.9 C 37.8 D 39.8 D WB 26.3 C 26.9 C 28.9 C 32.6 C 34.6 C NB 55.3 E 55.9 E 57.9 E 61.5 E 65.6 E SB 67.3 E 68.1 E 71.0 E 75.2 E 76.4 E Overall 41.9 D 42.6 D 45.0 D 48.9 D 51.8 D EB 36.2 D 36.2 D 36.4 D 37.2 D 39.8 D NB 1.4 A 1.4 A 2.0 A 2.4 A 2.6 A SB 2.7 A 2.7 A 3.6 A 4.1 A 4.5 A Overall 3.0 A 3.0 A 4.9 A 5.5 A 6.7 A EB 4.5 A 12.4 B 13.2 B 14.3 B 15.4 B WB 9.8 A 19.1 B 19.7 B 20.3 C 21.2 C NB 74.8 E 45.2 D 45.4 D 45.6 D 46.3 D SB 88.9 F 41.4 D 45.5 D 46.5 D 67.6 E Overall 28.0 C 22.7 C 23.9 C 25.1 C 28.9 C EB 103.7 F 45.3 D 61.4 E 60.7 E 82.7 F WB 25.1 C 18.8 B 19.1 B 19.3 B 19.5 B NB 14.4 B 25.6 C 25.9 C 27.7 C 29.8 C SB 22.9 C 37.3 D 37.5 D 38.8 D 38.8 D Overall 59.1 E 38.1 D 45.9 D 46.1 D 57.1 E EB 27.1 C 28.8 C 28.2 C 28.5 C 28.5 C WB 22.7 C 24.4 C 24.0 C 24.1 C 24.1 C NB 10.4 B 11.7 B 12.5 B 12.5 B 13.0 B SB 7.7 A 8.8 A 9.3 A 9.2 A 9.4 A Overall 10.9 B 12.2 B 12.7 B 12.8 B 13.0 B EB 31.2 C 40.3 D 40.3 D 45.1 D 45.1 D WB 24.2 C 31.5 C 33.8 C 34.2 C 37.8 D NB 169.3 F 91.6 F 104.2 F 106.0 F 118.5 F SB 26.2 C 23.3 C 23.6 C 23.5 C 23.8 C Overall 82.6 F 55.1 E 60.6 E 60.7 E 66.1 E SB 15.0 B 15.2 C 20.3 C 28.6 D 54.9 F Overall 1.2 A 1.2 A 2.0 A 3.1 A 6.8 A EB 14.8 B 15.1 C 15.1 C 44.0 E 44.0 E WB 20.8 C 21.3 C 21.3 C 51.0 F 51.0 F Overall 1.2 A 1.2 A 1.2 A 9.6 A 9.6 A NB - - - - 39.8 E - - 47.9 E Overall - - - - 0.9 A - - 1.0 A NB - - - - 16.0 C - - 17.1 C Overall - - - - 0.1 A - - 0.1 A NB - - - - 66.1 F - - 95.3 F Overall - - - - 7.4 A - - 9.6 A Stop-Controlled Approach - No movements in Time Period 2020 Background Traffic 2020 Background plus Site Traffic PM Peak Hour PM Peak Hour PM Peak Hour Signalized Unsignalized 2025 Background Traffic PM Peak Hour 2025 Background plus Site Traffic PM Peak Hour LOS

Page 22 C. 2018 Existing Traffic Operations The analysis of the 2018 existing traffic operations shows the signalized intersections operating with minor delay during weekend peak hour and moderate delays in the weekday PM peak hour. The intersections of Corinth Street and Cockrell Street, Cadiz Street and Griffin Street and that of Cadiz Street and Hotel Street operate at LOS B or better during both peak hours. The intersections of Corinth Street and Riverfront Boulevard, and that of Corinth Street and Lamar Street operate at a LOS E or worse during weekday PM peak hour but LOS B during weekend peak hour. Cadiz Street and Lamar Street operates at a LOS D during both peak hours. Cadiz Street and Riverfront Boulevard operates at a LOS C during both peak hours. All but one of the approaches to the unsignalized intersections operate at LOS B. The westbound approach to the intersection of Lamar Street and Cockrell Avenue operates at LOS C during the weekday PM peak hour but operates at a LOS B during the weekend peak hour. D. 2020 Background Traffic Operations The signalized intersections during the weekend peak hour has negligible additional delay from the existing condition. The intersections have excess capacity at the intersections during the Saturday peak hour and perform with minor delays. The total delay for the intersection of Cadiz Street and Riverfront Boulevard was reduced by signal timing changes. The signalized intersections during the PM peak hour perform at equal or better level of service. The LOS improves due to signal timing adjustments that were made to accommodate changes in traffic volumes due to background growth and site traffic. These adjustments are completed to replicate how City staff will periodically review signal operations in the future. The improvement is significant at the intersections of Riverfront Boulevard and Corinth Street and that of Corinth Street and Lamar Street. This improvement may be due to the many recent construction activities, detours, and traffic pattern changes in the area and that the timing has not be updated in conjunction with these projects. The unsignalized intersections also experience negligible delay changes with the added years of background traffic growth. There are no changes in level of service for the weekend peak hour. The LOS for the EB approach of Lamar Street and Cockrell changes from LOS B to LOS C during the weekday PM peak hour. However, this is because the existing delay sits just below the LOC C threshold; the additional delay is only 3 tenths of a second. E. 2020 Background Plus Site-Generated Traffic Operations The addition of the site-generated traffic to the 2020 background traffic results in some additional delay at the existing signalized intersections, however there are no changes in LOS during both peak hours. All but the intersection of Corinth Street and Lamar Street

Page 23 have LOS in the favorable range of operations; Corinth Street and Lamar Street remains a LOS E. With the addition of site-generated traffic, there are no changes in level of service in both peak hours at the unsignalized intersections. All unsignalized intersection approaches operate within favorable conditions. The site driveways 1, 2 and 3 operate at LOS C or better during the weekend peak hour. During the weekday PM peak hour, drive 1 and 2 operate at a LOS E and LOS C, respectively. Drive 3 has a LOS F with a delay of 66 seconds due to the high volume of vehicles on Riverfront Boulevard and its proximity to the development site s parking lot. F. 2025 Background Traffic Operations The analysis of the 2025 background traffic operations shows the signalized intersections have no changes in level of service with the addition of five more years of background traffic growth from the 2020 Background traffic. For the unsignalized approaches of the study intersections, there are changes in level of service with the additional background traffic. There are no changes in level of service during the weekend peak hour, but during the PM peak hour the southbound approach on the freeway off-ramp intersecting with Riverfront Boulevard changes from a LOS C to a LOS D. The intersection of Lamar Street and Cockrell Avenue has more significant additional delay. However, the entirety of this delay is due to the trip distribution of the Texas Bullet Train station as none of the Texas Odyssey traffic is routed through this intersection. The eastbound and westbound approaches change from LOS C to LOS E and LOS C to LOS F, respectively. G. 2025 Background Plus Site-Generated Traffic Operations The addition of the site-generated traffic to the 2025 background traffic results in some additional delay at the existing signalized intersections. All the intersections remain at the same LOS as the 2025 background traffic except for the intersection of Riverfront Boulevard and Corinth Street. The intersection weekend peak hour and the weekday PM peak hour change from LOS B to LOS C and LOS D to LOS E, respectively. With the addition of site-generated traffic, there are no changes in level of service during the weekend peak hour at the unsignalized intersections, and all approaches operate with a LOS B. During the weekday PM peak hour, the southbound approach on the freeway off-ramp intersecting with Riverfront Boulevard changes from a LOS D to a LOS F, with a delay of 55 seconds. This delay is typical and expected for a stop control approach entering onto a Principal Arterial during the PM peak hour. The HCM methodology for unsignalized intersections was originally designed to analyze low to moderate volume locations where the traffic is, generally, evenly distributed throughout

Page 24 the intersection. However, for unsignalized locations located on major thoroughfares, the methodology is deficient. Although a LOS C or better is desirable, LOS F commonly results and cannot be operationally mitigated unless a traffic signal is installed. Since no alternative analysis methodology exists, the results directly obtained from the HCM calculations are presented. It is recommended that analysis results of this location be taken in the context of day-to-day experience rather than an absolute determination of inadequacy. The site driveways 1, 2 and 3 operate at LOS C or better during the weekend peak hour. However, during the weekday PM peak hour, drive 1 and 2 operate at a LOS E and LOS C, respectively. Drive 3 continues to have a LOS F with a delay with 95 seconds due to the high volume of vehicles on riverfront boulevard and its proximity to the development site s parking lot. H. Link Volume Analysis The link capacity analysis examines the operating conditions of roadway links rather than intersections, using the daily and peak hour volumes passing a fixed point. The operating condition is defined by the ratio of link volume to link capacity, or V/C. The V/C of the different roadway links that would be impacted by the proposed development s traffic was calculated for the 2018 existing traffic, 2020 background and background plus site traffic, 2025 background and background plus site traffic scenarios. The daily link capacity for each roadway is taken from the NCTCOG model capacity volumes, with a capacity of 775 vphpl for a divided arterial such as Riverfront Boulevard. Corinth Street changes its capacity as it crosses Riverfront Boulevard because it changes from a Minor Arterial to a Principal Arterial. North of Riverfront Boulevard, Corinth Street has a capacity of 775 vphpl, and south of Riverfront Boulevard its capacity is 825 vphpl. Cadiz Street has a capacity of 775 vphpl serving as an outer business district Minor Arterial. The link analyses, displayed below in Table 6, show that Riverfront Boulevard currently operates at LOS C. With the addition of background traffic, which includes the Texas Central Train Station and a 1% growth rate, this link remains at LOS C for both the 2020 and 2025 background scenarios. After site-generated traffic is added to the network, Riverfront Boulevard changes to LOS D in the 2025 traffic scenario. Corinth Street, north of Riverfront Boulevard currently operates at LOS E and with the addition of background traffic, this link becomes a LOS F by 2025. When the site generated traffic is added to the background volumes, the link performs at a LOS F in 2020. The link is a divided minor arterial road that is constrained to one lane in each direction. The link is already very near full capacity and because it travels underneath the existing railway is not feasible to widen.

Page 25 Cadiz Street currently operates at LOS A/B. With the addition of background and sitegenerated traffic, the link continues to operate optimally and remains at LOS A/B for each of the 2020 and 2025 scenarios. Corinth Street, south of Riverfront Boulevard operates at a LOS C and do so through the 2025 background plus site-generated traffic scenario. Table 6 Link Operational Results Roadway Link 2018 Existing 2020 Background 2020 Site-Generated 2020 Background+Site From To Volume V/C Ratio LOS Volume Daily Volume Volume V/C Ratio LOS Assignment Daily Volume Volume V/C Ratio LOS Riverfront Boulevard Cadiz St Corinth St 14,814 0.48 C Bullet Train Station 0 15,112 0.49 C 50.0% 4,207 19,319 0.62 C Volume Limit 4 Lanes = 31,000 Corinth Street 0.0% 1% growth for 2 years Lamar St Riverfront Blvd 16,419 0.97 E Bullet Train Station 0 16,749 0.99 E 22.5% 1,893 18,642 1.10 F Volume Limit 2 Lanes = 17,000 Corinth Street 0.0% 1% growth for 2 years Riverfront Blvd 8th St 14,751 0.48 C Bullet Train Station 0 15,047 0.49 C 20.0% 1,683 16,730 0.54 C Volume Limit 4 Lanes = 31,000 Cadiz Street 0.0% 1% growth for 2 years Riverfront Blvd Hotel St 10,885 0.35 A/B Bullet Train Station 0 11,104 0.36 A/B 12.5% 1,052 12,156 0.39 A/B Volume Limit 4 Lanes = 31,000 0.0% 1% growth for 2 years Roadway Link 2025 Background 2025 Site-Generated 2025 Background+Site From To Volume Daily Volume Volume V/C Ratio LOS Assignment Daily Volume Volume V/C Ratio LOS Riverfront Boulevard Cadiz St Corinth St Bullet Train Station 1,096 16,963 0.55 C 50.0% 4,207 21,170 0.68 D Volume Limit 4 Lanes = 31,000 Corinth Street 10.0% 1% growth for 5 additional years Lamar St Riverfront Blvd Bullet Train Station 0 17,587 1.03 F 22.5% 1,893 19,480 1.15 F Volume Limit 2 Lanes = 17,000 Corinth Street 0.0% 1% growth for 5 additional years Riverfront Blvd 8th St Bullet Train Station 1,096 16,896 0.55 C 20.0% 1,683 18,579 0.60 C Volume Limit 4 Lanes = 31,000 Cadiz Street 10.0% 1% growth for 5 additional years Riverfront Blvd Hotel St Bullet Train Station 1,644 12,748 0.41 A/B 5.0% 421 13,169 0.42 A/B 15.0% Volume Limit 4 Lanes = 31,000 1% growth for 2 years Volume Limit Based on NCTCOG DFWRTM Hourly Capacity Per Lane

Page 26 V. MITIGATION ANALYSIS The intersection of Corinth Street and Lamar Street was selected for a Mitigation Analysis due to the intersection approaches reaching LOS E during the 2020 and 2025 weekday PM peak hour scenarios and having the overall highest intersection delay. The northbound approach operates at a LOS F where the other three approaches operate with favorable LOS. The intersection of Corinth Street and Riverfront Boulevard was also selected for analysis. The eastbound approach operates with a LOS F and the intersection operates at a LOS E during the weekday PM peak hour in 2025. A. Lane Geometry Corinth Street and Lamar Street The intersection of Corinth Street and Lamar Street northbound approach is approximately 40 wide with one left turn lane, 2 through lanes, and one through-right shared lane. The intersection has 622 right-turning vehicles, whereas it only has 400 through vehicles. The intersection could dedicate the through-right turn lane as a rightturn lane and the adjacent through lane as a through-right shared lane to accommodate the heavy right turn movement. The worst-case scenario from the analysis recorded in Section IV of this report was the PM peak hour of the 2025 background plus site traffic scenario where the intersection as a whole experienced LOS E and the northbound approach experienced LOS F. The analysis below, shown in Table 7, uses these same volumes with the northbound approach having a left turn lane, one through lane, one through-right lane and one dedicated right-turn lane. Table 7 Mitigation Analysis Results Corinth Street and Lamar St INTERSECTION Corinth St @ Lamar St APPROACH DELAY (SEC/VEH) 2025 Background Plus Site Weekday PM AS PROPOSED LOS WITH MITIGATIONS DELAY (SEC/VEH) LOS EB 45.1 D 45.1 D WB 37.8 D 37.8 D NB 118.5 F 38.7 D SB 23.8 C 23.4 C Overall 66.1 E 36.7 D After the intersection of Corinth Street and Lamar Street is restriped to have the new northbound approach configuration with no other improvements made all approaches operate at LOS D or better during the worst-case scenario analyzed in this report.

Page 27 B. Signal Retiming Riverfront Boulevard and Corinth Street The intersection of Riverfront Boulevard and Corinth Street currently operates at LOS E during the weekday PM peak hour in 2025. The eastbound approach to the intersection, with approximately 7% increase in volume due to site traffic, changes from 60.7 seconds of delay (LOS E) to 82.7 seconds of delay (LOS F). The traffic signal at the intersection currently operates on a 130-second cycle. 85 seconds of green time are dedicated to the Corinth Street approaches, and the remaining 45 seconds are dedicated to the Riverfront Boulevard approaches. The mitigation performed for this intersection reduced the cycle length from 130 seconds to 90 seconds. The retiming also optimized the timing to dedicate 40 seconds to Corinth Street and 50 seconds to Riverfront Boulevard. The results are summarized below in Table 8. Table 8 Mitigation Analysis Results Riverfront Boulevard and Corinth St INTERSECTION Riverfront Blvd @ Corinth St APPROACH DELAY (SEC/VEH) 2025 Background Plus Site Weekday PM AS PROPOSED LOS WITH MITIGATIONS DELAY (SEC/VEH) LOS NB 82.7 F 42.4 D EB 19.5 B 11.8 B WB 29.8 C 32.2 C SB 38.8 D 45.0 D Overall 57.1 E 40.0 D After the intersection of Riverfront Boulevard and Corinth Street is retimed, the delay experienced by eastbound drivers is improved by 40 seconds in the 2025 scenario. The overall intersection improves from an operational LOS E to LOS D and the intersection delay reduced by 17 seconds.

Page 28 VI. CONCLUSIONS AND RECOMMENDATIONS Based on the analysis presented in this report, the proposed Texas Odyssey development, located on Riverfront Boulevard in Dallas, TX, can be successfully incorporated into the surrounding roadway network. The proposed site driveways provide a reasonable level of access for the development. The site-generated traffic does not significantly affect the existing vehicle traffic operations of the nearby intersections. The intersection of Corinth Street and Lamar Street northbound approach is approximately 40 wide with one left turn lane, 2 through lanes, and one through-right shared lane. The intersection has a heavy right-turning movement, whereas it has a relatively light through movement. The right turning movement has an excessive delay due to having only one lane to turn from and competing with through vehicles for position in the shared lane. It is recommended that the intersection be reconfigured to dedicate the through-right turn lane as a right-turn only lane and the adjacent through lane as a through-right shared lane to accommodate the heavy right turn movement. On Riverfront Boulevard at Drive 1 (the western driveway): 1. Construct a westbound left-turn lane. 2. Construct an eastbound right-turn lane to prevent the right-hook conflict between bicyclists in the bike lane and right-turning vehicles. On Riverfront Boulevard at Drive 2 (the central driveway): 1. Construct an eastbound right-turn lane to prevent the right-hook conflict between bicyclists in the bike lane and right-turning vehicles. On Riverfront Boulevard at Drive 3 (the eastern driveway): 1. Construct a westbound left-turn lane. 2. Construct an eastbound right-turn lane to prevent the right-hook conflict between bicyclists in the bike lane and right-turning vehicles.