1 CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN th Street Suite 200 Tustin, CA Fax: LOS ANGELES 145 S. Spring Street Suite 120 Los Angeles, CA SANTA CLARITA Springfield Court Suite 350 Santa Clarita, CA Fax TEMECULA Remington Avenue Suite 130 Temecula, CA Fax: VICTORVILLE Cajon Avenue Suite Fax PREPARED FOR: CenterPoint Integrated Solutions, LLC PREPARED BY: HALL & FOREMAN CAJON STREET, #101 VICTORVILLE, CA Final Report March 12,

2 March 12, 2015 Job No. II Heath Kennedy CenterPoint Integrated Solutions, LLC 1240 Bergen Parkway, Suite A-250 Evergreen, CO RE: Final Traffic Study CarMax Auto Superstore/Reconditioning Center #6002 Murrieta, California Dear Mr. Kennedy; Hall & Foreman is pleased to submit this Final Traffic Impact Study for a proposed CarMax Auto Superstore/Reconditioning Center #6002 located at the northeast corner of Madison Avenue and Guava Street in the City of Murrieta; Riverside County. The proposed project is comprised of a 92,600 square-foot facility, on an approximate acre site. The report examines traffic impacts specific to the project and presents recommended traffic improvements. The report also addresses the impacts of overall growth within the area to assure that cumulative traffic mitigations can be addressed. The outlined traffic mitigations comply with California Environmental Quality Act (CEQA) requirements. The report has been prepared in coordination with the City of Murrieta requirements and scope of work approved prior to this report. We are pleased to have been of assistance to you in processing and obtaining approval for the project. If you have any questions or comments, please feel free to contact me at Respectfully submitted, Hall & Foreman Inc. Robert A. Kilpatrick, P.E., T.E. Senior Associate i

3 TABLE OF CONTENTS Page 1. INTRODUCTION EXISTING CONDITION... 4 Existing Street System... 4 Existing Traffic Volumes... 5 Intersection Capacity Analysis Methodologies... 7 Roadway Segment Analysis Methodologies... 8 Existing Traffic Analysis EXISTING PLUS PROJECT CONDITION Project Trip Generation Project Trip Distribution Project Traffic Analysis BACKGROUND CONDITION Area Growth Background Traffic Analysis PROJECT COMPLETION Project Traffic Analysis CUMULATIVE CONDITION Area Growth Cumulative Condition Traffic Analysis GENERAL PLAN UPDATE PROJECT MITIGATION AND SUMMARY Project Specific Mitigations Cumulative Condition Mitigations APPENDIX ii

4 LIST OF TABLES Table 1: HCM LOS Criteria for Signalized Intersections... 7 Table 2: HCM LOS Criteria for TWSC and AWSC... 7 Table 3: Roadway Segment Analysis Methodologies... 8 Table 4: Intersection Capacity Analysis - Existing Condition... 9 Table 5: Roadway Segment Analysis - Existing Condition... 9 Table 6: Project Trip Generation Table 7: Intersection Capacity Analysis - Existing + Project Condition Table 8: Roadway Segment Analysis - Existing + Project Condition Table 9: Intersection Capacity Analysis - Background Condition Table 10: Roadway Segment Analysis - Background Condition Table 11: Intersection Capacity Analysis - Project Completion Table 12: Roadway Segment Analysis - Project Completion Table 13: Other Area Project Trip Generation Table 14: Intersection Capacity Analysis - Cumulative Condition Table 15: Roadway Segment Analysis - Cumulative Condition Table 16: Roadway Segment Analysis - General Plan Update LIST OF FIGURES Figure 1: Vicinity Map... 2 Figure 2: Site Plan... 3 Figure 3: Existing Condition Traffic Volumes... 6 Figure 4: Existing Condition Intersection Geometrics Figure 5: Project Trip Distribution Figure 6: Project Trips Figure 7: Existing plus Project Condition Traffic Volumes Figure 8: Existing plus Project Condition Intersection Geometrics Figure 9: Background Condition Traffic Volumes Figure 10: Project Completion Traffic Volumes Figure 11: Cumulative Other Area Project Trips Figure 12: Cumulative Condition Traffic Volumes Figure 13: Cumulative Condition Intersection Geometrics Figure 14: General Plan Update Volumes Figure 15: Proposed Geometric Layout iii

5 1. INTRODUCTION This report identifies the traffic impacts and presents recommendations for access and traffic mitigation for the proposed CarMax Auto Superstore/Reconditioning Center #6002 located near the northeast corner of Madison Avenue and Guava Street in the City of Murrieta; Riverside County. The proposed project is comprised of a 92,600 square-foot facility, on an approximate acre site. The site will be accessible from two driveways on Madison Avenue. Figure 1 illustrates the vicinity map and project location and Figure 2 illustrates the proposed project site plan. The project is located in Murrieta, California in Riverside County. It is approximately 0.19 miles southeast of Murrieta Hot Springs Road and is bounded to the north by the I-15 Freeway, Madison Avenue to the south, an existing Walmart to the west, and Guava Street to the east. Access to the project site is proposed off Madison Avenue. The intent of this TIA is to address the impacts and mitigations required for the proposed development. This report identifies five (5) scenarios necessary to address project specific mitigations. The scenarios include an Existing Condition, Existing + Project Condition, Background Condition (Existing + Ambient, without project), Project Completion (Existing + Ambient + Project), and Cumulative Condition (Existing + Ambient + Project + Cumulative). Existing + Project Condition addresses anticipated impacts if the project were completed today. The values generate a base comparison of project impacts without ambient growth. The Existing + Project Condition considers a trip distribution utilizing existing intersections included in the study area. Background Condition addresses impacts due to ambient growth up to the Project Year/Buildout 2016 within the study area. The ambient growth is estimated as an annual 2% growth rate. The Background Condition considers a trip distribution utilizing existing intersections included in the study area. Project Completion analysis is the examination of potential development correlating with the development of the project up to the Project Year/Buildout The values generate a base comparison of project impacts with ambient growth. The Project Completion considers a trip distribution utilizing existing intersections included in the study area. The Cumulative Condition addresses impacts due to expansion correlating with the development of other area projects up to the Project Year/Buildout 2016 within the study area. Traffic due to other projects is estimated as presented in their respective traffic reports. The Cumulative Condition considers a trip distribution utilizing existing intersections included in the study area. The Proposed Project is anticipated to be constructed by Project Year/Buildout To accommodate the proposed project layout, the No Name roadway and a portion of Monroe Avenue (extending from Guava Street to No Name roadway) will need to be removed from the General Plan 2035 Circulation Map. A discussion of the roadway analysis is provided in Chapter 7. 1

6 NOT TO SCALE VICINITY MAP CARMAX #6002 MURRIETA, CALIFORNIA 2 FIGURE 1 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 1.dwg Last Opened: Mar 09, :29pm by: TMunoz

7 NOT TO SCALE GUAVA STREET MADISON AVENUE SITE PLAN CARMAX #6002 MURRIETA, CALIFORNIA 3 FIGURE 2 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 2.dwg Last Opened: Mar 09, :29pm by: TMunoz

8 2. EXISTING CONDITION Existing Street System The project site currently is vacant and undeveloped. Land uses around the site consist of the I- 15 Freeway to the north, vacant land to the south, an existing Walmart to the west, and industrial developments to the east. Streets fronting the project property are developed asphalt roads. The following roadways provide regional access to the project within the study area: Interstate 15 Freeway provides regional access within the study area. The freeway is a six-lane (three in each direction) roadway with interchange access at Murrieta Hot Springs Road in the study area. This north-south freeway is an interstate that provides travel between the counties of San Bernardino, Riverside and San Diego and the City of Las Vegas to the north. Interstate 215 Freeway provides regional access within the study area. The freeway is a fourlane (two in each direction) roadway with interchange access at Murrieta Hot Springs Road in the study area. This north-south freeway is an interstate that provides travel between the counties of San Bernardino and Riverside. Madison Avenue provides direct access in the project site. Madison Avenue traverses north to south parallel to the I-15 Freeway alignment within the City of Murrieta. The roadway is primarily a two-lane road (one in each direction) with turn pockets at key intersections. Madison Avenue is identified as a major arterial on the City of Murrieta General Plan 2035 Circulation Map. Jefferson Avenue provides local and regional access in the project area. Jefferson Avenue traverses north to south parallel to the I-15 Freeway alignment within the City of Murrieta. This roadway is primarily a five-lane highway (two lanes in each direction with a center lane) with turn pockets at key intersections, and bike lanes. Jefferson Avenue is identified as an arterial on the City of Murrieta General Plan 2035 Circulation Map. Guava Street traverses east to west in the project area. The roadway is a two-lane (one in each direction) with turn pockets at Jefferson Avenue. The paved road begins just south of the Interstate 15 Freeway right of way to Jefferson Avenue. Guava Street is identified as a major arterial from Jefferson Street to Madison Avenue and a secondary highway north of Madison Avenue on the City of Murrieta General Plan 2035 Circulation Map. Murrieta Hot Springs Road provides local and regional access in the project area. Murrieta Hot Springs Road Street traverses east to west in the project area directly connecting to the I-15 Freeway and I-215 Freeway. The roadway is primarily a six-lane road (three in each direction) with turn pockets at key intersections. Murrieta Hot Springs Road is identified as an urban arterial from Jefferson Avenue to Alta Murrieta Drive on the City of Murrieta General Plan 2035 Circulation Map. 4

9 The project proposes to construct two driveways on Madison Avenue, as shown on the Site Plan, Figure 2. Nine (9) existing intersections within the study area have been identified that may potentially be impacted by the project. As well as two (2) future intersections within the study area have been identified that may potentially be impacted by the project. The intersections denoted with an asterisk () are future intersections analyzed under project conditions. The intersections are; 1. Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps 2. Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps 3. Murrieta Hot Springs Road and Hancock Avenue 4. Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps 5. Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps 6. Murrieta Hot Springs Road and Madison Avenue 7. Murrieta Hot Springs Road and Jefferson Avenue 8. Guava Street and Jefferson Avenue 9. Guava Street and Madison Avenue 10. Madison Avenue and Project Driveway #2 11. Madison Avenue and Project Driveway #1 Currently, the intersections of Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps, Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps, Murrieta Hot Springs Road and Hancock Avenue, Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps, Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps, Murrieta Hot Springs Road and Madison Avenue, Murrieta Hot Springs Road and Jefferson Avenue, and Guava Street and Jefferson Avenue are signalized. The intersection of Guava Street and Madison Avenue Street operates as a four way stop. Two (2) roadway segments within the study area have been identified that may potentially be impacted by the project. The Madison Avenue roadway segment is subdivided into 1A and 1B based on the roadway characteristics. The roadway segments are; 1A. Madison Avenue between Murrieta Hot Springs Road and Walmart Driveway #3 1B. Madison Avenue between Walmart Driveway #3 and Guava Street 2. Guava Street between Madison Avenue and Monroe Avenue The Madison Avenue roadway segment 1A is similar to a multilane highway as defined in the Highway Capacity Manual (HCM). The Madison Avenue roadway segment 1B and Guava Street roadway segment are similar to a Class III highway as defined in the HCM. Existing Traffic Volumes Figure 3 illustrates the existing peak hour traffic volumes in the study area. The traffic volume data used in the following intersectional analysis were based on traffic counts conducted by Newport Traffic Studies, an independent traffic data collection company. Turn movement counts were collected during the AM (7-9 AM) and PM (4-6 PM) peak periods at the above-mentioned existing intersections identified for detailed analysis. These counts were conducted in November The resulting turning movement volumes are presented in Appendix D of this report. 5

10 6 CARMAX #6002 MURRIETA, CALIFORNIA FIGURE 3 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 3.dwg Last Opened: Mar 09, :30pm by: TMunoz

11 Intersection Capacity Analysis Methodologies Based on the existing intersection geometrics and traffic volumes during the AM and PM Peak Hour, the intersection capacity analyses were conducted for the signalized and un-signalized intersections using the Synchro Software. Synchro is released by Trafficware Ltd, version 8. Synchro implements the methods of the 2010 Highway Capacity Manual, Chapter 15, 16 and 17; Urban Streets and Signalized intersections. The analysis determines a level-of-service (LOS) which quantitatively describes the operating characteristics of signalized intersections and the maximum delay. The LOS ranges from A (the best) through F (system breakdown). The level-of-service is based on the average delay of vehicles at the intersections. Table 1 provides the LOS thresholds for signalized intersections per the HCM 2010 methodology. Table 1: HCM LOS Criteria for Signalized Intersections LOS Control Delay per Vehicle (s/veh) A 10 B > 10 and 20 C > 20 and 35 D > 35 and 55 E > 55 and 80 F > 80 Source: HCM 2010 For un-signalized intersections the HCM measures the LOS based on the computed or measured control delay for Two Way Stop Controlled intersections (TWSC) and control delay for All Way Stop Controlled (AWSC) intersections. For a TWSC the LOS is computed for each movement and the most critical LOS is the one that describes the effectiveness of that intersection, which is typically the stop controlled left turn movement from the minor street. For an AWSC intersection the LOS defines the whole intersection. Table 2 provides the LOS thresholds for TWSC and AWSC intersections per the HCM 2010 methodology. Table 2: HCM LOS Criteria for TWSC and AWSC LOS Control Delay per Vehicle (s/veh) A 10 B > 10 and 15 C > 15 and 25 D > 25 and 35 E > 35 and 50 F > 50 Source: HCM 2010 The City of Murrieta Traffic Impact Analysis Preparation Guide, dated October 2013 outlines the City s Level of Service standards. Per the City of Murrieta General Plan, Chapter V, the peak hour intersection Level of Service standard is LOS D and for ramp intersections the Level of Service standard is LOS E. 7

12 Roadway Segment Analysis Methodologies The Roadway Segment Analysis complies with the County of Riverside General Plan. The guideline compares Average Daily Traffic (ADT) on a link to the roadway capacity. The ADT volumes for each of the four (4) conditions were factored from PM peak hour counts, obtained from the existing condition turn movement count. The following formula was used for each intersection leg in determining the ADT volumes. PM Peak Hour (Approach + Exit Volume) 11.5 = Daily Leg Volume Table 3 provides the LOS thresholds for Two Lane Highway Analysis per the County of Riverside General Plan Figure C-2. Table 3: Roadway Segment Analysis Methodologies Roadway Classification Number of Lanes Maximum Two-Way Traffic Volume (ADT) (2) Service Level C Service Level D Service Level E Collector 2 10,400 11,700 13,000 Secondary 4 20,700 23,300 25,900 Major 4 27,300 30,700 34,100 Arterial (3) 2 14,400 16,200 18,000 Arterial 4 28,700 32,300 35,900 Mountain Arterial (3) 2 12,900 14,500 16,100 Mountain Arterial 3 16,700 18,800 20,900 Mountain Arterial 4 29,800 33,500 37,200 Urban Arterial 4 28,700 32,300 35,900 Urban Arterial 6 43,100 48,500 53,900 Urban Arterial 8 57,400 64,600 71,800 Expressway 4 32,700 36,800 40,900 Expressway 6 49,000 55,200 61,300 Expressway 8 65,400 73,500 81,700 Freeway 4 61,200 68,900 76,500 Freeway 6 94, , ,500 Freeway 8 128, , ,500 Freeway , , ,600 Ramp (4) 1 16,000 18,000 20,000 Notes: (1) All capacity figures are based on optimum conditions and are intended as guidelines for planning purposes only. (2) Maximum two-way ADT values are based on the 1999 Modified Highway Capacity Manual Level of Service Tables as defined in the Riverside County Congestion Management Program. (3) Two-lane roadways designated as future arterials that conform to arterial design standards for vertical and horizontal alignment are analyzed as arterials. (4) Ramp capacity is given as a one-way traffic volume. Source: County of Riverside General Plan, Figure C-2 The City of Murrieta Traffic Impact Analysis Preparation Guide, dated October 2013 outlines the City s Level of Service standards. Per the City of Murrieta General Plan, Chapter V, the roadway segment Level of Service standard is LOS C. 8

13 Existing Traffic Analysis Intersection capacity analysis were conducted for the study intersection to determine an existing intersection level-of-service (LOS), based on the existing intersection geometrics and the AM and PM peak hour traffic volumes. The results of the analysis are shown in Table 4 and provided in Appendix D of this report. Figure 4 illustrates the existing intersection geometrics utilized in the capacity analysis. Table 4: Intersection Capacity Analysis - Existing Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Intersection AM PM Delay (1) LOS(2) Delay (1) LOS(2) 1 Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps 11.2 B 7.6 A 2 Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps 31.5 C 11.7 B 3 Murrieta Hot Springs Road and Hancock Avenue 11.8 B 14.6 B 4 Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps 12.8 B 18.7 B 5 Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps 22.1 C 19.2 B 6 Murrieta Hot Springs Road and Madison Avenue 43.9 D 46.2 D 7 Murrieta Hot Springs Road and Jefferson Avenue 21.9 C 33.1 C 8 Guava Street and Jefferson Avenue 9.7 A 11.0 B 9 Guava Street and Madison Avenue (3) 8.2 A 9.3 A (1) Delay In Seconds (2) LOS HCM Level of Service (3) Un-Signalized Intersection Source: Hall & Foreman Inc. As provided in Table 4 under Existing Condition, the study intersections are operating at LOS D or better and ramp intersections are operating at LOS E or better. The Roadway Segment analyses were conducted for the roadway segments to determine an existing level-of-service (LOS), based on the existing roadway geometrics and the AM and PM peak hour traffic volumes. The results of the analysis are shown in Table 5 and provided in Appendix E of this report. Table 5: Roadway Segment Analysis - Existing Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Roadway Segment No. Of Two-Way Traffic Daily Arterial Service Existing Volume (ADT) Leg V/C Classification Level Lanes Service Level E Volume Madison Avenue 1A between Murrieta Hot Springs Road and Walmart Driveway #3 4 Major Arterial 34,100 12, Madison Avenue 1B between Walmart Driveway #3 and Guava Street 2 Major Arterial 34,100 3, Guava Street between Madison Avenue and Monroe Avenue 2 Secondary Highway () The Roadway egment has a daily volume lower than the Service Level C threshold. Source: Hall & Foreman Inc. 25,900 1, As provided in Table 5 under Existing Condition, all the roadway segments daily volumes are lower than the Service Level C threshold. 9

14 CARMAX #6002 MURRIETA, CALIFORNIA 10 FIGURE 4 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 4.dwg Last Opened: Mar 09, :30pm by: TMunoz

15 3. EXISTING PLUS PROJECT CONDITION Project Trip Generation The project was analyzed to determine the amount of traffic that would be generated from the proposed development. To identify potential traffic impacts from the project, trip generation factors were applied to the type of use to generate project traffic estimates. The Trip Generation Study - CarMax Auto Superstore/Reconditioning Center, dated October 2014 was referenced. The Trip Generation Study provided a methodology for trip making characteristics of the CarMax Auto Superstore/Reconditioning Center in Laurel, Maryland, which consists of a preowned sales and service dealership including a Reconditioning Facility, an Auction Area, and Car Wash. As presented in Table 6, trips are provided as Auto Trips, Truck Trips, Total Trips, and ESAL Trips generated as a factor of the total site acres. The percentages used for the Auto Trips, Truck Trips, and Total Trips are values obtained from the Trip Generation Study - CarMax Auto Superstore/Reconditioning Center, October The Equivalent Single Axle Loads (ESAL) Trips are calculated with an ESAL factor of 2.0. Table 6: Project Trip Generation CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Use Weekday Weekend A.M. Peak Hour P.M. Peak Hour Daily Daily In Out Total In Out Total CarMax Auto Superstore / 1 Reconditioning Center Auto Trips Per Acre Truck Trips Per Acre Total Trips Per Acre Acres Auto Trips 2,841 2, Truck Trips Total Trips 3,023 2, PCE Trips 3,204 2, Source: Trip Generation Study - CarMax Auto Superstore/Reconditioning Center, October 2014 As presented in Table 6, it is estimated that the project will generate a total of 3,204 PCE weekday daily trips and 2,798 PCE weekend daily trips, with 246 PCE trips during the weekday AM peak hour and 271 PCE trips during the weekday PM peak hour. 11

16 Project Trip Distribution To address the impacts of the estimated project traffic, the trips were distributed and assigned to the surrounding streets and study intersections. The project traffic was distributed based on the anticipated project utilization. Once the distribution pattern was established, project trips were assigned to the area streets that serve the project. Figure 5 illustrates the general and specific estimated distribution pattern for the primary and pass-by project trips. Figure 6 illustrates the estimated AM and PM peak hours for the PCE project traffic volumes. The project traffic was added to the existing traffic volume to assess the impacts generated. 12

17 TRIP DISTRIBUTION CARMAX #6002 MURRIETA, CALIFORNIA 13 FIGURE 5 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 5.dwg Last Opened: Mar 09, :31pm by: TMunoz

18 PROJECT TRIPS CARMAX #6002 MURRIETA, CALIFORNIA 14 FIGURE 6 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 6.dwg Last Opened: Mar 09, :31pm by: TMunoz

19 Project Traffic Analysis Based on the proposed traffic distribution, assignment patterns and project trip generation, intersection capacity analyses were conducted to assess the estimated project impacts. To determine the project impacts at the study intersection and driveways, project trips were added to the Existing Condition volumes to produce the Existing plus Project Condition volumes. Figure 7 illustrates the calculated Existing plus Project Condition traffic volumes. Intersection capacity analysis for the Existing plus Project Condition was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 7 and provided in Appendix D of this report. Table 7: Intersection Capacity Analysis - Existing + Project Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Intersection AM PM Delay (1) LOS(2) Delay (1) LOS(2) 1 Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps 11.2 B 7.6 A 2 Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps 31.6 C 11.8 B 3 Murrieta Hot Springs Road and Hancock Avenue 11.8 B 14.6 B 4 Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps 13.2 B 24.7 C 5 Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps 22.4 C 19.2 B 6 Murrieta Hot Springs Road and Madison Avenue 46.7 D 51.5 D Mitigations Modify Intersection Striping 45.4 D 45.8 D 7 Murrieta Hot Springs Road and Jefferson Avenue 22.1 C 33.0 C 8 Guava Street and Jefferson Avenue 9.9 A 11.3 B 9 Guava Street and Madison Avenue (3) 8.3 A 9.4 A 10 Guava Street and Project Driveway #2 (3) 10.3 B 11.0 B 11 Guava Street and Project Driveway #1 (3) 9.0 A 11.0 B (1) Delay In Seconds (2) LOS HCM Level of Service (3) Un-Signalized Intersection Source: Hall & Foreman Inc. As presented in Table 7 under Existing plus Project Condition, all of the study intersections are anticipated to continue to operate at LOS D or better and ramp intersections are anticipated to continue operate at LOS E or better. The Project Specific Mitigations proposes extending the existing northbound right turn lane and converting a through lane to a shared through-right turn lane. With the proposed mitigations the intersection is anticipated to continue to operate at LOS D. Figure 8 illustrates the Existing plus Project Condition intersection geometrics, the mitigations are outlined in Chapter 7. 15

20 Roadway Segment analyses for the Existing plus Project Condition was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 8 and provided in Appendix E of this report. Table 8: Roadway Segment Analysis - Existing + Project Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Roadway Segment No. Of Two-Way Traffic Daily Arterial Service Existing Volume (ADT) Leg V/C Classification Level Lanes Service Level E Volume Madison Avenue 1A between Murrieta Hot Springs Road and Walmart Driveway #3 4 Major Arterial 34,100 15, Madison Avenue 1B between Walmart Driveway #3 and Guava Street 2 Major Arterial 34,100 3, Guava Street between Madison Avenue and Monroe Avenue 2 Secondary Highway ()The Roadway Segment has a daily volume lower than the Service Level C threshold. Source: Hall & Foreman Inc. 25,900 1, As provided in Table 8 under Existing + Project Condition, all the roadway segments daily volumes are anticipated to continue to be lower than the Service Level C threshold.. 16

21 CARMAX #6002 MURRIETA, CALIFORNIA 17 FIGURE 7 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 7.dwg Last Opened: Mar 09, :31pm by: TMunoz

22 CARMAX #6002 MURRIETA, CALIFORNIA 18 FIGURE 8 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 8.dwg Last Opened: Mar 12, :34pm by: TMunoz

23 4. BACKGROUND CONDITION Area Growth To analyze the project impacts, the inclusion of ambient traffic within the study area is necessary. Typically, regional and local growth is expected over the years at rates ranging from 1% to 2% compounded annually. The regional and local growth is based on the existing traffic volumes, an annual 2% increase up to Project Year/Buildout This growth is known as background traffic. The analysis of background traffic allows a comparison of traffic impacts with and without the project applying the growth to the existing turn movement volumes. Figure 9 illustrates Background Condition traffic volumes. Background Traffic Analysis To determine the impacts of the project to the study intersection, anticipated regional growth and other area project trips were added to existing condition volumes to produce the Background Condition volumes. The analysis was conducted with the existing intersection geometrics. Intersection capacity analysis for the Background Condition was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 9 and provided in Appendix D of this report. Table 9: Intersection Capacity Analysis - Background Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Intersection AM PM Delay (1) LOS(2) Delay (1) LOS(2) 1 Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps 11.5 B 7.6 A 2 Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps 31.8 C 12.3 B 3 Murrieta Hot Springs Road and Hancock Avenue 12.0 B 15.4 B 4 Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps 13.1 B 19.9 B 5 Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps 22.1 C 19.8 B 6 Murrieta Hot Springs Road and Madison Avenue 44.3 D 46.9 D 7 Murrieta Hot Springs Road and Jefferson Avenue 21.9 C 33.4 C 8 Guava Street and Jefferson Avenue 11.1 B 12.3 B 9 Guava Street and Madison Avenue (3) 8.5 A 9.8 A (1) Delay In Seconds (2) LOS HCM Level of Service (3) Un-Signalized Intersection Source: Hall & Foreman Inc. As provided in Table 9 under Background Condition, the study intersections are anticipated to continue operate at LOS D or better and ramp intersections are anticipated to continue operate at LOS E or better. 19

24 Roadway Segment analyses for Background Condition was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 10 and provided in Appendix E of this report. Table 10: Roadway Segment Analysis - Background Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Roadway Segment No. Of Two-Way Traffic Daily Arterial Service Existing Volume (ADT) Leg V/C Classification Level Lanes Service Level E Volume Madison Avenue 1A between Murrieta Hot Springs Road and Walmart Driveway #3 4 Major Arterial 34,100 12, Madison Avenue 1B between Walmart Driveway #3 and Guava Street 2 Major Arterial 34,100 3, Guava Street between Madison Avenue and Monroe Avenue 2 Secondary Highway ()The Roadway Segment has a daily volume lower than the Service Level C threshold. Source: Hall & Foreman Inc. 25,900 2, As provided in Table 10 under Background Condition, all the roadway segments daily volumes are anticipated to continue to be lower than the Service Level C threshold. 20

25 CARMAX #6002 MURRIETA, CALIFORNIA 21 FIGURE 9 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 9.dwg Last Opened: Mar 09, :39pm by: TMunoz

26 5. PROJECT COMPLETION Project Traffic Analysis Based on the proposed traffic distribution, assignment patterns and project trip generation, intersection capacity analyses were conducted to assess the estimated project impacts. To determine the project impacts at the study intersection and driveways, project trips were added to the Background Condition volumes to produce the Project Condition volumes. Figure 10 illustrates the calculated Project Completion traffic volumes. Intersection capacity analysis for the Project Condition was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 11 and provided in Appendix D of this report. Table 11: Intersection Capacity Analysis - Project Completion CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Intersection AM PM Delay (1) LOS(2) Delay (1) LOS(2) 1 Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps 11.5 B 7.9 A 2 Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps 31.9 C 12.3 B 3 Murrieta Hot Springs Road and Hancock Avenue 12.0 B 15.5 B 4 Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps 13.6 B 26.2 C 5 Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps 22.4 C 19.9 B 6 Murrieta Hot Springs Road and Madison Avenue 47.3 D 52.0 D Mitigations Modify Intersection Striping 45.9 D 46.4 D 7 Murrieta Hot Springs Road and Jefferson Avenue 22.1 C 33.9 C 8 Guava Street and Jefferson Avenue 11.2 B 12.6 B 9 Guava Street and Madison Avenue (3) 8.7 A 9.9 A 10 Guava Street and Project Driveway #2 (3) 10.4 B 11.1 B 11 Guava Street and Project Driveway #1 (3) 9.0 A 11.0 B (1) Delay In Seconds (2) LOS HCM Level of Service (3) Un-Signalized Intersection Source: Hall & Foreman Inc. As presented in Table 11 under Project Completion, the study intersections are anticipated to continue operate at LOS D or better and ramp intersections are anticipated to continue operate at LOS E or better. 22

27 Roadway Segment analyses for Project Completion was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 12 and provided in Appendix E of this report. Table 12: Roadway Segment Analysis - Project Completion CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Roadway Segment No. Of Two-Way Traffic Daily Arterial Service Existing Volume (ADT) Leg V/C Classification Level Lanes Service Level E Volume Madison Avenue 1A between Murrieta Hot Springs Road and Walmart Driveway #3 4 Major Arterial 34,100 15, Madison Avenue 1B between Walmart Driveway #3 and Guava Street 2 Major Arterial 34,100 4, Guava Street between Madison Avenue and Monroe Avenue 2 Secondary Highway ()The Roadway Segment has a daily volume lower than the Service Level C threshold. Source: Hall & Foreman Inc. 25,900 2, As provided in Table 12 under Project Completion, all the roadway segments daily volumes are anticipated to continue to be lower than the Service Level C threshold. 23

28 CARMAX #6002 MURRIETA, CALIFORNIA 24 FIGURE 10 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 10.dwg Last Opened: Mar 09, :41pm by: TMunoz

29 6. CUMULATIVE CONDITION Area Growth To analyze the cumulative impacts, the inclusion of traffic generated by other projects within the study area is necessary. The Other Area projects include approved projects that were recently constructed or will be constructed by Project Completion. The approved recently constructed or to be constructed Other Area projects are provided in Table 13. Table 13: Other Area Project Trip Generation CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Use A.M. Peak Hour P.M. Peak Hour Daily In Out Total In Out Total 1 Creekside Village TTM (TTM ) Creekside TTM (TTM ) 1, Fast 5 Xpress (DPO ) Hampton Inn (DP ) Jackson Highlands 9 TTM (GPA ) Jefferson Avenue/Elm Street Project (DP ) 4, Madison Avenue/Fig Street Project (DP ) 1, Marriott Murrieta (DPO ) 2, Murrieta 18 Office Campus (DPO ) 2, Murrieta 180 (DPO ) 1, Murrieta Apartments (DPO ) Triangle (SPO ) 5, Whittaker Professional Offices (DP ) 2, Source: (1) - City of Murrieta The project list was provided by the City of Murrieta. The list includes other area projects that do not provide trips to the proposed study intersections, these other area projects are noted with the asterisk (). The other area project trips are illustrated in Figure 11 and provided in the appendix. 25

30 CARMAX #6002 MURRIETA, CALIFORNIA 26 FIGURE 11 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 11.dwg Last Opened: Mar 09, :51pm by: TMunoz

31 Cumulative Condition Traffic Analysis The results of the Cumulative Condition forecasted calculations are illustrated in Figure 12, and presented in the Turn Movement summary worksheets provided in Appendix D of this report. Intersection capacity analysis for the Cumulative Condition was performed using the methodology presented in Chapter 2. The analysis was conducted with the Cumulative Condition traffic volumes and intersection geometrics from project completion and cumulative projects conditions. The results of the analysis are shown in Table 14. Table 14: Intersection Capacity Analysis - Cumulative Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Intersection AM PM Delay (1) LOS(2) Delay (1) LOS(2) 1 Murrieta Hot Springs Road and I-215 Freeway Northbound Ramps 12.0 B 8.3 A 2 Murrieta Hot Springs Road and I-215 Freeway Southbound Ramps 32.3 C 13.2 B 3 Murrieta Hot Springs Road and Hancock Avenue 35.0 D 25.6 C 4 Murrieta Hot Springs Road and I-15 Freeway Northbound Ramps 15.4 B 33.2 C 5 Murrieta Hot Springs Road and I-15 Freeway Southbound Ramps 24.1 C 20.9 C 6 Murrieta Hot Springs Road and Madison Avenue 73.1 E 97.3 F Mitigations Modify Intersection Striping 50.8 D 51.0 D 7 Murrieta Hot Springs Road and Jefferson Avenue 22.3 C 34.1 C 8 Guava Street and Jefferson Avenue 12.3 B 13.7 B 9 Guava Street and Madison Avenue (3) 11.3 B 16.8 C 10 Guava Street and Project Driveway #2 (3) 11.8 B 14.4 B 11 Guava Street and Project Driveway #1 (3) 9.4 A 13.9 B (1) Delay In Seconds (2) LOS HCM Level of Service (3) Un-Signalized Intersection Source: Hall & Foreman Inc. As presented in Table 14 under Cumulative Condition, the study intersections are anticipated to continue operate at LOS D or better and ramp intersections are anticipated to continue operate at LOS E or better. Figure 13 illustrates the Cumulative Condition with Project Completion intersection geometrics. 27

32 Roadway Segment analyses for Cumulative Condition was performed using the methodology presented in Chapter 2. The results of the analysis are shown in Table 15 and provided in Appendix E of this report. Table 15: Roadway Segment Analysis - Cumulative Condition CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Roadway Segment No. Of Two-Way Traffic Daily Arterial Service Existing Volume (ADT) Leg V/C Classification Level Lanes Service Level E Volume Madison Avenue 1A between Murrieta Hot Springs Road and Walmart Driveway #3 4 Major Arterial 34,100 20, Madison Avenue 1B between Walmart Driveway #3 and Guava Street 2 Major Arterial 34,100 6, Guava Street between Madison Avenue and Monroe Avenue 2 Secondary Highway ()The Roadway Segment has a daily volume lower than the Service Level C threshold. Source: Hall & Foreman Inc. 25,900 2, As presented in Table 15 under Cumulative Condition, all the roadway segments daily volumes are anticipated to continue to be lower than the Service Level C threshold. 28

33 CARMAX #6002 MURRIETA, CALIFORNIA 29 FIGURE 12 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 12.dwg Last Opened: Mar 09, :52pm by: TMunoz

34 CARMAX #6002 MURRIETA, CALIFORNIA 30 FIGURE 13 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 13.dwg Last Opened: Mar 09, :57pm by: TMunoz

35 7. GENERAL PLAN UPDATE The City of Murrieta General Plan 2035 Circulation Map is provided in the Chapter 5 Circulation Element of the General Plan Update. Madison Avenue is identified as major on the General Plan 2035 Circulation Map. A major roadway provides 76 curb to curb and 100 right of way (ROW). Guava Road between Madison Avenue and Monroe Avenue is identified as secondary on the General Plan 2035 Circulation Map. A secondary roadway provides 64 curb to curb and 88 right of way (ROW). Monroe Avenue (between Guava Street and No Name roadway) and No Name Roadway (between Madison Avenue and Monroe Avenue) are identified as an industrial collector on the General Plan 2035 Circulation Map. An industrial collector roadway provides 56 curb to curb and 78 right of way (ROW). On the General Plan 2035 Trails and Bikeways Map Monroe Avenue and No Name Roadway are proposed to provide Class II Striped Bike Lanes. No Name roadway as currently identified on the General Plan 2035 Circulation Map, extends the length of the project from Madison Avenue to Monroe Avenue. Monroe Avenue as currently identified on the General Plan 2035 Circulation Map, extends from Guava to No Name roadway.thus all that would be generated and distributed along these two segments would be a direct result of the underlying land use parcel. No additional traffic would be diverted. To accommodate the proposed project layout, the No Name roadway and a portion of Monroe Avenue (extending from Guava Street to No Name roadway) will need to be removed from the General Plan 2035 Circulation Map. The identification of No Name roadway and Monroe Avenue (extending from Guava to No Name roadway) as proposed Class II Striped Bike Lanes will also need to be removed from the General Plan 2035 Trails and Bikeways Map. Illustrated in Figure 14 is the General Plan Update Volumes. Roadway Segment analyses for the General Plan Update was performed using the methodology presented in the General Plan 2035 Update, Chapter 5 Circulation Element, provided in the appendix to the report. Table 16: Roadway Segment Analysis - General Plan Update CarMax Auto Superstore/Reconditioning Center #6002 Traffic Impact Analysis Roadway Links Madison Avenue between No Name Street 1 and Guava Street Guava Street between Madison Avenue 2 and Monroe Avenue (1) V/C - Volume to Capacity Ratio (2) LOS HCM Level of Service Source: Hall & Foreman Inc. Arterial Classification Maximum Two-Way Traffic Volume (ADT) LOS E Daily Leg Volume V/C Major 34,100 16, A Secondary 25,900 5, A As provided in Table 16 under General Plan Update, the roadway segments are anticipated to continue to operate at LOS A with the added volume from No Name Street. The roadway segment analysis confirms that the additional volume from the removal of No Name Street will not impact the Madison Avenue or Guava Street roadway segments. LOS 31

36 2035 MODEL PLOT NOT TO SCALE 2035 ADJUSTED DAILY VOLUME W/ REMOVAL OF NO NAME STREET GENERAL PLAN UPDATE VOLUMES CARMAX #6002 MURRIETA, CALIFORNIA 32 FIGURE 14 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 14.dwg Last Opened: Mar 09, :58pm by: TMunoz

37 8. PROJECT MITIGATION AND SUMMARY In summary, the project as presented will cause traffic impacts at one identified study intersection. The proposed mitigations are as follows. Project Specific Mitigations To accommodate project traffic, specific traffic mitigations have been identified. The project specific mitigation consists of improvements to the intersection of Murrieta Hot Springs Road and Madison Avenue as illustrated in Figure 15. The recommended project mitigations include; 1. The intersection of Murrieta Hot Springs Road and Madison Avenue proposed mitigations include extending the northbound right turn lane and restriping a through lane to a shared through-right turn lane. The eastbound direction will provide dual left turn lanes, three through lanes, and a shared through right turn lane. The westbound direction will provide dual left turn lanes, three through lanes, and a right turn lane. The northbound direction will provide dual left turn lanes, a through lane, a shared throughright turn lane, and right turn lane. The southbound direction will provide will provide two left turn lanes, a through lane, and a shared through right turn lane. Cumulative Condition Mitigations As presented, the following intersections will require improvements due to traffic from approved other area projects; 1. The intersection of Murrieta Hot Springs Road and Hancock Avenue proposed mitigations include the addition of the northbound approach, an eastbound right turn lane, dual westbound left turn lanes, and restriping of a southbound right turn lane to a through lane. The eastbound direction will provide dual left turn lanes, three through lanes, and a shared through right turn lane. The westbound direction will provide dual left turn lanes, three through lanes, and a right turn lane. The northbound direction will provide dual left turn lanes, a through lane, and right turn lane. The southbound direction will provide dual left turn lanes, a through lane, and right turn lane. The construction of the recommended traffic mitigation would be the responsibility of the identified approved projects. 33

38 NOT TO SCALE EXTEND RIGHT TURN LANE RESTRIPE AS SHARED THROUGH-RIGHT TURN LANE PROPOSED INTERSECTION GEOMETRICS MADISON AVE AND MURRIETA HOT SPRINGS RD CARMAX #6002 MURRIETA, CALIFORNIA 34 FIGURE 15 Drawing Name: S:\150015\Eng\ \Exhibit\03_Traffic\Study\Figure 15.dwg Last Opened: Mar 12, :40am by: TMunoz

39 9. APPENDIX A. Traffic Scoping Memo B. Trip Generation Study C. Other Area Projects D. Intersection Capacity Analysis Calculations E. Roadway Segment Analysis F. General Plan Update 35

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G.

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G. TRAFFIC IMPACT ANALYSIS z Photo here CAL MET ROYAL MRF EXPANSION City of Paramount, CA arch beach C O N S U L T I N G June 23, 214 TRAFFIC IMPACT ANALYSIS CAL MET ROYAL MATERIALS RECOVERY FACILITY (MRF)

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

TRAFFIC IMPACT STUDY CANYON HILLS PROJECT LOS ANGELES, CALIFORNIA INTRODUCTION This traffic analysis has been conducted to identify and evaluate the potential traffic impacts of the proposed Canyon Hills

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS FOR A PROPOSED NEIGHBORHOOD SHOPPING CENTER Civic Center Way and Cross Creek Road City of Malibu Prepared for: Goldman Firth Rossi Architects Prepared by:

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

Los Coyotes Country Club Development Plan Traffic Impact Analysis

Los Coyotes Country Club Development Plan Traffic Impact Analysis Los Coyotes Country Club Development Plan Traffic Impact Analysis Prepared For: Phil Martin Associates 2073007450 Los Coyotes Country Club Development Plan Traffic Impact Analysis June 19, 2014 Prepared

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY PREPARED BY: Aric Evatt, PTP aevatt@urbanxroads.com (949) 660-1994 x204 Charlene So, PE cso@urbanxroads.com (949) 660-1994 x222 OCTOBER 18, 2018

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS The capacity of the toll plaza was estimated based on data from numerous studies as well as traffic counts conducted at the toll plaza

More information

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION ENVIRONMENTAL SETTING The following section is based on the Draft Traffic Circulation Study for the Malibu La Paz Project (Traffic Study),

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719) LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC

More information

3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director

3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 53.552.37 Oroville, California 95965 F: 53.538.7785 buttecounty.net/dds BUTTE COUNTY

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

MEMORANDUM. To: 1.0 PURPOSE

MEMORANDUM. To: 1.0 PURPOSE MEMORANDUM To: Scott Holland, Elements Architecture From: Brian Grover, Dudek Date: July 16, 2014 1.0 PURPOSE In response to the November 4, 2013 request (RE: Incomplete Application Southern California

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68) 3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68) 3.1 Existing Conditions Roadway Physical Characteristics Typical Section The existing typical cross-section for SH68 is shown on Figure 3-1 and is comprised

More information

Overland Traffic Consultants, Inc. October 15, Mr. Bruce McBride Project Delivery Analysts, LLC Shawnee Street Moorpark, CA 93021

Overland Traffic Consultants, Inc. October 15, Mr. Bruce McBride Project Delivery Analysts, LLC Shawnee Street Moorpark, CA 93021 Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach, CA 90266 Phone (661) 799-8423 E-mail: otc@overlandtraffic.com October 15, 2015 Mr. Bruce McBride Project Delivery

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Michael A. Werthmann, PE, PTOE Principal

Michael A. Werthmann, PE, PTOE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 MEMORANDUM TO: FROM: Brian Lorenc GHB-630, LLC Michael A. Werthmann, E, TOE rincipal Luay R. Aboona, E rincipal

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

APPENDIX H TRAFFIC REPORT

APPENDIX H TRAFFIC REPORT APPENDIX H TRAFFIC REPORT Keith Higgins Traffic En ginee r WEST END SAND CITY TRAFFIC IMPACT ANALYSIS DRAFT REPORT SAND CITY, CALIFORNIA Prepared for DBO Development No. 3 Monterey, CA Prepared by Keith

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Isle of Capri Casinos, Inc. Waterloo, Iowa SEH No. A-CLAAS0501.00 November 16, 2004 Table of Contents (Continued) Table of Contents Certification Page Table of Contents Page 1.0

More information

5.16 TRAFFIC AND CIRCULATION

5.16 TRAFFIC AND CIRCULATION 5.16 TRAFFIC AND CIRCULATION This section is based upon the Tierra Robles Traffic Impact Study (May 2015) and Supplemental Traffic Impact Analysis (August 2017) prepared by Omni-Means Engineering Solutions,

More information

Clay Street Realignment Project Traffic Study

Clay Street Realignment Project Traffic Study Final Clay Street Realignment Project Traffic Study November 24, 2009 Prepared for: City of Placerville RS07-2466 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 (916) 773-1900 Fax (916) 773-2015

More information

Queensgate Drive Corridor Traffic Study

Queensgate Drive Corridor Traffic Study January 2015 Prepared for: City of Richland Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington 99336 Table of Contents Introduction and Background... 1 Existing

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Cheyenne Metropolitan Planning Organization

Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study PHASE II SECTION 20 DRAFT Prepared for: Cheyenne Metropolitan Planning Organization November 20, 2015 (Section 20 is bordered by Powderhouse Road on the west, Storey

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT Technical Memorandum TO: Hoang Hong, NDOT DATE: September 21, 2012 FROM: SUBJECT: COPIES: John Karachepone, Jacobs USA Parkway Traffic Operations Analysis, Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

T R A N S P O R T A T I O N M E M O R A N D U M

T R A N S P O R T A T I O N M E M O R A N D U M WILKINSON LLC t raffic engineering and t ransportation p lanning 3405 Harbor Way Fort Collins, CO 80524 phone: 970-988-0143 fax: 970-472-0223 martinawilkinson@msn.com T R A N S P O R T A T I O N M E M

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018 Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928 Traffic Impact Analysis Texas Odyssey

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

4.13 TRANSPORTATION AND TRAFFIC

4.13 TRANSPORTATION AND TRAFFIC 4.13 This chapter describes the regulatory framework and existing conditions in the vicinity of the Project site related to transportation and traffic, and the potential impacts of the proposed Project

More information

6.14 Traffic and Circulation

6.14 Traffic and Circulation 6.14 Traffic and Circulation 6.14.1 Introduction The analysis in this section summarizes the findings and recommendations presented in the "Marywood Development Traffic Impact Study, City of Orange, California"

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK 000 MASER ASSOCIATES Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY DEVELOPMENT SEA GULL VILLAGE TOWNSHIP OF COLTS NECK MONMOUTH COUNTY Prepared By: Richard

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information