1 Los Coyotes Country Club Development Plan Traffic Impact Analysis Prepared For: Phil Martin Associates

2 Los Coyotes Country Club Development Plan Traffic Impact Analysis June 19, 2014 Prepared by: Cathy Lawrence, PE Transportation Engineer Stantec Consulting Services Inc. Reviewed by: Joe Foust, PE Principal, Transportation Planning and Traffic Engineering Stantec Consulting Services Inc. Prepared for: Phil Martin Associates 3002 Dow Avenue, Suite 122 Tustin, CA Submitted by: Stantec Consulting Services Inc. 38 Technology Drive, Suite 100 Irvine, CA i.1

3 Table of Contents 1.0 INTRODUCTION BACKGROUND AND SCOPE STUDY AREA METHODOLOGY PERFORMANCE MEASUREMENTS AND THRESHOLDS OF SIGNIFICANCE DEFINITIONS REFERENCES EXISTING CONDITIONS EXISTING CIRCULATION SYSTEM EXISTING TRAFFIC CONDITIONS FUTURE TRAFFIC VOLUMES Short-Range Conditions Long-Range Conditions (Year 2035) PROJECT DESCRIPTION TRIP GENERATION PROJECT TRIP DISTRIBUTION PROJECT IMPACT ANALYSIS EXISTING PROJECT IMPACTS Average Daily Traffic Volumes and Levels of Service Intersection Levels of Service SHORT-RANGE PROJECT IMPACTS Average Daily Traffic Volumes and Levels of Service Intersection Levels of Service LONG-RANGE PROJECT IMPACTS Average Daily Traffic Volumes and Levels of Service Intersection Levels of Service CMP INTERSECTION IMPACTS PROJECT ALTERNATIVES LOS COYOTES DRIVE AT COUNTRY CLUB DRIVE 3-WAY STOP SIGN CONCLUSIONS AND RECOMMENDATIONS EXISTING CONDITIONS SHORT-RANGE CONDITIONS LONG-RANGE CONDITIONS CONCLUSIONS CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx i

4 Table of Contents List of Figures Figure 1-1 Project Study Area Figure 1-2 Proposed Development Plan Figure 1-3 Study Intersection Locations Figure 2-1 Existing Circulation System Figure 2-2 Existing ADT Volumes and V/C Ratios Figure 2-3 Short-Range Background ADT Volumes and V/C Ratios Figure No-Project ADT Volumes and V/C Ratios Figure 3-1 General Project Distribution Figure 4-1 Existing + Project ADT Volumes and V/C Ratios Figure 4-2 Short-Range + Project ADT Volumes and V/C Ratios Figure Project ADT Volumes and V/C Ratios List of Tables Table 1-1 Level of Service Descriptions Table 1-2 Intersection Performance Criteria Table 2-1 Existing ADT Volume and V/C Ratio Summary Table 2-2 Existing LOS Summary Table 2-3 Existing LOS Summary Mid-Day and Saturday Table 2-4 Related Project Summary Table 2-5 Short-Range Background ADT Volume and V/C Ratio Summary Table 2-6 Short-Range Background LOS Summary Table 2-7 Short-Range Background LOS Summary Mid-Day and Saturday Table No-Project ADT Volume and V/C Ratio Summary Table 2-9 Year 2035 No-Project LOS Summary Table 2-10 Year 2035 No-Project LOS Summary Mid-Day and Saturday Table 3-1 Trip Generation Summary Table 4-1 Existing + Project ADT Volume and V/C Ratio Summary Table 4-2 Existing-Plus-Project LOS Summary Table 4-3 Existing-Plus-Project LOS Summary Mid-Day and Saturday Table 4-4 Short-Range + Project ADT Volume and V/C Ratio Summary Table 4-5 Short-Range-Plus-Project LOS Summary Table 4-6 Short-Range-Plus-Project LOS Summary Mid-Day and Saturday Table Project ADT Volume and V/C Ratio Summary CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx ii

5 Table of Contents Table 4-8 Year 2035-Plus-Project LOS Summary Table 4-9 Year 2035-Plus-Project LOS Summary Mid-Day and Saturday Table 4-10 Project Alternatives Trip Generation Summary Table 4-11 Country Club Drive at Los Coyotes Drive 3-Way Stop Control LOS Summary Appendices Appendix A: Peak Hour Volumes Appendix B: HCM Delay Worksheets Appendix C: ICU Calculation Worksheets CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx iii

6 1.0 Introduction Stantec Consulting Services Inc. (Stantec) has performed a traffic impact analysis for the proposed Los Coyotes Country Club Development Plan located on Los Coyotes Drive in the City of Buena Park. The purpose of the study is to determine the amount of traffic generated by the proposed project, analyze the impacts of the project on traffic and circulation, and to propose mitigation measures to reduce or eliminate those impacts. This report has been prepared for submittal to the in support of the environmental documents for the project. 1.1 Background and Scope The project is located within the existing Los Coyotes Country Club property in the City of Buena Park in Orange County. The project site is the site of the existing country club management office, former swimming pool, and tennis courts. The proposed project consists of 125 private residences. The project also includes 10,000 square feet of new space atop the existing clubhouse consisting of 5,000 square feet of gathering/event space, 1,000 square feet of private meeting space, and 4,000 square feet of country club management office space, enhanced landscaping, hardscape, and common area elements, and golf practice area enhancements. The project will remove the six existing tennis courts and construct two replacement courts at a different location within the Los Coyotes Country Club. The total development area encompasses approximately 21.8 acres, of which 7.9 acres consist of the proposed residential component. The site is designated for open space in the Buena Park General Plan, and the project site is zoned Recreational Open Space (OR) by the Buena Park Municipal Code. Access to the project site would be provided by Los Coyotes Drive. The Los Coyotes Country Club gate which led into the Fullerton neighborhood east of the project site and had a limited amount of daily traffic was recently closed to vehicles. Access for emergency vehicles and Country Club member pedestrians and golf carts only is provided by this private secured gate. Figure 1-1 shows the project location in relation to the area roadways, and Figure 1-2 shows the proposed development plan. The traffic analysis is presented in several settings as required by the and the Orange County Congestion Management Program (CMP). These include existing conditions, opening year conditions (short-range 2016), and long-range cumulative conditions (2035). This analysis assumes full buildout of the project. The scope of work for this traffic study is intended to satisfy the traffic impact requirements of environmental impact review. The overall approach can be summarized as follows: 1. Existing Analysis: This part of the analysis identifies project impacts under existing conditions as if it were built today. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.1

7

8

9 Introduction 2. Short-Range Analysis: This part of the analysis identifies project impacts under opening year conditions. 3. Long-Range/Cumulative Impact Analysis: This part of the analysis addresses longrange cumulative impacts of the project using a long-range (year 2035) time frame. Chapter 2.0 of this report provides the transportation setting for the impact analysis, and Chapter 3.0 provides a detailed project description. Chapter 4.0 of this traffic report then focuses on the potential traffic impacts of full implementation of the project under existing, short-range, and longrange (year 2035) time frames. Chapter 5.0 provides a summary discussion and identifies intersection improvements that would be necessary to mitigate project impacts, if any. 1.2 Study Area The study area for the analysis was defined based on the location of major intersections within the and the surrounding cities that potentially have an impact from the project. The study area is based on where project traffic dissipates to less than significant levels (i.e., change in intersection capacity utilization (ICU) or volume/capacity (V/C) of less than.02). Figure 1-3 illustrates the locations of the study intersections. Traffic forecasts were obtained for the study area, and a peak hour intersection analysis carried out for each intersection shown here. The study area encompasses 15 intersections in the cities of Buena Park, La Mirada and Fullerton, and two freeway interchange intersections and three arterial intersections along Beach Boulevard under Caltrans jurisdiction. One intersection in the study area, Beach Boulevard at I-5 southbound, is identified on the Orange County Congestion Management Program (CMP) highway system. Eleven of the study intersections are signalized and two study intersections are stop-controlled (unsignalized). Two study intersections have no traffic control (unsignalized); however, both of these uncontrolled intersections are tee-intersections, which by California Vehicle Code Basic Rules of the Road (Section 21800), traffic on the stem of the tee must yield the right of way to traffic on the through street whether a stop sign is present or not. 1.3 Methodology The traffic forecasts for the study area circulation system were produced using a combination of data produced by the Orange County Traffic Analysis Model (OCTAM) for the long-range analysis, and application of an annual growth factor for the short-range forecasts. The OCTAM model is based on standardized modeling techniques in which future socioeconomic data and/or land uses in an area are quantified and corresponding traffic volumes on the future roadway network are estimated. Traffic forecasts are given for 15 intersections and the adjacent roadway segments in the study area. Standard capacity ranges are used to calculate volume/capacity (V/C) ratios for average daily traffic (ADT) volumes on the study area roadways. The traffic analysis also utilizes peak CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.4

10

11 Introduction hour intersection volumes, and the corresponding level of service (LOS) at each intersection based on the Highway Capacity Manual (HCM) delay methodology for both signalized and unsignalized study intersections is determined. Caltrans requires analysis of intersections under their jurisdiction using the HCM delay methodology. In addition to the HCM delay methodology, an analysis at the signalized study intersections based on the intersection capacity utilization (ICU) methodology, which is consistent with the CMP guidelines, is presented. The study periods for the proposed project consist of the typical weekday AM (7 AM 9 AM) and PM peak hours (4 PM 6 PM), and also include the weekday Mid-Day (11 AM 1 PM) and Saturday peak hours. 1.4 Performance Measurements and Thresholds of Significance Impact criteria are defined which determine whether a project causes a significant impact. These criteria include performance standards and thresholds of significance, both of which are used for identifying project impacts. The impact criteria used here are based on two primary measures. The first is capacity which establishes the vehicle carrying ability of a roadway and the second is volume. The volume measure is either a traffic count (in the case of existing volumes) or a forecast for a future point in time. The ratio between the volume and the capacity is determined, and based on that V/C ratio, the corresponding LOS is defined. The methodology used in this analysis, including lane capacity and clearance intervals, is consistent with the CMP requirements. The LOS of an intersection is a report card letter grade that ranges from A to F characterizing the operational conditions of the traffic flow. LOS A represents the free-flow conditions where vehicles experience little to no delays. LOS F indicates the worst-case scenario with high congestion, a breakdown of traffic flow and high vehicular delays. Although LOS A through C are desired levels, LOS D is generally considered acceptable in urban conditions such as the project area. The HCM provides for calculation of LOS for a wide variety of facilities, but the results all adhere to the report card grade format, A F. Table 1-1 provides a qualitative description of each LOS as a function of delay or ICU value. The LOS calculation methodologies and performance standards used in this analysis are those adopted by the and the Orange County CMP. The traffic study uses LOS D (ADT V/C or ICU value of.90, or average stopped delay not to exceed 55 seconds for signalized intersections and 35 seconds for unsignalized intersections) as the standard for roadway segments and intersections analyzed within the study area, including CMP intersections even though CMP deems LOS E (ICU of 1.00) as acceptable. There is one intersection defined as a CMP location in the study area. The CMP location in the study area is Beach Boulevard at I-5 southbound ramp. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.6

12 Introduction Table 1-1 Level of Service Descriptions Level of Service Delay Description Delay (seconds) Signalized Unsignalized ICU Signalized A Minimal or no vehicle delay B Slight delay to vehicles C Moderate vehicle delays, traffic flow remains stable D More extensive delays at intersections E Long queues create lengthy delays F Severe delays and congestion > 80 > 50 > 1.00 Source: Transportation Research Board Highway Capacity Manual 2010 Exhibit 15-3 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.7

13 Introduction For impact analysis purposes, the significance criteria are based on the LOS and either the increase in average vehicle delay, ICU value or V/C due to the project. The study periods for the proposed project consist of the typical weekday ADT and AM and PM peak hours, as well as the weekday Mid-Day and Saturday peak hours. The HCM delay and ICU analyses are both based on peak hour volumes and use individual turn movements and the corresponding lane geometry to estimate level of service. The calculation methodology and associated impact criteria used for the study area is summarized in Table 1-2. For the HCM delay analysis, the average stopped delay per vehicle is used to determine LOS. The procedures are those set out in the HCM and utilize peak hour turn movement volumes and intersection lane geometry in the calculation. For the HCM delay analysis, a significant impact occurs if the intersection is deficient without the project (LOS E or F), and the project contribution to the with-project delay is greater than two seconds. A significant impact also occurs if the intersection is not deficient without the project (LOS D or better), and the project contribution to the with-project delay causes it to become deficient (LOS E or F). The ICU methodology sums the V/C ratios for the critical movements of an intersection and is the methodology specified in the Orange County CMP guidelines. The performance criteria utilized in this analysis is consistent with CMP analysis guidelines since the criteria used here is more constrictive than the LOS E (ICU not to exceed 1.00) allowed by the Orange County CMP. For the roadway segment V/C and intersection ICU analyses, a significant impact occurs if the roadway segment or intersection is deficient without the project (LOS E or F), and the project contribution to the with-project V/C ratio or ICU value is.02 or more. A significant impact also occurs if the intersection is not deficient without the project (LOS D or better), and the project contribution to the with-project V/C ratio or ICU value causes it to become deficient (LOS E or F). Mitigation of the project is required if the performance standard is exceeded. Mitigation measures to bring the intersection back to an acceptable level of service where the deficiency is caused by the project or to no-project conditions where the project adds to a deficient condition are identified. 1.5 Definitions Certain terms used throughout this report are defined below to clarify their intended meaning: ADT Average Daily Traffic. Generally used to measure the total two-directional traffic volumes passing a given point on a roadway. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.8

14 Introduction Table 1-2 Intersection Performance Criteria Arterial Roads V/C Calculation Methodology Level of service to be based on average daily traffic (ADT) volume/capacity (V/C) ratios calculated Using the following capacities: Smart Street 8 lanes 80,300 6 lanes 60,200 Principal Arterial 8 lanes 75,000 Major Arterial 6 lanes 56,300 Primary Arterial 4 lanes 37,500 Secondary Arterial 4 lanes 25,000 Local 2 lanes 12,500 The capacity of a Smart Street (i.e., Beach Boulevard) is seven percent higher than the capacity of a major arterial, due to traffic flow operations enhancements that are associated with the Smart Street facility designation. Arterial deficiencies identified based on ADT V/C ratios are further examined using peak hour data. Performance Standard All arterials: Level of Service D (V/C less than or equal to.90) Mitigation Requirement For V/C greater than the acceptable level of service, mitigation of the project contribution is required to bring the link location back to an acceptable level of service where the deficiency is caused by the project, or to no-project conditions where the project adds more than.03 to a deficient condition for CMP roadways (the impact threshold specified in the CMP) or.02 or greater for all other arterials. Intersections HCM Delay Calculation Methodology Level of service to be based on average peak hour intersection delay calculated using the following assumptions: Ideal Flow Rate: 1,900 vehicles/hour/lane Peak Hour Factor:.92 for existing conditions,.95 for future conditions Cycle Length: 70 seconds to 140 seconds Minimum Phase Time: 6 seconds Yellow Time: 3.5 sec All-Red Time: 0.5 sec V/C Calculation Methodology Level of service to be based on peak hour intersection capacity utilization (ICU) values calculated using the following assumptions: Saturation Flow Rate: 1,700 vehicles/hour/lane Clearance Interval:.05 Right-Turn-On-Red Factor:.75 Continued CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.9

15 Introduction Table 1-2 Intersection Performance Criteria (Continued) Performance Standard Level of service D in the cities of Buena Park, La Mirada, and Fullerton Level of service C based on HCM Delay Methodology for Caltrans locations Level of service E for CMP locations Threshold of Significance Cities of Buena Park, La Mirada, Fullerton: For an intersection that is forecast to operate worse than the performance standard (LOS D) the impact of the project is considered to be significant if the project increases the HCM average delay by more than 2 seconds. An increase of more than 2 seconds per vehicle does not cause the threshold of significance to be exceeded if the with-project delay does not exceed the performance standard. For an intersection that is forecast to operate worse than the performance standard (LOS D) the impact of the project is considered to be significant if the project increases the ICU by.02 or more. An ICU increase of.02 or more does not cause the threshold of significance to be exceeded if the with-project ICU value does not exceed the performance standard. Caltrans: For an intersection that is forecast to operate worse than the performance standard (LOS C) the impact of the project is considered to be significant if the project increases the HCM average delay by more than 2 seconds. An increase of more than 2 seconds per vehicle does not cause the threshold of significance to be exceeded if the with-project delay does not exceed the performance standard. CMP Locations: For a CMP intersection that is forecast to operate worse than the performance standard (LOS E) the impact of the project is considered to be significant if the project increases the ICU by.03 or more. An ICU increase of.03 or more does not cause the threshold of significance to be exceeded if the with-project ICU value does not exceed the performance standard CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.10

16 Introduction ICU LOS Peak Hour TSF V/C Intersection Capacity Utilization. A measure of the volume to capacity ratio for an intersection. Typically used to determine the peak hour level of service for a given set of intersection volumes. Level of Service. A scale used to evaluate circulation system performance based on intersection average delay or ICU values or volume/capacity ratios of arterial segments. This refers to the hour during the AM peak period (typically 7 AM 9 AM), the PM peak period (typically 3 PM 6 PM), or the Mid-Day peak period (11:00 AM 1:00 PM) in which the greatest number of vehicle trips are generated by a given land use or are traveling on a given roadway. Thousand Square Feet. Used in quantifying non-residential land uses, and refers to building floor area. Volume to Capacity Ratio. This is typically used to describe the percentage of capacity utilized by existing or projected traffic on a segment of an arterial or intersection. 1.6 References 1. Highway Capacity Manual 2010, Transportation Research Board, National Research Council. 2. Trip Generation, 9th Edition, Institute of Transportation Engineers (ITE), CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 1.11

17 2.0 Existing Conditions This chapter describes the project site in relation to the transportation setting. The existing roadway system and present day traffic volumes and levels of service are summarized first, followed by a discussion of future traffic volumes against which the impacts of the project will be evaluated. 2.1 Existing Circulation System The project is located on Los Coyotes Drive within the existing Los Coyotes Country Club. Access to the project site will be provided by Los Coyotes Drive which terminates within the Los Coyotes Country Club east of Country Club Drive. Figure 2-1 illustrates the existing circulation system. Shown here are the existing intersection controls at the study intersections and along the study roadways within the residential area. Los Coyotes Drive is a two-lane local street with residences fronting on it. A landscaped median is provided on Los Coyotes Drive. The street currently carries approximately 2,100 ADT west of Country Club Drive and 1,100 ADT east of Country Club Drive. The speed limit is 30 mph. Onstreet parking is allowed. Los Coyotes Drive provides access to Beach Boulevard west of the project site. Country Club Drive is a two-lane local street which provides a connection between Los Coyotes Drive and Malvern Avenue to the southwest of the project site. Country Club Drive passes by two elementary schools in the neighborhood. Country Club Drive has a 25-mph speed limit, and on-street parking is allowed. Beach Boulevard is classified as a Major Arterial north of SR-91 Freeway on the Buena Park Circulation Plan and is designated as an Orange County Transportation Authority (OCTA) Smart Street. Beach Boulevard has six lanes and a raised median in the project vicinity, and the speed limit is 35 mph south of La Mirada Boulevard and 45 mph north of La Mirada Boulevard. Onstreet parking is prohibited on Beach Boulevard in the project vicinity. La Mirada Boulevard/Malvern Avenue is a Primary Arterial on the City s Circulation Plan. La Mirada Boulevard west of Beach Boulevard is six lanes with a landscaped median. On-street parking is prohibited on La Mirada Boulevard in the project vicinity. Malvern Avenue east of Beach Boulevard is six lanes with a painted median to Country Club Drive, and four lanes with a painted median east of Country Club Drive. On-street parking is allowed along segments of Malvern Avenue. La Mirada Boulevard/Malvern Avenue has a 45-mph speed limit in the project vicinity. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.1

18

19 Existing Conditions The I-5 Freeway travels from northwest to southeast through the study area approximately two miles south of the project site. The I-5 Freeway is a ten-lane freeway (eight general purpose lanes plus auxiliary lanes and two high-occupancy vehicle lanes) through Buena Park. I-5 currently carries approximately 170,000 ADT in the project vicinity. 2.2 Existing Traffic Conditions Existing AM, PM, Mid-Day, and Saturday peak hour volumes at the study intersections, as well as mid-block ADT volumes, were collected in June 2012 and provided by City staff, with the exception of peak hour traffic counts at Beach Boulevard and La Mirada Boulevard/Malvern Avenue, I-5 northbound and Auto Center Drive, and Beach Boulevard and I-5 southbound which were collected in May 2013 by Traffic Data Services, Inc. All of the counts were collected while the area schools were in session. These volumes were factored to 2014 levels by applying a one percent per year growth rate. The one percent per year growth factor is consistent with the annual growth experienced in the City s traffic model. Traffic in the City s traffic model increases approximately 13 percent over a 20-year span in the study area, which has been rounded to one percent per year growth for this analysis. Table 2-1 summarizes the existing ADT volumes in the study area along with the corresponding ADT V/C ratios. These ADT volumes and V/C ratios are illustrated in Figure 2-2. Existing peak hour intersection turning movement volumes are illustrated in Appendix A. Two roadway segments currently operate at LOS E or F. Beach Boulevard south of La Mirada Boulevard/Malvern Avenue currently operates at LOS F, and La Mirada Boulevard west of Beach Boulevard operates at LOS E. The remaining roadway segments in the study area currently operate at acceptable LOS D or better. As discussed in the impact criteria section in Chapter 1.0, operating conditions for both the signalized and unsignalized study area intersections are evaluated using the HCM delay method of analysis. In addition, the ICU method of analysis estimates the peak hour V/C relationship for signalized intersections and translates the V/C ratio into a level of service measure of the intersection performance. The calculation methodologies used in the HCM delay and ICU analyses were noted in the impact criteria discussion. Table 2-2 summarizes the existing AM and PM peak hour HCM delay and ICU values and the corresponding LOS for the study area intersections based on existing traffic volumes and street geometry (actual HCM delay worksheets are included in Appendix B and ICU calculation worksheets are included in Appendix C). Table 2-3 summarizes the existing Mid-Day and Saturday peak hour HCM delay and ICU values. As mentioned in Chapter 1.0, the intersection performance standard is LOS D. As the LOS tables indicate, the intersection of Beach Boulevard at Rosecrans Avenue currently operates at LOS E during the PM peak hour and the Saturday peak hour based on the HCM delay methodology. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.3

20 Existing Conditions Table 2-1 Existing ADT Volume and V/C Ratio Summary Roadway Capacity ADT V/C Beach s/o Rosecrans 60,200 45, Beach s/o Los Coyotes 60,200 43, Beach s/o La Mirada/Malvern 60,200 62, Rosecrans e/o Beach 37,500 20, Rosecrans w/o Sunny Ridge 37,500 19, La Mirada w/o Beach 37,500 35, Malvern e/o Beach 37,500 27, Malvern e/o Country Club 37,500 25, Malvern e/o Burlingame 37,500 25, Malvern e/o Burning Tree 37,500 26, St Andrews w/o Los Coyotes 4, Los Coyotes n/o St Andrews 4,000 2, Los Coyotes e/o Country Club 4,000 1, Country Club s/o Los Coyotes 4,000 1, Country Club e/o Burlingame 4,000 1, Country Club e/o Malvern 4,000 2, Burlingame s/o Country Club 4,000 1, Burning Tree e/o Clear Creek 4,000 1, Bold = Exceeds target LOS CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.4

21

22 Existing Conditions Table 2-2 Existing LOS Summary Control Existing Intersection Type AM PM HCM Delay 1. Beach & Rosecrans * Signal 51 sec/d 58 sec/e 2. Beach & Los Coyotes * Signal 5 sec/a 8 sec/a 3. Ralph B. Clark & Rosecrans Signal 22 sec/c 23 sec/c 4. Sunny Ridge & Rosecrans Signal 18 sec/b 18 sec/b 5. Gilbert & Rosecrans Signal 29 sec/c 27 sec/c 6. Beach & La Mirada/Malvern * Signal 53 sec/d 54 sec/d 7. Malvern & Country Club Signal 16 sec/b 12 sec/b 8. Dale/Burlingame & Malvern Signal 41 sec/d 31 sec/c 9. Burning Tree & Malvern Signal 17 sec/b 18 sec/b 10. I-5 NB & Auto Center * Signal 24 sec/c 22 sec/c 11. Beach & I-5 SB * Signal 20 sec/b 37 sec/d 12. Burlingame & Country Club Unsignalized 10 sec/a 9 sec/a 13. Los Coyotes & St Andrews Unsignalized 9 sec/a 9 sec/a 14. Country Club & Los Coyotes Unsignalized 10 sec/a 9 sec/a 15. Clear Creek & Los Coyotes Unsignalized 8 sec/a 9 sec/a ICU 1. Beach & Rosecrans Signal.79/C.86/D 2. Beach & Los Coyotes Signal.45/A.52/A 3. Ralph B. Clark & Rosecrans Signal.32/A.33/A 4. Sunny Ridge & Rosecrans Signal.35/A.35/A 5. Gilbert & Rosecrans Signal.54/A.55/A 6. Beach & La Mirada/Malvern Signal.83/D.78/C 7. Malvern & Country Club Signal.46/A.41/A 8. Dale/Burlingame & Malvern Signal.55/A.55/A 9. Burning Tree & Malvern Signal.40/A.45/A 10. I-5 NB & Auto Center Signal.22/A.24/A 11. Beach & I-5 SB Signal.67/B.84/D * Caltrans intersection Bold = Exceeds target LOS Level of service ranges: LOS A B C D E F Delay - Unsignalized 0 10 sec sec sec sec sec Above 50 sec Delay - Signalized 0 10 sec sec sec sec sec Above 80 sec ICU Above 1.00 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.6

23 Existing Conditions Table 2-3 Existing LOS Summary Mid-Day and Saturday Control Existing Intersection Type Mid-Day Saturday HCM Delay 1. Beach & Rosecrans * Signal 39 sec/d 60 sec/e 2. Beach & Los Coyotes * Signal 8 sec/a 8 sec/a 3. Ralph B. Clark & Rosecrans Signal 21 sec/c 20 sec/c 4. Sunny Ridge & Rosecrans Signal 16 sec/b 16 sec/b 5. Gilbert & Rosecrans Signal 22 sec/c 24 sec/c 7. Malvern & Country Club Signal 9 sec/a 10 sec/b 8. Dale/Burlingame & Malvern Signal 24 sec/c 26 sec/c 9. Burning Tree & Malvern Signal 16 sec/b 17 sec/b 12. Burlingame & Country Club Unsignalized 9 sec/a 9 sec/a 13. Los Coyotes & St Andrews Unsignalized 9 sec/a 9 sec/a 14. Country Club & Los Coyotes Unsignalized 10 sec/a 10 sec/a 15. Clear Creek & Los Coyotes Unsignalized 8 sec/a 9 sec/a ICU 1. Beach & Rosecrans Signal.54/A.68/B 2. Beach & Los Coyotes Signal.33/A.40/A 3. Ralph B. Clark & Rosecrans Signal.19/A.27/A 4. Sunny Ridge & Rosecrans Signal.22/A.30/A 5. Gilbert & Rosecrans Signal.35/A.45/A 7. Malvern & Country Club Signal.25/A.29/A 8. Dale/Burlingame & Malvern Signal.33/A.38/A 9. Burning Tree & Malvern Signal.30/A.39/A * Caltrans intersection Bold = Exceeds target LOS Level of service ranges: LOS A B C D E F Delay - Unsignalized 0 10 sec sec sec sec sec Above 50 sec Delay - Signalized 0 10 sec sec sec sec sec Above 80 sec ICU Above 1.00 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.7

24 Existing Conditions All other study intersections currently operate at LOS D or better during the AM and PM peak hours based on HCM delay. Based on the ICU values, all of the study intersections currently operate at LOS D or better. The Caltrans intersection performance standard is LOS C based on the HCM delay methodology. The Caltrans intersection of Beach Boulevard at Rosecrans Avenue currently operates at LOS D during the AM peak hour and LOS E during the PM peak hour, Beach Boulevard at La Mirada Boulevard/Malvern Avenue operates at LOS D during the AM and PM peak hours, and Beach Boulevard at I-5 southbound ramp operates at LOS D during the PM peak hour. The Caltrans intersections of Beach Boulevard at Los Coyotes Drive and Auto Center Drive at I-5 northbound ramp currently operate at acceptable LOS C or better during the AM and PM peak hours. 2.3 Future Traffic Volumes Future traffic forecasts were prepared for the short-range and long-range (year 2035) time frames Short-Range Conditions Short-range background volumes were based on one percent per year ambient growth rate applied to the existing traffic counts plus traffic generated by approved and pending projects in the project vicinity provided by City staff. The short-range time frame is approximately two years, and no changes to the existing circulation system are assumed in the short-range time-frame. One approved retail project was identified as a related project at the northwest corner of Beach Boulevard and La Mirada Boulevard. A summary of the approved project is presented in Table 2-4. Table 2-4 Related Project Summary Project Location Description ADT Village Circle N/W corner Beach Blvd/La Mirada Blvd 74.0 TSF Retail 5,584 ADT Table 2-5 summarizes the short-range background ADT volumes and corresponding V/C ratios, and Figure 2-3 illustrates these ADT volumes. Two roadway segments, Beach Boulevard south of La Mirada Boulevard/Malvern Avenue and La Mirada Boulevard west of Beach Boulevard, operate at LOS F under short-range background conditions. Peak hour short-range background intersection turning movement volumes are illustrated in Appendix A. The AM and PM peak hour HCM delay and ICU values based on these short-range background intersection volumes and existing lane configurations are summarized in Table 2-6 (actual HCM delay calculation worksheets are included in Appendix B and ICU calculation worksheets are included in Appendix C). CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.8

25 Existing Conditions Table 2-5 Short-Range Background ADT Volume and V/C Ratio Summary Roadway Capacity ADT V/C Beach s/o Rosecrans 60,200 47, Beach s/o Los Coyotes 60,200 45, Beach s/o La Mirada/Malvern 60,200 66, Rosecrans e/o Beach 37,500 21, Rosecrans w/o Sunny Ridge 37,500 19, La Mirada w/o Beach 37,500 38, Malvern e/o Beach 37,500 29, Malvern e/o Country Club 37,500 26, Malvern e/o Burlingame 37,500 27, Malvern e/o Burning Tree 37,500 27, St Andrews w/o Los Coyotes 4, Los Coyotes n/o St Andrews 4,000 2, Los Coyotes e/o Country Club 4,000 1, Country Club s/o Los Coyotes 4,000 1, Country Club e/o Burlingame 4,000 1, Country Club e/o Malvern 4,000 2, Burlingame s/o Country Club 4,000 1, Burning Tree e/o Clear Creek 4,000 1, Bold = Exceeds target LOS CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.9

26

27 Existing Conditions Table 2-6 Short-Range Background LOS Summary Control Short-Range Background Intersection Type AM PM HCM Delay 1. Beach & Rosecrans * Signal 53 sec/d 65 sec/e 2. Beach & Los Coyotes * Signal 7 sec/a 8 sec/a 3. Ralph B. Clark & Rosecrans Signal 22 sec/c 23 sec/c 4. Sunny Ridge & Rosecrans Signal 18 sec/b 18 sec/b 5. Gilbert & Rosecrans Signal 29 sec/c 28 sec/c 6. Beach & La Mirada/Malvern * Signal 59 sec/e 66 sec/e 7. Malvern & Country Club Signal 16 sec/b 12 sec/b 8. Dale/Burlingame & Malvern Signal 42 sec/d 31 sec/c 9. Burning Tree & Malvern Signal 17 sec/b 18 sec/b 10. I-5 NB & Auto Center * Signal 24 sec/c 23 sec/c 11. Beach & I-5 SB * Signal 21 sec/c 48 sec/d 12. Burlingame & Country Club Unsignalized 10 sec/a 9 sec/a 13. Los Coyotes & St Andrews Unsignalized 9 sec/a 9 sec/a 14. Country Club & Los Coyotes Unsignalized 10 sec/a 9 sec/a 15. Clear Creek & Los Coyotes Unsignalized 8 sec/a 9 sec/a ICU 1. Beach & Rosecrans Signal.82/D.89/D 2. Beach & Los Coyotes Signal.46/A.54/A 3. Ralph B. Clark & Rosecrans Signal.32/A.33/A 4. Sunny Ridge & Rosecrans Signal.35/A.35/A 5. Gilbert & Rosecrans Signal.57/A.55/A 6. Beach & La Mirada/Malvern Signal.85/D.86/D 7. Malvern & Country Club Signal.47/A.43/A 8. Dale/Burlingame & Malvern Signal.55/A.58/A 9. Burning Tree & Malvern Signal.42/A.47/A 10. I-5 NB & Auto Center Signal.23/A.26/A 11. Beach & I-5 SB Signal.70/B.90/D * Caltrans intersection Bold = Exceeds target LOS Level of service ranges: LOS A B C D E F Delay - Unsignalized 0 10 sec sec sec sec sec Above 50 sec Delay - Signalized 0 10 sec sec sec sec sec Above 80 sec ICU Above 1.00 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.11

28 Existing Conditions As Table 2-6 shows, the intersection of Beach Boulevard and Rosecrans Avenue operates at LOS E during the PM peak hour under short-range background conditions, and the intersection of Beach Boulevard at La Mirada Boulevard/Malvern Avenue operates at LOS E during the AM and PM peak hours based on the HCM delay. Based on the ICU values, all of the study intersections operate at LOS D or better during the AM and PM peak hours under short-range background conditions. Under short-range background conditions, the Caltrans intersection of Beach Boulevard at Rosecrans Avenue operates at LOS D during the AM peak hour and LOS E during the PM peak hour, Beach Boulevard at La Mirada Boulevard/Malvern Avenue operates at LOS E during the AM and PM peak hours, and Beach Boulevard at I-5 southbound ramp operates at LOS D during the PM peak hour. The Caltrans intersections of Beach Boulevard at Los Coyotes Drive and Auto Center Drive at I-5 northbound ramp operate at LOS C or better during the AM and PM peak hours under short-range background conditions. The Mid-Day and Saturday peak hour HCM delay and ICU values for short-range background conditions are summarized in Table 2-7 (actual HCM delay calculation worksheets are included in Appendix B and ICU calculation worksheets are included in Appendix C). All of the study intersections operate at LOS D or better during the Mid-Day and Saturday peak hours based on the HCM delay and ICU methodologies under short-range background conditions, with the exception of Beach Boulevard at Rosecrans Avenue during the Saturday peak hour. The intersection of Beach Boulevard at Rosecrans Avenue would operate at LOS E during the Saturday peak hour under short-range background conditions based on the HCM delay methodology Long-Range Conditions (Year 2035) The long-range setting for this analysis assumes the year 2035 OCTAM demographic projections for the (i.e., General Plan) and surrounding region. Buildout (year 2035) no-project traffic forecasts were derived from a 2035 OCTAM model run by applying post-processing procedures in which existing ground counts, existing modeled volumes and future modeled volumes are used in deriving the forecast. The 2035 forecasts assume buildout of the Orange County Master Plan of Arterial Highways (MPAH) and the Circulation Element of the City s General Plan, although the existing circulation system in the study area is mostly built-out. No circulation improvements are assumed in the study area, and existing lane configurations are assumed at the intersections. Year 2035 no-project ADT volumes and V/C ratios within the study area are summarized in Table 2-8 and illustrated in Figure 2-4. Year 2035 no-project peak hour volumes are illustrated in Appendix A. Four roadway segments in the study area operate at LOS E or F under 2035 noproject conditions. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.12

29 Existing Conditions Table 2-7 Short-Range Background LOS Summary Mid-Day and Saturday Control Short-Range Background Intersection Type Mid-Day Saturday HCM Delay 1. Beach & Rosecrans * Signal 39 sec/d 60 sec/e 2. Beach & Los Coyotes * Signal 7 sec/a 7 sec/a 3. Ralph B. Clark & Rosecrans Signal 21 sec/c 20 sec/c 4. Sunny Ridge & Rosecrans Signal 16 sec/b 16 sec/b 5. Gilbert & Rosecrans Signal 23 sec/c 24 sec/c 7. Malvern & Country Club Signal 11 sec/b 12 sec/b 8. Dale/Burlingame & Malvern Signal 26 sec/c 27 sec/c 9. Burning Tree & Malvern Signal 16 sec/b 17 sec/b 12. Burlingame & Country Club Unsignalized 9 sec/a 9 sec/a 13. Los Coyotes & St Andrews Unsignalized 9 sec/a 9 sec/a 14. Country Club & Los Coyotes Unsignalized 10 sec/a 10 sec/a 15. Clear Creek & Los Coyotes Unsignalized 8 sec/a 9 sec/a ICU 1. Beach & Rosecrans Signal.56/A.71/C 2. Beach & Los Coyotes Signal.36/A.42/A 3. Ralph B. Clark & Rosecrans Signal.19/A.27/A 4. Sunny Ridge & Rosecrans Signal.22/A.30/A 5. Gilbert & Rosecrans Signal.38/A.47/A 7. Malvern & Country Club Signal.30/A.34/A 8. Dale/Burlingame & Malvern Signal.36/A.41/A 9. Burning Tree & Malvern Signal.33/A.43/A * Caltrans intersection Bold = Exceeds target LOS Level of service ranges: LOS A B C D E F Delay - Unsignalized 0 10 sec sec sec sec sec Above 50 sec Delay - Signalized 0 10 sec sec sec sec sec Above 80 sec ICU Above 1.00 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.13

30 Existing Conditions Table No-Project ADT Volume and V/C Ratio Summary Roadway Capacity ADT V/C Beach s/o Rosecrans 60,200 54, Beach s/o Los Coyotes 60,200 54, Beach s/o La Mirada/Malvern 60,200 62, Rosecrans e/o Beach 37,500 21, Rosecrans w/o Sunny Ridge 37,500 21, La Mirada w/o Beach 37,500 36, Malvern e/o Beach 37,500 38, Malvern e/o Country Club 37,500 39, Malvern e/o Burlingame 37,500 24, Malvern e/o Burning Tree 37,500 25, St Andrews w/o Los Coyotes 4, Los Coyotes n/o St Andrews 4,000 2, Los Coyotes e/o Country Club 4,000 1, Country Club s/o Los Coyotes 4,000 1, Country Club e/o Burlingame 4,000 1, Country Club e/o Malvern 4,000 2, Burlingame s/o Country Club 4,000 1, Burning Tree e/o Clear Creek 4,000 1, Bold = Exceeds target LOS CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.14

31

32 Existing Conditions Table 2-9 summarizes the AM and PM peak hour HCM delay and ICU values based on the 2035 no-project volumes and existing lane configurations (actual HCM delay calculation worksheets are included in Appendix B, and ICU calculation worksheets are included in Appendix C). As this table shows, two intersections operate at LOS E or F under 2035 no-project conditions based on the HCM delay methodology. The intersection of Beach Boulevard at Rosecrans Avenue operates at LOS E during the AM peak hour. The intersection of Beach Boulevard at La Mirada Boulevard/Malvern Avenue operates at LOS F during the AM and PM peak hours. Based on the ICU methodology, the intersection of Beach Boulevard at La Mirada Boulevard/Malvern Avenue operates at LOS E during the AM peak hour and LOS F during the PM peak hour. The intersection of Beach Boulevard at I-5 southbound operates at LOS E during the PM peak hour. Under 2035 no-project conditions, the Caltrans intersection of Beach Boulevard at Rosecrans Avenue operates at LOS E during the AM peak hour and LOS D during the PM peak hour, Beach Boulevard at La Mirada Boulevard/Malvern Avenue operates at LOS F during the AM and PM peak hours, and Beach Boulevard at I-5 southbound ramp operates at LOS D during the PM peak hour. The Caltrans intersections of Beach Boulevard at Los Coyotes Drive and Auto Center Drive at I-5 northbound ramp operate at acceptable LOS C or better during the AM and PM peak hours under 2035 no-project conditions. The 2035 no-project Mid-Day and Saturday HCM delay and ICU values are summarized in Table As this table shows, the study intersections operate at LOS D or better under 2035 conditions during the Mid-Day and Saturday peak hours based on the HCM delay and ICU methodologies. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.16

33 Existing Conditions Table 2-9 Year 2035 No-Project LOS Summary Control 2035 No-Project Intersection Type AM PM HCM Delay 1. Beach & Rosecrans * Signal 68 sec/e 49 sec/d 2. Beach & Los Coyotes * Signal 8 sec/a 9 sec/a 3. Ralph B. Clark & Rosecrans Signal 22 sec/c 23 sec/c 4. Sunny Ridge & Rosecrans Signal 18 sec/b 19 sec/b 5. Gilbert & Rosecrans Signal 30 sec/c 28 sec/c 6. Beach & La Mirada/Malvern * Signal 86 sec/f 98 sec/f 7. Malvern & Country Club Signal 19 sec/b 15 sec/b 8. Dale/Burlingame & Malvern Signal 36 sec/d 30 sec/c 9. Burning Tree & Malvern Signal 17 sec/b 17 sec/b 10. I-5 NB & Auto Center * Signal 28 sec/c 26 sec/c 11. Beach & I-5 SB * Signal 23 sec/c 49 sec/d 12. Burlingame & Country Club Unsignalized 10 sec/a 9 sec/a 13. Los Coyotes & St Andrews Unsignalized 9 sec/a 9 sec/a 14. Country Club & Los Coyotes Unsignalized 10 sec/a 9 sec/a 15. Clear Creek & Los Coyotes Unsignalized 8 sec/a 9 sec/a ICU 1. Beach & Rosecrans Signal.83/D.80/C 2. Beach & Los Coyotes Signal.53/A.63/B 3. Ralph B. Clark & Rosecrans Signal.35/A.34/A 4. Sunny Ridge & Rosecrans Signal.37/A.37/A 5. Gilbert & Rosecrans Signal.59/A.59/A 6. Beach & La Mirada/Malvern Signal.95/E 1.01/F 7. Malvern & Country Club Signal.57/A.56/A 8. Dale/Burlingame & Malvern Signal.63/B.65/B 9. Burning Tree & Malvern Signal.39/A.42/A 10. I-5 NB & Auto Center Signal.26/A.28/A 11. Beach & I-5 SB Signal.75/C.94/E * Caltrans intersection Bold = Exceeds target LOS Level of service ranges: LOS A B C D E F Delay - Unsignalized 0 10 sec sec sec sec sec Above 50 sec Delay - Signalized 0 10 sec sec sec sec sec Above 80 sec ICU Above 1.00 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.17

34 Existing Conditions Table 2-10 Year 2035 No-Project LOS Summary Mid-Day and Saturday Control 2035 No-Project Intersection Type Mid-Day Saturday HCM Delay 1. Beach & Rosecrans * Signal 33 sec/c 46 sec/d 2. Beach & Los Coyotes * Signal 7 sec/a 6 sec/a 3. Ralph B. Clark & Rosecrans Signal 21 sec/c 21 sec/c 4. Sunny Ridge & Rosecrans Signal 17 sec/b 17 sec/b 5. Gilbert & Rosecrans Signal 25 sec/c 25 sec/c 7. Malvern & Country Club Signal 9 sec/a 11 sec/b 8. Dale/Burlingame & Malvern Signal 25 sec/c 26 sec/c 9. Burning Tree & Malvern Signal 15 sec/b 16 sec/b 12. Burlingame & Country Club Unsignalized 9 sec/a 9 sec/a 13. Los Coyotes & St Andrews Unsignalized 9 sec/a 9 sec/a 14. Country Club & Los Coyotes Unsignalized 10 sec/a 10 sec/a 15. Clear Creek & Los Coyotes Unsignalized 8 sec/a 9 sec/a ICU 1. Beach & Rosecrans Signal.51/A.69/B 2. Beach & Los Coyotes Signal.39/A.47/A 3. Ralph B. Clark & Rosecrans Signal.21/A.28/A 4. Sunny Ridge & Rosecrans Signal.23/A.31/A 5. Gilbert & Rosecrans Signal.39/A.49/A 7. Malvern & Country Club Signal.35/A.42/A 8. Dale/Burlingame & Malvern Signal.37/A.45/A 9. Burning Tree & Malvern Signal.29/A.39/A * Caltrans intersection Bold = Exceeds target LOS Level of service ranges: LOS A B C D E F Delay - Unsignalized 0 10 sec sec sec sec sec Above 50 sec Delay - Signalized 0 10 sec sec sec sec sec Above 80 sec ICU Above 1.00 CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 2.18

35 3.0 Project Description This chapter describes the traffic characteristics of the proposed project. Trip generation is summarized, and the distribution of project trips on the study area roadway network is presented. 3.1 Trip Generation The proposed project consists of 125 private residential units and expansion of the existing country club clubhouse consisting of 5,000 square feet of gathering/event space, 1,000 square feet of private meeting space, and 4,000 square feet of country club management office space. The proposed management office space is replacing 1,500 square feet of existing office space; therefore, trips generated by the additional 2,500 square feet of office space are included in the trip generation estimate. The proposed development also consists of landscaping, common area, and golf practice area enhancements which would not generate any additional traffic. The meeting/event space in the proposed community building would be used for special events. Peak hour and daily trip generation rates for the proposed project were obtained from Institute of Transportation Engineers (ITE) Trip Generation, 9th Edition. The ITE rates for Low-Rise Condominium/Townhouse (Category 231) were used for the residential portion of the proposed project. This category does not include an ADT trip rate or Mid-Day or Saturday peak hour rates; therefore, these trip rates were estimated based on the ITE Single Family Detached and Apartment ADT rates. The ADT, Mid-Day, and Saturday trip rates used in this analysis were interpolated between the Single Family rates and the Apartment rates based on the PM peak hour trip rates. Trip rates for the management office were determined from ITE General Office Building rates and applied to the increase in office square footage (i.e., 2,500 square feet). ITE provides weekday ADT and peak hour and Saturday peak hour trip rates for General Office uses. The proposed meeting/event space would be used for special events such as weddings or corporate events. Neither ITE nor San Diego Association of Governments (SANDAG), the second most common source of trip generation rates used in Southern California, has a trip rate for meeting/special event facilities. Therefore, to provide a conservatively high estimate of the amount of traffic which could be generated by the meeting/special event space, the ITE trip rates for High-Turnover Restaurant were utilized. Table 3-1 summarizes the trip rates and the resulting trip generation for the proposed project. As this table shows, the project would generate 1,774 weekday daily trips, of which 152 are generated during the AM peak hour, 160 are generated during the PM peak hour, and 143 are generated during the Mid-Day peak hour. On Saturday, the project would generate 172 peak hour and 1,944 daily trips. CAL v:\2073\active\ \report\rpt_los_coyotes_cc_dev_plan_tia.docx 3.1

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Appendix G. Traffic Study

Appendix G. Traffic Study Appendix G Traffic Study City of Lake Forest SPORTS PARK AND RECREATION CENTER Traffic Study March 2010 Draft City of Lake Forest SPORTS PARK AND RECREATION CENTER Traffic Study Prepared by: Austin-Foust

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION ENVIRONMENTAL SETTING The following section is based on the Draft Traffic Circulation Study for the Malibu La Paz Project (Traffic Study),

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

4.4 TRAFFIC and CIRCULATION

4.4 TRAFFIC and CIRCULATION 4.4 TRAFFIC and CIRCULATION This section analyzes potential impacts relating to traffic and circulation. The section summarizes the findings of a traffic impact study performed by Associated Transportation

More information

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology 4.11 TRANSPORTATION This section describes the road transportation system in the vicinity of the proposed Project and the potential impacts to this system from the proposed Project. The analysis in this

More information

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G.

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G. TRAFFIC IMPACT ANALYSIS z Photo here CAL MET ROYAL MRF EXPANSION City of Paramount, CA arch beach C O N S U L T I N G June 23, 214 TRAFFIC IMPACT ANALYSIS CAL MET ROYAL MATERIALS RECOVERY FACILITY (MRF)

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information

TRAFFIC IMPACT STUDY CANYON HILLS PROJECT LOS ANGELES, CALIFORNIA INTRODUCTION This traffic analysis has been conducted to identify and evaluate the potential traffic impacts of the proposed Canyon Hills

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

MEMORANDUM. To: 1.0 PURPOSE

MEMORANDUM. To: 1.0 PURPOSE MEMORANDUM To: Scott Holland, Elements Architecture From: Brian Grover, Dudek Date: July 16, 2014 1.0 PURPOSE In response to the November 4, 2013 request (RE: Incomplete Application Southern California

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

6.14 Traffic and Circulation

6.14 Traffic and Circulation 6.14 Traffic and Circulation 6.14.1 Introduction The analysis in this section summarizes the findings and recommendations presented in the "Marywood Development Traffic Impact Study, City of Orange, California"

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY PREPARED BY: Aric Evatt, PTP aevatt@urbanxroads.com (949) 660-1994 x204 Charlene So, PE cso@urbanxroads.com (949) 660-1994 x222 OCTOBER 18, 2018

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

4.11 TRANSPORTATION/CIRCULATION

4.11 TRANSPORTATION/CIRCULATION 4.11 TRANSPORTATION/CIRCULATION This section was developed using information from a Traffic Analysis Report prepared for the project by OEG, Inc. (2010), the Paradiso del Mare Ocean and Inland Estates

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS FOR A PROPOSED NEIGHBORHOOD SHOPPING CENTER Civic Center Way and Cross Creek Road City of Malibu Prepared for: Goldman Firth Rossi Architects Prepared by:

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

4.10 TRAFFIC AND CIRCULATION

4.10 TRAFFIC AND CIRCULATION 4.10 TRAFFIC AND CIRCULATION The following section is based on a traffic and circulation study prepared by Fehr & Peers, Inc. (November 2003; refer to Appendix F for technical calculations). The effects

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018 Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928 Traffic Impact Analysis Texas Odyssey

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

4.0 TRAFFIC IMPACT STUDIES

4.0 TRAFFIC IMPACT STUDIES SECTION 4 4.0 TRAFFIC IMPACT STUDIES 4.1 TRAFFIC IMPACT STUDY REQUIREMENTS The City has established Traffic Impact Study (TIS) requirements for the purpose of ensuring that both the quantitative and qualitative

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Figure shows the existing roadway network in Daly City.

Figure shows the existing roadway network in Daly City. The following section presents a description of various transportation system components within Daly City. Interstate 280 (I-280), State oute (S-), Skyline Boulevard (S-) and Mission Street (S-82) all

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

Mission Street Medical Office Development

Mission Street Medical Office Development reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA 95020 Hexagon Job Number: 11RD11

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

4.10 TRANSPORTATION AND CIRCULATION

4.10 TRANSPORTATION AND CIRCULATION 4.10 TRANSPORTATION AND CIRCULATION PURPOSE The section discusses the potential impacts to traffic and circulation as a result of the implementation of the proposed Via Princessa East Extension, which

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

SELECTED ROADWAY CAPACITY ANALYSIS

SELECTED ROADWAY CAPACITY ANALYSIS CHAPTERFOUR SELECTED ROADWAY CAPACITY ANALYSIS 4.1 SELECTED ROADWAY CAPACITY ANALYSIS Introduction Capacity analysis was performed on six selected roadways within the Dearborn County study area using the

More information

Section 5.4 Traffic and Circulation

Section 5.4 Traffic and Circulation Section 5.4 Traffic and Circulation SECTION 5.4 TRAFFIC AND CIRCULATION This section addresses the impacts of future traffic growth, planned physical improvements, and additional improvements to accommodate

More information