Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Similar documents
The Discussion of this exercise covers the following points:

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Exercise 4-2. Centrifugal Pumps EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Pumps

The Discussion of this exercise covers the following points: Range with an elevated or suppressed zero Suppressed-zero range Elevated-zero range

The Discussion of this exercise covers the following points:

Heat Pump Connections and Interior Piping

The Discussion of this exercise covers the following points: Pumps Basic operation of a liquid pump Types of liquid pumps The centrifugal pump.

Process Control Measurement Pressure, Flow, and Level Courseware Sample

Multi-Process Station

CONTROL and INSTRUMENTATION

Armfield Distillation Column Operation Guidelines

Cover Page for Lab Report Group Portion. Pump Performance

Lab 1c Isentropic Blow-down Process and Discharge Coefficient

Cover Page for Lab Report Group Portion. Head Losses in Pipes

P-5215 Differential Pressure Transmitter

EXPERIMENT 2 LEVEL CONTROL SYSTEM

CHEMICAL ENGINEERING LABORATORY CHEG 239W. Control of a Steam-Heated Mixing Tank with a Pneumatic Process Controller

Model 130M Pneumatic Controller

Job Sheet 1. Geothermal Energy

BUBBLER CONTROL SYSTEM

BUBBLER CONTROL SYSTEM

Exercise 8. Closed-Loop Pressure Control, Proportional-Plus-Integral Mode EXERCISE OBJECTIVE

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

Bubble Tube Installations

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

DPC-30 DPC-100. Reference Manual

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

Mitos Fluika Pressure and Vacuum Pumps Datasheet

Lab #1 Pressure: Bubblers and Water Balloons CEE 331 Fall 2003

Fluid Flow. Link. Flow» P 1 P 2 Figure 1. Flow Model

INSTRUMENTS A THERMAL MASS FLOW SENSOR USING A CONSTANT DIFFERENTIAL TEMPERATURE ABOVE THE AMBIENT GAS TEMPERATURE

Exploring the Properties of Gases

InstrumentationTools.com

Exploring the Properties of Gases. Evaluation copy. 10 cm in diameter and 25 cm high)

ACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING

1.2 Example 1: A simple hydraulic system

RC 195 Receiver-Controller

Gerald D. Anderson. Education Technical Specialist

Exploring the Properties of Gases

Manual for continuous distillation

Boyle s law Verifying the relation between air pressure and volume measuring air pressure in a closed container.

Ultrasonic Level Transmitter

Cover Page for Lab Report Group Portion. Drag on Spheres

The Ins and Outs of I/P Transducers

Installation and Operation Manual

This portion of the piping tutorial covers control valve sizing, control valves, and the use of nodes.

HEATEC TEC-NOTE. Setting Siemens Pressure Transmitter. Used on Heatec Vertical Asphalt Tanks. Publication No , Revised

Lab 4: Root Locus Based Control Design

Electronic gas volume corrector model DGVC-04

Digital Level Control One and Two Loops Proportional and Integral Control Single-Loop and Cascade Control

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

PRESSURE CONTROL TRAINER

Exercise 3. Power Versus Wind Speed EXERCISE OBJECTIVE DISCUSSION OUTLINE. Air density DISCUSSION

TR Electronic Pressure Regulator. User s Manual

Instruction and Maintenance Manual

Applying Hooke s Law to Multiple Bungee Cords. Introduction

CHAPTER 7: THE FEEDBACK LOOP

Operating Instructions

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

Introductory Lab: Vacuum Methods

BAPI Pressure Line of Products - FAQs

FX134, FX1234, FX3030 Problem and Solutions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Single Pressure/ vacuum decay leak rate, loss, rate of loss, or occlusion tests with standard Cv valves.

How to specify a product. Process Sensors and Mechanical Instruments

AMT-Ex Dewpoint Transmitter

Gas Diluter Portable Gas Dilution System User s Manual

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Model GFC 7000T CO 2 Analyzer (Addendum to GFC 7000TA Manual, PN 07272)

NATIONAL UNIVERSITY OF SINGAPORE. EE3302/EE3302E Industrial Control Systems E1: ADVANCED CONTROL SYSTEMS

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition

COMPAFLOW. Compressed Air. Volumetric flow. Gas. Mass flow. Steam. Net volumetric flow. Liquid

Introduction. Part one: Identify the Hydraulic Trainer Components

Modeling Diffusion Rates of a Gas in an Enclosed Space

4150K and 4160K Series Wizard II Pressure Controllers and Transmitters

ACV-10 Automatic Control Valve

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

AFC. SDPROC and AFC Analog Mass Flow Controller ANALOG MASS FLOW CONTROLLERS. Principles of Operation. Design Features

INSTALLATION & MAINTENANCE INSTRUCTIONS

UNIVERSITY OF WATERLOO

Instruction and Maintenance Manual

Application Worksheet

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

Boyle s Law VC 09. Experiment 9: Gas Laws. Abstract

Level Process Control. Penn State Chemical Engineering

Test Report # Rev 0. Adiabatic Compression With Constant Bleed Valve

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

GP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI

CASCADE CONTROL TRAINER

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI

PROCESS DYNAMIC AND CONTROL MODIFIED II QUADRUPLE TANK ON LABVIEW APPLICATION

SomnoSuite FAQ. Setup. Calibration 4. What are the calibration requirements for the SomnoSuite? Settings

Code Basic module and level control complete with optionals code

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

LOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/12

SAPCON. User Manual. Capacitance Continuous Level Indicator. . Introduction. . General Description. . Principle of Operation. .

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

EN00 Pre-Instructional Survey

Additel761 Series Firmware Updates

Transcription:

Exercise 2-2 Second-Order Interacting Processes EXERCISE OBJECTIVE Familiarize yourself with second-order interacting processes and experiment with the finer points of controller tuning to gain a deeper understanding of interacting processes. DISCUSSION OUTLINE The Discussion of this exercise covers the following point: The actual setup DISCUSSION The actual setup In this exercise, you will set up and control a second-order interacting level process similar to the one described in Figure 2-4, except that an additional drain line will be connected to the first tank, as shown in Figure 2-11. This introduces a new flow rate,, and an additional resistance,, in the process. This causes the overall transfer function of the process to become: (2-27) Vent tube Figure 2-11. The interacting second-order system. Festo Didactic 86007-00 69

Outline The final height of liquid in the second column can be found using the final-value theorem. The calculations assume the incoming flow to be constant during the experiment so that. (2-28) The resistance,, which controls the output flow,, will be adjusted with a hand valve and will be taken in a first time to be so large as to make. Equation (2-27) reduces to the previously obtained equation in such a case and we obtain: (2-29) and (2-30) PROCEDURE OUTLINE The Procedure is divided into the following sections: Setup and connections Adjusting the differential-pressure transmitter Adjusting and characterizing the system Controlling the process PROCEDURE Setup and connections 1. Connect the equipment according to the piping and instrumentation diagram (P&ID) shown in Figure 2-12 and use Figure 2-13 to position the equipment correctly on the frame of the training system. Table 2-3. Material to add to the basic setup for this exercise. Name Model Identification Column (small diameter) 46902 - Differential-pressure transmitter (low-pressure range) 46921 LIT 1 Color paperless recorder 46972 UR Controller * LIC 1 70 Festo Didactic 86007-00

Vent tube Open to the atmosphere Figure 2-12. P&ID - Second-order interacting process. Festo Didactic 86007-00 71

Air from the pneumatic unit (140 kpa (20 psi)) Figure 2-13. Setup - Second-order interacting process. 2. Connect the control valve to the pneumatic unit. 3. Connect the pneumatic unit to a dry-air source with an output pressure of at least 700 kpa (100 psi). 4. Wire the emergency push-button so that you can cut power in case of emergency. 5. Do not power up the instrumentation workstation yet. You should not turn the electrical panel on before your instructor has validated your setup that is not before step 10. 72 Festo Didactic 86007-00

6. Connect the controller to the control valve and to the differential-pressure transmitter. You must also include the recorder in your connections. On channel 1 of the recorder, plot the output signal from the controller, on channel 2, plot the signal from the transmitter. Be sure to use the analog input of your controller to connect the differential-pressure transmitter. 7. Figure 2-14 shows how to connect the different devices together. Analog input Analog output In1 Out1 Ch1 Ch2 24 V Figure 2-14. Connecting the equipment to the recorder. 8. Before proceeding further, complete the following checklist to make sure you have set up the system properly. The points on this checklist are crucial elements to the proper completion of this exercise. This checklist is not exhaustive, so be sure to follow the instructions in the Familiarization with the Training System manual as well. f All unused ports of the two tanks are closed with a cap. The hand valves are in the positions shown in the P&ID. The control valve is fully open. The pneumatic connections are correct. The controller is properly connected to the differential-pressure transmitter and to the control valve. The paperless recorder is connected correctly to plot the appropriate signals on channel 1 and channel 2. 9. Ask your instructor to check and approve your setup. Festo Didactic 86007-00 73

10. Power up the electrical unit, this starts all electrical devices as well as the pneumatic unit. Activate the control valve of the pneumatic unit to power the devices requiring compressed air. 11. With the controller in manual mode, set the output of the controller to 0%. The control valve should be fully open. If it is not, revise the electrical and pneumatic connections and be sure the calibration of the I/P converter is appropriate. 12. Test your system for leaks. Use the drive to make the pump run at low speed to produce a small flow rate. Gradually increase the flow rate, up to 50% of the maximum flow rate that the pumping unit can deliver (i.e., set the drive speed to 30 Hz). Repair any leaks and stop the pump. Adjusting the differential-pressure transmitter 13. Connect the impulse line leading to the high-pressure port of the differentialpressure transmitter to the pressure port at the base of the column. Leave the low-pressure port open to atmospheric pressure. Bleed the impulse lines and configure the transmitter for level measurement. Adjust the zero of the differential-pressure transmitter. Set the transmitter parameters so that a 4 ma signal is sent for a level of 5 cm (2 inches) and a 20 ma signal for a level of 50 cm (20 inches). Adjusting and characterizing the system The adjustment of the different parameters is delicate and requires some trial and error over a few minutes. The following steps will guide you through the process of adjusting the resistance at the output of the small-diameter column. 14. With the controller in manual mode (or with a calibrator), send a signal of about 40% (about 10 ma) to the control valve. The control valve should be partly closed. Start the drive at a speed of 25 Hz. Valve HV4 should be fully open and valve HV5 should be fully closed. The flow, as measured by the rotameter, should be close to 12 L/min (3.2 gal/min). Adjust the opening of the control valve to match this value. Write down the control signal used to obtain the required flow rate: Control signal: % (or ma) 15. The resistance,, must now be adjusted in order to obtain an appropriate level in the small-diameter column when the system reaches equilibrium. Turn valve HV4 about halfway through its full course to increase the resistance and let the level of water increase in both columns. 74 Festo Didactic 86007-00

16. Adjust valve HV4 to obtain, at equilibrium, a level of about 43 cm (17 inches) in the small-diameter column. Aim for the specified level within a ± 3 cm (± 1 inch) range. This step takes time, but is crucial to the proper completion of the exercise. Once valve HV4 is properly adjusted, do not modify its opening for the remainder of the exercise. Record the measured levels below: Level measured in the small column: Level measured in the large column: 17. The system is to be characterized in this step. Configure the trend recorder correctly to record the step change in the controller output. Perform a step change by increasing the output of the controller by 5.0% (or increasing the output current of the calibrator by 0.8 ma). Wait until the level in the small column stabilizes (about 10 minutes), transfer the data to a computer, and note the following information: Flow rate: Control output: % or ma Level in the small-diameter column: Level in the large-diameter column: 18. Assuming you can approximate the resultant process as a first-order process, analyze your results and write down the process parameters obtained: Use these parameters to calculate : 19. From the process characteristics you just obtained, you can now calculate the PID coefficients prescribed by the open-loop Ziegler-Nichols method. Write your results in Table 2-4. Table 2-4. Calculated control parameters for the Ziegler-Nichols method. Mode Proportional Gain Integral Time Derivative Time PI PID a Be on the lookout with units. Your controller might use units different from those you used in Table 2-4. Festo Didactic 86007-00 75

Ex. 2-2 Second-Order Interacting Processes Conclusion Controlling the process 20. Set the controller to operate in PID mode with the parameters you just calculated. Optimize your parameters if possible. 21. Create a 40-60% step change in set point and observe the evolution of the system. Record and transfer the data to a computer. Plot a graph of your results. 22. Stop the system, turn off the power, and store the equipment. CONCLUSION This experiment allowed you to work with a second-order system where two tanks were interacting. Approximating the system to a first-order process made it possible to obtain process characteristics, which were used to calculate PID parameters with the Ziegler-Nichols method. Finally, control was exerted upon the process. REVIEW QUESTIONS 1. What is the difference between a second-order non-interacting process and a second-order interacting process? 2. Is the mathematical representation of a second-order non-interacting process simpler if two identical tanks are used? Why? 76 Festo Didactic 86007-00