Gianluca Gemme LN2 DISTRIBUTION PLANT

Similar documents
Liquid Gas Cylinder (LGC)

Cryostream 800 Series

Cryogenic Equipment. Accessories. Directors. Director Series Storage Vessels Specifications

ON-SITE OXYGEN GENERATION WHY PSA SYSTEMS ARE A GOOD CHOICE

Storage and transfer of cryofluids

DEMACO DESIGN DOCUMENT. INVESTIGATION CRYOSTAT for the VIRGO EXPERIMENT

LAr Filling and Commissioning of Cryogenics

Vacuum Systems and Cryogenics for Integrated Circuit Fabrication Technology 01

Self-operated Pressure Regulators for special applications

Installation restrictions for length of sections should also be noted.

Combined Pressure / Vacuum Relief Valve KITO VD/o

- Cost for regular gas filling. - Additinal costs, i.e. tank rent, delivery. - Cost for regular liquid nitrogen filling

Cool - Headed Solutions

Status on the DFBXF commissioning

KGW-ISOTHERM. Information and Operating Instructions for Dewar Vessels Type 26 to 29 B or B-E

ALU-CD 12, ALU-CD 25, ALU-CD 35, ALU-CD

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd.

Type 131. Roller base. Information and Operating Instructions for Dewar Vessels Type 131 up to 135 boxed shaped KGW-ISOTHERM

REFERENCES...

Earlier Lecture. In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System.

Vacuum Jacketed Piping Solutions

Hand-operated regulating valves in stainless steel Types REG-SA SS and REG-SB SS

PTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump

Microscopy Cryogenic WORKSTATION. Performance by Design

Operating Manual ALU 7 - ALU 10 - ALU 20 - ALU 26 ALU 35 - ALU 60 - ALU 100

APPS-160 Gen 2 User Manual

TECHNICAL BULLETIN CRYOGENIC APPLICATION SERVICES. website:

First Experimental Data of the Cryogenic Safety Test Facility PICARD

Chapter 8: Cryo-sorption pumps

Series Environmental Chambers

Cryogenics The Basics. Lesson 2 D. Kashy

Hand operated regulating valves Types REG-SA and REG-SB

Cryolinks for Advanced Virgo. Tender information

from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010

Regulating valves REG-SA and REG-SB

Chapter 4, Problem 30.

Spallation target cryogenic cooling design challenges at the European Spallation Source

Materials : Dichromate zinc plated steel flanges or AISI 316

v. Size shall be specified on drawings.

TURBO OXYGEN NITROGEN PLANT

Specifications of Cryogenic vacuum jacketed valves

GUKO FDA. einfach. gut. beraten.

Research activities on cryogenic safety

Overflow valves Type OFV REFRIGERATION AND AIR CONDITIONING. Technical leaflet

RC102 & RC110 Sample in Vacuum Continuous Flow Cryogenic Workstation Cryostats

excellence of Italian engineering Field adjustable PRESSURE RELIEF VALVES

The Principles of Vacuum Technology

Regulating valves Type REG 6-65 Type REG-SS REFRIGERATION AND AIR CONDITIONING. Technical leaflet

Superior Result from Analytical Instruments The constant purity of the nitrogen improves system stability and ensures reproducible results

Rev. 1. Cryogenics Thermoflasks. 2122, 2123, 2124, 2129, and 2130

Magnet and RF Cavity Test Stand Design. Tom Peterson, SLAC USPAS January, 2017

VACCUPERM Vacuum chlorine gas dosing systems

NGN Series nitrogen generator

Dynamic Simulation for T-9 Storage Tank (Holding Case)

Materials : Dichromate zinc plated steel flanges

IMPROVED XENON LOADING EQUIPMENT WITH LOADING CAPACITY UP TO 1200 KG FOR ALPHABUS

Automatic LN2 Fill Station Instructions

Development of High Efficiency 4K Two-Stage Pulse Tube Cryocooler

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming,

The Cyclone Tire Deflation & Inflation Tool

AN EXPERIMENTAL INVESTIGATION ON HELIUM LIQUEFACTION USING TWO-STAGE GIFFORD McMAHON CRYOCOOLER

23.1 Functions, Basic Configuration, and Interfaces

University of Cincinnati

CONSIDERATION OF DENSITY VARIATIONS IN THE DESIGN OF A VENTILATION SYSTEM FOR ROAD TUNNELS

Overflow valves Type OFV Type OFV-SS REFRIGERATION AND AIR CONDITIONING. Technical leaflet

THERMODYNAMICS, HEAT AND MASS TRANSFER TUTORIAL NO: 1 (SPECIFIC VOLUME, PRESSURE AND TEMPERATURE)

Liquid Nitrogen for Duct Cleaning

Loss of Vacuum Experiments on a Superfluid Helium Vessel

EXERCISE 2: THE VACUUM SYSTEM

ON-SITE INDUSTRIAL GASES. Nitrogen & Oxygen Generators

GUMMIKOMPENSATOR GKF8000 / GKF8130

Pressure regulating valves Types OFV, OFV-SS

INSTRUMENT INSTRUMENT YL INSTRUMENT

Materials : Galvanized steel flanges

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

Cycle Isolation Monitoring

EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC MAGNETS

Vacuum Insulated vertical cryogenic CO 2 & N 2 O Tanks

Medical Oxygen Concentrator Systems. Generate gases on site generate savings

Blanketing Valve ZM-R. low pressure reducing valve

TECHNICAL SPECIFICATION. SPC-4 Stirling Process Cryogenerator

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

T 2523 EN Type 2406 Excess Pressure Valve Self-operated Pressure Regulators ANSI version

Unique solutions for Oxygen and Nitrogen supply

Hovacal DATASHEET JUNHO 2013

AC : ACCURATE CRYOCHAMBER FOR A SMALL LABORATORY WITH SMALL BUDGET

An Experimental Performance Study of Vortex Tube Refrigeration System

OIL AND GAS INDUSTRY

Gas Vapor Injection on Refrigerant Cycle Using Piston Technology

Determination of the Vacuum System for R2R by using a New Pumping Simulation Program

RESIDENTIAL WATER DISTRIBUTION

ATEX VACUUM PUMPS AND GAUGES CHEMICALLY RESISTANT, OIL-FREE AND SAFE

CRYOGENIC PRESSURE REGULATOR

University of Cincinnati

THERMAL PERFORMANCE COMPARISON OF GLASS MICROSPHERE AND PERLITE INSULATION SYSTEMS FOR LIQUID HYDROGEN STORAGE TANKS

LUGB Vortex Flowmeter

Wastewater combination air valve in stainless steel AISI 316 Mod. SCS

Matching Vacuum Pump to Process

Customer Responsibilities

Transcription:

Gianluca Gemme LN2 DISTRIBUTION PLANT

Design parameters Cryogen Liquid Nitrogen Volume 200 l (one trap) Heat load 300 W (one trap) Trap cold mass 500 Kg Number of traps 4 Liquid nitrogen input 7.10 l/h (one trap) Evaporated GN2 4.5 Nm 3 /h (in standard operation) LN2 for cool-down 650 l Working hours (between refilling) 840 h (35 days) Operating life 10 yrs Liquid nitrogen cost 0.094 /l 2

Plant general features Liquid nitrogen tanks Liquid nitrogen transfer lines Automatic valve for the regulation of the liquid flow into the trap System for the regeneration and baking of the traps (hot GN2) GN2 exhaust lines (LN2 evaporation, cool-down, regeneration and baking) 3

Tank position central building One 20.000 l tank (> 1 month between refilling) Advantages: Cheaper than two 10.000 l tanks Less occupation of space around the central building Lower loss rate than two smaller tanks Disadvantages: Longer transfer lines (50m vs 25m) 4

Tank position - end buildings One 10.000 l tank (> 1 month between refilling) Transfer lines approx 22m lenght Schematic layout of the delimited area around the tank Tank height: 9.75m 20.000 l 5.75m 10.000 l

Liquid nitrogen tanks Super insulated vacuum tank LN2 loss ~0.04-0.05 %/day (5-8 l/d) Cost 46,000 (10,000 l) 75,000 (20,000 l) Standard vacuum tank LN2 loss ~0.3 %/day (30-50 l/d) Cost 32,000 (10,000 l) 46,000 (20,000 l) Rented tanks Standard vacuum tanks High cost over 10 yrs (approx 10,500/month) Maintenance included 6

Tank self-consumption 70000 65000 Standard tank 60000 55000 Total Cost [ ] 50000 Super insulated tank 45000 40000 35000 30000 0 5 10 15 20 25 30 35 Lifetime [yrs]

Tank layout and instrumentation

Refilling of the tanks One refilling per week during maintenance The time needed will be 45 for the 20,000 l tank 30 for the 10,000 l tank 9

Liquid nitrogen transfer lines Super insulated lines under vacuum Stratified flow (gas-liquid separation) Low losses Low pressure drop Inner conduit Φ 21.3x1.65 mm ASTM A312 Tp 304 Outer conduit Φ 60.3x1.5 mm AISI 304 Design pressure 16 bar Working temperature -196 C Linear heat loss 0.4 W/m Linear weight 3.7 Kg/m 10

Liquid nitrogen transfer lines central building 11

Central building 12

Liquid nitrogen transfer lines end building 13

End building 14

Cryogenic valve 15

LN2 flash The trap works at atmospheric pressure At the level of the regulating valve, on the tank side, we have in the worst case (central building) 1.3 bar g This causes a sudden expansion across the valve with the formation of 0.12 g/s of GN2 (0.08 m 3 /h) This is much less than the gas produced into the trap (4.5 m 3 /h) No problem from the point of view of the operation of the system Vibrations? A phase separator can anyway be installed 16

Regeneration (rare event) Temperature 50 C Duration 4 days Transient 6 hours Gas load 415 Nm 3 /h (transient) 50 Nm 3 /h (regime) LN2 consumption 3,800 l + 1,870 l/d Baking (very rare event) Temperature 160 C Duration 4 days Transient 22 hours Gas load 170 Nm 3 /h (transient) 50 Nm 3 /h (regime) LN2 consumption 5,800 l + 1,870 l/d Regeneration and baking 17

Regeneration and baking 18

Gas exhaust lines Max load 500 Nm 3 /h cool-down 415 Nm 3 /h regeneration and baking Design pressure 0.5 bar g Design temperature -196 - +150 C Nominal diameter DN80 19

Overall LN2 consumption Central building North building West building Transfer line lenght (m) 106 22 22 Line loss (l/d) 38.39 7.97 7.97 Tank size (l) 20.000 10.000 10.000 Tank loss (l/d) 56 32 32 Trap consumption (l/d) 340.8 170.4 170.4 Refilling interval (days) 35 35 35 Total consumption (l) 15.232 7.363 7.363 Cool down (l) 1.680 840 840 Total incl cool down (l) 18.592 9.043 9.043 20

LN2 plant/trap interfaces One DN15 liquid nitrogen input line One DN80 vent line One DN80 hot gas input line Liquid nitrogen level (input to cryogenic valve) 21

COSTS

Overall cost Operating life 10 yrs Liquid nitrogen cost 0.094 /l Rent Buy Super-insulated lines k 163 k 163 LN2 consumption k 384 k 384 Vaporizers k 93 k 93 Maintenance k 0 k 104 Tanks k 1.260 k 111 TOTAL k 1.900 k 855 Initial investment k 256 (13%) k 367 (43%) Running cost k 1.644 (87%) k 488 (57%) 23

Cost splitting

Initial investment vs. Running costs Renting option Buying option

Conclusions Three LN2 tanks, one for the central building and one for each of the end towers Standard vacuum tanks Buying the tank looks more convenient than renting them Super-insulated transfer lines Regeneration and baking system with two atmospheric vaporizers and one heater for each trap 26

Acknowledgements EGO Vacuum group EGO Site&Infrastructure Department CRIOTEC Impianti 27