The following notes describe comments received that were written/drawn on maps by workshop participants.

Similar documents
Public Event 1 Community Workshops

Appendix B Workshop Materials

Public Event 1 Community Workshops

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Submission to Metrolinx on Eglinton LRT - East End. Response to December 2012 Public Meeting

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Appendix A-K Public Information Centre 2 Materials

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Richmond-Adelaide Cycle Tracks

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Governance and Priorities Committee Report For the July 2, 2015 Meeting

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Terwillegar Drive Expressway Draft Concept Plan

TORONTO TRANSIT COMMISSION REPORT NO.

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

3.5 Preferred Design Description of LRT/Road Layout, Stops and Stations

10.0 CURB EXTENSIONS GUIDELINE

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Complete Streets. Designing Streets for Everyone. Sarnia

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

West Village Mobility & Integration

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Plant City Walk-Bike Plan

Gardiner East. Gardiner Expressway & Lake Shore Boulevard Reconfiguration Environmental Assessment & Urban Design Study

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

SUDA. A Transit End to the Gardiner Expressway. February 15, 2013 For Immediate Release

122 Avenue: 107 Street to Fort Road

TRANSPORTATION NEEDS ASSESSMENT

Hurontario-Main Light Rail Transit (LRT) Project

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Tunnel Reconstruction South 5 th Street Association October 16, 2018

2.0 LANE WIDTHS GUIDELINE

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Dowling/Beaty Cycling Route

WELCOME. The following materials and resources are available to you:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

to the Public Information Centre for the Downtown Traffic Study

Chapter 3 BUS IMPROVEMENT CONCEPTS

Gardiner Expressway Improvements Kipling Avenue to Park Lawn Road Class Environmental Assessment Study

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Washington DC Section of ITE Project Briefing

Duwamish Way-finding and CTR Report

City of Davis East Covell Corridor Plan

Markham Sports, Entertainment and Cultural Centre Transportation Overview

DON MILLS-EGLINTON Mobility Hub Profile

North Coast Corridor:

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Sacramento Grid 2.0. The Downtown Transportation Study

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Transportation Master Plan Advisory Task Force

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

Transportation Assessment

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Richmond, Adelaide and Simcoe Street Pilot Cycle Tracks. Special Report: Opinions of Property Representatives & Drivers

DUNDAS WEST-BLOOR Mobility Hub Profile

Building a Toronto that Moves

Draft North Industrial Area-Wide Traffic Plan

Why do we need a Gondola?

NEWMARKET CENTRE Mobility Hub Profile

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Welcome to the McKenzie Interchange Project Open House!

Transportation Impacts: Toronto York Spadina Subway Extension

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

Chapter 5 Future Transportation

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Toronto Complete Streets Guidelines

Monroe Street Reconstruction

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Access Routes from US 101 to the Richmond San Rafael Bridge

REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS

Hamilton Transportation Master Plan. Public Information Centre Three Summary

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Key objectives of the survey were to gain a better understanding of:

COMMUNITY CONSULTATION: 11/21/17 Summary of Community Feedback. Community Consultation Summary. Event Overview

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Comments The Plan for Port Whitby

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Project Launch Community Meeting 1 Summary

Memorandum To: Jen Malzer Date: March 29, 2011 Project: TC1004 From: David Hopper Revision: 0

MEETING NOTES. 26 Street Station Committee. October 22, Westgate Community Hall

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Public Meeting #1 Comment Summary

Transcription:

Stakeholder Workshop Additional Feedback Received Maps and Comment Forms October 5, 2016 The following notes describe comments received that were written/drawn on maps by workshop participants. MAP 1 MAP 2 MAP 3-66 Prince Edward join current split routes in one larger loop double service frequency - [Add] collector lane off ramp to existing Lake Shore Blvd W. exit - Westbound Lakeshore off-ramp extension to Park Lawn - Need to pave underpass for bus traffic [under Gardiner]. Additional benefit of better connection when 501 Long Branch is running buses instead - [create] transit hub [at Park Lawn and Lake Shore on Christie's site]. Underground loop to preserve development air rights and reduce acquisition costs, all weather enclosed transfers, north side side-by-side alignment facilitates better turning movements for vehicles - Lay-by parking??? None for truck deliveries - Legion Road extension??$$ for whom - Humber River Bridge remain same? Or traffic accommodated??$$ - [at Lake Shore Blvd W and Park Lawn] LRT to Lakeview, Hamilton, Burlington o Go, TTC, Cyclist, Pedestrian POD o Don't take Parkland to turn streetcars - Enhance streetcar underpass to better accommodate pedestrians and buses [at Humber Loop] - Underpass opportunity [at Brookers Lane] as alternative to Legion Road - Bike lanes required [on Queensway] - Separated LRT to Mississauga - Bike lane along the Queensway, better use of Blvd, Queensway direct EW route through Etobicoke - North new off ramp [from Gardiner] to Park Lawn - New ramp merge [west of Park Lawn] to Gardiner - Transit Hub [at existing Humber Loop] 1

o Pedestrian access [across Gardiner] from Park Lawn to new Go transit platform north of Gardiner o Future Queensway LRT o New west Waterfront LRT o Pedestrian access tunnel [under Gardiner connects south to Lake Shore Blvd, east of Brookers Lane] [from Marine Parade Drive north to Transit Hub] [from Palace Pier north to Transit Hub] o King and Queen streetcar [along Queensway] o New tunnel for car, bike, pedestrian access to Humber Loop and Sobeys, Transit Node - Continuous east-west bike lane along Lake Shore o serves fast and commuter cyclists o bike lane across Humber (along Lake Shore) o will connect with Martin Goodman Trail o more direct routes = good commuter cyclists Comment Forms The following comments were received by workshop participants via comment form. Hot buttons for the Community o loss of green space o business interruption o building businesses that may have to be torn down if Lakeshore LRT is proposed solution vs. Queensway, people don't agree o decision must reflect service to the most people o how long will it take before the community sees improvement Don't take the parkland to build the streetcar loop. Park Lawn to Humber Loop is very dangerous for cyclists on the Queensway. We need to improve options to help and encourage people to get out of their cars. Is legion Road still the best option now that the former Christie site is available? TTC streetcar underpass should be enhanced to accommodate pedestrians and buses. A further reason for not relocating the Humber Loop to the southwest corner of Park Lawn and Lake Shore: not only would it sacrifice a valuable chunk of parkland. It would result in streetcars turning left from travelling west on Lake Shore to heading south into the loop (off Marine Parade Drive). Slow moving streetcars making these left turns would aggravate the congestion and delays at the Park Lawn Lake Shore intersection. One thing that seems to be working well is the new turning lanes at the Lake Shore Park Lawn intersection. One new problem: vehicles exiting the new mixed-use development at 2200 Lake Shore Blvd and turning left to travel east on LakeShore. Accidents have resulted. Such turn lanes should be prohibited. Cars could exit instead onto Park Lawn, travel south to Lake Shore then turn left to continue eastward. See SmartCommute/Metrolinx -Humber College Survey. BIA is concerned about the TTC Waterfront Transit Reset and the impact of a dedicated LRT on our main street. The BIA supports enhanced streetcar and transit service but NOT a dedicated LRT. In full support of a new GO stop in the Humber Bay area. 2

Date of Workshop Wednesday October 5, 2016 Time 6:30 pm 8:30 pm Project Name Location Regarding Park Lawn Lake Shore Transportation Master Plan Humber College, Lake Shore Campus, 3199 Lake Shore Blvd W. Room E204 Stakeholder Workshop Comment Record Has there been consideration given as to how we arrived at this study? We do not share the view that nothing can be done with the Gardiner Expressway, but we can all agree that it is a major problem in the study area. Land development is the biggest culprit in the area. I would recommend a study that assesses how much the Gardiner Expressway is affecting the area/how much is development. A detailed analysis would be beneficial. Put a pause on development and review conditions. Is public transit being considered as part of this study? How is this study going to relate to the Waterfront Transit Study? We have counted the number of cars coming off of the Gardiner Expressway background traffic dropped from 40%-20%. Let traffic stay off the Gardiner Expressway and flow downtown. It is understood that the Christie Site has been sold. What are assumptions are you making for this site? What do Employment uses for the Christie site mean? Retail? I m not convinced that it is going to be limited to employment. When the Christie site was first sold, it was noted to be large enough for twenty-seven (27) towers. [Councillor] Grimes will say all the developments were approved; however some went to the OMB. Is this just another process (community consultation)? Do we need to plan around numbers? In the numbers calculation, does it consider different land use scenarios? I assume the Christie site will become a retail area. People don t consider the amount of traffic that will be attracted to the area in this case. The Humber Bay Shores Condo Association has done some research on this regard, the findings of which have indicated that it will attract approximately 4,000-5,000 vehicles per day. In relation to accommodation of future development, some condos have received an exemption from parking based on their proximity to transit. The Christie site is situated on a large parcel of land but there is no indication to sell it. If there was a Master Plan for this area how much would be considered for use by transit and/or vehicle users. I suggest a new integrated GO station at the existing Humber Loop and put on new streetcar line on The Queensway. Users would be within walking distance to the Employment and Residential land uses. The Humber Loop could be relocated in parkland, or on Christie site, but again it is far away from the Queensway. It would be beneficial to build an integrated node. A new pedestrian access would connect to the residential area. I suggest making Park Lawn local traffic only. And having a connection to the Lake Shore off-ramp [east of Park Lawn Road] from the Gardiner Expressway collector lanes to reduce traffic being directed from the Park Lawn Road off ramp from the Gardiner to Lake Shore Boulevard. Carry a Lake Shore exit on the collector lane then all of the traffic. Westbound traffic [going from Gardiner Expressway] to Lake Shore, there is a lot of room to carry the off ramp adjacent to the rail and reduce the amount of traffic directed through the existing connection to Lake Shore Boulevard. The Prince Edward transit line goes south along Park Lawn. I would suggest the underpass for the streetcar at the Humber Loop be paved to support buses and thereby support both the bus and streetcar routes. There are several right-of-way restrictions in the study area given that there would be significant impacts to businesses. The Humber Loop is not always suitable for pedestrians (e.g., inclimate weather, accessibility constraints). It needs to be recognized that the Humber Bay development is significant to the west. Relocating the Humber Loop in this area would make it in proximity to a significant number of users. The 66 bus is re-routing in recognition of the existing congestion along the Lake Shore. Can we eliminate any possibility of choke points over the Humber River?

Comment Record Workshop Date: Wednesday, October 5, 2016 Page 2 Are you still considering the Legion Road extension (at a significant cost)? Who are you servicing following completion of Legion Road? Why is Legion Road the responsibility of taxpayers? It was previously a contribution by others only. The underpass connecting Legion Road north-south - this needs to be studied further. There are roughly 5,000-6,000 cars running along Manitoba Street alone daily. Widening Lake Shore Road over the Humber River is that being reviewed as part of this study? When I spoke to Transportation roughly 10 yrs ago it was noted that it was not possible. If you widen it they will come. Metrolinx indicates that they need 300 m for a platform does your idea consider this? This would be in the minimal range between stops, alternating stops. It is important to look at the Humber Loop and the GO Station. It is clear where the best site would be given the number of people that would walk to the station. You are not going to have a number of commuters parking vehicles there. Has there ever been a comparative cost completed between transportation alternatives? People don t know what to recommend because they do see the costs. We are talking a lot about vehicles and getting around this area is challenging. Pedestrian and cyclist infrastructure should be considered as part of this study. If the distance to the GO Station is too far for people to walk, the streetcar line is only 1-2 stops away. With an integrated fare the distance issue is addressed. We need to talk about that people are commuting to financial services jobs downtown from the west, as well as their needs. The vision is to have lake views, parks, residential, LRT, etc., from Mississauga to the downtown core as part of the Waterfront Reset. Complete Streets - different communities have a different view of what this means to them. 90% of commuters living outside of the City take their cars. The Waterfront Trail also runs through this area and that needs to be considered as part of this study. Why not open the option of cycling to the GO station by providing bike racks, etc.? Cycling on the Waterfront, there is a lot of congestion on the trail and cycling is no longer viable as it is not well separated like it is on the other side of the Humber River. With regards to truck traffic/goods movement, I feel that more dedicated access from the food terminal to the Gardiner Expressway is required. A lot of the traffic might be early morning. An overpass or underpass might eliminate another light on Park Lawn Road. When these developments are planned, consultation meetings are more like a presentation and we often talk about accommodating trucks. The study area does not have many layby areas, but The Queensway has at least 50. When we look at traffic we never seem to look at moving trucks and how they obstruct the road. There is nowhere for them to park. Trucks stop in the middle of the road in this area. One of the issues is finding parking at Mimico GO station. Have micro transit options been looked at yet? If they [general public] can t find parking they stay in their cars and head downtown. Humber Bay Shores suggested that the express bus be used as a shuttle. This could serve the whole community in getting to the GO station and back. Cyclists often ask for a safe place to ride and a door-to-door solution. If it doesn t work they will turn to the car or public transit. Commuter cyclists cannot get across the Humber River. There are people who want to cycle in the community and they want to get to the Humber Loop, and others that want to get through the area (via Lake Shore). Something that crosses the river and is more accessible to cyclists would be ideal. We suggested to the TTC that the 76 route down Royal York be brought into Lake Shore and eventually Mimico. We drove it in rush hour, tested it but it was refused. This would get people out of their cars. Light signalization/synchronization, what would be the cost and benefit of this? Eastbound on Brookers Lane there is a left lane that is access to the Gardiner on-ramp. People coming from Park Lawn are going in that left lane, continuing across and then there is bottlenecking at that point. How do you achieve the proposed quiet roads? Have they looked at the projected use of the Mimico GO station? It s going to be very busy. There isn t going to be another station built for a very long time and a lot of development in the area. There was an early relocation of the Humber Loop on the south side of Lake Shore Boulevard, but nobody wants to sacrifice parkland. It also would congest the area. It would increase the streetcar flow from 8 min to 4 min. TTC has track in storage for this area. Park Lawn Lake Shore Stakeholder Workshop Comment Record_Oct 5'16_Final (2)

Comment Record Workshop Date: Wednesday, October 5, 2016 Page 3 Metrolinx might feel that if there was a Park Lawn GO station there would be less use of Mimico GO station, but users would not desire losing this station as well. Relocation of Mimico GO station I can t see it given the development in the area, it would not make sense. Are you using existing transportation data for the modelling? Are you collecting new data? The Humber Bay Shores study did not consider cyclists or associated infrastructure. Would you be referencing the data you are using in your modelling? Park Lawn Lake Shore Stakeholder Workshop Comment Record_Oct 5'16_Final (2)