Roadsoft Culvert Module

Similar documents
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

PASER Road Survey. For Berrien County, Michigan

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals

PASER Road Survey. For Berrien County, Michigan

Secondary Road Program

GDOT GDOT PowerPoint. Title Page

UNDERWATER INSPECTION REPORT DOUBLE CORRUGATED METAL PIPE CULVERT HAWTHORN ROAD OVER RICE CREEK (PELKEY LAKE) MORRISON COUNTY

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

Welcome! Sherbrooke Neighbourhood Renewal Open House. Sherbrooke Open House February 3, Capital Construction

Michigan Technological University ASCE Student Chapter, Attn: Sarah Reed Dillman Hall Mailbox # Townsend Drive Houghton, MI 49931

WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

TIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018

Smoothing Out the Bumpy Road Ahead

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser

Bristol Township Zoning Commission

REDUCING ACCIDENTS MEANS SAVING LIVES.

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

2016 GPCOG CULVERT PIPE - BID RESULTS

Pavement Management Program

Culvert Safety Inspection Report

Access requests to County streets and roadways are processed through one of the following methods:

CHAPTER 5 CULVERT DESIGN

Comparison of Turning Movement Count Data Collection Methods for a Signal Optimization Study. White Paper

Driving Indiana s Economic Growth

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Safe Routes to School Action Plan Aberdeen, Idaho

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Driveway Design Criteria

MN 5 Corridor Performance. Current Corridor Characteristics Highway: MN AADT: 2,400 73,000

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

Township of Springwater

Perched Box Caisson Overview. January 2014

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

CLEANING, INSPECTION, AND TESTING OF SEWERS

saving lives SWARCO The Better Way. Every Day.

PM2 Pavement SOP Overview. RPUG 2017 Denver, CO November 15, 2017

Click to edit Master title style

Safe Road Design Practiced by KEC

Kentucky s Surface Transportation System

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

CTH M HIGHWAY PROJECT CTH Q to STH 113

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Bridge Failures in Alberta

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

GHFRA CompMan imatchsheets User Guide for Referees

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

GREAT THINGS TO KNOW ABOUT YOUR. IRwin Methane Leak Detector

Perryville TOD and Greenway Plan

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY

CITY OF SOUTH DAYTONA

CHECKLIST 4: PRE-OPENING STAGE AUDIT

New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district

CHAPTER 9 PAVEMENT MARKERS

Swing Labs Training Guide

Toronto Public Library

Bermad Pressure Reducing. Model: 42T

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

Highway User Fee Funding Of Local Roads in Illinois. NOT Equitable. NOT Sustainable. October 20, 2015

The City of Port Moody 2013 Paved Road Network Condition Assessment

SECTION 5: PEER CITY REVIEW

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Work Zone Traffic Safety

Utah Department of Transportation Division of Asset Management taking care of what we have

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Shoulders. Chapter 4: chapter contents

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

STUDY PROCESS & SCHEDULE

Traffic Records Forum Noteworthy State Safety Roadway Data Programs

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Optimising Gravel Road Maintenance Strategies. Presenter: Gerrie van Zyl

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

The Toll Industry of the Future: Looking Ahead to Ed Regan Senior Vice President

Little Traverse Bay Watershed Road/Stream Crossing Inventory

Living Streets Policy

CALL-TO-ARTISTS. Issue Request for Qualifications. Artist Designed Bike Racks Downtown Investment District, Lancaster, PA

Road Safety Inspection. Matt Chamberlain RSA Road Safety Consultants Ltd

Access Management Standards

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

FALL PROTECTION. Supplement to Standard Training Module

Walking Routes to School Program

A Threatened Bay: Challenges to the Future of the Penobscot Bay Region and its Communities

I-90 Corridor Performance Corridor Result

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Transcription:

Roadsoft Culvert Module The Dirt on Culvert Data Collection Larry Brown Managing Director, Retired Allegan County Road Commission April 2018

Traffic Safety Concerns

Safety Concerns Footing

Safety Concerns Insects and Reptiles

Inventory Items Location Field Measurements

Inventory Items Historic Data Plans Annual Reports Other Sources

Location

Material CMP Visual Probe

Plastic Deformation Joints Material

Material Concrete Joints

Material

Blockage Hampers Getting Size Makes Getting Condition Rating Difficult Effects Overall Culvert Rating

Blockage

Blockage

1-10 is too Complex Too Many Options Used more of a Good, Fair, Poor Rating Condition

Data Collection Used a Laptop for Data Collection Set up Defaults in Roadsoft LDC to Suit Your Needs Backup Regularly Throughout Day Downloaded Data Every Day Created Filter for Every Day

Example Culvert Issues

Example Culvert Issues

Example Culvert Issues

Thank You Larry Brown lbrown@alleganroads.org

(906) 487-2102 roadsoft@mtu.edu www.roadsoft.org

2018 Culvert Pilot Project Overview Center for Technology & Training Dillman 309 1400 Townsend Drive Houghton, MI 49931-1295 (906) 487-2102 Roadsoft@mtu.edu www.roadsoft.org

Culvert Pilot Background The pilot was funded though House Bill 4320 (S- 3) - Supplemental Appropriation Adjustments, which added $2 million to TAMC s fiscal year 2018 budget from the state restricted Michigan Infrastructure Fund. Based on recommendations made in the 21 st Century Infrastructure Commission Report. TAMC Bridge Committee decided to use the funding for a local agency culvert project All work was to be completed by Sept. 30, 2018

Goal of the Pilot Estimate the total number of culverts in the state. Estimate the overall condition of culverts in the state using similar inspection components and rating. Determine the range of physical characteristics (inventory information) of culverts, such as material, size, and depth, that may impact the cost to maintain or replace the asset. Benchmark estimates of agency labor (time and materials) necessary to find and collect inventory data for culverts on a dollar per mile or other production rate basis. Benchmark estimates of agency labor (time and materials) necessary to find and collect condition data for culverts on a dollar per mile or other production rate basis.

Topics for Today Pilot Overview Importance Houghton County Flood Culvert Pilot Results Tablet Experiences Roadsoft Improvements Roadsoft Next Steps

Houghton County Flood June 17, 2019 7-10 of rain in 4.5 hours 100+ Houghton County roads affected $100+ million in damages to publically-owned infrastructure 10 roads are still impassable

Houghton County Flood

Houghton County Flood

Houghton County Flood

Houghton County Flood

Culvert Pilot Participating Agencies 49 Local Agencies Approximatel y 13 weeks to Collect Data

Culvert Pilot Data Collection

Culvert Pilot Participating Agencies 44 Agencies Used Roadsoft to Collect and Submit Data Non-Roadsoft Agencies Submitted Data to CTT for Conversion and Submittal to CSS

Culvert Pilot Data 49,644 Culverts inventoried 196,000 Local-Agency Owned Culverts

Culvert Data Collected

Pilot Findings Local agencies own between 7.3 to 9.2 million feet (1,389 to 1,756 miles) of culvert.

Pilot Findings Estimated total replacement value of locallyowned culverts in Michigan exceeds approximately $1.48 billion.

Pilot Findings Culvert material: 69% corrugated steel pipe, 21% concrete, and 5% plastic Culvert shape: 88.9% circular, 90% were 48 inches or less in span Depth of cover: 85% have 6 feet or less of cover Road surface: 66% asphalt pavement, 28% gravel Estimated cost of $10.5 - $11.5 million to collect data and evaluation all local agency culverts in the state

TABLET EXPERIENCES

Tablet Considerations Internal GPS Ruggedized & Weather Resistant Horsepower to Run Roadsoft LDC Built-in Camera Found Three That Met Criteria (may have been others): MobileDemand xtablet T1600 Trimble T10 Getac F110

Tablet Use in the Field

Tablet Use in the Field

Tablet Use in the Field

Tablet Gotchas GPS Setup GPS Driver Issues Windows Updates Don t Help Tablet Interface Similar But Different to Windows Desktop Screen Real Estate Issues

Tablet Gotchas

Tablet Gotchas

Tablet Gotchas

Tablet Gotchas

Roadsoft Improvements Updates to Culvert Module Updates to both LDC and Roadsoft to accommodate new data & provide upload functionality Updated LDC interface to accommodate touch screen

Roadsoft Next Steps Picture Attachments Data Quality Review Method for Reporting Collection Area Data Sharing

Questions?

(906) 487-2102 roadsoft@mtu.edu www.roadsoft.org