1 5. Bicycle & Pedestrian Element Executive Summary/Key Points Providing bicycle and pedestrian transportation options is one of the key elements in building a healthy, livable community. To encourage greater use of active transportation options, the MPO must create a complete network of well-connected bicycle, pedestrian, and greenway facilities. The MPO should pursue policies and ordinances that lead to the construction of complete streets that serve all roadway users safely and efficiently. Education programs are needed to ensure that all roadway users understand their rights and responsibilities in relation to others. The transportation network should be planned and designed to provide maximum safety and comfort to vulnerable roadway users to encourage greater use of active transportation options. Map and Table References Maps Winston-Salem Urban Area 2035 Network Map Bicycle Facilities Winston-Salem Urban Area 2025 Network Map Pedestrian Facilities Winston-Salem Urban Area 2035 Network Map Greenway Facilities Tables Table 5.1 Winston-Salem Urban Area Bicycle Network Facilities Table 5.1A Winston-Salem Urban Area 2035 On-Street Bicycle Facilities Project Lists Table 5.2 Winston-Salem Urban Area Pedestrian Network Facilities Table 5.2A Winston-Salem Urban Area 2035 Pedestrian Project Lists Table 5.3A Winston-Salem Urban Area 2035 Greenway Project Lists 5.1 Bicycle Transportation Citizen demand for improved bicycling conditions, combined with a renewed emphasis on urban development, has created an environment primed for encouraging bicycle travel. Bicycling is a way for citizens to stay healthy, while building a livable community by reducing traffic congestion and pollution. Clearly marked on-street bicycle facilities, bicycle paths, convenient bicycle parking, and showers at destinations are examples of enhancements that would provide an improved bicycling environment and make the Winston-Salem Urban Area a more bicycle friendly locale. With the adoption of the Winston-Salem Urban Area Comprehensive Bicycle Master Plan in September 2005 by the Transportation Advisory Committee (TAC), a series of goals, policies and standards were adopted to improve the safety, efficiency and convenience of the area s bicycle facilities. The Comprehensive Bicycle Master Plan is included in the Appendix. Please refer to Table 5.1A On-Road Bicycle Project List and Map Bicycle Network Map at the end of this Section for proposed projects. Vision Statement The Winston-Salem Urban Area provides a safe and effective system of bicycle facilities that links together existing resources and destinations, supports alternatives to automobile travel, increases recreation opportunities, and advances the community s mobility, health, and quality of life. Figure 1: Shared Lane Marking on Burke Street 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 1

2 Goal 1 Improve the quality and quantity of bicycle facilities in the Winston-Salem Urban Area by bolstering the bicycle infrastructure, including the installation of bicycle lanes, shared lanes, bicycle parking, bicycle detection for traffic signals, cycle tracks, and other innovative bicycle facilities. Seamlessly integrate a complete network of bicycle facilities into the overall transportation system. To encourage cycling as a viable transportation option, the MPO must provide the physical infrastructure that cyclists need to travel safely and conveniently. Bicycle parking, bicycle lanes, shared lane markings, cycle tracks, side paths, showers, and lockers should be provided to accommodate those who choose bicycling as their primary mode of transportation. Figure 2: Parking Meter Modified for Bicycle Parking The improvement of street conditions by MPO communities is one of the most effective ways to increase the number of cyclists on the roads. Roadway improvements may include the installation of traffic light sensors that recognize bicyclists, the inclusion of on-street bicycle facilities into all roadway projects, and the construction of wider travel lanes to better accommodate bicyclists. To facilitate the successful implementation of these goals, it is imperative that this Bicycle Plan be incorporated into all local governmental transportation and planning documents. Create public/private partnerships to leverage limited funding. With limited local funding available to implement bicycle and pedestrian projects, it is vital that communities develop partnerships with private entities to leverage available funds in order to construct infrastructure improvements. The City of Winston-Salem, for example, has partnered with the Piedmont Triad Research Park to create bicycle and pedestrian facilities throughout the PTRP, including a rail with trail project that will serve as the bicycle and pedestrian transportation spine between the north and south districts. Partnerships with health care agencies should be a priority for the Winston-Salem Urban Area. With several large health care providers in the area, the Winston- Salem Urban Area is uniquely situated to encourage greater reliance on active transportation to incorporate activity into daily routines and, ultimately, to improve the health of all citizens. Local community goals to increase bicycle and pedestrian transportation activity complement healthcare provider goals to increase the health of the community, so those relationships should be explored wherever possible. Figure 3: Future site of PTRP Rail with Trail Objective 3 Capitalize on concurrent roadway projects. To further stretch limited funding for bicycle and pedestrian projects, local communities should apply Complete Streets techniques to all roadway projects. Integrating bicycle and pedestrian projects into other roadway projects is the most efficient way to add those facilities to the transportation network, saving money Figure 4: Bicycle lanes installed as part of a resurfacing project on Northwest Boulevard 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 2

3 by combining projects and adding a significant amount of facilities that may affect travel behavior. NCDOT recently adopted a Complete Streets policy to guide its project development. The Winston- Salem Urban Area MPO has adopted its own Complete Streets policy that will encourage the inclusion of bicycle, pedestrian, and transit facilities in all roadway projects. Goal 2 Institute policies, practices, and programs related to bicycle transportation to encourage greater use of active transportation options throughout the MPO and to educate all roadway users of their rights and responsibilities. Implement programs to educate and to generate more interest and encourage residents in active transportation options. As operators of legal vehicles, cyclists should be recognized as legitimate users of the transportation network. One of the MPO s primary goals is to acclimate drivers and cyclists to the concept of sharing the road and recognizing that each group has its own set of rights and responsibilities. Educating motorists and cyclists is a vital objective in ensuring the safety and enjoyment of all modes of transportation. The MPO has developed an extensive set of educational materials and the focus should now be on distributing those materials through schools, driver education programs, public libraries, auto dealerships, TV13, and all other Figure 5: Kernersville Middle School students learn bicycle safety skills available outlets. Messages to the public about bicycling should also serve to encourage them to try an active transportation option. Educating and encouraging students is also a priority for Winston-Salem Urban Area, as is evident with the MPO s Safe Routes to School (SRTS) program. The MPO maintains a trailer and a fleet of bicycles that are used to teach bicycle safety courses to elementary and middle school students. The SRTS education program has proven to be very popular among students and teachers and should be expanded to include additional bicycles that can be used to train students through local YMCA branches, the City s recreation centers, and other outlets. Implement policies and ordinances to improve the physical infrastructure for cycling. Complete Streets policies that ensure that all roadway users are considered in all road improvement projects are becoming commonplace throughout the nation and in North Carolina. NCDOT recently adopted a Complete Streets policy to guide the development if its projects and the Winston-Salem Urban Area has followed suit to ensure that all projects being funded through the MPO consider all modes of transportation. In addition, local communities should consider updating their Unified Development Ordinances to include bicycle accommodations, such as bicycle parking, as a standard feature as new developments are reviewed and approved. Objective 3 Implement programs that encourage and educate the public about using cycling as a mode of transportation. The Winston-Salem Urban Area currently partners with the Forsyth County Health Department and others to host a series of programs aimed at encouraging greater use of active transportation on public roads and greenways. Cycling Sunday, Figure 6: Cyclists and pedestrians enjoy Greenway Walk & Talks, Sunday Fun Days on the Greenways, car-free streets during Cycling Sunday and the Winston-Salem Community Bike Ride are all programs designed to get people out using the biking and walking facilities in the MPO. The programs should be continued in their current states and expanded to other MPO communities to reach a wider audience Transportation Plan Update Bicycle & Pedestrian Element - Page 3

4 Goal 3 Provide a safe and secure environment that encourages citizens to use bicycles for transportation. Perform analyses on bicycle and pedestrian crashes throughout the Winston-Salem Urban Area. The City of Winston-Salem recently completed its first analysis of bicycle and pedestrian crash statistics for the years , during which time there were over 300 bicycle crashes and 700 pedestrian crashes. The analysis focused on identifying root causes of the crashes, including engineering problems and driver/cyclist behavior problems. While lack of safe cycling infrastructure is a problem, the analysis also revealed that most crashes could be avoided with changes to cyclists and driver behavior. This kind of analysis is crucial in identifying areas that need additional infrastructure and for identifying populations that could be served by better education as to the rights and responsibilities of all roadway users. Going forward, crash statistics should be updated on a regular basis and the database of crash information should be extended to include all MPO communities. Relationships should be established with all law enforcement agencies to ensure the regularly collection of crash data. Encourage greater public involvement to identify leading causes of bicycle safety problems and causes for lack of ridership. While bicycle crash analysis can help identify problem areas for cyclists, turning to citizens can prove to be a more effective way to address safety issues. Citizen involvement should be encouraged at the MPO s Bicycle & Greenway and Sidewalk & Pedestrian Subcommittee meetings. These meetings provide an opportunity for citizen advocates to meet with local staff to identify and discuss projects. Seeking public input at public events and locations is also valuable in identifying why people may choose not to ride a bicycle for transportation. Setting up at events where people are likely to gather increases public participation and may lead to new information about the barriers preventing people from cycling more often. As an example, in September 2005, the City of Winston-Salem produced a bicycle master plan for the MPO. The planning process took nine months to complete and included regular input from local advisory and technical committees related to transportation. Also, as part of the planning process, two public open houses were held and an area-wide survey was sent to residents. The Winston-Salem Urban Area Comprehensive Bicycle Master Plan is included in the Appendix of this report and can be viewed on the City of Winston-Salem website. Objective 3 Use the latest design standards to construct bicycle facilities that improve safety for cyclists. The latest edition of the AASHTO Guide for the Development of Bicycle Facilities was released in 2012 and the NACTO Urban Bikeway Design Guide was released in Both guides should be used when designing bicycle facilities in the Winston-Salem Urban Area, as they represent significant leaps in the detail and guidance provided compared to previous guides. They cover on-street bicycle facilities, as well as separated paths, with greater attention paid to the relative safety of each facility. These guides, along with the Manual on Uniform Traffic Control Devices (MUTCD), should serve as the foundation for the development of all bicycle facilities. Figure 7: AASHTO Bike Guide 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 4

5 Table 5.1 Winston-Salem Urban Area Bicycle Network Facilities Existing Facilities Recommended Bicycle Network Facility Type Mile 1 Facility Type Mile 1 Bicycle lanes and SLMs 8.4 Bicycle lanes and SLMs 65.0 Shared-use path/greenway 23.2 Shared-use path/greenway 16.2 Total 31.6 Total Additional centerline miles (facilities on both sides of the road are not counted separately). 5.2 Pedestrian Transportation Over the past 20 years, public interest in walking has steadily increased. Whether for transportation, exercise, or just to meet neighbors, citizens in the Winston-Salem Urban Area have taken to sidewalks, greenways, other pedestrian facilities. Just as important, with rising gas prices and concerns for our urban area s increasing traffic congestion and air quality problems, people are choosing to walk to work, to the grocery store, and to schools, and are demanding an improved system of sidewalks and pedestrian facilities. Most of the existing sidewalks are in the urban core of our city and town centers: Winston-Salem, Kernersville and Rural Hall. The Town of Lewisville and the Village of Clemmons began installing sidewalks in the mid 1990 s and Walkertown has recently started installing sidewalks as well. Since World War II, Forsyth County has experienced a dispersal of development and a division of land uses resulting in minimal pedestrian connectivity. Roads were designed and built to accommodate this sprawling type of development, mostly without sidewalks. As a result, citizens have moved farther away from the urban core, away from the existing infrastructure, jobs, services and shopping areas, which has made it more difficult to maintain a viable sidewalk network. Over time we have increased our dependence on the automobile and reduced transportation options for all citizens. Since the adoption in 1999 of the Winston-Salem/Forsyth County 2025 Multi-Modal Long-Range Transportation Plan, the goal has been to improve the pedestrian infrastructure throughout the county. All nine Forsyth County municipalities have adopted the county s comprehensive plan the Legacy Development Guide that supports more wide spread pedestrian accommodations. A well-planned pedestrian transportation system provides for a more balanced overall transportation system. Legacy provides a framework for detailed land use plans within the county, area planning and the development guide process. The LRTP Figure 1: Street trees provide a buffer for pedestrians Pedestrian Facilities Plan also recommends using the area plan process as the framework to build the pedestrian system along local streets. Since the area plan process is citizen driven, it offers the most appropriate avenue for the evaluation of existing and proposed pedestrian facilities. With the adoption by the Transportation Advisory Committee (TAC) of the Winston-Salem Urban Area Sidewalk and Pedestrian Facilities Plan in July 2007, (See Appendix 5.2), a series of goals, policies, and standards were adopted to improve the safety, efficiency and convenience of the area s pedestrian facilities. The Sidewalk and Pedestrian Facilities Plan, was developed with extensive public involvement and compiles the community s goals and objectives for creating a walkable community. Please refer to Table Pedestrian Project List and Map 5.2A 2035 Pedestrian Network Map at the end of this Section for a list of proposed sidewalk projects. Vision Statement The Winston-Salem Urban Area recognizes that every citizen is a pedestrian at some point and aims to provide a safe and effective system of pedestrian facilities that links together existing resources and 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 5

6 destinations, supports alternatives to automobile travel, increases recreation opportunities, and advances the community s mobility, health, and quality of life. Goal 1 Improve the quantity and quality of pedestrian facilities in the Winston-Salem Urban Area by bolstering the pedestrian infrastructure, including the installation of sidewalks, pedestrian signals, transit connections, and ensuring that pedestrian facility designs focus on the comfort and safety of pedestrians. Construct sidewalks where necessary. New sidewalk construction should be a top priority for MPO communities, particularly in creating connectivity between neighborhoods and important resources, such as schools, parks, greenways, recreational facilities, libraries, and bikeways. Currently, about 35% of streets in the MPO have sidewalks, so it is crucial that important sidewalk connections are identified and funded. A complete sidewalk network is the most fundamental element to encouraging more walking. While it may be years before there is a complete sidewalk network, current projects aimed at filling in missing gaps and connecting housing with important destinations can capture a majority of possible walking trips. Bridges without pedestrian accommodations present one of the greatest challenges to creating a complete pedestrian network. There are often no convenient alternative pedestrian routes, and bridges are only reconstructed every years. Therefore, it is crucial that when bridges are reconstructed they are designed with pedestrian accommodations included wherever there may be pedestrian activity over the life of the bridge, based on community development plans. Please refer to Tables 5.2 and 5.2A for a list of sidewalk projects, some of which include bridges that are recommended to have pedestrian facilities when rebuilt. Improve connectivity between pedestrian and transit facilities. Transit users are particularly dependent on the pedestrian facility network as they go to and from transit stops. Typically, transit users are willing to walk up to one-half mile to access a transit stop and that distance may even increase for those with few options. Therefore, a complete network of pedestrian facilities is vital to operating an effective transit system. While a thorough network of pedestrian facilities provides optimal accommodations for transit users, communities in the Winston-Salem MPO are not currently at that level. In the absence of a complete pedestrian network, there are steps that can be taken to accommodate transit users to the best extent possible. When selecting pedestrian projects, special attention should be given to projects that increase accessibility to transit stops. In addition, Figure 2: Improved sidewalk at Corpening Plaza Figure 3: Transit stop with pedestrian connectivity and amenities municipalities should work with transit providers to identify transit stops that are in need of pedestrian facility upgrades, including sidewalks, curb ramps, pedestrian signals, benches, shelters, and other pedestrian amenities Transportation Plan Update Bicycle & Pedestrian Element - Page 6

7 Objective 3 Install pedestrian facilities, in addition to sidewalks, that improve safety and create a pedestrianoriented environment, including pedestrian signals, crosswalk treatments, signage, refuge islands, and streetscape elements. Sidewalks are a vital first step in creating a walkable community, but sidewalks do not address safety issues at intersections or address pedestrian comfort in many cases. Intersections crossings are particularly challenging for pedestrians when there are no pedestrian signals. The presence of sidewalks may lead walkers to an intersection, but without pedestrian signals, they are left to fend for themselves. Large intersections with multiple lanes are especially difficult for walkers to cross without the assistance of pedestrian signals. Other facilities, such as high-visibility crosswalks, refuge islands, and signage can also aid pedestrians as they attempt to cross busy intersections. Streetscape Figure 4: Pedestrian signals, crosswalks, and improvements should be considered by MPO communities when refuge islands at a busy intersection designing pedestrian facilities as well. Lighting, benches, and trash receptacles all contribute to a safe and comfortable pedestrian experience. Goal 2 Institute policies, practices, and programs related to pedestrian transportation to encourage greater use of active transportation options throughout the MPO and to educate all roadway users of their rights and responsibilities. Elevate candidate sidewalk projects that provide the most benefit to the community in terms of pedestrian transportation. Because of limited funding, difficult decisions must be made by the MPO and individual communities on which sidewalk projects to fund. Considering the absence of sidewalks in many neighborhoods, almost all sidewalk construction will have a positive impact on pedestrian activity for transportation and recreation. However, residents in some locations are more dependent on the pedestrian infrastructure for their primary mode of transportation. Whether those people use the transit system or they simply do not own a automobile or bicycle, they rely on the pedestrian network for their daily commutes. Sidewalks in those areas take on added Figure 5: A path worn into the grass conveying the need for sidewalk significance to the community and should be prioritized over sidewalks that are likely to be used primarily for recreation. In locations where residents rely on walking for transportation, one is likely to find paths worn in the grass, indicating popular pedestrian transportation routes. Promote walkable communities and land development policies that prioritize pedestrian transportation. Even an excellent network of sidewalk and pedestrian accommodations will not benefit citizens unless that system connects to popular destinations within reasonable walking distances. While local development ordinances require sidewalk on at least one side of the street in most instances, new developments should provide sidewalk connections to the nearest continuous sidewalk segment, just as would be required for water, sewer, or street connectivity. In addition, development patterns designed around automobile travel, may not be suitable for regular pedestrian transportation. Autodependent development separates housing from work, school, and shopping, which creates 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 7

8 significant barriers to pedestrian transportation. The Legacy Plan, as adopted by the City-County Planning Board, provides guidance on creating compact, walkable communities and new developments and re-developments should adhere to these guidelines to create communities that are walkable and livable. Objective 3 Implement a program of customized marketing to educate citizens and encourage walking. Figure 6: Bicycle and pedestrian education materials Trips under one mile for walkers and under three miles for cyclists are relatively quick, but most residents drive even those short distances for many of their trips. Some people identify the lack of bicycle and pedestrian facilities as the cause of their transportation choice, while others cite limited time as the cause. Others, however, simply may not have considered walking or cycling to their destination. It is important to educate citizens about the transportation options they have, so that people can make informed decisions. Those who are accustomed to driving everywhere many not have considered the benefits of cycling or walking for transportation. To remedy this situation, many locations have experimented with custom marketing programs to engage and educate residents on their transportation choices. Those interested in trying to walk or bicycle for transportation can submit information about their transportation situation and MPO staff can advise them on safe and convenient walking, bicycling, or transit routes, in addition to other helpful advice on how to integrate those modes into their daily routines. Goal 3 Provide a safe and secure environment that encourages people to walk for transportation. Perform analyses on bicycle and pedestrian crashes throughout the Winston-Salem Urban Area. The City of Winston-Salem recently completed its first analysis of bicycle and pedestrian crash statistics for the years , during which time there were over 700 pedestrian crashes. The analysis focused on identifying root causes of the crashes, including engineering and driver or pedestrian behavior problems. While lack of safe walking infrastructure is a problem, the analysis revealed that most crashes could be avoided with changes to pedestrian and driver behavior. This kind of analysis is crucial in locating areas that need additional infrastructure and for identifying populations to serve by better education as to the rights and responsibilities of all roadway users. Going forward, crash statistics should be updated on a regular basis and the database of crash information should be extended to include all MPO communities. Relationships should be established with all law enforcement agencies to ensure the regularly collection of crash data. Develop a pedestrian network that makes walking the safest, most convenient, most enjoyable transportation option available. All agencies involved in building pedestrian facilities have made great strides in recent years, as emphasis has returned to walking as a legitimate transportation option. Sidewalk construction has increased, as has awareness for providing ADA accommodations, as well as other pedestrian amenities. All agencies are ready for the next step in improving the transportation network for walkers. In many cases, sidewalks have been built at the back of the curb and are about five feet wide. This type of sidewalk, particularly if it is located next to a Figure 2035 Transportation 7: Street trees help Plan create Update a walkable environment Bicycle & Pedestrian Element - Page 8

9 high-volume, high-speed road provides minimal pedestrian accommodation. While the sidewalk is present, it is not likely to be used unless absolutely necessary, because few people will choose to walk in that type of location. Pedestrian facilities should be built to encourage more walking and planners and engineers need to determine what those facilities should look like and how they should operate. Objective 3 Provide accessible accommodations throughout the transportation network. The pedestrian transportation network must accommodate all users if it is to be considered complete. Obstacles that may seem like minor inconveniences to most pedestrians may prevent someone in a wheelchair from reaching their destination. Communities should continue to make strides in improving the pedestrian transportation network by installing curb ramps, detectable warning mats, audible pedestrian signals, and adhering to the Public Right-of-Way Accessibility Guidelines (PROWAG) for all projects. In addition, the MPO should work with NCDOT to ensure that all state-maintained roads have appropriate signals and sidewalks that do not create barriers for pedestrian travel. Standardized, state-wide guidance on pedestrian facilities will help ensure that pedestrians are able to travel unimpeded regardless of where they are in the state. Figure 8: Fully accessible pedestrian signal with audible warning Table 5.2 Winston-Salem Urban Area Pedestrian Network Facilities Existing Sidewalk Facilities Miles Recommended Sidewalk Facilities Miles Transportation Plan Update Bicycle & Pedestrian Element - Page 9

10 5.3 Greenways The pedestrian and on-street bicycle facility recommendations outlined in this chapter will go a long way to providing a complete transportation network that encourages the use of active transportation options. However, residents regularly comment on the need for improved transportation options via separate paths. While bicycle lanes serve confident cyclists who are comfortable riding on the roads, many potential cyclists will not willingly ride on roads with automobiles. To encourage more cycling, potential cyclists should be trained for vehicular cycling using the existing network of streets. Even with that education, however, many residents still prefer to ride on separated paths. The MPO, therefore, needs to identify the transportation needs of residents and build a network of greenways that connects destinations, such as housing, schools, recreation areas, and employment centers. The recently completed Greenway Plan Update (See Appendix 5.3) goes a long way in identifying and ranking potential greenways to be constructed in the MPO over the next 15 to 20 years. The goal of the plan is to improve the quality of life for residents of Forsyth County by expanding coverage of the existing greenway system, providing recreational opportunities, protecting our natural environment and open space, and creating opportunities for walking and bicycling to a variety of destinations. The Winston-Salem MPO TAC, the City/County Planning Board, Forsyth County, and the City of Winston-Salem adopted the countywide Greenway Plan Update in 2012, which calls for expanding the existing 24-mile greenway system through a series of strategic projects to link all of the existing major greenway segments and expand them beyond their current limits. The plan places the potential greenway projects into different tiers based upon their potential to serve residents and their constructability. Tier 1 and 2 projects are the projects most likely to be constructed within 20 years, while lower tier projects may need further study. Please refer to Table 5 A Greenway Project List and Map Greenway Network Map at the end of this Section for a list of proposed greenway projects. Figure 8: Salem Lake Trail Vision Statement The Winston-Salem Urban Area provides a complete network of separated paths and greenways that links existing resources and destinations, supports alternatives to automobile travel, increases recreation opportunities, and encourages active transportation amongst a broader range of citizens. Goal 1 Improve the quality and quantity of greenways and multi-use paths in the Winston-Salem Urban Area. Create an interconnected network of greenways focusing planning and construction efforts on connecting all existing greenways via new greenways, on-street bicycle facilities, and sidewalks. The current greenway system in the Winston-Salem MPO consists of a series of paths that are, for the most part, isolated from one another and from important destinations. Early greenway construction focused on providing recreational opportunities for various neighborhoods, so it was natural to spread the construction efforts. However, as the greenway system has become more popular and more residents are looking for alternatives to motor vehicle transportation, there is a strong need to provide 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 10

11 connections between the existing greenway segments. Whether for recreation or transportation, a greenway network serves residents best when segments are connected, allowing for longer trips exclusively on greenways and separated paths. The focus of the recently adopted Greenway Plan Update was on determining the constructability of greenway segments that would connect existing greenways. As a result, several of the top tier projects identified were extensions of existing greenways, rather than new segments scattered throughout the urban area. Along with this effort to connect the existing greenway segments, the MPO should continue to explore options to connect the greenways to neighborhoods via separated paths to give residents an exclusive bicycle and pedestrian route to the greenways, which will allow greater use of the greenway network for transportation. In some instances, greenways may not be able to be connected directly because of terrain or property issues. In those cases, the MPO should focus sidewalk and on-street bicycle facility planning and construction on routes to connect the greenway segments. Bicycle lanes and sidewalks will provide adequate connectivity between greenways for many residents. Create a greenway network that provides viable transportation options to all citizens by creating a complete network and adding features, such as lighting, wayfinding, and restrooms. Creating a well-connected greenway network is the top priority for the MPO, but that network is just one of the requirements for creating a bicycle and pedestrian transportation system. There are a number of other features that must be incorporated into the greenway system to allow for increased use a transportation system, including lighting, wayfinding, and other amenities. Figure 11: Restroom facilities on a greenway in Charlotte Figure 9: Bridge over Salem Creek provides a greenway connection to the Gateway YWCA Figure 10: Wayfinding sign along a greenway in Raleigh Currently, the greenway system is closed between sunset and sunrise, just like all other unlit parks. Unlike the other parks, however, the greenway system can provide value at night to bicycle commuters, particularly in winter months, when either a morning or evening commute is likely to be done in the dark. Pedestrian-scale lighting should be considered for all new greenway construction, but also for existing greenways that have the potential to serve as transportation corridors. Wayfinding systems are also an important feature to consider as the greenway network transitions towards a transportation solution. Many regular greenway users may not be aware of how close they can get to various destinations by simply using the greenway network. Destination-based signs, therefore, can indicate distances and directions for various key destinations, including schools, shopping areas, and cultural destinations. Guests will also appreciate the wayfinding signs as they attempt to transition from one greenway to the next. Finally, as the greenway system expands, efforts should be made to incorporate amenities, such as restrooms, drinking fountains, benches, public art, and bicycle repair stands into the designs. Those types of amenities will encourage mores users and make their experiences on the greenway system more enjoyable Transportation Plan Update Bicycle & Pedestrian Element - Page 11

12 Objective 3 Develop a comprehensive active transportation plan that integrates bicycle, pedestrian, and greenway components. The Winston-Salem Urban Area has a bicycle plan, a pedestrian plan, and a greenway plan, and each of those plans makes mention of importance of creating a full network of integrate sidewalks, bicycle facilities, and greenways. However, the overlap between the plans ends there, as there is no comprehensive active transportation plan that focuses on the connections between all three facility types. It will be many years before the Winston-Salem Urban Area has a complete network of bicycle, pedestrian, and greenway facilities, but planning those facilities at the same time will ensure that as the MPO progresses with the construction that those facilities will complement each other to enhance connectivity. To that end, the next bicycle and pedestrian planning effort should be a comprehensive active transportation plan that incorporates all aspects of bicycle and pedestrian transportation, including on-street bicycle facilities, sidewalk and other pedestrian facilities, greenways, and transit. Goal 2 Institute policies, practices, and programs that encourage the creation of a network of separated bicycle and pedestrian transportation facilities. Work with NCDOT to create a policy to provide bicycle and pedestrian accommodations on, and greenway accommodations below, all bridge construction and replacement projects. Bridges present one of the greatest challenges to bicycle and pedestrian transportation, because it can be difficult and dangerous to cross a bridge if cyclists and pedestrians are not taken into account during the bridge design process. Narrow bridges with only enough room for motor vehicle travel lanes leave no room for sidewalks or bicycle lanes, so pedestrians and cyclists are forced into the travel lanes where clearances are often tight. Only those residents who absolutely have to walk or bike over a bridge of this nature are likely to do so, severely limiting the number of possible active transportation users. The MPO should work with NCDOT to identify bridges that serve, or will serve, as Figure 12: Brushy Fork Greenway and First Street Bridge important connectors for all roadway users. Bridges are replaced very infrequently and are expected to last a minimum of 50 years, so it is vital that the MPO and NCDOT consider future land uses and how an area is likely to change decades into the future. In addition to bicycle and pedestrian accommodations bridge decks themselves, the MPO and NCDOT should work together to identify bridges that cross future greenway corridors and build the bridge in such a way as to allow a separated crossing for greenway users. Building a separated greenway crossing under an established bridge has proven to be costly and difficult. Reserve, obtain, or acquire right-of-way easements for proposed bikeways, sidewalks, multi-use paths, and greenways if facilities are not required to be constructed as part of the development approval process. Obtaining easements for greenway construction once development has occurred in an area is extremely difficult; as residents are often hesitant to provide easements at a later time for fear that a greenway may change the nature of their land. In many cases, a single resident opposed to a greenway may be able to stop its construction. Therefore, it is important that right-of-way easements are obtained during the development process. Doing so ensures that the MPO will have the right-of Transportation Plan Update Bicycle & Pedestrian Element - Page 12

13 way necessary to construct planned greenway projects and it provides property owners with early notice that the easement may be used to construct a greenway in the future, helping to eliminate surprise and apprehension when new greenways are announced. Objective 3 Educate citizens about the value and benefits of greenways. Many residents are wary about new greenway construction through their neighborhoods, because of misconceptions they have about greenway users and the greenways themselves. Fears about crime and decreases in property values are common for many residents, though many studies have shown that greenways do no attract crime and have a positive effect on property values. Negative opinions of greenways often stem from a lack of knowledge about greenway design and users. In fact, many people who initially oppose greenways in their neighborhoods eventually come to enjoy using the greenways themselves. The MPO must reach out to residents with evidence of the benefits of living near greenways, including studies of crime and property values, as well as firsthand accounts from residents who live near greenways. Educating residents about greenways will make greenway planning and construction easier for all involved. Figure 13: Salem Creek Greenway Piedmont Triad Regional Trail Plan & Inventory (2011) The Piedmont Triad Regional Trail Plan & Inventory includes existing & locally proposed trails, and identification of new proposed regional trail connections throughout the 12-County Piedmont Triad. The Mountains to Sea, Deep River and Yadkin River Trails are three State designated trail facilities that cross through the Piedmont Triad. Though these trails are not fully built out, local, regional and State agencies and non-profits are working together to complete these trails systems. There are nearly 400 miles of hiking, biking, equestrian and multi-use trails open to the public in the region. Nearly 2,000 more miles of trail are identified in long range transportation and recreation plans. Locally driven efforts to support trail development are critical to successful implementation and build out of trail plans. Appendix References Documents Comprehensive Bicycle Master Plan Sidewalk and Pedestrian Facilities Plan Greenway Plan Update 2035 Transportation Plan Update Bicycle & Pedestrian Element - Page 13

BIKE PLAN CONTENTS GATEWAY

BIKE PLAN CONTENTS GATEWAY CONTENTS Acknowledgments...vii Great Rivers Greenway District Board of Directors... vii Great Rivers Greenway District Staff... vii Project Consultants... vii Committees... viii Citizens Advisory Committee

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Perryville TOD and Greenway Plan

Perryville TOD and Greenway Plan Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST. VISION, MISSION, AND GOALS AND OBJECTIVES Chapter 3 The Plan s vision, mission, and goals and objectives were developed through a series of interactive exercises with the Citizens Advisory Committee (CAC)

More information

CHAPTER 3: Vision Statement and Goals

CHAPTER 3: Vision Statement and Goals Davidson Walks & Rolls: Active Transportation Master Plan CHAPTER 3 Contents: Overview Vision Statement Measurable Goals Public Outreach CHAPTER 3: Vision Statement and Goals Overview The vision statement

More information

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

5. Pedestrian System. Accomplishments Over the Past Five Years

5. Pedestrian System. Accomplishments Over the Past Five Years 5. Pedestrian System Accomplishments Over the Past Five Years The Alamo Area Metropolitan Planning Organization (MPO) and its partner agencies recognize the importance of improving pedestrian mobility.

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another. Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Hennepin County Bicycle and Pedestrian Planning

Hennepin County Bicycle and Pedestrian Planning Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Goals, Objectives, and Policies

Goals, Objectives, and Policies Goals, Objectives, and Policies ADVISORY GROUP INPUT PUBLIC INPUT SNS PREVIOUS STUDIES RBPP Goals Vision Statement Southern Nevada will develop a safe, connected, and convenient walking and bicycling system

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

The Florida Bicycle and Pedestrian Partnership Council

The Florida Bicycle and Pedestrian Partnership Council The Florida Bicycle and Pedestrian Partnership Council Input to the Update of the Florida Transportation Plan March 2015 This document presents input from the Florida Bicycle and Pedestrian Advisory Council

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities. 2. Vision & Goals Overview The goals of the Santa Rosa Bicycle and Pedestrian Master Plan Update reflect the priorities expressed by the community throughout the public outreach phase of this Plan Update.

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

DRAFT. Table of Contents. Background

DRAFT. Table of Contents. Background Douglas County Table of Contents Existing Infrastructure 86 Funding 89 Policy and Program Recommendations 90 Infrastructure Recommendations 92 Conclusion 95 Background Home to 4,500 residents and Baker

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

4 Goals, Objectives & Actions

4 Goals, Objectives & Actions Chapter4 4 This chapter presents goals, objectives, and recommended actions to support the vision of making Overland Park a safer and easier place to ride a bicycle. 35 4.1 Recommendations Structure The

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

EXISTING CONDITIONS. Chapter General Overview

EXISTING CONDITIONS. Chapter General Overview GRAHAM PEDESTRIAN TRANSPORTATION PLAN Chapter 2 T 2.1 General Overview he City of Graham is the Alamance County Seat, located within the Piedmont Triad section of North Carolina. About halfway between

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Appendix C 3. Bicycle / Pedestrian Planning

Appendix C 3. Bicycle / Pedestrian Planning Appendix C 3. Bicycle / Pedestrian Planning BICYCLE/PEDESTRIAN PLANNING 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city-wide

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Chapter PERFORMANCE MEASURES AND ACCOUNTABILITY. Introduction

Chapter PERFORMANCE MEASURES AND ACCOUNTABILITY. Introduction PERFORMANCE MEASURES AND ACCOUNTABILITY Introduction Performance measures are helpful in evaluating the progress being made toward achieving the goals and objectives of the Gateway Bicycle Plan. The Plan

More information

AMATS Complete Streets Policy

AMATS Complete Streets Policy AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Physical Implications of Complete Streets Policies

Physical Implications of Complete Streets Policies Presentation Overview Physical Implications of Complete Norm Cox, ASLA, LLA Landscape Architect Ann Arbor, Michigan, 10:45 to Noon What Are Complete Streets? What Matters to Bicyclists and Pedestrians

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

Morristown, NJ Complete Streets Policy

Morristown, NJ Complete Streets Policy Morristown, NJ Complete Streets Policy Introduction A Complete Street is defined as a means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal

More information

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan... BICYCLE AND This plan was created through a grant from the Healthy Communities Program with the cooperation of the City of Cynthiana, Cynthiana Main Street, Cynthiana-Harrison County-Berry Joint Planning

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH

DRAFT MOVING FORWARD RHODE ISLAND BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH RHODE ISLAND MOVING FORWARD BICYCLE MOBILITY PLAN 2018 PREPARED FOR PREPARED BY IN ASSOCIATION WITH T AF CHAPTER 1 D R INTRODUCTION CHAPTER 3 ARTICULATES VISION Bicycling is safe, fun and practical in

More information

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION

ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION BACKGROUND Active transportation, also known as nonmotorized transportation, is increasingly recognized as an important consideration when planning and

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

City of Waterloo Complete Streets Policy

City of Waterloo Complete Streets Policy City of Waterloo Complete Streets Policy Chris Hodgson P. Eng City of Waterloo Complete Streets Forum 2011 April 28-29 Toronto Waterloo context: Current population Major employers Universities and student

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

1. Engineering: An Inviting Network of Bicycling Facilities for Cyclists of All Ages and Abilities and Destinations that Support Bicycling

1. Engineering: An Inviting Network of Bicycling Facilities for Cyclists of All Ages and Abilities and Destinations that Support Bicycling This Plan lays out a framework for creating and expanding programs and improvements to increase bicycling in Greenville. The Vision, Goals, and Objectives of the City of Greenville Bicycle Master Plan

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

Chapter 5. Complete Streets and Walkable Communities.

Chapter 5. Complete Streets and Walkable Communities. Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN WELCOME! PLEASE FEEL FREE TO REVIEW THE EXHIBITS THE PRESENTATION WILL BEGIN AT 6:00 PM VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT EXISTING CONDITIONS REPORT AND PUBLIC MEETING WELCOME!

More information

Safe Streets. City of Lake Forest Park. March 21, 2017

Safe Streets. City of Lake Forest Park. March 21, 2017 Safe Streets City of Lake Forest Park March 21, 2017 1 01 WELCOME 2 Agenda WELCOME WHAT IS THIS PROJECT? CONTEXT DRAFT CITYWIDE PROJECTS EXERCISE INTRODUCTION 3 02 WHAT IS THIS PROJECT? 4 WHAT IS THIS

More information

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

5/31/2016 VIA  . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed

More information

2014 Bellingham Bicycle Master Plan

2014 Bellingham Bicycle Master Plan 2014 Bellingham Bicycle Master Plan Acknowledgements The City of Bellingham is honored by the commitment of the numerous community members and bicycling enthusiasts who participated in the development

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

Welcome. Background. Goals. Vision

Welcome. Background. Goals. Vision Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara

More information

Section 8. Partnerships and Funding

Section 8. Partnerships and Funding This section discusses the potential partnership and funding options that the Town should consider in order to assist with the implementation of the recommendations provided in the Plan. Section 8. Partnerships

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Bicycle-Pedestrian Master Plan Update

Bicycle-Pedestrian Master Plan Update Bicycle-Pedestrian Master Plan Update Planning & Zoning Commission November 29, 2017 Overview Project Purpose & Scope Project History Plan Vision & Goals Chapter 5: Making Connections-Beyond the Path Next

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

COMPLETE STREETS POLICY Exhibit A to Ordinance

COMPLETE STREETS POLICY Exhibit A to Ordinance CITY OF WENATCHEE COMPLETE STREETS POLICY Exhibit A to Ordinance 2016-24 Prepared and Reviewed By: City of Wenatchee Community & Economic Development Department City of Wenatchee Public Works Department

More information

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years) 12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.

More information

Develop a Multi-Modal Transportation Strategy (Theme 6)

Develop a Multi-Modal Transportation Strategy (Theme 6) DEVELOP A MULTI-MODAL TRANSPORTATION STRATEGY (THEME 6) WHY IS THIS THEME ADDRESSED? Develop a Multi-Modal Transportation Strategy (Theme 6) Statement of Ideal Reduce resident and visitor reliance on single

More information

7 Complete Streets & Roadway Aesthetics

7 Complete Streets & Roadway Aesthetics 7 Complete Streets & Roadway Aesthetics 7.1 OVERVIEW Our streets lay the foundation for how we interface with travel needs, physical exercise, social exchanges and access to goods and services. They are

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

Pedestrian Project List and Prioritization

Pedestrian Project List and Prioritization To: Kyle Wagenschutz, City of Memphis CC: From: Anne Conlon and John Cock, Alta Planning + Design Date: December, 2014 Re: Project List Development (Task 3.1-3.2) and Project List Prioritization (Task

More information

WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM. Greg Errett City of Winston-Salem DOT September 14, 2011

WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM. Greg Errett City of Winston-Salem DOT September 14, 2011 WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM Greg Errett City of Winston-Salem DOT September 14, 2011 Presentation Outline History MPO Expansion/Changes Current Plans State of Active Transportation

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

EXECUTIVE DIRECTIVE NO. 20. Issue Date: July 1, 2011

EXECUTIVE DIRECTIVE NO. 20. Issue Date: July 1, 2011 ANTONIO R. VILLARAIGOSA MAYOR EXECUTIVE DIRECTIVE NO. 20 Issue Date: July 1, 2011 SUBJECT: Implementation of the 2010 Bicycle Plan It is no secret that the quality of life in Los Angeles is directly influenced

More information

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third. CHAPTER 6 Recommended Policies and Action Items To achieve the goals stated in Chapter 1 and guide implementation of the Bicycle Plan, policies and action items have been identified. They are presented

More information

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

11/3/2014 VIA  . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the 11/3/2014 VIA EMAIL Antonio Ablog Planning Department City of Sacramento 300 Richards Boulevard Sacramento, CA 95811 RE: Design Review for Stockton and T Mixed-Use (P14-042) Dear Mr. Ablog: WALKSacramento

More information

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

6/22/2018 VIA  . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 6/22/2018 VIA EMAIL Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 RE: Quick Quack Car Wash (DD9801) Dear Ms. Goulart: WALKSacramento

More information

MTP BICYCLE ELEMENT UPDATE. November 2017

MTP BICYCLE ELEMENT UPDATE. November 2017 MTP BICYCLE ELEMENT UPDATE November 2017 TIME FOR AN UPDATE Bicycle Element adopted in July 2008 Almost 10 years old Many planned facilities have been implemented 10 years more experience in planning,

More information

Chapter 9: Pedestrians and Bicyclists

Chapter 9: Pedestrians and Bicyclists Chapter 9: Pedestrians and Bicyclists Walking and bicycling are essential modes of transportation. These modes allow people to travel without contributing to congestion and air pollution, to access other

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

Bicycle and Pedestrian

Bicycle and Pedestrian Bicycle and Pedestrian Planning for Bikeable and Walkable Communities W H O L E H E A L T H C O N F E R E N C E 0 3 / 2 2 / 2 0 1 6 R O Y G O T H I E P E N N D O T B I C Y C L E - P E D E S T R I A N C

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

East Burke Transportation, Safety and Capacity Improvements

East Burke Transportation, Safety and Capacity Improvements East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the

More information

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 Humboldt County Association of Governments Eureka, CA, 95501 AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 DATE: May 1, 2014 TO: HCAOG Technical Advisory Committee (TAC) FROM:, SUBJECT: Letters of

More information

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

8/31/2016 VIA  . RE: Freeport Arco Fuel Station (P16-039) 8/31/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Freeport Arco Fuel Station (P16-039)

More information

3.9 Recreational Trails and Natural Areas

3.9 Recreational Trails and Natural Areas 3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information