MA MARINE ACCIDENT INVESTIGATION REPORT

Size: px
Start display at page:

Download "MA MARINE ACCIDENT INVESTIGATION REPORT"

Transcription

1 MA MARINE ACCIDENT INVESTIGATION REPORT September 28, 2017

2 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan Transport Safety Board is to determine the causes of an accident and damage incidental to such an accident, thereby preventing future accidents and reducing damage. It is not the purpose of the investigation to apportion blame or liability. Kazuhiro Nakahashi Chairman Japan Transport Safety Board Note: This report is a translation of the Japanese original investigation report. The text in Japanese shall prevail in the interpretation of the report.

3 MARINE ACCIDENT INVESTIGATION REPORT Vessel type and name: Chemical Tanker BUCCOO REEF Vessel number: (IMO number: ) Gross tonnage: 21,101 tons Accident type: Date and time: Location: Fatality of a crew member Around 19:15, April 22, 2016 (local time, UTC +2 hours) Port of Bordeaux, French Republic Around 342 true bearing, 1.8 nautical miles from the Cariette Lighthouse (approximately N, W) September 7, 2017 Adopted by the Japan Transport Safety Board Chairman Kazuhiro Nakahashi Member Kuniaki Syoji Member Satoshi Kosuda Member Toshiyuki Ishikawa Member Mina Nemoto SYNOPSIS < Summary of the Accident > While the chemical tanker BUCCOO REEF was docking, with a master, 21 crew members and a pilot onboard, assisted by tugboats at the port of Bordeaux, French Republic, at around 19:15 on April 22, 2016 (local time), an ordinary seaman who was letting out the messenger rope of a tug line was struck on his body by a structural part of the bow and fell overboard and died on April 23. < Probable Causes > It is probable that the accident occurred when, as BUCCOO REEF (Vessel A) was docking in an approximately 2.6-knot upstream current in Bordeaux Port, French Republic, in a state in which the Accident Tug Line had been removed from the Accident Bollard during release of the end of a tug line from RM PAUILLAC (Vessel B) (the Accident Tug Line), and as the ordinary seaman in charge of letting out the tug line (Ordinary Seaman A) was letting out the messenger rope of the Accident Tug Line with it coiled once around a bollard on Vessel A s bow s port side (the Accident Bollard), Ordinary Seaman A fell to the deck and was dragged until his body struck a structure on the foredeck because the messenger rope s exit speed increased, and then his leg had become entangled in the messenger rope. The circumstances by which Ordinary Seaman A s leg became entangled in the messenger rope could not be determined as there were no witnesses to those circumstances. It is probable that the increase in the messenger rope s exit speed was caused by an increase in the separation speed between Vessel A s bow end and Vessel B that occurred when Vessel A

4 gathered sternway while continuing her starboard turn. It is somewhat likely that chief officer of Vessel A gave Ordinary Seaman A no instructions to keep distance from the messenger rope such as holding the end of the messenger rope in case unexpected tension occur, when having Ordinary Seaman A hold the messenger rope in order to avoid it becoming entangled with the propeller, and that this contributed to the accident.

5 1 PROCESS AND PROGRESS OF THE INVESTIGATION 1.1 Summary of the Accident While the chemical tanker BUCCOO REEF was docking, with a master, 21 crew members and a pilot onboard, assisted by tugboats at the port of Bordeaux, French Republic, at around 19:15 on April 22, 2016 (local time; hereinafter the same), an ordinary seaman who was letting out the messenger rope of a tug line was struck on his body by a structural part of the bow and fell overboard and died on April Outline of the Accident Investigation Setup of the Investigation The Japan Transport Safety Board appointed an investigator-in-charge and one other marine accident investigator to investigate this accident on June 24, Collection of Evidence June 29, September 13, 26, October 5, November 4, 2016, January 6 and February 6, 2017: Collection of questionnaire November 16, 2016: On-site investigations, interviews and collection of questionnaire Cooperation with the Investigation Investigative information concerning the tugboat MR PAUILLAC was provided by the accident investigatory organization of the French Republic (BEAmer, Bureau d'enquêtes sur les événements de mer (hereinafter referred to as the French Investigative Authority )) Comments from Parties Relevant to the Cause Comments on the draft report were invited from the parties relevant to the cause of the accident Comments from the Substantially Interested State Comments on the draft report were invited from the substantially interested state of the BUCCOO REEF

6 2 FACTUAL INFORMATION 2.1 Events Leading to the Accident Events in Navigation according to the Voyage Data Recorder, etc. (1) Ship s position information According to the data record of the Voyage Data Recorder *1 (hereinafter referred to as VDR ) of the BUCCO REEF (hereinafter referred to as Vessel A ), the Vessel A s navigation track from 19:05:00 to 19:19:45 on April 22, 2016 was as shown in Table below. Table 2.1-1: VDR Record of Vessel A (Excerpt) Ship s position* Course Speed Over Time Over the Heading* Latitude (N) Longitude (W) the Ground (HH:MM:SS) Ground* ( ) ( - - ) ( - - ) ( ) (knots [kn]) 19:05: :10: :13: :13: :13: :13: :14: :14: :14: :14: :15: :15: :15: :15: :16: :16: :16: :16: :17: :17: :17: :17: :18: :18: :18: :18: :19: :19: :19: *1 Voyage Data Recorder (VDR) is an instrument that is able to record the position, course, speed, and other information about navigation, communication by VHF radio telephone, and voices in the bridge

7 19:19: *: The vessel position indicates the position of the GPS antenna installed above the bridge, meters from the end of the bow, and the courses over the ground and headings indicated in true bearings (hereinafter the same). (2) Radar images of the VDR Record According to the record of radar images taken every fifteen seconds between 19:14:00 and 19:16:00 on April 22, 2016, that was recorded in Vessel A s VDR, bearing and distance from Vessel A to the area near the center of the image of RM PAUILLAC (hereinafter referred to as Vessel B ) were as shown in Table (See Attached Figure 1 Radar Images from Vessel A s VDR) Table Bearing and Distance from Vessel A to the Area Near the Center of Vessel B s Image Time (HH:MM:SS) True Bearing ( ) Distance (Nautical Miles [M]) 19:14: :14: :14: :14: :15: :15:15 No image of Vessel B appeared 19:15: :15: :16: (3) Information on voice communication on the bridge According to the voice record of Vessel A s VDR, communication by VHF radio telephone (hereinafter referred to as VHF ) among the master and chief officer of Vessel A (hereinafter referred to as Master A and Officer A, respectively), the pilot, Vessel B, tugboat RM THOMAS (hereinafter referred to as Vessel C ) and the Bordeaux Harbor Master s Office (hereinafter referred to as the Harbor Master s Office ); conversation on the bridge of Vessel A; and communication by transceiver between Vessel A s bridge and crew members stationed at the bow between 19:12:25 and 19:29:05 on April 22, 2016, were as shown in Table The record indicates that conversation on the bridge between Master A and the pilot, communication by transceiver between Master A and Officer A, and communication by VHF among the pilot and Vessel B and Vessel C, which were assisting in Vessel A s docking, took place. It should be noted that the conversation on Vessel A s bridge and communication by transceiver were in English, while the communication by VHF was in French. Table Audio Record of Communication by VHF, etc. Time Communication Speaker Content (HH:MM:SS) or Conversation 19:12:25 Master A When we are in position we will let go Transceiver the tug on the center lead. 19:12:35 Officer A Yes, ok. Transceiver - 3 -

8 19:14:11 Pilot Let go the forward tug. The center lead On bridge one. Master A Let go the forward tug. Transceiver 19:14:18 Pilot Vessel B, you are going to cast off and VHF you go to the aft port side. 19:15:28 Officer A Man overboard. Transceiver 19:15:44 Officer A He is pulled out by the tug. Transceiver 19:15:45 Master A Man overboard. On bridge 19:15:54 Pilot Man overboard. VHF 19:16:32 Master A Where is there a man overboard? Transceiver 19:16:33 Officer A is man overboard, pulled out by the Transceiver tug. 19:16:38 Vessel B I don t believe that there is a man VHF overboard. 19:16:41 Pilot Well, I don t know, that s what s been VHF said by the mooring crew on the forecastle. 19:16:47 Vessel C We have to ask Master B but I believe VHF that his full crew is on deck, only the tug line has whipped a bit, it has passed very close to the head of the deck hand at the moment it was released, but I don t believe there is a man overboard. 19:16:59 Pilot Yes, ok, but listen. VHF 19:17:02 Vessel C There is no man overboard, I confirm. VHF 19:17:06 Pilot It s ok with you, all is clear. VHF 19:19:06 Pilot Be careful vessel B, they are saying that VHF someone is at the end of the messenger line. 19:19:24 Vessel B There is someone at the end of the rope. VHF 19:20:13 Vessel C If there is somebody in the water, it must VHF be somebody of your ship. 19:20:17 Pilot Oh, yes, it s someone from vessel A. VHF 19:20:21 Vessel C We have seen nobody falling into the VHF water, we have seen that the towline has tightened, well the messenger line tightened, someone retained it from above, the towline got released all of sudden, but we have seen nobody fall into the water. 19:20:49 Pilot Well there is a man overboard who has been picked up from the water, a man who went overboard, just picked up by vessel B. VHF - 4 -

9 19:20:51 Harbor Master s Hauled out of the water by vessel B, so VHF Office everything s ok? 19:20:54 Pilot No, no, in principle I don t know if he is VHF still alive. 19:21:00 Harbor Master s Well received, I call the emergency VHF Office service. 19:21:35 Vessel B Yes, my chief is doing cardiac massage. VHF A defibrillator. Yes, we have to give him oxygen. The emergency service has to be called so that we can disembark him. 19:24:41 Vessel B Tell me where I should berth? VHF 19:26:26 Vessel B He is breathing. We have put him lie VHF quietly. The crew are providing a first aid. 19:26:49 Vessel B The RORO ramp would have been good, VHF no? 19:26:51 Harbor Master s Office Yes, that what we thought, yes, we d better off doing that. Does the man have VHF a heartbeat? You said that he s breathing. 19:27:06 Vessel B Well, he has a heartbeat and he s VHF breathing. 19:27:09 Harbor Master s Received. In this case, you would be VHF Office better off going to the RORO ramp. 19:27:17 Vessel B Ok, we ll berth there, he is wounded on VHF his head. 19:27:22 Harbor Master s Received, he is wounded on his head. Did VHF Office you compress? 19:27:42 Vessel B Yes, he is bleeding from his mouth. VHF 19:27:45 Harbor Master s Office Received. VHF Events Leading to the Accident according to the Statements According to the statements of the pilot and person in charge at the Bordeaux Harbor Master s Office, the information of the French Investigative Authority, the replies to the questionnaire by Mitsui O.S.K. Line, which is the operator of Vessel A (hereinafter referred to as Company A1 ), and Officer A, the events leading to the accident were as follows. (1) Vessel A At around 14:20 on April 22, 2016, Vessel A departed her anchorage at the mouth of the Gironde Estuary in the French Republic for the Bassens Terminal in Bordeaux Port, also in France, for the purpose of unloading, with Master A, Officer A, and 20 crew members (19 nationals of the Republic of the Philippines and national of the Republic of Croatia) on board. At around 14:45, the pilot came aboard Vessel A and conducted a meeting on the navigation plan, docking method, use and stationing of tugboats, and other matters, after - 5 -

10 which Vessel A continued navigating Gironde Estuary and then the Garonne River under the pilotage of the pilot. Because the scheduled place for docking was approaching, Officer A discussed the mooring method with Master A on the bridge. Officer A subsequently took his position on the bow and explained the mooring method to boatswain, the ordinary seaman in charge of letting out the tug line (national of the Republic of the Philippines) (hereinafter referred to as Ordinary Seaman A ) and another ordinary seaman. At around 19:00, Vessel A met with Vessel B and Vessel C. After lowering a small line from a Panama chock *2 in her bow s front, Vessel A heaved up a messenger rope and tug line from Vessel B that had been tied to the line and then attached the becket (hereinafter referred to as eye ) at the end of a tug line from Vessel B (hereinafter referred to as the Accident Tug Line ) to a bollard *3 on her bow s port side (hereinafter referred to as the Accident Bollard ), and after lowering a small rope from a mooring hole *4 on her bow s port side, heaved up a messenger rope and tug line from Vessel C that had been tied to the line and attached the eye of tug line from Vessel C to a bollard on her port side. Vessel A then continued sailing. At around 19:10, Vessel A arrived at a location near her intended wharf and began a starboard turn while moving ahead with assistance from Vessel C for a starboard side head out. At around 19:14, the pilot decided to release the Accident Tug Line because the turn was two-thirds completed and communicated this decision to Master A. At the same time, the pilot instructed Vessel B to push Vessel A s port-side stern after the Accident Tug Line was released. Master A ordered Officer A, who was stationed at the bow, to release the Accident Tug Line. Because the Accident Tug Line had slackened as Vessel B approached Vessel A, the crew members stationed at the bow removed the eye of the Accident Tug Line, which had been hooked on the Accident Bollard. Ordinary Seaman A stood on the port side of the Accident Bollard and let out the Accident Tug Line from the Panama chock by gradually letting out the messenger rope, which he had wound once around the Accident Bollard, the boatswain placed the leftover messenger rope on the deck near the port anchor hawsepipe *5 after paying the messenger rope coiled out *6 for Ordinary Seaman A, and Officer A verified that the eye of the Accident Tug Line being let out had reached the water s surface. At around 19:15, Officer A and the boatswain noticed that the speed of the messenger rope s exit had quickened and saw that Ordinary Seaman A was moving to the port side through the space between the bitts of the Accident Bollard. Although they shouted at Ordinary Seaman A to let go of the rope and step clear, Ordinary Seaman A fell to the deck and was dragged with the rope entangled around his leg (whether it was his right or left leg is unknown) until his body struck a structure near the chain stopper * 7. He then fell *2 A Panama chock is a mooring hole installed at the bow s end. *3 A bollard is a stationary structure that is fixed to the deck that is comprised of one or two bitts (posts) and used to stop, tie, or control a rope. *4 A mooring hole is a fixture installed in a part that passes through a bulwark for the leading of lines. *5 A hawsepipe is a tube passing from a ship s deck to plating shell through which an anchor chain passes. *6 Coil down refers to the act of winding a rope on top of itself into a circle. *7 Chain stopper refers to a fixture installed on a ship s structural member. It is a device for holding a chain that is attached to the end of a mooring line when mooring a single mooring line to a buoy

11 overboard from the Panama chock. The crew member stationed at the bow did not see what was happening at the instant that Ordinary Seaman A s leg became entangled in the messenger rope. Because the speed of messenger rope s exit had quickened, Officer A and the boatswain thought that Ordinary Seaman A had difficulty letting out the Accident Tug Line while holding the messenger rope and therefore moved to take a posture that made the work easier. Officer A attempted to notify Vessel B of the accident by shouting and waving his hands, but Vessel B did not acknowledge. He therefore notified Master A that Ordinary Seaman A had fallen overboard by transceiver. Master A notified the pilot that a crew member stationed at the bow had fallen overboard, and then the pilot notified Vessel B and Vessel C that a crew member of Vessel A had fallen overboard by VHF. The pilot continued piloting while communicating the accident with Vessel B, Vessel C, and the Harbor Master s Office by VHF, and Vessel A docked at Bassens Terminal Berth 436 at around 20:05. (See Figure 2.1-1, Figure 2.1-2, Photo 2.1-1, Photo 2.1-2, and Photo 2.1-3) - 7 -

12 Bow Panama chock Accident Bollard Messenger rope of Vessel B Navigation Officer A Ordinary Seaman A Boatswain Chain stopper Port side bollard Tug line of Vessel C Other ordinary seaman Mooring hole Hawsepipe Figure Stations of Crewmembers on Vessel A s Bow Panama chock 1 Width: Approx. 30 cm Accident Bollard 2 Chain stopper Figure Ordinary Seaman A s Movement of Work Position (1 indicates position at start of work, 2 indicates position just before the accident) - 8 -

13 Position at start of work Boatswain Position just before the accident Ordinary seaman A Ordinary Seaman A Messenger rope Boatswain Warning paint Photo Photo Reenactment of Ordinary Seaman A s Work by Crew Members of Vessel A (Provided by Company A1) (The yellow and black warning paint on the surface of the deck used to reenact Ordinary Seaman A s work positions was applied after the accident.) Photo Vessel A s Panama Chock (Provided by Company A1) (2) Vessel B and Vessel C At around 18:00 on April 22, 2016, Vessel B and Vessel C each departed from Cariette Wharf of Bordeaux Port, Vessel B with a master (hereinafter referred to as Master B ) and three crew members and Vessel C with a master and three crewmembers, for Vessel A, which was navigating the Garonne River, to provide docking assistance to Vessel A. At around 19:00, Vessel B and Vessel C met Vessel A. Vessel B took a position directly ahead of Vessel A and Vessel C took a position off the port-side bow of Vessel A. Vessel B and Vessel C each tied their own messenger line to a small line lowered by Vessel A and sent their own tug line to Vessel A

14 At around 19:10, Vessel C began pushing the port-side bow of Vessel A in response to an instruction from the pilot to begin a starboard turn, and Vessel B locked the Vessel B end of the Accident Tug Line on a tow hook on her aft deck and moved with the turn without pulling on the Accident Tug Line. At around 19:14, Vessel B was ordered by the pilot to release the Accident Tug Line. After slackening the Accident Tug Line by approaching Vessel A, Vessel B saw that the Accident Tug Line was being let out through Vessel A s Panama chock and thus began manually recovering the Accident Tug Line. A crew member who was engaged in recovery work on Vessel B s stern saw the Accident Tug Line whip up taut for a moment but then continued recovery because the line immediately slackened again. At that moment, Vessel B received word of a man overboard by VHF. At around 19:19, while recovering the Accident Tug Line with a winch, Vessel B saw Ordinary Seaman A with his ankle entangled in the messenger rope and lifted Ordinary Seaman A to her deck. A crew member of Vessel B saw that the messenger rope had wrapped once around Ordinary Seaman A s ankle but did not see a knot. Ordinary Seaman A had an injury to the back of his head and was bleeding from the mouth. Because he did not have a pulse, a crew member of Vessel B administered a cardiac massage, after which Ordinary Seaman A s pulse returned. Vessel B was released from docking assistance by the pilot, and at around 19:27 proceeded to the wharf as instructed by the Harbor Master s Office as her crew members administered first aid to Ordinary Seaman A. At around 19:30, Vessel B handed Ordinary Seaman A over to an ambulance that was called by the Harbor Master s Office. Vessel C continued providing assistance until Vessel A docked. The date and time of occurrence of the accident were at around 19:15 on April 22, 2016, and the location was at around 1.8 M at 342º true bearing from the Cariette Lighthouse. (See Attached Figure 2 Outline Map of the Accident Location) 2.2 Injuries to Persons According to the postmortem certificate of Ordinary Seaman A, Ordinary Seaman A s injuries were as follows. Ordinary Seaman A died at 19:45 on April 23 at the hospital to which he was transported. The cause of death was a cerebral contusion. 2.3 Crew Information (1) Gender, Age, and Certificate of Competence (i) Master A According to the reply to the questionnaire of Company A1, Master A s gender, age, and certificate of competence were as follows. Male, 52 years old, national of the Republic of the Philippines Endorsement attesting the recognition of certificate under STCW regulation I/10: Master (issued by Japan)

15 Date of Issue: December 5, 2014 (Valid until March 23, 2018) (ii) Officer A According to the reply to the questionnaire of Company A1, Officer A s gender, age, and certificate of competence were as follows. Male, 55 years old, national of the Republic of Croatia Endorsement attesting the recognition of certificate under STCW regulation I/10: Chief engineer (issued by Japan) Date of Issue: July 16, 2015 (Valid until September 4, 2019) (iii) Ordinary Seaman A According to the reply to the questionnaire of Company A1, Ordinary Seaman A s gender, age, and certificate of competence were as follows. Male, 26 years old, national of the Republic of the Philippines (iv) Pilot: Male, 49 years old, national of the French Republic Gironde pilot s certification Date of Issue: June 30, 2001 (v) Master B: Male, age unknown, national of the French Republic According to the information provided by the French Investigative Authority, Master B possessed a master s certificate for vessels of less than 500 gross tonnage. (2) Sea-going Experience and Status of Health (i) Master A According to the reply to the questionnaire of Company A1, Master A s sea-going experience and status of health were as follows. He had approximately 17 years of experience as a master and had served as a master on a tanker for approximately five years. He was aboard Vessel A from July to November 2015 and again for a second time that began in March He was in good health at the time of the accident. (ii) Officer A According to the reply to the questionnaire of Company A1, Officer A s sea-going experience and status of health were as follows. He had been aboard tankers as a chief officer since He was aboard Vessel A from August to November 2015 and again for a second time that began in January He was in good health at the time of the accident. (iii) Ordinary Seaman A According to the reply to the questionnaire of Company A1, Ordinary Seaman A s sea-going experience and status of health were as follows. He had served as an ordinary seaman for approximately three years and six months. He had been aboard Vessel A since January He was in good health at the time of the accident. (iv) Pilot According to the statement of the pilot, the pilot s sea-going experience and status

16 of health were as follows. He became a seafarer in 1998 and served on merchant ships. After serving as a master on a large tanker for approximately one year and six months, he became a pilot in He was in good health at the time of the accident. (v) Master B According to the information provided by the French Investigative Authority, Master B s sea-going experience was as follows. He served as a crew member on a fishing vessel for approximately 23 years, approximately three years of which as a master. He had approximately three years of experience as a tugboat master. (3) Clothing, etc., Worn by Ordinary Seaman A at the Time of the Accident According to the reply to the questionnaire of Company A1, Ordinary Seaman A s clothing, etc., at the time of the accident were as follows. He was wearing orange-colored work clothes, work gloves, a helmet, safety glasses, and safety shoes. Ordinary Seaman A s left work glove, helmet, safety glasses, and wristwatch remained on the deck after he fell overboard. 2.4 Vessel Information Particulars of Vessel (1) Vessel A According to the reply to the questionnaire of Company A1, the particulars of Vessel A were as follows. Vessel number: IMO number: Port of registry: Owner: Operator: Management company: Gross tonnage: L B D: Hull material: Tokyo FO Rhythm Leasing Ltd. Company A1 MOL TANKSHIP MANAGEMENT (EUROPE) LTD. (United Kingdom) (hereinafter referred to as Company A2 ) 21,101 tons m x m x m Steel Engine: Diesel engine x 1 Output: 7,230 kw Propulsion: 4-blade fixed pitch propeller x 1 Date of launch: August 4, 2014 (See Photo 2.4-1)

17 Photo Vessel A (Provided by Company A1) (2) Vessel B According to the information provided by the French Investigative Authority, the particulars of Vessel B were as follows. IMO number: Owner: Gross tonnage: L B D: Output: REMORQUAGE BORDEAUX BASSENS (French Republic) 144 tons m x 7.70 m x 4.20 m 1,326 kw Year of launch: 1959 Propulsion: Kort nozzle x 1 (See Photo 2.4-2) (3) Vessel C According to the information provided by the French Investigative Authority, the particulars of Vessel C were as follows. IMO number: Owner: REMORQUAGE BORDEAUX BASSENS (French Republic) Gross tonnage: 286 tons L B D: m x 9.50 m x 4.20 m (See Photo 2.4-3)

18 Photo Vessel B (Port Side) Photo Vessel C (Front Side) Vessel A s Load Conditions According to the reply to the questionnaire by Company A1, at the time of the Accident, Vessel A was loaded with approximately 5,000 tons of methanol. Her draft was about 6.92 m in the bow and about 7.61 m in the stern Hull Structure and Equipment (1) Vessel A According to the general arrangement plan and the reply to the questionnaire by Company A1, the hull structure and equipment were as follows. Vessel A was a chemical tanker with a docking bridge and mooring equipment installed on her foredeck and quarterdeck. On the foredeck were installed two pairs of bollards on both sides and one chain stopper on the starboard side of the Accident Bollard. At the end of the bow was an oval Panama chock with an opening measuring 45 cm high by 60 cm across. The Accident Bollard and the chain stopper were arranged in an inverted open-bottomed V shape approximately four meters from the bow s end. The distance at the narrowest point between the Accident Bollard and the chain stopper was approximately 30 cm. At the time of the accident, the height from the surface of the water to the bottom edge of the Panama chock was about meters. At the time of the accident, there were no malfunctions or failures with the hull, engine and machineries, deck equipment, or communications devices. (See Figure 2.4.1)

19 Figure Vessel A s General Arrangement Plan (2) Vessel B Vessel B had a wheel house located slightly forward of hull s center. She was equipped with a tow hook and winch installed on her aft deck. According to the information provided by the French Investigative Authority, there was a portion of the wheel house s view astern that was blocked by the funnel. (See Figure 2.4-2) At the time of the accident, there were no malfunctions or failures with the hull, engine and machineries, deck equipment, or communications devices. Double cross bitt Winch Tow hook Funnel Wheel house Double cross bitt Stern Bow Figure Plan of Vessel B (Outline) 2.5 Information concerning the Accident Tug Line and Messenger Rope According to the information provided by the French Investigative Authority, the Accident Tug Line and messenger rope were as follows. The Accident Tug Line had a diameter of approximately 56 mm and a length of approximately 40 meters, and the messenger rope had a diameter of approximately 24 mm and a length of approximately 40 meters. The end of the Accident Tug Line on the Vessel B side was locked on the tow hook on Vessel B s

20 aft deck. (See Photo 2.5) Tow hook Photo 2.5 Circumstances of Vessel B s Aft Deck 2.6 Weather and Sea Conditions Observations by Crew According to the reply to the questionnaire by Company A1, the weather and sea conditions at 19:00 near the accident location were as follows. Weather: Clear Wind direction: west Wind speed: Approx knots Visibility: Good Water s surface: Calm Air temperature: 17 C Water temperature: 12 C Tide Data According to the tide table issued by the Bordeaux Harbor Master s Office, the incoming tide at Bordeaux was reaching its end at the time of the accident. According to the reply to the questionnaire by Company A1, the current direction near the accident location at 19:00 was south-southeasterly (flowing from downstream to upstream) and the current speed was approximately 2.6 knots. Sunset on the day of the accident was 20: Handling of Tug Lines Procedure for Releasing Messenger Ropes According to the reply to the questionnaire of Company A1, an ordinary seaman removes the eye of the tug line from the bollard and lowers the tug line to the water s service using the messenger rope. Then, after confirming that tugboat has recovered the tug line and that the messenger rope will not get caught in the tugboat s propeller, the officer in charge orders the ordinary seaman to release the messenger rope that he is holding Normal Procedure when Vessel B Recovers a Tug Line According to the information provided by the French Investigative Authority, the normal procedure when Vessel B recovered a tug line was as follows

21 Upon receiving the instruction to release the tug line from the pilot by VHF, Master B ordered Vessel B s crew members to prepare to recover the tug line. Master B approached the towed vessel at reduced speed, causing the taut tug line to slacken, and when he saw the eye of the tug line that was removed from the bollard of the towed vessel from the Panama chock, he had crew members at the stern recover approximately ten meters of the tug line manually and then complete recovery by winding the tug line with the winch. Master B maneuvered the vessel and the chief engineer operated the winch. Regarding the timing of this series of steps, Master B did not receive signals from the towed vessel, but rather made judgments based on visual confirmation while looking astern from the wheel house. 2.8 Information on Safety Management, etc. of Vessel A Safety Management System (SMS) Manual According to Company A2 s SMS Manual, the following procedure and important points when handling tug lines during mooring were established. (Excerpt) (1) Procedure for SMS Manual The tug line must be let out in a controlled manner. (2) Risk assessments in the SMS Manual 1) Handling of tugs lines All personnel are fully aware of the hazards in handling tugs lines, in particular the risk of tension coming on the line while it is being handled. The OIC on station shall maintain constant over watch and pay particular attention over side to the movement/actions of the tugs while the line is being handled. Crew shall also pay attention when letting go tugs lines to ensure the line is not dropped in an uncontrolled manner onto the tugs deck. 2) Sudden and unanticipated tensioning of lines This may be caused by vessel movement, tugs, wind or winch operator, personnel to stand clear of working lines and always be aware of the risks. Awareness and supervision to ensure personnel do not stand in a crush zone where a tensioning line may trap them against ships structure etc. Good oversight, supervision and warnings from OIC and Master Education and Training concerning Tug Line Handling According to the reply to the questionnaire of Company A1, education and training for tug line handling were as follows. All crew members of vessels operated by Company A1 received training on safe mooring and use of tugboats once every three years. When company instructors visited vessels, they conducted training for safe mooring and handling of tug lines and mooring lines. For new crew members, Company A1 provided training and education with computers, videos, and other teaching materials that were in addition to training on mooring and tug line handling, and checked the crew members level of comprehension using a checklist. Additionally, Company A1 provided education and training so that crew members will act with safety foremost in mind in dangerous situations

22 2.8.3 Information on Mutual Communication According to the reply to the questionnaire of Company A1, English was used as the common language on Vessel A. Officer A and Ordinary Seaman A possessed the basic language ability needed to execute their assigned tasks and there was no problem in mutual communication between them

23 3 ANALYSIS 3.1 Situation of the Accident Course of the Events According to 2.1, it is probable that the following events occurred. (1) At around 14:20 on April 22, 2016, Vessel A departed her anchorage at the mouth of the Gironde Estuary in the French Republic and sailed in the Gironde River and Garonne River under pilotage for Bassens Terminal in Bordeaux Port, also in the French Republic. (2) At around 18:00, Vessel B and Vessel C each departed from Cariette Wharf of Bordeaux Port for Vessel A, which was navigating the Garonne River. (3) At around 19:00, Vessel A met with Vessel B and Vessel C, received one tug line each from Vessel B and Vessel C, and continued sailing. At around 19:10, Vessel A began a turn to starboard while moving ahead with assistance from Vessel C. (4) At around 19:14, the crew members stationed on Vessel A s bow removed the eye of the Accident Tug Line that had been hooked to the Accident Bollard and began letting out the Accident Tug Line. Vessel B began recovering the Accident Tug Line and Vessel A began gathering sternway. (5) At around 19:15, Ordinary Seaman A fell to the deck and was dragged with his leg (whether it was his right or left leg is unknown) entangled in the messenger rope until his body struck a structure near the chain stopper. He then fell overboard from the Panama chock Location of the Accident Occurrence According to 2.1 and 3.1.1, it is probable that the accident location was Vessel A s location at the time of the accident, which was around 19:15, when Vessel A was N, W (around 1.8 M at 342º true bearing from the Cariette Lighthouse) Injuries to Persons According to 2.1 and 2.2, it is probable that the injuries to persons were as follows. (1) After Ordinary Seaman A fell overboard from the Panama chock, he was rescued by a crew member of Vessel B, given first aid on Vessel B, and then transported to a hospital, but he died at 19:45 on April 23. (2) When Ordinary Seaman A was lifted up by a crew member of Vessel B, a messenger rope was wound once around Ordinary Seaman A s ankle, although there was no knot. (3) The cause of Ordinary Seaman A s death was a cerebral contusion. 3.2 Causal Factors of the Accident Situation of Crew Members According to 2.3, the situations of the crew members were as follows. (1) Master A It is probable that Master A possessed a legally valid endorsement attesting the recognition of certificate under STCW regulation 1/10 and was in good health. (2) Officer A It is probable that Officer A possessed a legally valid endorsement attesting the recognition of certificate under STCW regulation 1/10 and was in good health

24 (3) Ordinary Seaman A It is somewhat likely that Ordinary Seaman A had approximately three years and six months of experience as an ordinary seaman and was in good health. (4) Pilot It is probable that the pilot possessed a legally valid pilot s certification and was in good health. (5) Master B It is probable that Master B possessed a legally valid certificate of competence. Master B s status of health could not be determined Circumstances of Mutual Communication between Officer A and Ordinary Seaman A According to 2.8.3, it is probable that English was used as the common language on Vessel A, that Officer A and Ordinary Seaman A possessed the basic language ability needed to execute their assigned tasks, and that there was no problem in mutual communication between them Situations of the Vessels According to 2.4.3, it is probable that the situations of the vessels were as follows. (1) Vessel A There were no malfunctions or failures with the hull, engine and machineries, deck equipment, or communications devices. (2) Vessel B There were no malfunctions or failures with the hull, engine and machineries, deck equipment, or communications devices Weather and Sea Conditions (1) According to 2.6.1, the weather conditions were as follows. At the time of the accident, the weather was clear, the wind was from the west, the wind speed was approximately 11.6 knots, visibility was good, the water s surface was calm, the air temperature was 17 C, and the water temperature was 12 C. (2) According to 2.6.2, the sea conditions were as follows. At the time of the accident, the tide at Bordeaux was an incoming tide that was reaching its end. The current direction near the accident location was south-southeasterly (flowing from downstream to upstream) and the current speed was approximately 2.6 knots Analysis of the Movements and Distances of Vessels A and Vessel B According to 2.1, 2.5, and 3.1.1, the movements and distances of Vessel A and Vessel B were as follows. (1) It is probable that at around 19:10, Vessel A began a starboard turn. Vessel A completed about two-thirds of the turn at around 19:14 and began gathering sternway. (2) It is probable that at around 19:14, Vessel B was ordered by the pilot to release the Accident Tug Line, and she slackened the Accident Tug Line by approaching Vessel A. (3) It is probable that the position of Vessel B and the distance between Vessel A s bow end and Vessel B at time intervals between 19:14:15 and 19:15:45 that were obtained from the ship s position recorded in Vessel A s VDR and radar images are as shown in the following table

25 Based on the table, Vessel A s bow end and Vessel B reached their closest distance at around 19:15:00 and then their distance began to widen, and between 19:15:30 and 19:15:45 the speed of separation between the two vessels increased to more than two meters per second. (See Figure and Figure 3.2-2) No. Ship s position Time Latitude (N) Longitude (E) (HH:MM:SS) ( - - ) ( - - ) Distance 1 19:14: Approx. 34 m 2 19:14: Approx. 31 m 3 19:14: Approx. 25 m 4 19:15: Approx. 20 m 19:15:15 No image of Vessel B 5 19:15: Approx. 59 m 6 19:15: Approx. 96 m Vessel B (Headings are based on supposition) 19:15: Vessel A Vessel C (Pushes Vessel A s port-side bow) 19:14:15 Vessel B s position at 19:15:15 is not shown because Vessel B did not appear on Vessel A s radar. 100m Figure Movements and Changes in Distance of Vessel A and Vessel B at 15-Second Intervals

26 Hight from the water s surface to the bottom edge of Vessel A s Panama chock: Approx m Vessel A Approx. 20 m Vessel B Approx. 30 seconds later Around 19:15:00 Approx. 59 m Around 19:15:30 Figure Circumstances of the Growing Distance between Vessel A s Bow End and Vessel B (Conceptual Image) (4) It is probable that Vessel B s position did not change significantly between 19:15:00 and 19:15:30. (5) It is probable that from 19:15:00, the exit speed of the messenger rope on Vessel A s deck increased as tension was applied with the increasing speed of separation between Vessel A s bow end and Vessel B Analysis of Deck Work on Vessel A According to 2.1, 2.4.3, 2.7.1, 3.1.1, and 3.2.5, the deck work on Vessel A was as follows. (1) It is probable that, at around 19:14, the pilot told Master A to release the Accident Tug Line and that Master A instructed Officer A, who was stationed at the bow, to release the Accident Tug Line. (2) It is probable that, because the Accident Tug Line slackened as Vessel B approached Vessel A, the crew members stationed at the bow removed the eye of the Accident Tug Line, which had been hooked on the Accident Bollard, and began letting out the Accident Tug Line from the Panama chock. (3) It is probable that, on Vessel A, Ordinary Seaman A was standing on the port side of the Accident Bollard and letting out the Accident Tug Line from the Panama chock by gradually letting out the messenger rope, which he had wound once around the Accident Bollard; the boatswain placed the leftover messenger rope on the deck near the port anchor hawsepipe after paying the messenger rope for Ordinary Seaman A, and the Officer A verified that the eye of the Accident Tug Line being let out by had reached the water s surface

27 (4) It is probable that as Vessel A continued a starboard turn and began gathering sternway, the speed of separation between Vessel A and Vessel B increased, and then the messenger rope s exit speed increased. (5) It is somewhat likely that because Ordinary Seaman A had not been instructed to release the messenger rope that he was holding, he continued to hold the rope. (6) It is somewhat likely that, when the exit speed at which the messenger rope increased, Ordinary Seaman A, when he moved his hold on the messenger rope to the starboard side, straddled the space between where he had been holding the messenger rope and the end of the rope. (7) It is probable that, at around 19:15, Officer A and the boatswain noticed that the speed at which the messenger rope was being sent out had increased, shouted at Ordinary Seaman A to let go of the messenger rope and step clear, and, approximately simultaneously, witnessed Ordinary Officer A fall to the deck and be dragged with his leg entangled in the messenger rope. (8) Regarding the circumstances of the messenger rope s becoming entangled around Ordinary Seaman A s leg, there were no witnesses and therefore it was not possible to determine the circumstances Analysis of Accident Tug Line Recovery Work on Vessel B According to 2.1, 2.5, 2.7.2, and 3.2.5, the Accident Tug Line recovery work on Vessel B was as follows. (1) It is probable that the end of the Accident Tug Line on the Vessel B side was locked on the tow hook on the aft deck. (2) It is probable that, at around 19:14, Vessel B was ordered by the pilot to release the Accident Tug Line and that, after slackening the Accident Tug Line by approaching Vessel A, Vessel B saw that the Accident Tug Line was being let out through Vessel A s Panama chock and thus began manually recovering the Accident Tug Line. (3) It is probable that a crew member who was engaged in recovery work on Vessel B s stern saw the Accident Tug Line whip up taut for a moment but then continued recovery of the Accident Tug Line because the line immediately slackened again. (4) It is somewhat likely that the reason the Accident Tug Line whipped up taut for a moment was an increase in the separation speed between Vessel A s bow end and Vessel B. (5) It is probable that, at around 19:19, while recovering the Accident Tug Line with a winch, Vessel B saw Ordinary Seaman A with his ankle entangled in the messenger rope and lifted him to her deck Safety Management aboard Vessel A According to 2.1, 2.8, 3.2.5, and 3.2.6, the safety management situation of Vessel A was as follows. (1) Although the Safety Management System Manual established that tug lines must be let out in a controlled manner so that they do not fall onto a tugboat s deck, it is probable that Vessel A had provided education and training so that her crew members will act with safety foremost in mind in dangerous situations during work. (2) It is probable that it was established on Vessel A that officers in charge shall constantly pay attention to the tugboat s movements and conditions of workers. Additionally, it is probable that, given that movements of the vessel or a tugboat may cause sudden and

28 unanticipated tug line tension, it was established that officers in charge shall provide conscious and appropriate supervision to ensure that workers do not enter areas where the danger of being caught by a tug line under tension exists. (3) It is somewhat likely that whereas Officer A instructed Ordinary Seaman A to drop the messenger rope when, after letting out the messenger rope, the separation speed between Vessel A and Vessel B increased, Officer A did not instruct Ordinary Seaman A to keep distance from the messenger tope, such as holding the end of the messenger, in case unexpected tension on the messenger rope occur, when Officer A instructed Ordinary Seaman A to hold the messenger rope to avoid it becoming entangled with the propeller of Vessel B Analysis of the Accident Occurrence According to 2.1, 3.1.1, 3.2.1, and to 3.2.8, the analysis of the accident was as follows. (1) It is probable that Vessel A, Vessel B, and Vessel C came together at around 19:00, that Vessel A received one tug line each from Vessel B and Vessel C and then continued sailing, and that Vessel A began a turn to starboard while moving ahead with assistance from Vessel C at around 19:10. (2) It is probable that Vessel A gathered sternway while continuing her starboard turn and that Vessel B, after being ordered by the pilot to release the Accident Tug Line and slackening the line by approaching Vessel A, began manual recovery of the line and saw the Accident Tug Line whip up taut for a moment but then continued recovery of the Accident Tug Line because the line immediately slackened again. (3) It is probable that Vessel A s bow end and Vessel B reached their closest distance at 19:15:00 and then their distance began to gradually widen, and between 19:15:30 and 19:15:45 the separation between the two vessels increased to more than two meters per second. (4) It is probable that the exit speed of the messenger rope being let out by Ordinary Seaman A increased from 19:15:00 as tension was applied to it as a result of the increasing separation speed between Vessel A s bow end and Vessel B. (5) It is somewhat likely that, given that the Safety Management System Manual established that tug lines must be let out in a controlled manner so that they do not fall onto a tugboat s deck on Vessel A, Ordinary Seaman A continued holding the messenger rope he was holding because he had not been instructed to let go of it. (6) It is somewhat likely that Ordinary Seaman A straddled the space between where he had been holding the messenger rope, which he had wound once around the Accident Bollard, and the end of the coiled down rope. (7) It is somewhat likely that whereas Officer A instructed Ordinary Seaman A to drop the messenger rope when, after letting out the messenger rope, the separation speed between Vessel A and Vessel B increased, Officer A did not instruct Ordinary Seaman A to keep distance from the messenger tope, such as holding the end of the messenger, in case unexpected tension on the messenger rope occur, when Officer A instructed Ordinary Seaman A to hold the messenger rope to avoid it becoming entangled with the propeller of Vessel B. (8) The circumstances by which Ordinary Seaman A s leg was entangled by the messenger rope could not be determined as there were no witnesses to those circumstances. (9) It is probable that Ordinary Seaman A fell to the deck and was dragged with his leg entangled in the messenger rope until his body struck a structure and he fell overboard from the Panama chock

29 4 PROBABLE CAUSES It is probable that the accident occurred when, as Vessel A was docking in an approximately 2.6-knot upstream current in Bordeaux Port, French Republic, in a state in which the Accident Tug Line had been removed from the Accident Bollard during release of the Accident Tug Line, and as Ordinary Seaman A was letting out the messenger rope of the Accident Tug Line with it coiled once around the Accident Bollard, Ordinary Seaman A fell to the deck and was dragged until his body struck a structure on the foredeck because the messenger rope s exit speed increased, and then his leg had become entangled in the messenger rope. The circumstances by which Ordinary Seaman A s leg became entangled in the messenger rope could not be determined as there were no witnesses to those circumstances. It is probable that the increase in the messenger rope s exit speed was caused by an increase in the separation speed between Vessel A s bow end and Vessel B that occurred when Vessel A gathered sternway while continuing her starboard turn. It is somewhat likely that Officer A gave Ordinary Seaman A no instructions to keep distance from the messenger rope such as holding the end of the messenger rope in case unexpected tension occur, when having Ordinary Seaman A hold the messenger rope in order to avoid it becoming entangled with the propeller, and that this contributed to the accident

30 5 SAFETY ACTIONS It is probable that the accident occurred when Ordinary Seaman A, who was stationed at the bow, continued to hold the messenger rope as its exit speed increased when releasing the Accident Tug Line, Ordinary Seaman A s leg became entangled in the messenger rope, and Ordinary Seaman A fell to the deck, was dragged until his body struck a structure. It is somewhat likely that Officer A gave Ordinary Seaman A no instructions to keep distance from the messenger rope such as holding the end of the messenger rope, and that this contributed to the accident. Accordingly, implementation of the following measures is necessary to prevent occurrence of a similar accident. (1) The operator shall establish response procedures for worker safety that include immediately letting go of a messenger rope when the rope s exit speed increases and it becomes difficult to let out the rope while holding it, provide education and training on those procedures, and have workers adhere to those procedures. (2) Work leaders shall instruct workers to keep distance from a messenger rope such as holding an end of a messenger rope in case unexpected tension occur. 5.1 Safety Actions Taken Company A1 took the following safety actions following the accident. (1) Made information on the accident and the results of an internal investigation known to all company ships and made said information and results known at a seminar for company seafarers. (2) Instructed all company ships to hold onboard safety meetings and conduct mooring training. (3) Revised risk assessment items in the Safety Management System Manual and added an item requiring workers that are letting out a tug line to work in a location where they can immediately let go of the messenger rope if holding it becomes difficult. (4) Provided yellow and black warning paint on the deck s floor between the bollard that Ordinary Seaman A was working on and the chain stopper to alert crew members of danger

31 Attached Figure 1 Radar Images from Vessel A s VDR (19:14:00 19:15:45) Vessel B Vessel A 19:14:00 19:14:

32 19:14:30 19:14:

33 19:15:00 Vessel B s image disappears. (It is possible that it entered a blind spot near Vessel A s bow.) 19:15:

34 Vessel B reappears. Approximately 2 seconds after Navigation Officer A shouted Man overboard! on the transceiver 19:15:30 19:15:

35 Attached Figure 2 Outline Map of the Location of the Accident Events Downstream French Republic Bordeaux Bassens Terminal Berth 436 Accident location (Occurred around 19:15 on April 22, 2016) Cariette Lighthouse Upstream 1 0 1M

MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT MARINE ACCIDENT INVESTIGATION REPORT December 8th,2016 Adopted by the Japan Transport Safety Board Member Kuniaki Shoji Member Satoshi Kosuda Member Mina Nemoto Accident Type Contact (light buoy) Date

More information

MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT MA2013-10 MARINE ACCIDENT INVESTIGATION REPORT October 25, 2013 Japan Transport Safety Board The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2013-4 MARINE ACCIDENT INVESTIGATION REPORT April 26, 2013 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan Transport

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2014-2 MARINE ACCIDENT INVESTIGATION REPORT February 28, 2014 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2017-2 MARINE ACCIDENT INVESTIGATION REPORT February 23, 2017 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2016-10 MARINE ACCIDENT INVESTIGATION REPORT October 27, 2016 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2019-2 MARINE ACCIDENT INVESTIGATION REPORT February 28, 2019 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2013-1 MARINE ACCIDENT INVESTIGATION REPORT January 25, 2013 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2017-11 MARINE ACCIDENT INVESTIGATION REPORT Novemb 30, 2017 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

Unit 18 LEAVING THE DOCK

Unit 18 LEAVING THE DOCK Unit 18 LEAVING THE DOCK Basic terms - Dock Pilot - River Pilot - tug-boat - transverse thrust - effect of the screw - singling up - mooring ropes - skipper - handling of ships - buoys - dolphins - slack

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2017-9 MARINE ACCIDENT INVESTIGATION REPORT September 28, 2017 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements

Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements Harbourmaster s Office Operation of Superyacht in the Auckland Region Navigation Safety Operating Requirements Foreword Maritime Rule 90 requires that every vessel of 500 Gross tonnage or greater carries

More information

Injury during mooring operation

Injury during mooring operation July 2016 Injury during mooring operation It was early morning and the vessel was approaching the port. There was no wind or currents. On the stern was an AB preparing the mooring ropes. The stern lines

More information

MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT MA2011-4 MARINE ACCIDENT INVESTIGATION REPORT April 22, 2011 Japan Transport Safety Board The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for

More information

MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT MA2010-5 MARINE ACCIDENT INVESTIGATION REPORT May 28, 2010 Japan Transport Safety Board The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2013-5 MARINE ACCIDENT INVESTIGATION REPORT May 31, 2013 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan Transport

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2018-2 MARINE ACCIDENT INVESTIGATION REPORT February 22, 2018 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines)

Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) Code Of Practice For Towage Operations In The Port of St Helier (Towage Guidelines) This Code Covers The Use Of Tugs And Towage In The Port Of St Helier Page number Contents 2 Introduction 3 Communication

More information

Simplified report of safety investigation

Simplified report of safety investigation Simplified report of safety investigation COLLISION BETWEEN SALVATORE CAFIERO AND NAUSICAA ON 22 APRIL 2012 IN THE WESTERN APPROACHES TO THE ENGLISH CHANNEL Report published on : July 2013 2 COLLISION

More information

MARINE ACCIDENT INVESTIGATION REPORT

MARINE ACCIDENT INVESTIGATION REPORT MA2011-6 MARINE ACCIDENT INVESTIGATION REPORT June 24, 2011 Japan Transport Safety Board The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for

More information

Uncontrolled document if printed.

Uncontrolled document if printed. APPENDIX 3 APPRENTICE PILOT S TRAINING SYLLABUS Issue Date: 16 th March, 2010 Date of Revision: 22nd May, 2013 Revision #2 i THE PURPOSE OF THIS SYLLABUS The purpose of this training syllabus is to ensure

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 12 Choose the best answer to the following Multiple Choice Questions. 1. The Certificate of Inspection for your

More information

MANAGEMENT SYSTEM MANUAL

MANAGEMENT SYSTEM MANUAL 1. Purpose The purpose of this procedure is to establish routine check-off lists to be used in preparation for arrival and departure aboard the R/V Oceanus. 2. Responsibility The Master is responsible

More information

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary

Note to Shipbuilders, shipowners, ship Managers and Masters. Summary MARINE GUIDANCE NOTE MGN 301 (M+F) Manoeuvring Information on Board Ships Note to Shipbuilders, shipowners, ship Managers and Masters This note supersedes Marine Guidance Note MGN 201 (M+F) Summary The

More information

Class B Accident Report. Tokerau & Kawau Kat Collision

Class B Accident Report. Tokerau & Kawau Kat Collision Class B Accident Report Tokerau & Kawau Kat Collision At Auckland on 11 December 2004 REPORT NO: 04 3624 TOKERAU& KAWAU KAT COLLISION Whilst departing from the ferry terminal in Auckland, Tokerau collided

More information

INTERIM REPORT INTO THE FATAL INCIDENT ON-BOARD FV CU NA MARA APPROXIMATELY 130 NAUTICAL MILES WEST OF SLEA HEAD ON 30th JUNE 2016.

INTERIM REPORT INTO THE FATAL INCIDENT ON-BOARD FV CU NA MARA APPROXIMATELY 130 NAUTICAL MILES WEST OF SLEA HEAD ON 30th JUNE 2016. INTERIM REPORT INTO THE FATAL INCIDENT ON-BOARD FV CU NA MARA APPROXIMATELY 130 NAUTICAL MILES WEST OF SLEA HEAD ON 30th JUNE 2016. REPORT NO. MCIB/261/INTERIM (No.5 OF 2017) The Marine Casualty Investigation

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 14 Choose the best answer to the following Multiple Choice Questions. 1. The maneuvering information required to

More information

Class B Accident Report. Melilla 201 Man Overboard

Class B Accident Report. Melilla 201 Man Overboard Class B Accident Report Melilla 201 Man Overboard 96 Nautical Miles south of Stewart Island on 19 November 2004 REPORT NO: 04 3607 MELILLA 201 MAN OVERBOARD FATALITY At 0545 hours New Zealand Standard

More information

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)

GENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018) RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 AMENDED EFFECTIVE JANUARY

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2015-3 MARINE ACCIDENT INVESTIGATION REPORT February 26, 2015 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

Serenity Houseboat. Standard Operating Procedures for:

Serenity Houseboat. Standard Operating Procedures for: Serenity Houseboat Standard Operating Procedures for: Docking I. Safety a. Never get between the houseboat and the dock or other larger object. b. Always wear PFDs during docking. c. Always wear snug fitting,

More information

Incident Report. Close Quarters Pegasus II & Distraction. 26 April 2006 Class B

Incident Report. Close Quarters Pegasus II & Distraction. 26 April 2006 Class B Incident Report Close Quarters Pegasus II & Distraction 26 April 2006 Class B NARRATIVE Pegasus II (See Photograph 1 Pegasus II) is a 15.46 metre commercial fishing vessel with a gross tonnage of 40. She

More information

AA AIRCRAFT ACCIDENT INVESTIGATION REPORT. Setouchi SEAPLANES Inc. J A 0 2 T G

AA AIRCRAFT ACCIDENT INVESTIGATION REPORT. Setouchi SEAPLANES Inc. J A 0 2 T G AA2018-2 AIRCRAFT ACCIDENT INVESTIGATION REPORT Setouchi SEAPLANES Inc. J A 0 2 T G February 22, 2018 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with

More information

AIRCRAFT ACCIDENT INVESTIGATION REPORT

AIRCRAFT ACCIDENT INVESTIGATION REPORT AA2018-1 AIRCRAFT ACCIDENT INVESTIGATION REPORT PRIVATELY OWNED J A 0 0 7 P January 25, 2018-0 - The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the

More information

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016

PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016 PILOTAGE DIRECTIONS REVIEWED DECEMBER 2016 REVISION LIST Revision No. Date Details Approved by: Original All sections 12 Dec 2013 First edition of C W Brand v1.0 Pilotage Directions Revision 2 all sections

More information

MARINE INVESTIGATION REPORT M01C0059 STRIKING

MARINE INVESTIGATION REPORT M01C0059 STRIKING MARINE INVESTIGATION REPORT M01C0059 STRIKING OF TANK BARGE PML 2501 BY CHEMICAL TANKER CORAL TRADER ALGOMA STEEL CORPORATION WHARF SAULT STE. MARIE, ONTARIO 22 AUGUST 2001 The Transportation Safety Board

More information

Enclosure (5) to NVIC 03-16

Enclosure (5) to NVIC 03-16 TOWING OFFICER ASSESSMENT RECORD LIMITED LOCAL AREA LOCAL LIMITED AREA (LLA) TOAR INSTRUCTIONS FOR USE The following Towing Officer Assessment Record (TOAR) is intended as a model for endorsements as Limited

More information

properly applied assessment in the use.1 landmarks.1 approved in-service of ECDIS is not experience The primary method of fixing required for those

properly applied assessment in the use.1 landmarks.1 approved in-service of ECDIS is not experience The primary method of fixing required for those STCW Code Table A-II/3 Specification of minimum standard of for officers in charge of a navigational watch and for masters on ships of less than 500 gross tonnage engaged on near-coastal voyages Ref: https://www.edumaritime.net/stcw-code

More information

Local Notice to Mariners 02/2018

Local Notice to Mariners 02/2018 Local Notice to Mariners 02/2018 ABERDEEN HARBOUR PILOTAGE DIRECTIONS 2018 1. PILOTAGE DIRECTIONS Aberdeen Harbour Board as the competent harbour authority for the port and harbour of Aberdeen pursuant

More information

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS 1. Purpose The purpose of this procedure is to set forth the standards for small boat operations and the qualifications for a small boat operator. These guidelines shall be used while operating the small

More information

ANY OTHER BUSINESS. Guidelines for passenger ship tender operator. Submitted by Cruise Lines International Association (CLIA) SUMMARY

ANY OTHER BUSINESS. Guidelines for passenger ship tender operator. Submitted by Cruise Lines International Association (CLIA) SUMMARY E SUB-COMMITTEE ON STANDARDS OF TRAINING AND WATCHKEEPING 42nd session Agenda item 3 STW 42/13/2 25 October 2010 Original: ENGLISH ANY OTHER BUSINESS Guidelines for passenger ship tender operator Submitted

More information

Function: Navigation at the support level

Function: Navigation at the support level STCW Code Table A-II/5 Specification of Minimum Standards of Competence of Ratings as Able Seafarer Deck Ref: https://www.edumaritime.net/stcw-code Source: IMO Function: Navigation at the support level

More information

05 Boat Handling. Captain

05 Boat Handling. Captain 05 Boat Handling Competence (Skills) Knowledge, Understanding and Proficiency Level Required Boat handling theory and techniques Coxswain Crew RQ RQ Describe the forces acting on a vessel while manoeuvering

More information

THE COMMONWEALTH OF THE BAHAMAS. M.v. Skandi Skansen IMO Number: Official Number:

THE COMMONWEALTH OF THE BAHAMAS. M.v. Skandi Skansen IMO Number: Official Number: THE COMMONWEALTH OF THE BAHAMAS M.v. Skandi Skansen IMO Number: 9459759 Official Number: 8001928 Report of the marine safety investigation into a fatality on an Anchor Handling Supply vessel on 21 February

More information

Columbia River Pilots Vessel Movement Guidelines. Table of Contents

Columbia River Pilots Vessel Movement Guidelines. Table of Contents Columbia River Pilots Vessel Movement Guidelines Table of Contents I. Introduction.... 2 II. Pilot Transfers.. 3 III. General Information.... 4 Harbor Safety Plan... 4 Restricted Main Engine RPMs 4 Channel

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 14 Choose the best answer to the following Multiple Choice Questions. 1. The maneuvering information required to

More information

MARINE INVESTIGATION REPORT M00L0039 STRIKING

MARINE INVESTIGATION REPORT M00L0039 STRIKING MARINE INVESTIGATION REPORT M00L0039 STRIKING OF THE BULK CARRIER TECAM SEA BY THE BULK CARRIER FEDERAL FUJI PORT OF SOREL, QUEBEC 27 APRIL 2000 The Transportation Safety Board of Canada (TSB) investigated

More information

Interim Investigation Report pertaining to the investigation report 71/17. Very Serious Marine Casualty

Interim Investigation Report pertaining to the investigation report 71/17. Very Serious Marine Casualty Federal Higher Authority subordinated to the Ministry of Transport and Digital Infrastructure Interim Investigation Report pertaining to the investigation report 71/17 Very Serious Marine Casualty Collision

More information

C C S Technical Information

C C S Technical Information C C S Technical Information (2014) Technical Information No.7 Total No.129 Jan.28,2014 (Total 3+5+1 pages) To: CCS Surveyors, Plan Approval Surveyors, Relevant Ship Companies, Shipyards and Design Institutes

More information

National Transportation Safety Board

National Transportation Safety Board Accident no. Vessel names Accident type Location DCA14LM017 National Transportation Safety Board Marine Accident Brief Collision of Offshore Supply Vessel Gloria May and Fishing Vessel Capt Le Offshore

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners Q301 Rules of the Road-Inland (Sample Examination) Page 1 of 19 Choose the best answer to the following Multiple Choice Questions. NO reference

More information

Rules Practice Exam 14

Rules Practice Exam 14 1 BOTH INTERNATIONAL & INLAND Additional light signals are provided in the Annexes to the Rules for vessels. A. engaged in fishing B. not under command C. engaged in towing D. under sail 2 BOTH INTERNATIONAL

More information

Roles: Presentation Questions:

Roles: Presentation Questions: DECKHAND CREW Instructions: (mates read aloud) This crew packet contains important information for you to know aboard the Balclutha, and it will help you complete your project. First, read the part about

More information

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT AERO ASAHI CORPORATION J A

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT AERO ASAHI CORPORATION J A AI2017-3 AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT AERO ASAHI CORPORATION J A 9 6 7 8 July 27, 2017 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with

More information

Forth Ports Limited. Port of Dundee. Rig Move Guidelines

Forth Ports Limited. Port of Dundee. Rig Move Guidelines Forth Ports Limited Port of Dundee Contents 1 Introduction... 4 2 Pre-Arrival... 4 2.1 Planning Meetings... 4 2.2 Priority of Movements... 4 2.3 Confirmation/Cancellations... 5 2.4 Weather Parameters...

More information

PILOTAGE INFORMATION

PILOTAGE INFORMATION PILOTAGE INFORMATION Revised A PILOTAGE DIRECTIONS The Gloucester Harbour Trustees is the Competent Harbour Authority for the Gloucester Harbour under the Pilotage Act 1987 and responsible for the provision

More information

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container LESSONS LEARNED FROM MARINE CASUALTIES 1 FATALITY Very serious marine casualty: tug master struck by a falling stores container While discharging a routine parcel of crude oil alongside an oil terminal,

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2014-1 MARINE ACCIDENT INVESTIGATION REPORT January 31, 2014 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

REPORT INTO THE INCIDENT ON BOARD THE "ARKLOW BROOK" ON 15TH JANUARY 2002 WHERE A CREWMEMBER SUSTAINED SERIOUS INJURIES.

REPORT INTO THE INCIDENT ON BOARD THE ARKLOW BROOK ON 15TH JANUARY 2002 WHERE A CREWMEMBER SUSTAINED SERIOUS INJURIES. REPORT INTO THE INCIDENT ON BOARD THE "ARKLOW BROOK" ON 15TH JANUARY 2002 WHERE A CREWMEMBER SUSTAINED SERIOUS INJURIES. The Marine Casualty Investigation Board was established on the 25 th March, 2003

More information

SAFETY BULLETIN. SB1/2015 July 2015 M A RINE A C C I DENT INVES TIG A T ION BR A NCH. Figure 1: Zarga alongside South Hook LNG terminal

SAFETY BULLETIN. SB1/2015 July 2015 M A RINE A C C I DENT INVES TIG A T ION BR A NCH. Figure 1: Zarga alongside South Hook LNG terminal M A RINE A C C I DENT INVES TIG A T ION BR A NCH SAFETY BULLETIN SB1/2015 July 2015 Extracts from The United Kingdom Merchant Shipping (Accident Reporting and Investigation) Regulations 2012 Regulation

More information

Report on Vessel Casualty of Accident (Form Casualty) Instructions:

Report on Vessel Casualty of Accident (Form Casualty) Instructions: Report on Vessel Casualty of Accident (Form Casualty) Tuvalu Ship Registry 10 Anson Road #25-16 International Plaza Singapore 079903 Tel: (65) 6224 2345 Fax: (65) 6227 2345 Email: info@tvship.com Website:

More information

Pilotage Directions 2017

Pilotage Directions 2017 Pilotage Directions 2017 1. Commencement These Pilotage Directions shall come into force on 31 st August 2017 on which date the existing Pilotage Directions are revoked. 2. Short Title These Pilotage Directions

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 16 Choose the best answer to the following Multiple Choice Questions. 1. The possibility of wake damage can be

More information

SS&S Chapter 8 Instructor Guide

SS&S Chapter 8 Instructor Guide SS&S Chapter 8 Instructor Guide The Rules of the Nautical Road The PowerPoints (PPT) slides for this SS&S chapter were copied from the BS&S-13 th Ed PPT because they are identical. Only the chapter numbers

More information

Deckhand Crew. Deckhand Crew Responsibilities

Deckhand Crew. Deckhand Crew Responsibilities Deckhand Crew Responsibilities Deckhand Crew Deckhands must be thorough seamen, for they are responsible for many types of tasks. Deckhands, along with the Bosuns, are in charge of most tasks done "on

More information

M/V SE CERULEAN 9V9934

M/V SE CERULEAN 9V9934 Page 1 EMERGENCY TOWING BOOKLET Volume A Table of Communicating Information (Information to be provided to a towing company) M/V SE CERULEAN 9V9934 PK 148 1 HEAVY LIFT VESSEL A Written 04.10.12 SSV 14.10.12

More information

SAFETY INVESTIGATION REPORT

SAFETY INVESTIGATION REPORT Marine Safety Investigation Unit SAFETY INVESTIGATION REPORT REPORT NO.: 21/2017 October 2017 The Merchant Shipping (Accident and Incident Safety Investigation) Regulations, 2011 prescribe that the sole

More information

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL (Issued under section 3(5) of the Gibraltar Merchant Shipping (Safety etc.) Ordinance 1993

More information

IN-SERVICE QUALIFICATION AS A LIFEBOATMAN AND CERTIFICATION AS PROFICIENT IN SURVIVAL CRAFT AND RESCUE BOATS

IN-SERVICE QUALIFICATION AS A LIFEBOATMAN AND CERTIFICATION AS PROFICIENT IN SURVIVAL CRAFT AND RESCUE BOATS Commanding Officer United States Coast Guard National Maritime Center 4200 Wilson Blvd. Suite 630 Arlington, VA 22203-1804 Staff Symbol: STCWIT Phone: 202-493-1022 FAX: 202-493-1060 6 Apr, 2001 From: Commanding

More information

MARINE OCCURRENCE REPORT

MARINE OCCURRENCE REPORT MARINE OCCURRENCE REPORT COLLISION BETWEEN THE U.S. FISHING VESSEL "EAGLE" AND THE U.S. RAIL BARGE "AQUA TRAIN" UNDER TOW OF THE U.S. TUG "CRAIG FOSS" CHATHAM SOUND, BRITISH COLUMBIA 28 MAY 1995 REPORT

More information

Rules Practice Exam 11

Rules Practice Exam 11 1 BOTH INTERNATIONAL & INLAND While underway in fog, you hear a vessel sound one prolonged blast followed by two short blasts on the whistle. What does this signal indicate? A. A vessel towing B. A vessel

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners U.S.C.G. Merchant Marine Exam (Sample Examination) Page 1 of 22 U.S.C.G. Merchant Marine Exam: Illustrations: 10 Choose the best answer to the

More information

The LA/LB Harbors handle more than 5,500 commercial vessel arrivals per year (excluding local coastwise and Catalina Island traffic).

The LA/LB Harbors handle more than 5,500 commercial vessel arrivals per year (excluding local coastwise and Catalina Island traffic). X. SMALL CRAFT For the purpose of the Los Angeles and Long Beach Harbor Safety Plan, pleasure vessels, commercial fishing vessels and sportfishing boats are designated as small craft. A. BACKGROUND: The

More information

GENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions

GENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 I GENERAL The Rules and

More information

WORK-REST REQUIREMENTS FOR PILOTS

WORK-REST REQUIREMENTS FOR PILOTS AN ORDER OF THE BOARD OF PILOT COMMISSIONERS FOR THE PORT OF CORPUS CHRISTI AUTHORITY REGARDING WORK-REST REQUIREMENTS FOR PILOTS AND COMBINED BEAM RESTRICTION Whereas, the current Rules and Regulations

More information

References: Manual Chapt. 9 ISO 9001 par.7 ISO par. 4 ISM Code par. 7; 8

References: Manual Chapt. 9 ISO 9001 par.7 ISO par. 4 ISM Code par. 7; 8 SQEMS OPERATING PROCEDURE OP-SAF-03 1 of 5 References: Manual Chapt. 9 ISO 9001 par.7 ISO 14001 par. 4 ISM Code par. 7; 8 1. SCOPE This Procedure establishes criteria for the control and management of

More information

SAMOTHRAKI. Report on the investigation of the grounding. of the oil tanker. Gibraltar 17 March 2007

SAMOTHRAKI. Report on the investigation of the grounding. of the oil tanker. Gibraltar 17 March 2007 Report on the investigation of the grounding of the oil tanker SAMOTHRAKI Gibraltar 17 March 2007 Government of Gibraltar Maritime Administration Watergate House 2/8 Casemates Square Gibraltar NOTE This

More information

United 4 Sailing. SAILING INSTRUCTIONS UNITED 4 SAILING REGATTA 2018 WORKUM April

United 4 Sailing. SAILING INSTRUCTIONS UNITED 4 SAILING REGATTA 2018 WORKUM April SAILING INSTRUCTIONS UNITED 4 SAILING REGATTA 2018 WORKUM April 28-29 2018 April 28-29, 2018 on the IJsselmeer off Workum In the classes: Europe, Laser 4.7, Laser Radial, Laser Standard, Optimist, RS Feva,

More information

STANDARD PILOTAGE CONDITIONS

STANDARD PILOTAGE CONDITIONS STANDARD PILOTAGE CONDITIONS (Revised on 1st January 2009) THE TOKYO BAY LICENCED PILOTS' ASSOCIATION 1 STANDARD PILOTAGE CONDITIONS (Revised on 1st January 2009) Chapter I General Conditions (Scope of

More information

EQUIPMENT AND PERSONNEL

EQUIPMENT AND PERSONNEL 1 EQUIPMENT AND PERSONNEL Inland Rivers and Gulf Coast 2013 Section 4 Topics 4.1 Equipment Boats 4.1.1 Types and Sizes of Towboats 4.1.2 Main Propulsion Equipment 4.2 Equipment Barges 4.2.1 Barge Sizes,

More information

Mooring Balls Explained A checklist for a secure mooring

Mooring Balls Explained A checklist for a secure mooring First Edition Mooring Balls Explained A checklist for a secure mooring Kimberly Ann Brown Kimberly Ann Brown The Boat Basics Collection: Mooring Balls Explained A checklist for a secure mooring Copyright

More information

AA AIRCRAFT ACCIDENT INVESTIGATION REPORT YAMANASHI PREFECTURAL POLICE HEADQUARTERS J A Y

AA AIRCRAFT ACCIDENT INVESTIGATION REPORT YAMANASHI PREFECTURAL POLICE HEADQUARTERS J A Y AA2018-9 AIRCRAFT ACCIDENT INVESTIGATION REPORT YAMANASHI PREFECTURAL POLICE HEADQUARTERS J A 1 1 0 Y November 29, 2018 The objective of the investigation conducted by the Japan Transport Safety Board

More information

Delaware River Vessel Reporting System Mariners Advisory Committee For

Delaware River Vessel Reporting System Mariners Advisory Committee For Delaware River Vessel Reporting System Mariners Advisory Committee For the Bay and River Delaware The Mariner's Advisory Committee is comprised of Master Mariners, River Pilots, and concerns itself with

More information

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS 3654-A (OPXI v. 3-2-2011 AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS ADVISORY TO SHIPPING No. A-20-2013 August 2, 2013 TO : All Shipping Agents, Owners, and Operators SUBJECT:

More information

GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE

GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE (12/2009) GUIDELINES FOR NAVIGATION UNDER THE CONFEDERATION BRIDGE REVISION 1 DECEMBER 2009 Responsible Authority The Regional Director Marine Safety Atlantic Region is responsible for this document, including

More information

SEMI FINAL EXAMINATION

SEMI FINAL EXAMINATION SEMI FINAL EXAMINATION 1. Which vessel may exhibit, if practicable, the lights for sailing vessels, but if she does not, she shall have ready at hand a electric torch or lighted lantern showing a white

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2014-1 MARINE ACCIDENT INVESTIGATION REPORT January 31, 2014 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice MAN-001 Rev. 06/12 TO: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS,

More information

1998 MARITIME TRAFFIC REGULATIONS FOR THE TURKISH STRAITS AND THE MARMARA REGION PART I Purpose, Applicability and Definitions

1998 MARITIME TRAFFIC REGULATIONS FOR THE TURKISH STRAITS AND THE MARMARA REGION PART I Purpose, Applicability and Definitions Page 1 of 16 1998 MARITIME TRAFFIC REGULATIONS FOR THE TURKISH STRAITS AND THE MARMARA REGION PART I Purpose, Applicability and Definitions REGULATION 1 Purpose and applicability. The purpose of Vessel

More information

TOWING OFFICER ASSESSMENT RECORD

TOWING OFFICER ASSESSMENT RECORD TOWING OFFICER ASSESSMENT RECORD NEAR COASTAL / OCEANS SIGNATED EXAMINER INFORMATION All Designated Examiners (s) signing off successful completion of practical assessments should provide the information

More information

CMI QUESTIONNAIRE ON UNMANNED SHIPS

CMI QUESTIONNAIRE ON UNMANNED SHIPS HRVATSKO DRUŠTVO ZA POMORSKO PRAVO ASSOCIATION CROATE DE DROIT MARITIME CROATIAN MARITIME LAW ASSOCIATION Member of Comité Maritime International University of Rijeka Faculty of Maritime Studies Studentska

More information

PORT INFO GENERAL BERTH INFO

PORT INFO GENERAL BERTH INFO s ervices SHIPWRIGHT WWW.SHIPWRIGHTSERVICES.CO.ZA 9 DE DUINE CLOSE, BLUEWATERBAY, SALDANHA, 7395, WESTERN CAPE, SOUTH AFRICA TEL. +27 71 040 6022 EMAIL. DERICK@SHIPWRIGHTSERVICES.CO.ZA PORT INFO GENERAL

More information

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA N$4.00 WINDHOEK - 19 November 2015 No. 5877 CONTENTS Page GOVERNMENT NOTICES No. 269 No. 270 Regulations to reduce incidental by-catch of seabirds in the hake

More information

Rules Practice Exam 9

Rules Practice Exam 9 1 BOTH INTERNATIONAL & INLAND If your vessel is underway in fog and you hear one prolonged and three short blasts, this is a. A. vessel not under command B. sailing vessel C. vessel being towed (manned)

More information

NavRule Practice Exam, 70 Series Practice April 24, Labeled F (I received a reply from the testing service that all these answers were

NavRule Practice Exam, 70 Series Practice April 24, Labeled F (I received a reply from the testing service that all these answers were 1. INTERNATIONAL & INLAND An all-round flashing yellow light may be exhibited by a(n)? a. vessel laying cable b. vessel towing a submerged object c. vessel not under command d. air cushion vessel 2. INTERNATIONAL

More information

National Maritime Center

National Maritime Center National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 19 Choose the best answer to the following multiple choice questions. NO reference materials are authorized for

More information

Table of Summary on Operating Regulations governing Vessels Entering and Exiting and Mooring/Berthing at the Port of Taichung

Table of Summary on Operating Regulations governing Vessels Entering and Exiting and Mooring/Berthing at the Port of Taichung Table of Summary on Operating Regulations governing Vessels Entering and Exiting and Mooring/Berthing at the Port of Taichung Typhoon Intense When the Central Weather Bureau announcing a sea and land alerts,

More information

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This

This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This Harbourmaster s Direction 2-15 Pilotage Foreword This direction contains the requirements for the compulsory pilotage areas within the Auckland region. This direction updates and supersedes previous Harbourmaster

More information

SIP005 GUIDANCE ON MOORING

SIP005 GUIDANCE ON MOORING SIP005 GUIDANCE ON MOORING DISCLAIMER This guidance has been produced by the ports industry, with assistance from the Health and Safety Executive, to help those who owe duties under health and safety legislation

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck Page 1 of 7 Compiled by Approved by Chief Examiner Syllabus Committee:22 November 2011 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Ratings: Page 2 of 7 1. Contribute

More information