ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 1 EO M USE A STROP FOR SLINGING PREPARATION

Size: px
Start display at page:

Download "ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 1 EO M USE A STROP FOR SLINGING PREPARATION"

Transcription

1 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 1 EO M USE A STROP FOR SLINGING Total Time: 90 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Photocopy the handouts located at Annex A and either Annex B or C for each cadet. PRE-LESSON ASSIGNMENT N/A. APPROACH An interactive lecture was chosen for TP1 as it allows the instructor to generate interest in slinging a strop. Demonstration and performance was chosen for TP2 and TP3 as it allows the instructor to explain and demonstrate how to use a strop for slinging while providing an opportunity for the cadets to practice these skills under supervision. REVIEW N/A. OBJECTIVES INTRODUCTION By the end of this lesson the cadet shall have made a strop and used it for slining. IMPORTANCE It is important for cadets to make and use a strop for slinging as it is a useful skill when working with rigging and handling lines. Making and using a strop allows cadets to safely hoist and lower a load. M

2 Teaching Point 1 Time: 5 min Describe a Strop Method: Interactive Lecture STROP A strop is a continuous loop in a line or wire rope. When using line, it can be made by tying the two ends together with a reef knot or by making a short splice in one length of line. PURPOSE A strop is used to pass around a case, spar, piece of line, etc. so as to provide an eye to be placed over a hook or shackle. Figure 1 Strop on a Case Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 195) Figure 2 Strop on a Spar Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 193) Figure 3 Strop on a Line Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 193) Provide examples of pre-made strops on hand for the cadets to view. CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What is a strop? Q2. How is a strop usually made? Q3. What is the purpose of a strop? M

3 ANTICIPATED ANSWERS A1. A strop is a continuous loop in a line or wire rope. A2. A strop is made by tying the two ends together with a reef knot or by making a short splice in one length of line. A3. A strop is used to pass around a case, spar, piece of line, etc. so as to provide an eye to be placed over a hook or shackle. Teaching Point 2 Time: 60 min Demonstrate and Have the Cadets Make a Strop Method: Demonstration and Performance SHORT SPLICE Purpose The short splice is used to join two pieces of line that are not required to pass through a block. When made with one piece of line a strop is created. Figure 4 Short Splice B-GN /FP-E00, CFCD 105 Fleet Seamanship Rigging and Procedures Manual (p. 5-58) Ottawa, ON: Department of National Defence. Three-Strand Line Three-strand line consists of three strands twisted together in the same direction. This process is known as laying. Figure 5 Line Lay B-GN /FP-E00 (p. 5-11) Explain and demonstrate the steps to making a strop using a short splice prior to the cadets completing their own. Distribute line and handouts to the cadets. M

4 STEPS TO MAKING A STROP USING A SHORT SPLICE 1. Complete a whipping on both ends of the line at a distance from the line s end equal to 20 times the diameter of the rope (e.g. 2 cm diameter line requires a whip located at 40 cm from its end, 1/4 inch diameter line requires a whip located 5 inches from its end, etc.). Figure 6 Example of Whipping Distance D Cdts 3, 2007, Ottawa, ON: Department of National Defence 2. Unlay the strands of the line back to the whippings and whip the ends of each strand. Masking tape may be used to finish the ends of each strand, instead of a whipping. 3. Marry the ends of the line together so that one strand of each end lies between two strands of the opposite end. Figure 7 Steps of Line Marrying B-GN /FP-E00 (p. 5-58) Strands are spliced in the opposite direction of the line lay. To prevent the married lines from loosening, place a small whip or a piece of tape around the join between lines A and B. When making a short splice, finish splicing the end of line A before starting line B. Tape the strands (C, D and E) against line B until you are ready to splice that end. M

5 4. Remove the whipping from line A. To make tucking the strands easier the use of a marlin spike/fid is recommended. Strands are always spliced in the opposite direction of the line lay. 5. Lay F over C, tuck it under E, and bring it out between D and E. Figure 8 Steps of Line Marrying B-GN /FP-E00 (p. 5-58) 6. Lay G over E, tuck it under D, and bring it out between D and C. M

6 Figure 9 Steps of Line Marrying B-GN /FP-E00 (p. 5-58) 7. Lay H over D, tuck it under C, and bring it out between C and E. Figure 10 Steps of Line Marrying B-GN /FP-E00 (p. 5-58) 8. Continue until all strands have been tucked under the strands of the other end of line. Once the initial tucks have been completed, continue the remaining tucks by going over one strand and under the next until the length of each strand is completely tucked into the other end of line. 9. Remove the whipping from line B. M

7 10. Lay and tuck C, D and E in the same manner as F, G and H listed above. 11. To finish the splice, dog the ends. To do so, split the ends of each strand in half. Take each half and whip it to its neighbour over the adjacent strand. Figure 11 Completed Short Splice by Dogging B-GN /FP-E00 (p. 5-58) Allow the cadets to practice making a short splice. Complete an additional splice with the cadets so they can follow along, asking questions and verifying the tucks are being completed properly. Another option is to colour the ends of each strand with a different colour. This will clarify the tucking of each strand. As illustrated in Annex C. CONFIRMATION OF TEACHING POINT 2 QUESTIONS Q1. What is the purpose of a short splice? Q2. What is the process called when the three strands of line are twisted together in the same direction? Q3. How do you determine the amount of line required to complete the short splice? ANTICIPATED ANSWERS A1. The short splice is used for joining two pieces of line that are not required to pass through a block. A2. Laying. A3. The distance required is equal to 20 times the diameter of the rope. M

8 Teaching Point 3 Time: 20 min Demonstrate and Have the Cadets Use a Strop for Slinging Method: Demonstration and Performance PUTTING A STROP ON A SPAR Explain and demonstrate how to attach a strop to a spar. Place the strop around the spar. Pull the strop through itself exposing a loop which may be attached to a hook. Figure 12 Strop on a Spar Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 193) Allow the cadets to practice attaching a sling to a spar. USING A STROP FOR SLINGING A BOX Explain and demonstrate how to use a strop for slinging a box. Whenever an item or a collection of packages is to be hoisted, it is attached to a hook through the use of a sling. A sling can be made with a single strop placed around the box, tucked through itself and attached to a hook or by using two strops; one located on either end of the item. M

9 Figure 13 Sling a Box Using a Strop Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 195) Figure 14 Sling a Case Using Two Strops Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 194) When using strops for hoisting, the angle between the legs of the sling will determine the amount of stress the strops must endure. The recommended angle of work is between 0 degrees and 120 degrees. Figure 15 provides examples of some stress that a strop maybe be subject to when using slings. M

10 Figure 15 Stresses in the Legs of Slings Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 194) The angles at which a sling is operated should be limited to prevent unnecessary stress on strops when hoisting items. Allow the cadets to practice using a strop for slinging a box. CONFIRMATION OF TEACHING POINT 3 QUESTIONS Q1. What is a sling used for? Q2. What are the recommended angles of work for the legs of a sling? Q3. How do you use a strop to sling a box? M

11 ANTICIPATED ANSWERS A1. Hoisting an item or a collection of packages. A2. Between 0 degrees and 120 degrees. A3. Place the strop around the box, tuck it through itself and attach it to a hook. END OF LESSON CONFIRMATION The cadets participation in TP2 and TP3 will serve as the confirmation of this lesson. HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT CONCLUSION The use of strops is a necessary component of slinging objects that require hoisting. Being able to make a short splice, hence completing a strop, will be a useful skill during Phase Three training when learning to rig sheer legs. INSTRUCTOR NOTES/REMARKS N/A. REFERENCES A1-004 B-GN /FP-E00 Chief of Maritime Staff. (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON: Department of National Defence. C1-003 (ISBN II ) Royal Navy. (1972). Admiralty Manual of Seamanship 1964 (Vol. 1). London, England: Her Majesty s Stationery Office. M

12 THIS PAGE INTENTIONALLY LEFT BLANK M

13 Annex A to EO M Instructional Guide STEPS TO MAKING A STROP USING A SHORT SPLICE The strands of each line are tucked between the strands of the other line. The strands are laid against the lay and tucked under the next strand and emerging between this and the subsequent strand. 1. Complete a whipping on both ends of the line at a distance from the lines end equal to 20 times the diameter of the rope (e.g. 2 cm diameter line requires a whip located at 40 cm from its end, 1/4 inch diameter line requires a whip located 5 inches from its end, etc.). 2. Unlay the strands of the line back to the whippings and whip the ends of each strand. 3. Marry the ends of the line together so that one strand of each end lies between two strands of the opposite end. To prevent the married lines from loosening, place a small whip or a piece of tape around the join between lines A and B. When making a short splice, finish splicing the end of line A before starting line B. Tape the strands (C, D and E) against line B until you are ready to splice that end. 4. Remove the whipping from line A. Strands are spliced in the opposite direction of the line lay. 5. Lay F over C, tuck it under E, and bring it out between D and E. 6. Lay G over E, tuck it under D, and bring it out between D and C. 7. Lay H over D, tuck it under C, and bring it out between C and E. 8. Continue until all strands have been tucked under the strands of the other end of line. 9. Remove the whipping from line B. 10. Lay and tuck C, D and E in the same manner as F, G and H listed above. 11. To finish the splice, dog the ends. To do so, split the ends of each strand in half. Take each half and whip it to its neighbour over the adjacent strand. Figure A-1 Completed Short Splice by Dogging B-GN /FP-E00 (p. 5-58) M221.01A-1

14 Annex A to EO M Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK M221.01A-2

15 Annex B to EO M Instructional Guide SHORT SPLICE Figure B-1 Short Splice B-GN /FP-E00 (p. 5-58) M221.01B-1

16 Annex B to EO M Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK M221.01B-2

17 Annex C to EO M Instructional Guide SHORT SPLICE (COLOUR ENDS) Figure C-1 Short Splice (Colour Ends) B-GN /FP-E00 (p. 5-38) M221.01C-1

18 Annex C to EO M Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK M221.01C-2

19 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 2 EO M MOUSE A HOOK Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Photocopy the handout located at Annex A for each cadet. PRE-LESSON ASSIGNMENT N/A. APPROACH An interactive lecture was chosen for TP1 as it allows the instructor to orient the cadets to mousing a hook. Demonstration and performance was chosen for TP2 and TP3 as it allows the instructor to explain and demonstrate mousing a hook while providing an opportunity for the cadets to practice this skill under supervision. REVIEW N/A. OBJECTIVES INTRODUCTION By the end of this lesson the cadet shall have moused a hook. IMPORTANCE It is important for cadets to know how to mouse a hook as it is not only a practical skill when securing loads to a hook, but a safety precaution whenever any hook is under stress. M

20 Teaching Point 1 Time: 5 min Describe Mousing a Hook Method: Interactive Lecture MOUSING A HOOK Mousing a hook is securely wrapping a length of line or small wire between the bill and shank of a hook. PURPOSE Mousing is used to prevent a load from slipping off a hook. Identify the two parts of a hook, illustrated in Figure 1, that will be used when mousing a hook. Figure 1 Completed Mousing B-GN /FP-E00 (p. 5-46) Have a hook moused to use as an example. CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What is mousing a hook? Q2. What is used to mouse a hook? Q3. What is the purpose of mousing a hook? M

21 ANTICIPATED ANSWERS A1. Mousing a hook is securely wrapping a length of line or small wire between the bill and shank of a hook. A2. Small line or whipping twine. A3. Mousing is used to prevent a load from slipping off a hook. Teaching Point 2 Time: 50 min Demonstrate and Have the Cadets Mouse a Hook Method: Demonstration and Performance Explain and demonstrate the steps to mousing a hook prior to the cadets completing their own. Distribute whipping twine, hook and handout to the cadets. Coat hangers may be used in place of hooks. Bend one end of the coat hanger to serve as the bill of the hook. MOUSING A HOOK Steps to Mousing a Hook 1. Cut a length of whipping twine that is approximately six times the distance between the bill and shank of the hook (e.g. 10 cm distance between the bill and shank requires a 60 cm length of line, 2 inch distance between the bill and shank requires a 12 inch length of line, etc.). Figure 2 Example of Distance Between the Shank and Bill B-GN /FP-E00 (p. 5-46) 2. Using the full length of twine, make a bight in the middle of the length of twine. A bight is when you make a loop in a piece of line. M

22 Figure 3 Bight Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 154) 3. Place the bight around the shank and pass the ends through the bight. 4. Tightly wrap the ends around the bill and back around the shank. Figure 4 Mousing (Steps Three and Four) B-GN /FP-E00 (p. 5-46) 5. Complete step four again, hauling the turns taut. 6. Holding one end of the whipping twine near the shank bring the other to the bill. Tightly hold the whipping twine against the bill with your thumb and index finger. 7. Bring the piece of whipping twine near the shank up and around the shank. 8. Starting underneath, begin wrapping the end of the whipping twine around the turns made between the bill and shank in steps four and five. Figure 5 Mousing (Steps Six to Eight) B-GN /FP-E00 (p. 5-46) Be sure to keep tension on the whipping twine to ensure the mousing does not slip off when completed. 9. Continue to wrap the whipping twine around the turns between the bill and the shank until it reaches the bill. M

23 10. Complete the mousing by tying a reef knot between the two ends of the whipping twine at the bill of the hook. 11. Cut off the excess whipping twine. Figure 6 Mousing (Steps Nine to Eleven) B-GN /FP-E00 (p. 5-46) Allow the cadets to practice mousing a hook. The steps to mousing a hook are outlined in Annex A. Provide each cadet with a copy of these instructions. CONFIRMATION OF TEACHING POINT 2 QUESTIONS Q1. What is the first step in mousing a hook? Q2. What is a key point to remember when mousing a hook? Q3. What knot is used to end a mousing? ANTICIPATED ANSWERS A1. Cut a piece of whipping twine to a length approximately six times the distance between the bill and the shank of the hook. A2. Be sure to keep tension on the whipping twine to ensure the mousing does not slip off when completed. A3. A reef knot. END OF LESSON CONFIRMATION The cadets mousing a hook will serve as the confirmation of this lesson. HOMEWORK/READING/PRACTICE N/A. CONCLUSION M

24 METHOD OF EVALUATION N/A. CLOSING STATEMENT Mousing a hook is a practical skill that is still used in the Canadian Navy today when spring hooks are not available and a mousing must be applied. It is important to know how to mouse a hook in order to safely attach a load to any hook, preventing potential accidents and injuries. INSTRUCTOR NOTES/REMARKS Coat hangers may be used in place of hooks. Bend one end of the coat hanger to serve as the bill of the hook. REFERENCES A1-004 B-GN /FP-E00 Chief of Maritime Staff. (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON: Department of National Defence. C1-003 (ISBN II ) Royal Navy. (1972). Admiralty Manual of Seamanship 1964 (Vol. 1). London, England: Her Majesty s Stationery Office. M

25 Annex A to EO M Instructional Guide MOUSING A HOOK Steps to Mousing a Hook 1. Cut a length of whipping twine that is approximately six times the distance between the bill and shank of the hook (e.g. 10 cm distance between the bill and shank requires a 60 cm length of line, 2 inch distance between the bill and shank requires a 12 inch length of line, etc.). 2. Using the full length of twine, make a bight in the middle of the length of twine. 3. Place the bight around the shank and pass the ends through the bight. 4. Tightly wrap the ends around the bill and back around the shank. 5. Complete step four again, hauling the turns taut. 6. Holding one end of the line near the shank bring the other to the bill. 7. Bring the piece of whipping twine near the shank up and around the shank. 8. Starting underneath, begin wrapping the end of the whipping twine around the turns made between the bill and shank in steps four and five. 9. Continue to wrap the whipping twine around the turns between the bill and the shank until it reaches the bill. 10. Complete the mousing by tying a reef knot between the two ends of the whipping twine at the bill of the hook. 11. Cut off the excess whipping twine. Figure A-1 Mousing a Hook B-GN /FP-E00 (p. 5-46) M221.02A-1

26 Annex A to EO M Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK M221.02A-2

27 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 3 EO M REEVE BLOCKS Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. PRE-LESSON ASSIGNMENT N/A. APPROACH An interactive lecture was chosen for TP1 and TP2 as it allows the instructor to introduce blocks and to generate interest. Demonstration and performance was chosen for TP3 as it allows the instructor to explain and demonstrate reeving a rope through a block while providing an opportunity for the cadets to practice this skill under supervision. An in-class activity was chosen for TP4 as it is an interactive way to reinforce reeving a block and to confirm the cadets comprehension of the material. REVIEW N/A. OBJECTIVES INTRODUCTION By the end of this lesson the cadet shall have reeved blocks. IMPORTANCE It is important for cadets to know how to reeve blocks as it is the first step in constructing pulley systems which will be introduced in future lessons. This skill will provide cadets with alternative options when lifting or moving heavy objects from one place to another. M

28 Teaching Point 1 Time: 5 min Describe the Parts of a Block Method: Interactive Lecture WHAT IS A BLOCK? A block is a pulley made of wood, metal, and/or synthetic-resin bonded fibre and, in some cases, a combination of wood and metal. It is used to provide assistance when moving objects from one location to another. Have a block to use as an example. PARTS OF A BLOCK Crown. The top area of the block. Cheek. The side housing of the block. Pin. Secures the sheave between the cheeks. Becket. An eye connected to the bottom of the block, used for securing the line when reeving two or more blocks. Tail. The lower area of the block. Sheave. The wheel found inside the cheeks of the block that the lines sits on. Swallow. The space between the sheave and the crown of the block. This distance determines the maximum size of line a block can handle. Head Fitting (Eye). An eye located at the top of the block, used for connecting the block to a deckhead, bulkhead, etc. Tally plate. A metal plate that identifies a block s safe working load. It is fixed to the cheek of the block. M

29 Figure 1 Parts of a Metal Block B-GN /FP-E00 (p. 5-94) Figure 2 Parts of a Wooden Block Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 210) CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What is a block? Q2. What is the side housing of a block called? Q3. What is the swallow? ANTICIPATED ANSWERS A1. A block is a pulley made of wood, metal, and/or synthetic-resin bonded fibre and, in some cases, a combination of wood and metal. A2. The cheek. A3. The space between the sheave and the crown of the block. This distance determines the maximum size of line a block can handle. Teaching Point 2 Time: 5 min Describe the Blocks for Reeving Method: Interactive Lecture There are two different blocks that are commonly used in the Cadet Program. Single Block. This block consists of one sheave. A single block can be used as a stand alone block, which will provide a change of direction when pulling a load. It can also be used in series with additional single or double blocks. Double Block. This block consists of two sheaves. The double block is not a stand alone block, and is used in a series with other types of blocks. M

30 Figure 3 Single and Double Block Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 218) Have a single and double block to use as an example. CONFIRMATION OF TEACHING POINT 2 QUESTIONS Q1. How many sheaves does a single block have? Q2. What type of block has two sheaves? Q3. What does a stand alone single block provide? ANTICIPATED ANSWERS A1. One. A2. A double block. A3. A change of direction. Teaching Point 3 Time: 10 min Demonstrate and Have the Cadets Practice Reeving a Line Through a Block Method: Demonstration and Performance Explain and demonstrate how to reeve a line through a block. M

31 REEVING Lines are reeved through the sheave of the block. When reeving blocks the line should be checked for kinks and tangles. Coiling or faking out the line will help prevent this from occuring. Take one end of the line and feed it through the sheave of the block. When the line has been reeved through the block a figure eight knot shall be tied in the end. Figure 4 Reeving a Block Royal Navy, Admiralty Manual of Seamanship 1964, Her Majesty s Stationery Office (p. 216) Allow the cadets to practice reeving a single block. The block should be attached to a wall or object to prevent the block from moving while reeving. CONFIRMATION OF TEACHING POINT 3 The cadet s participation in reeving blocks will serve as the confirmation of this TP. Teaching Point 4 Time: 5 min Conduct an Activity for Reeving Blocks Method: In-Class Activity ACTIVITY OBJECTIVE The objective of this activity is to have cadets review the parts of a block and reeve blocks. RESOURCES Block labels located at Annex A. Two single blocks per group. M

32 Tape. Bag per group. A length of line per group. ACTIVITY LAYOUT Mark off a starting line. For each group, lay out one single block for labelling the parts five metres from the starting line. Lay another single block with a length of line at a distance five metres from the other block. Cut out the block labels and place them in a bag. ACTIVITY INSTRUCTIONS SAFETY Divide the cadets into two groups. Figure 5 Activity Layout D Cdts 3, 2007, Ottawa, ON: Department of National Defence Have each group line up behind the starting line. On the starting signal, the first cadet must choose a label from the bag, run to the block, and place the label on the corresponding part. When the label is placed on the block, return to the starting line, where the next person will choose a label from the bag and run to the block and label it accordingly. If a team member labels a part incorrectly, the label is to be placed back into the bag. The first team to label the entire block correctly will advance to the other single block and reeve it. The block is reeved once the figure eight knot has been tied. The first team to correctly label and reeve the block is the winner. This activity must be conducted in a large area that is free of obstructions. M

33 CONFIRMATION OF TEACHING POINT 4 The cadet s participation in the activity will serve as the confirmation of this TP. END OF LESSON CONFIRMATION The cadets participation in the activity in TP4 will serve as the confirmation of this lesson. HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT CONCLUSION For a block to work efficiently the line must move freely; therefore lines should be free of kinks and tangles when reeving blocks. This skill will be applied in future rigging tasks. INSTRUCTOR NOTES/REMARKS N/A. REFERENCES A1-004 B-GN /FP-E00 Chief of Maritime Staff. (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON: Department of National Defence. C1-003 (ISBN II ) Royal Navy. (1972). Admiralty Manual of Seamanship 1964 (Vol. 1). London, England: Her Majesty s Stationery Office. M

34 THIS PAGE INTENTIONALLY LEFT BLANK M

35 Annex A to EO M Instructional Guide BLOCK LABELS M221.03A-1

36 Annex A to EO M Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK M221.03A-2

37 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 4 EO M IDENTIFY COMPONENTS OF TACKLES Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Prepare and rig the tackles that are to be presented during this lesson. Photocopy the labels located at Annex A. Photocopy the handout located at Annex B for each cadet. PRE-LESSON ASSIGNMENT N/A. APPROACH An interactive lecture was chosen for TP1, TP3, and TP4 as it allows the instructor to introduce components of tackles and to create interest in ropework. An in-class activity was chosen for TP2 as it is an interactive way to provoke thought, stimulate interest, and to confirm the cadets comprehension of the parts of the tackle. REVIEW N/A. OBJECTIVES INTRODUCTION By the end of this lesson the cadet shall identify components of tackles. IMPORTANCE It is important for cadets to know the components of tackles to understand how to use tackles at the maximum efficiency possible with minimal effort. The concepts surrounding tackles will provide assistance when completing future seamanship based tasks. M

38 Teaching Point 1 Time: 10 min Describe Tackles Method: Interactive Lecture WHAT IS A TACKLE (PRONOUNCED TAYCKLE )? A purchase is a mechanical device to which an applied pull or force is increased. A tackle is a purchase consisting of a rope rove through a block or multiple blocks, providing assistance to lifting a load. The amount of force of the pull required to lift a load is dependent on the number of sheaves in the blocks and the manner in which the rope is rove through them. TYPES OF TACKLES Single Whip. This is a tackle consisting of a line rove through a single block. It is used for hoisting light loads, and where speed of hoisting is an important factor. Figure 1 Single Whip B-ON /PT-004, BR 67 Admiralty Manual of Seamanship (p ) Double Whip. This is a tackle consisting of a line rove through two single blocks. It is mainly used for hoisting loads. M

39 Figure 2 Double Whip Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Luff. This is a tackle consisting of a line rove through a single and double block. Figure 3 Luff Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Two-fold Purchase. This is a tackle consisting of a piece of line rove through two double blocks. It is a useful general-purpose tackle, as it provides the greatest assistance of the four tackles described in this lesson. M

40 Figure 4 Two-fold Purchase Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) The type of tackle used will depend on the assigned task. Things to consider will be, blocks available, length of line available, weight of the load, distance the load is to be moved, location, and the strength and number of people available to control the tackle. CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What is a single whip tackle? Q2. What blocks make up a luff? Q3. What tackle is considered a useful general-purpose tackle? ANTICIPATED ANSWERS A1. A line rove through a single block. A2. A single and a double block. A3. A two-fold purchase. M

41 Teaching Point 2 Time: 10 min Describe the Parts of a Tackle Method: In-Class Activity PARTS OF A TACKLE Figure 5 Parts of a Tackle Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Standing Block. This block is attached to a fixed surface and does not move when the tackle is being used. Standing Part. This is the line attached to the standing block and is rove through the moving block. Hauling Part. This is either hauled or eased out to hoist, lower, or move the load. Moving Block. This block is attached to the load being hoisted/lowered/moved and moves when the hauling part is pulled or eased out respectively. Running Part. This is the line that is rove through the moving and standing block. Load. Any item or load, connected to a tackle, being hoisted or moved from one point to another. ACTIVITY Time: 5 min OBJECTIVE The objective of this activity is to review the parts of a tackle. RESOURCES Two single blocks. Two metres of line. A load of 22 kg (50 lbs) or less. M

42 Tackle labels located at Annex A to this EO. Tape. ACTIVITY LAYOUT Rig two double whip tackles and place them in the front of the class. ACTIVITY INSTRUCTIONS Divide cadets into two groups. Provide each team with a set of tackle labels and tape. Assign each group to a double whip. Have each group label the double whip. SAFETY N/A. If there is a large group, make additional sets of labels and double whips. CONFIRMATION OF TEACHING POINT 2 The cadets participation in the activity will serve as the confirmation of this TP. Teaching Point 3 Time: 20 min Describe Mechanical Advantage Method: Interactive Lecture MECHANICAL ADVANTAGE The amount by which the pull on the hauling part is multiplied by the tackle is called the mechanical advantage (MA) and, if friction is disregarded, this is equal to the number of parts of line emerging from the moving block. For the point of this lesson friction will be disregarded. Figure 6 is an example of the MA in a tackle. There are two lines attached to the moving block, therefore the MA equals two. M

43 Figure 6 Mechanical Advantage Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) The MA will change how heavy the load feels to the person(s) pulling on the hauling part. For example, in Figure 6 the MA equals two. Therefore, the weight felt would equal 50 kg for the 100 kg load, meaning the weight felt is equal to 1/2 the actual weight of the load. The following formula is an easy way to determine the weight felt by the hauling part. Example: MA equals three, load weight equals 300 kg WEIGHT = (1/3) x 300 kg WEIGHT = 100 kg WEIGHT = (1 / MA) x Actual Load Weight M

44 MECHANICAL ADVANTAGE IN TACKLES Figure 7 Single Whip MA Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Figure 8 Double Whip MA Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Figure 9 Luff MA Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Figure 10 Two-Fold Purchase MA Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) RIGGING TO ADVANTAGE AND DISADVANTAGE If a tackle from Figure 8 to Figure 10 was flipped upside down there would be an extra part of the line emerging from the moving block. The MA would therefore increase by one. When a tackle is rigged to this maximum MA it is rigged to advantage. When the tackle is rigged as in Figures 8 and 9 it is rigged to disadvantage. The single whip provides no advantage. The weight felt on the hauling part will be the actual weight of the load. M

45 Figure 11 Rigging to Advantage and Disadvantage Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Tackle MA When Rigged to Disadvantage MA When Rigged to Advantage Single Whip 1 1 Double Whip 2 3 Luff 3 4 Two-Fold Purchase 4 5 Figure 12 Advantage vs. Disadvantage D Cdts 3, 2007, Ottawa, ON: Department of National Defence Normal use of tackles will result in many tackles being rigged to disadvantage as it is easier to pull downwards on the hauling part. To maximize MA, change the direction of pull by reeving the hauling part through an additional single block. CONFIRMATION OF TEACHING POINT 3 QUESTIONS Q1. What is the MA of a double whip rigged to disadvantage? Q2. If the MA equals two and the actual load weight equals 500 kg, what is the weight felt by the hauling part? Q3. What is the MA of a two-fold purchase when rigged to advantage? M

46 ANTICIPATED ANSWERS A1. Two. A kg. A3. Five. Teaching Point 4 Time: 10 min Describe Velocity Ratio Method: Interactive Lecture VELOCITY RATIO The ratio between the distance moved by the hauling part and the distance moved by the moving block is known as velocity ratio (VR) and is always equal to the number of parts of the line coming from the moving block. The VR is directly related to the amount of MA of a tackle. MA is gained only at the expense of speed of work, or how much you must pull in order to move a load a desired distance. If the MA is increased so is the VR, therefore, requiring more line to move a load the desired distance. Figure 13 Velocity Ratio of a Tackle Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) In Figure 13, in order to raise the load 0.5 m the hauling part is required to move a distance of 1 m. If the distance the load must be moved and the VR are known, calculate the hauling part distance using the following formula: Example: Hauling Part Distance = Distance the Load Must be Moved x VR VR equals 2, distance the load must be moved 0.5 m. Hauling Part Distance = 0.5 m x 2 M

47 Hauling Part Distance = 1 m CONFIRMATION OF TEACHING POINT 4 QUESTIONS Q1. What is the term for the ratio between the distance moved by the hauling part and the distance moved by the moving block? Q2. If there are four parts of the line emerging from the moving block, what is the VR? Q3. What is the hauling part distance required to move a load 20 m, with a tackle that has a VR of two? ANTICIPATED ANSWERS A1. Velocity ratio. A2. Four. A3. 40 m. END OF LESSON CONFIRMATION Have cadets complete the handout located at Annex B. HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT CONCLUSION The ability to identify the components of a tackle will assist in completing ropework tasks more efficiently with minimal effort. Understanding the concepts surrounding tackles will provide the knowledge to maximize the use of these tackles. INSTRUCTOR NOTES/REMARKS N/A. REFERENCES C1-003 (ISBN II ) Royal Navy. (1972). Admiralty Manual of Seamanship 1964 (Vol. 1). London, England: Her Majesty s Stationery Office. C1-047 (ISBN ) B-ON /PT-004 Command of the Defence Council. (1995). BR 67 Admiralty Manual of Seamanship. London, England: HMSO Publications Centre. M

48 THIS PAGE INTENTIONALLY LEFT BLANK M

49 Annex A to EO M Instructional Guide TACKLE LABELS M221.04A-1

50 Annex A to EO M Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK M221.04A-2

51 Annex B to EO M Instructional Guide TACKLES REVIEW 1. What type of blocks make up a luff tackle?. 2. What type of blocks make up a two-fold purchase?. 3. What is the following tackle called?. Figure B-1 Tackle Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) 4. Identify the tackle rigged to advantage/disadvantage? Circle the appropriate answer: Figure B-2 Advantage or Disadvantage Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) 5. What is the mechanical advantage (MA) of a luff when rigged to: a. disadvantage. b. advantage. 6. If you want to lift a load of 200 kg using a two-fold purchase rigged to advantage, what would be the weight felt by the hauling part?. M221.04B-1

52 Annex B to EO M Instructional Guide 7. If you want to raise a load a distance of four metres using a double whip rigged to disadvantage, what would be the required hauling distance?. M221.04B-2

53 Annex C to EO M Instructional Guide TACKLES REVIEW ANSWER KEY 1. What type of blocks make up a luff tackle? One single block and one double block. 2. What type of blocks make up a two-fold purchase? Two double blocks. 3. What is the following tackle called? A luff. Figure C-1 Tackle Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) 4. Identify the tackle rigged to advantage/disadvantage? Circle the appropriate answer: Figure C-2 Advantage or Disadvantage Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) 5. What is the mechanical advantage (MA) of a luff when rigged to: a. disadvantage Two. b. advantage Three. 6. If you want to lift a load of 200 kg using a two-fold purchase rigged to advantage, what would be the weight felt by the hauling part? Forty kilograms. M221.04C-1

54 Annex C to EO M Instructional Guide 7. If you want to raise a load a distance of four metres using a double whip rigged to disadvantage, what would be the required hauling distance? Eight metres. M221.04C-2

55 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 5 EO M RIG TACKLES Total Time: 90 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Photocopy the station cards located at Annex A. PRE-LESSON ASSIGNMENT N/A. APPROACH Demonstration and performance was chosen for TP1 to TP4 as it allows the instructor to explain and demonstrate how to rig various tackles while providing an opportunity for the cadets to practice these skills under supervision. An in-class activity was chosen for TP5 as it is an interactive way to reinforce rigging tackles and to confirm the cadets comprehension of the material. REVIEW N/A. OBJECTIVES By the end of this lesson the cadet shall rig tackles. IMPORTANCE INTRODUCTION It is important for cadets to know how to rig tackles to be able to perform tasks that would be otherwise too difficult to complete. This knowledge will provide assistance when completing future ropework tasks. M

56 Teaching Point 1 Time: 5 min Explain the Use of, Demonstrate, and Have Cadets Rig a Single Whip Method: Demonstration and Performance Explain and demonstrate how to rig a single whip. SINGLE WHIP A single whip is used for hoisting light loads where speed is an important factor. STEPS TO RIGGING 1. Lay a single block on its cheek. 2. Reeve the line through the sheave. 3. Finish rigging by tying a figure eight knot in the line s end. 4. Secure the standing block to a deckhead/post, etc. 5. Secure the line to the load. 6. Mouse all hooks. 7. Raise the load by hauling in on the hauling part. Figure 1 Single Whip Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) MECHANICAL ADVANTAGE The single whip provides a mechanical advantage (MA) equal to one and is often used to change the direction of pull on the hauling part of a tackle. M

57 Allow the cadets to practice rigging a single whip. CONFIRMATION OF TEACHING POINT 1 The cadets rigging of a single whip will serve as the confirmation of this TP. Teaching Point 2 Time: 15 min Explain the Use of, Demonstrate, and Have the Cadets Rig a Double Whip Method: Demonstration and Performance Explain and demonstrate how to rig a double whip. DOUBLE WHIP A double whip consists of two single blocks and is used for hoisting. STEPS TO RIGGING 1. Lay two single blocks on their cheeks with the beckets toward each other. 2. Label one block A and the other block B. 3. Starting with block A, secure the line to the becket with a bowline. 4. Reeve the other end of the line through the sheave of block B. 5. Reeve the line through the sheave of block A. 6. Finish rigging by tying a figure eight knot in the line s end. 7. Secure the standing block to a deckhead/post, etc. 8. Secure the load to block B. 9. Mouse all hooks. 10. Raise the load by hauling in on the hauling part. M

58 Figure 2 Double Whip Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) MECHANICAL ADVANTAGE The double whip provides a mechanical advantage of two or three depending on the number of lines coming from the moving block. In Figure 2 the MA equals two (rigged to disadvantage). If this tackle was reversed, it would result in three lines coming from the moving block, changing the MA to three (rigged to advantage). Allow the cadets to practice rigging a double whip to both advantage and disadvantage. CONFIRMATION OF TEACHING POINT 2 The cadets rigging of a double whip will serve as the confirmation of this TP. Teaching Point 3 Time: 20 min Explain the Use of, Demonstrate, and Have the Cadet Rig a Luff Method: Demonstration and Performance Explain and demonstrate how to rig a luff. LUFF A luff consists of one single block and one double block. M

59 STEPS TO RIGGING 1. Lay the single and double blocks on their cheeks with the beckets toward each other. 2. Label the single block A and the double block B. 3. Starting with block A, secure the line to the becket with a bowline. 4. Reeve the other end of the line through the lower sheave of block B. 5. Reeve the line through the sheave of block A. 6. Reeve the line through the upper sheave of block B. 7. Finish rigging by tying a figure eight knot in the line s end. 8. Secure the standing block to a deckhead/post, etc. 9. Secure the load to block A. 10. Mouse all hooks. 11. Raise the load by hauling in on the hauling part. Figure 3 Luff Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) MECHANICAL ADVANTAGE The luff provides a mechanical advantage of three or four depending if it is rove to advantage or disadvantage. In Figure 3 the MA equals three (rigged to disadvantage) because there are three lines coming from the moving block. If this tackle was reversed, it would result in four lines coming from the moving block, changing the MA to four (rigged to advantage). Allow the cadets to practice rigging a luff to both advantage and disadvantage. M

60 CONFIRMATION OF TEACHING POINT 3 The cadets rigging of a luff will serve as the confirmation of this TP. Teaching Point 4 Time: 20 min Explain the Use of, Demonstrate, and Have the Cadets Rig a Two-Fold Purchase Method: Demonstration and Performance Explain and demonstrate how to rig a two-fold purchase. TWO-FOLD PURCHASE A two-fold purchase is a useful general-purpose tackle and consists of two double blocks. STEPS TO RIGGING 1. Lay the two double blocks on their cheeks with the beckets toward each other. 2. Label one block A and the other block B. 3. Starting with block A, secure the line to the becket with a bowline. 4. Reeve the other end of the line through the lower sheave of block B. 5. Reeve the line through the lower sheave of block A. 6. Reeve the line through the upper sheave of block B. 7. Reeve the line through the upper sheave of block A. 8. Finish rigging by tying a figure eight knot in the line s end. 9. Secure the standing block to a deckhead/post, etc. 10. Secure the load to block B. 11. Mouse all hooks. 12. Raise the load by hauling in on the hauling part. M

61 Figure 4 Two-fold Purchase Command of Defence Council, BR 67 Admiralty Manual of Seamanship, Her Majesty s Stationery Office (p ) Be careful not to cross the lines as you are reeving each block. MECHANICAL ADVANTAGE The two-fold purchase provides a mechanical advantage of four or five depending if it is rove to advantage or disadvantage. In Figure 4 the MA equals four (rigged to disadvantage) because there are four lines coming from the moving block. If this tackle was reversed, it would result in five lines coming from the moving block, changing the MA to five (rigged to advantage). Allow the cadets to practice rigging a two-fold purchase to both advantage and disadvantage. CONFIRMATION OF TEACHING POINT 4 The cadets rigging of a two-fold purchase will serve as the confirmation of this TP. Teaching Point 5 Time: 20 min Conduct an Activity for Rigging Tackles Method: In-Class Activity ACTIVITY OBJECTIVE The objective of this activity is to have cadets review rigging tackles. M

62 RESOURCES Two single blocks. Two double blocks. Twenty-six metres of line. A load of 22 kg (50 lbs) or less. Bag (any type). Whistle. Stopwatch. Station cards located at Annex A. ACTIVITY LAYOUT Mark off a start area. Next to the start area lay out two single blocks, two double blocks, and two lengths of line. Place the load at station two. Set-up the pylons as illustrated in Figure 5. Place a bag at each station. In each bag place the corresponding station card located at Annex A. Figure 5 Tackle Run D Cdts 3, 2007, Ottawa, ON: Department of National Defence M

63 ACTIVITY INSTRUCTIONS 1. Divide the cadets into two or more teams. 2. Have one team line up behind the start area. 3. On the whistle signal, the team must gather up the blocks and line located at the start area. 4. The team must then advance to each station consecutively and complete the task found on the card. 5. The team will continue the course until all tasks have been completed correctly. 6. The team is finished when all members have crossed the finish line. 7. If a team is unable to complete a task they will be required to return to the start line and re-start. 8. Have each team repeat steps two to eight. 9. The team that completes the tackle run with the fastest time is the winner. SAFETY If a team is required to re-start, review the areas in which the team had difficulties prior to allowing them another opportunity to complete the tackle run. For each question answered correctly five seconds will be deducted from the team s finish time. This activity must be conducted in a large area that is free of obstructions. CONFIRMATION OF TEACHING POINT 5 The cadets participation in the activity will serve as the confirmation of this TP. END OF LESSON CONFIRMATION The cadets participation in the TPs will serve as the confirmation of this lesson. HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT CONCLUSION Rigging tackles free of twists and tangles will enable the line to move freely through the blocks ensuring the tackle works efficiently. The ability to rig tackles will provide the necessary assistance to perform tasks that require the movement of heavy loads, with little difficulty. M

64 INSTRUCTOR NOTES/REMARKS N/A. REFERENCES C1-047 (ISBN ) B-ON /PT-004 Command of the Defence Council. (1995). BR 67 Admiralty Manual of Seamanship. London, England: HMSO Publications Centre. M

65 Annex A to EO M Instructional Guide STATION CARDS M221.05A-1

66 Annex A to EO M Instructional Guide M221.05A-2

67 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 6 EO C MAKE A BACK SPLICE Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Photocopy the handouts located at Annexes A and B for each cadet. PRE-LESSON ASSIGNMENT N/A. APPROACH Demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate making a crown knot and a back splice while providing an opportunity for the cadets to practice these skills under supervision. REVIEW INTRODUCTION Review three-strand line from EO M (Use a Strop for Slinging). OBJECTIVES By the end of this lesson the cadet shall have made a back splice. IMPORTANCE It is important for cadets to know how to make a back splice as it is an effective way to finish the end of a line, preventing it from unlaying while it is in use. C

68 Teaching Point 1 Time: 25 min Explain the Use of, Demonstrate, and Have the Cadets Tie a Crown Knot Method: Demonstration and Performance CROWN KNOT A crown knot is used to begin the back splice and is a basis for more complicated knots, but is seldom used on its own. When finished, the crown knot leaves the three strands pointing back along the length of the line as illustrated in Figure 6. Explain and demonstrate the steps to making a crown knot prior to the cadets completing their own. Distribute the handout located at Annex A to the cadets. STEPS TO MAKING A CROWN KNOT The strands in the following figures will be identified by capital letters, whereas loops formed between these strands will be identified by numbers. 1. Complete a whipping at a distance equal to 20 times the diameter of the line, from the line s end (e.g., a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). Figure 1 Example of Whipping Distance D Cdts 3, 2007, Ottawa, ON: Department of National Defence 2. Unlay the strands of the line back to the whipping and whip the ends of each strand. Masking tape may be used as an alternate way of finishing the ends of each strand, instead of a whipping. 3. Spread the strands out in the form of a star. C

69 Figure 2 Star Formation B-GN /FP-E00 (p. 5-38) 4. Bring strand A to the front to form a loop and lay it over strand B. 5. Loop strand B over A and C. Figure 3 Step Four B-GN /FP-E00 (p. 5-38) Figure 4 Step Five B-GN /FP-E00 (p. 5-38) 6. Loop strand C over strand B and through loop 1. C

70 Figure 5 Step Six B-GN /FP-E00 (p. 5-38) 7. Pull all strands taut until the crown knot is tidy and uniform. Figure 6 Finished Crown Knot B-GN /FP-E00 (p. 5-55) Allow the cadets to practice tying a crown knot. Complete an additional crown knot with the cadets so they can follow along. CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What is a crown knot used for? Q2. What distance should the whipping be from the end of the line? Q3. What is the final step in creating the crown knot? ANTICIPATED ANSWERS A1. To begin the back splice as well as a basis for more complicated knots, but is seldom used on its own. A2. A distance equal to 20 times its diameter. A3. To pull all strands taut until the crown knot is tidy and uniform. C

71 Teaching Point 2 Time: 30 min Explain the Use of, Demonstrate, and Have the Cadets Make a Back Splice Method: Demonstration and Performance BACK SPLICE The back splice is used to finish the end of a line that is not required to pass through a block, eye plate or similar fitting. Figure 7 Back Splice B-GN /FP-E00 (p. 5-55) Explain and demonstrate the steps to making a back splice prior to the cadets completing their own. Distribute the handout located at Annex B to the cadets. Cadets can use the same line from TP1 to complete the back splice. STEPS TO MAKING THE BACK SPLICE 1. Complete a whipping at a distance equal to 20 times the diameter of the line, from the line s end (e.g., a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). Figure 8 Example of Whipping Distance D Cdts 3, 2007, Ottawa, ON: Department of National Defence 2. Unlay the strands of the line back to the whipping and whip the ends of each strand. Masking tape may be used as an alternate way of finishing the ends of each strand, instead of a whipping. C

72 3. Make a crown knot. 4. Remove the whipping below the crown knot. Figure 9 Crown Knot B-GN /FP-E00 (p. 5-55) To make tucking the strands easier the use of a marlin spike/fid is recommended. Always splice in the direction opposite the lay of the line. 5. Starting with A, lay it over the adjacent strand and tuck it under the next strand. Figure 10 Back Splice B-GN /FP-E00 (p. 5-55) 6. Lay B over the adjacent strand and tuck it under the next strand. 7. Lay C over the adjacent strand and tuck it under the next strand. 8. After each strand is tucked, pull the strands taut and tidy up the tucks until each strand is uniform. C

73 9. Repeat tucking the strands two more times, hauling them taut. Figure 11 Back Splice B-GN /FP-E00 (p. 5-55) 10. To finish the splice, dog the ends. To do so, remove the whipping and split the ends of each strand in half. Take each half and whip it to its neighbour over the adjacent strand. Allow the cadets to practice making a back splice. Complete an additional splice with the cadets so they can follow along, asking them questions, and verifying they are making the tucks properly. CONFIRMATION OF TEACHING POINT 2 QUESTIONS Q1. What is a back splice used for? Q2. What distance should the whipping be from the end of the line? Q3. What knot is used to start a back splice? ANTICIPATED ANSWERS A1. It is used to finish the end of a line that is not required to pass through a block, eye plate or similar fitting. A2. A distance equal to 20 times the diameter of the line. A3. A crown knot. END OF LESSON CONFIRMATION The cadets participation in TP1 and TP2 will serve as the confirmation of this lesson. C

74 CONCLUSION HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT A back splice is a useful and effective means of finishing the end of a line. INSTRUCTOR NOTES/REMARKS N/A. REFERENCES A1-004 B-GN /FP-E00 Chief of Maritime Staff. (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON: Department of National Defence. C

75 Annex A to EO C Instructional Guide STEPS TO MAKING THE CROWN KNOT 1. Complete a whipping at a distance equal to 20 times the diameter of the line, from the line s end (e.g. a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). 2. Unlay the strands of the line back to the whipping and whip the ends of each strand. 3. Spread the strands out in the form of a star. 4. Bring strand A to the front to form a loop and lay it over strand B. 5. Loop strand B over A and C. 6. Loop strand C over strand B and through loop Pull all strands taut until the crown knot is tidy and uniform. Figure A-1 Crown Knot B-GN /FP-E00 (p. 5-38) C221.01A-1

76 Annex A to EO C Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK C221.01A-2

77 Annex B to EO C Instructional Guide STEPS TO MAKING THE BACK SPLICE 1. Complete a whipping at a distance equal to 20 times the diameter of the line, from the line s end (e.g. a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). 2. Unlay the strands of the line back to the whipping and whip the ends of each strand. 3. Make a crown knot below the crown knot. 4. Remove the whipping. 5. Starting with A, lay it over the adjacent strand and tuck it under the next strand. 6. Lay B over the adjacent strand and tuck it under the next strand. 7. Lay C over the adjacent strand and tuck it under the next strand. 8. After each strand is tucked, pull the strands taut and tidy up the tucks until each strand is uniform. 9. Repeat tucking the strands two more times, hauling them taut. 10. To finish the splice, dog the ends. To do so, remove the whipping and split the ends of each strand in half. Take each half and whip it to its neighbour over the adjacent strand. Figure B-1 Back Splice B-GN /FP-E00 (p. 5-55) C221.01B-1

78 Annex B to EO C Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK C221.01B-2

79 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 7 EO C MAKE AN EYE SPLICE Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Photocopy the handout located at Annex A or B for each cadet. PRE-LESSON ASSIGNMENT N/A. APPROACH Demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate making an eye splice while providing an opportunity for the cadets to practice this skill under supervision. REVIEW INTRODUCTION Review three-strand line from EO M (Use a Strop for Slinging). OBJECTIVES By the end of this lesson the cadet shall have made an eye splice. IMPORTANCE It is important for cadets to know how to make an eye splice as it is a strong and effective means of making a permanent eye in the end of a line. C

80 Teaching Point 1 Time: 55 min Explain the Use of, Demonstrate, and Have the Cadets Make an Eye Splice Method: Demonstration and Performance EYE SPLICE An eye splice is used to make a permanent eye in the end of a line. Figure 1 Eye Splice Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-93) Explain and demonstrate the steps to making an eye splice prior to the cadets completing their own. Distribute the handout to the cadets. STEPS TO MAKING AN EYE SPLICE 1. Complete a whipping at a distance equal to 20 times the diameter of the line, from the line s end ( e.g., a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). Figure 2 Example of Whipping Distance D Cdts 3, 2007, Ottawa, ON: Department of National Defence 2. Unlay the strands of the line back to the whipping and whip the ends of each strand. Masking tape may be used as an alternate way of finishing the ends of each strand, instead of a whipping. 3. Mark the place intended for the crown of the eye, and bend the line back from there so as to bring the unlaid strands alongside the place where the splice is to be made, with the left and middle strands lying on top of the line. C

81 Figure 3 Start of an Eye Splice Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-92) Strands in the following figures will be identified by letters, with the middle strand identified as letter A. 4. Tuck strand A, from right to left, under the nearest strand of the standing part. The centre strand is always the first strand tucked. Figure 4 Step Four Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-93) 5. Tuck strand B, from right to left, under the next strand of the standing part. C

82 Figure 5 Step Five Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-93) 6. Turn the line over in order to bring the remaining strand C on the top, and then tuck strand C from right to left under the unoccupied strand of the standing part. Figure 6 Step Six Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-93) 7. Beginning with strand C, haul each strand taut and tidy up the tucks until each strand is uniform. 8. Tuck all strands a second and third time. 9. Remove the whipping. 10. To finish the splice, dog the ends. To do so, split the ends of each strand in half. Take each half and whip it to its neighbour over the adjacent strand. C

83 Figure 7 Finished Eye Splice with Dogged Ends Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-93) Allow the cadets to practice making an eye splice. Complete an additional eye splice with the cadets so they can follow along, asking questions and verifying the tucks are being completed properly. Another method of instructing this splice is to colour the ends of each strand with a different colour. This will help clarify the tucking of each strand. See Annex B. CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What distance should the whipping be from the end of the line? Q2. What may be used as an alternate to whipping each strand? Q3. What is one way to finish an eye splice? ANTICIPATED ANSWERS A1. A distance equal to 20 times the diameter of the line. A2. Masking tape. A3. Dogging the ends. END OF LESSON CONFIRMATION The cadets making of an eye splice will serve as the confirmation of this lesson. C

84 CONCLUSION HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT An eye splice is a quick and effective means of making a permanent eye in the end of a line. An eye splice offers a strong alternative to basic knots in areas where a permanent eye would better suit the requirements for lines under strain. INSTRUCTOR NOTES/REMARKS N/A. REFERENCES C1-047 (ISBN )/B-ON /PT-004 Command of the Defence Council. (1995). BR 67 Admiralty Manual of Seamanship. London, England: HMSO Publications Centre. C

85 Annex A to EO C Instructional Guide STEPS TO MAKING AN EYE SPLICE 1. Complete a whipping at a distance equal to 20 times the diameter of the line, from the line s end (e.g. a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). 2. Unlay the strands of the line back to the whipping and whip the ends of each strand. 3. Mark the place intended for the crown of the eye, and bend the line back from there so as to bring the unlaid strands alongside the place where the splice is to be made, with the left and middle strands lying on top of the line. Figure A-1 Start of an Eye Splice Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-92) 4. Tuck strand A, from right to left, under the nearest strand of the standing part. 5. Tuck strand B, from right to left, under the next strand of the standing part. 6. Turn the line over in order to bring the remaining strand C on the top, and then tuck strand C from right to left under the unoccupied strand of the standing part. 7. Beginning with strand C, haul each strand taut and tidy up the tucks until each strand is uniform. 8. Tuck all strands a second and third time. Figure A-2 Steps to Making an Eye Splice Command of the Defence Council, BR 67 Admiralty Manual of Seamanship, HMSO Publications Centre (p. 3-92) 9. Remove the whipping. 10. To finish the splice, dog the ends. To do so, split the ends of each strand in half. Take each half and whip it to its neighbour over the adjacent strand. C221.02A-1

86 Annex A to EO C Instructional Guide THIS PAGE INTENTIONALLY LEFT BLANK C221.02A-2

87 Annex B to EO C Instructional Guide STEPS TO MAKING A LONG SPLICE 1. Complete a whipping on both lines at a distance equal to 20 times the diameter of the line, from the line s end (e.g. a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). A long splice usually requires whippings at a distance equal to 40 times the circumference of the line. For the purpose of this TP use the distance outlined in step one. 2. Unlay the strands of the line back to the whippings and whip the ends of each strand. 3. Marry the ends of the line together so that one strand of each line lies between two strands of the opposite line. 4. Unlay strand H a total of four turns. 5. Lay strand E in the place of strand H. 6. Unlay strand D a total of four turns. 7. Lay strand F in the place of strand D. A long splice usually requires the strands to be unlaid back a distance of 12 times the diameter of the line. For the purpose of this TP use the distance outlined in steps four and six. 8. Strands G and C remain at the marry. 9. Separate one-third of the thickness of each strand (this will be cut and discarded later). The strands are separated and later cut away to maintain the diameter of the rope when it is spliced, enabling it to pass through a block. 10. Tie the remaining two-thirds of strands D and F in an overhand knot (if the lay of the line is in the same direction as EO C221.03, Figure 6 then tie it left over right). 11. Tie the remaining two-thirds of strands E and H in an overhand knot. 12. Tie the remaining two-thirds of strands C and G in an overhand knot. 13. Tuck the strands as in a short splice (over one strand and under the next). 14. Separate the strands in half (this will be cut and discarded later). 15. Tuck the remaining half of the strands as in a short splice. 16. Cut off any excess line (including the sections of the strands that have been separated). 17. Stretch the line out to haul the splice taut. C221.02B-1

88 Annex B to EO C Instructional Guide Figure B-1 Long Splice B-GN /FP-E00 (p. 5-61) C221.02B-2

89 ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 8 EO C MAKE A LONG SPLICE Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in the lesson specification located in A-CR-CCP-602/ PG-001, Chapter 4. Specific uses for said resources are identified throughout the Instructional Guide within the TP for which they are required. Review the lesson content and become familiar with the material prior to delivering the lesson. Photocopy the handout located at Annex A for each cadet. PRE-LESSON ASSIGNMENT N/A. APPROACH Demonstration and performance was chosen for this lesson as it allows the instructor to explain and demonstrate making a long splice while providing an opportunity for the cadets to practice this skill under supervision. REVIEW INTRODUCTION Review three-strand line from EO M (Use a Strop for Slinging). OBJECTIVES By the end of this lesson the cadet shall have made a long splice. IMPORTANCE It is important for cadets to know how to make a long splice as it is an effective way of connecting two lines of equal diameter without weakening the line, while allowing it to pass through a block. C

90 Teaching Point 1 Time: 55 min Explain the Use of, Demonstrate, and Have the Cadets Make a Long Splice Method: Demonstration and Performance LONG SPLICE A long splice is used to join two lines of equal diameter which are required to pass through a block. If the splice is made well, it will not increase the diameter or weaken the strength of the line. Figure 1 Long Splice B-GN /FP-E00 (p. 5-61) Explain and demonstrate the steps to making a long splice prior to the cadets completing their own. Distribute the handout to the cadets. STEPS TO MAKING A LONG SPLICE 1. Complete a whipping on both lines at a distance equal to 20 times the diameter of the line, from the line s end (e.g., a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). Figure 2 Example of Whipping Distance D Cdts 3, 2007, Ottawa, ON: Department of National Defence A long splice usually requires whippings at a distance equal to 40 times the circumference of the line. For the purpose of this TP use the distance outlined in step one. 2. Unlay the strands of the line back to the whippings and whip the ends of each strand. C

91 Masking tape may be used as an alternate way of finishing the ends of each strand, instead of a whipping. 3. Marry the ends of the line together so that one strand of each line lies between two strands of the opposite line. Figure 3 Long Splice Marry B-GN /FP-E00 (p. 5-61) 4. Unlay strand H a total of four turns. 5. Lay strand E in the place of strand H. Figure 4 Steps Five and Six B-GN /FP-E00 (p. 5-61) 6. Unlay strand D a total of four turns. 7. Lay strand F in the place of strand D. C

92 Figure 5 Steps Seven and Eight B-GN /FP-E00 (p. 5-61) A long splice usually requires the strands to be unlaid back a distance of 12 times the diameter of the line. For the purpose of this TP use the distance outlined in steps four and six. 8. Strands G and C remain at the marry. 9. Separate one-third of the thickness of each strand (this will be cut and discarded later). The strands are separated and later cut away to maintain the diameter of the rope when it is spliced, enabling it to pass through a block. 10. Tie the remaining two-thirds of strands D and F in an overhand knot (if the lay of the line is in the same direction as Figure 6 then tie it left over right). 11. Tie the remaining two-thirds of strands E and H in an overhand knot. 12. Tie the remaining two-thirds of strands C and G in an overhand knot. 13. Tuck the strands as in a short splice (over one strand and under the next). 14. Separate the strands in half (this will be cut and discarded later). 15. Tuck the remaining half of the strands as in a short splice. 16. Cut off any excess line (including the sections of the strands that have been separated). 17. Stretch the line out to haul the splice taut. C

93 Figure 6 Steps 9 14 B-GN /FP-E00 (p. 5-61) Figure 7 Finished Long Splice B-GN /FP-E00 (p. 5-61) Allow the cadets to practice making a long splice. Complete an additional long splice with the cadets so they can follow along, asking questions and verifying the tucks are being completed properly. CONFIRMATION OF TEACHING POINT 1 QUESTIONS Q1. What distance should the whipping be from the end of the line? Q2. What knot is used when tying the strands together? Q3. How do you finish a long splice? ANTICIPATED ANSWERS A1. A distance equal to 20 times the diameter of the line. A2. Overhand knot. A3. Tuck the strands as in a short splice for three tucks. C

94 END OF LESSON CONFIRMATION The cadets making of a long splice will serve as the confirmation of this lesson. HOMEWORK/READING/PRACTICE N/A. METHOD OF EVALUATION N/A. CLOSING STATEMENT CONCLUSION Although the long splice is more time consuming compared to other splices, it is one of the strongest splices, and can be used to join two lines of equal diameter. When a longer length of line is required to pass through a block and is not available, a long splice is a viable option that does not weaken the strength of the line. INSTRUCTOR NOTES/REMARKS N/A. REFERENCES A1-004 B-GN /FP-E00 Chief of Maritime Staff. (1997). CFCD 105 Fleet Seamanship Rigging and Procedures Manual. Ottawa, ON: Department of National Defence. C1-047 (ISBN )/B-ON /PT-004 Command of the Defence Council. (1995). BR 67 Admiralty Manual of Seamanship. London, England: HMSO Publications Centre. C

95 Annex A to EO C Instructional Guide STEPS TO MAKING A LONG SPLICE 1. Complete a whipping on both lines at a distance equal to 20 times the diameter of the line, from the line s end (e.g. a line 2 cm in diameter requires a whipping 40 cm from its end, a line 1/4 inch in diameter requires a whipping 5 inches from its end). A long splice usually requires whippings at a distance equal to 40 times the circumference of the line. For the purpose of this TP use the distance outlined in step one. 2. Unlay the strands of the line back to the whippings and whip the ends of each strand. 3. Marry the ends of the line together so that one strand of each line lies between two strands of the opposite line. 4. Unlay strand H a total of four turns. 5. Lay strand E in the place of strand H. 6. Unlay strand D a total of four turns. 7. Lay strand F in the place of strand D. A long splice usually requires the strands to be unlaid back a distance of 12 times the diameter of the line. For the purpose of this TP use the distance outlined in steps four and six. 8. Strands G and C remain at the marry. 9. Separate one-third of the thickness of each strand (this will be cut and discarded later). The strands are separated and later cut away to maintain the diameter of the rope when it is spliced, enabling it to pass through a block. 10. Tie the remaining two-thirds of strands D and F in an overhand knot (if the lay of the line is in the same direction as EO C221.03, Figure 6 then tie it left over right). 11. Tie the remaining two-thirds of strands E and H in an overhand knot. 12. Tie the remaining two-thirds of strands C and G in an overhand knot. 13. Tuck the strands as in a short splice (over one strand and under the next). 14. Separate the strands in half (this will be cut and discarded later). 15. Tuck the remaining half of the strands as in a short splice. 16. Cut off any excess line (including the sections of the strands that have been separated). 17. Stretch the line out to haul the splice taut. C221.03A-1

96 Annex A to EO C Instructional Guide Figure A-1 Long Splice B-GN /FP-E00 (p. 5-61) C221.03A-2

ROYAL CANADIAN SEA CADETS PHASE TWO SECTION 1 EO M USE A STROP FOR SLINGING PREPARATION

ROYAL CANADIAN SEA CADETS PHASE TWO SECTION 1 EO M USE A STROP FOR SLINGING PREPARATION ROYAL CANADIAN SEA CADETS PHASE TWO INSTRUCTIONAL GUIDE SECTION 1 EO M221.01 USE A STROP FOR SLINGING Total Time: 90 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson

More information

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M121.01 TIE KNOTS, BENDS AND HITCHES Total Time: 120 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this

More information

ROYAL CANADIAN SEA CADETS PHASE THREE INSTRUCTIONAL GUIDE SECTION 1 EO M DESCRIBE SAFETY PROCEDURES FOR OPERATING LIFTING DEVICES PREPARATION

ROYAL CANADIAN SEA CADETS PHASE THREE INSTRUCTIONAL GUIDE SECTION 1 EO M DESCRIBE SAFETY PROCEDURES FOR OPERATING LIFTING DEVICES PREPARATION ROYAL CANADIAN SEA CADETS PHASE THREE INSTRUCTIONAL GUIDE SECTION 1 EO M321.01 DESCRIBE SAFETY PROCEDURES FOR OPERATING LIFTING DEVICES Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources

More information

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M121.01 TIE KNOTS, BENDS AND HITCHES Total Time: 120 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this

More information

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO M TIE KNOTS AND LASHINGS PREPARATION

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO M TIE KNOTS AND LASHINGS PREPARATION ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO M490.03 TIE KNOTS AND LASHINGS Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery

More information

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 6 EO C PARTICIPATE IN A SEMAPHORE EXERCISE PREPARATION

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 6 EO C PARTICIPATE IN A SEMAPHORE EXERCISE PREPARATION COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 6 EO C123.03 PARTICIPATE IN A SEMAPHORE EXERCISE Total Time: 150 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this

More information

ROYAL CANADIAN SEA CADETS

ROYAL CANADIAN SEA CADETS ROYAL CANADIAN SEA CADETS MASTER LESSON PLAN PHASE LEVEL THREE PO: SEAMANSHIP PO/EO: 406.09 Rig a Tackle. REFERENCE(S): A. Course Training Plan/Instructor s Guide notes, chapter 5, page 5-III-28 SUPPLEMENTARY

More information

PHASE THREE INSTRUCTIONAL GUIDES

PHASE THREE INSTRUCTIONAL GUIDES ROYAL CANADIAN SEA CADETS BOOK 2 OF 2 PHASE THREE INSTRUCTIONAL GUIDES (ENGLISH) (Supersedes A-CR-CCP-603/PF-001 dated 2015-12-01) Cette publication est disponible en français sous le numéro A-CR-CCP-603/PF-002.

More information

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M IDENTIFY THE PARTS AND CHARACTERISTICS OF THE DAISY 853C AIR RIFLE PREPARATION

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M IDENTIFY THE PARTS AND CHARACTERISTICS OF THE DAISY 853C AIR RIFLE PREPARATION COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M106.01 IDENTIFY THE PARTS AND CHARACTERISTICS OF THE DAISY 853C AIR RIFLE Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS A complete list

More information

COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 4 EO C PRACTICE FIRING TECHNIQUES PREPARATION

COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 4 EO C PRACTICE FIRING TECHNIQUES PREPARATION COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 4 EO C206.03 PRACTICE FIRING TECHNIQUES Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in

More information

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 2 EO M CARRY OUT SAFETY PRECAUTIONS ON THE CADET AIR RIFLE PREPARATION

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 2 EO M CARRY OUT SAFETY PRECAUTIONS ON THE CADET AIR RIFLE PREPARATION COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 2 EO M106.02 CARRY OUT SAFETY PRECAUTIONS ON THE CADET AIR RIFLE Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS A complete list of resources

More information

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 4 EO M FOLLOW RULES AND COMMANDS ON AN AIR RIFLE RANGE PREPARATION

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 4 EO M FOLLOW RULES AND COMMANDS ON AN AIR RIFLE RANGE PREPARATION COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 4 EO M106.04 FOLLOW RULES AND COMMANDS ON AN AIR RIFLE RANGE Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS A complete list of resources needed

More information

COMMON TRAINING PHASE THREE INSTRUCTIONAL GUIDE SECTION 3 EO C CORRECT MARKSMANSHIP ERROR PREPARATION

COMMON TRAINING PHASE THREE INSTRUCTIONAL GUIDE SECTION 3 EO C CORRECT MARKSMANSHIP ERROR PREPARATION COMMON TRAINING PHASE THREE INSTRUCTIONAL GUIDE SECTION 3 EO C306.02 CORRECT MARKSMANSHIP ERROR Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are

More information

COMMON TRAINING PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO C SCORE AIR RIFLE MARKSMANSHIP TARGETS PREPARATION

COMMON TRAINING PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO C SCORE AIR RIFLE MARKSMANSHIP TARGETS PREPARATION COMMON TRAINING PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 3 EO C406.02 SCORE AIR RIFLE MARKSMANSHIP TARGETS Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery

More information

Chapter VIII. Rigging. Rope and its uses. Rope of any kind can be described as belonging to one of two main types:

Chapter VIII. Rigging. Rope and its uses. Rope of any kind can be described as belonging to one of two main types: Chapter VIII Rigging Rope and its uses Rope of any kind can be described as belonging to one of two main types: Cordage (which is made of vegetable or synthetic fibres). Steel wire rope, or stainless steel

More information

COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 3 EO C PRACTICE AIMING TECHNIQUES PREPARATION

COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 3 EO C PRACTICE AIMING TECHNIQUES PREPARATION COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 3 EO C206.02 PRACTICE AIMING TECHNIQUES Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this lesson are listed in

More information

Premium PowerPoint Presentation. Rigging Review

Premium PowerPoint Presentation. Rigging Review Premium PowerPoint Presentation Rigging Review Chapter 1 Hoisting Safety Review: What about the CG Symmetrical vs. Asymmetrical Balanced and Unbalanced Lifting Lug Hooks Angle Deformation Safety Gates

More information

End. Standing Part. An underhand loop is made by crossing the end under the standing part.

End. Standing Part. An underhand loop is made by crossing the end under the standing part. Knot Board Learn to tie the four basic camping knots as illustrated as well as others you might add. Practice them until you can tie them well. Display them on a knot board made from a square of peg board

More information

CHAPTER 6 PO 106 FIRE THE CADET AIR RIFLE

CHAPTER 6 PO 106 FIRE THE CADET AIR RIFLE CHAPTER 6 PO 106 FIRE THE CADET AIR RIFLE 6-106-1/2 COMMON TRAINING PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 1 EO M106.01 IDENTIFY THE PARTS AND THE CHARACTERISTICS OF THE DAISY 853C AIR RIFLE

More information

A-CR-CCP-701/PF-001 CHAPTER 6 PO 106 FIRE THE CADET AIR RIFLE

A-CR-CCP-701/PF-001 CHAPTER 6 PO 106 FIRE THE CADET AIR RIFLE CHAPTER 6 PO 106 FIRE THE CADET AIR RIFLE COMMON TRAINING INSTRUCTIONAL GUIDE SECTION 1 EO M106.01 IDENTIFY THE PARTS AND THE CHARACTERISTICS OF THE DAISY 853C AIR RIFLE Total Time: 30 min INTRODUCTION

More information

Knots, Hitches and Bends

Knots, Hitches and Bends Knots, Hitches and Bends It is hard to define clearly the terms knot, hitch and bend because their functions overlap. However, the terms may be generally defined as follows: Knots Hitches Bends Knots are

More information

Information Booklet 3

Information Booklet 3 TAKING. IT FURTHER Create lessons to demonstrate and learn how to tie the following knots: Timber hitch Highwayman s hitch Sheepshank Bowline Sheet bend Groups could then build knot boards showing how

More information

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 2 EO M DESCRIBE THE MAGNETIC COMPASS PREPARATION

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 2 EO M DESCRIBE THE MAGNETIC COMPASS PREPARATION ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 2 EO M437.02 DESCRIBE THE MAGNETIC COMPASS Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery

More information

Ropework. Stopper Knots. Overhand Knot ROPEWORK. Figure of Eight 3.

Ropework. Stopper Knots. Overhand Knot ROPEWORK. Figure of Eight 3. Ropework 157 Ropework Stopper Knots Stopper knots are used as a temporary method of stopping a rope from fraying or as a method of locking other knots which may be prone to loosening. These knots are:

More information

Ropework. Stopper knots. Overhand Knot ROPEWORK. Figure of Eight 3.

Ropework. Stopper knots. Overhand Knot ROPEWORK. Figure of Eight 3. Ropework 1 Ropework Stopper knots Stopper knots are used as a temporary method of stopping a rope from fraying or as a method of locking other knots which maybe prone to lossening. The knots are the Overhand

More information

COMMON TRAINING PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 1 EO M ADOPT THE POSITIONS OF ATTENTION, STAND AT EASE AND STAND EASY

COMMON TRAINING PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 1 EO M ADOPT THE POSITIONS OF ATTENTION, STAND AT EASE AND STAND EASY COMMON TRAINING PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 1 EO M108.01 ADOPT THE POSITIONS OF ATTENTION, STAND AT EASE AND STAND EASY Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources

More information

Heavy Equipment Technician Rigging

Heavy Equipment Technician Rigging 1. What is SWL? a. Single weight of load b. Second weakest location c. Working load limit Heavy Equipment Technician IP Red Seal Practice Exam d. Abbreviation for swivel Heavy Equipment Technician Rigging

More information

MSC-132: Introduction, Plain Whipping, Loops, Turns & Hitches

MSC-132: Introduction, Plain Whipping, Loops, Turns & Hitches MSC-132: Introduction, Plain Whipping, Loops, Turns & Hitches This presentation is designed to be used as a study companion to lectures, labs and handouts given in Fishing Gear Technology I. Advance each

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 8 Ropes - Knots Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 8 Ropes - Knots Revised Truck Module Page 1 of 8 SERVICE KNOTS Common Knot Tying Terms Working End- the working end of a rope is the part used in forming a knot. (also known as the loose end or bitter end) Running End- the running

More information

Knot Masters Program

Knot Masters Program The Knot Masters program helps Scouts to learn the knots they need for advancement, Scouters to become proficient in knot tying, and keeps knot tying skills sharp. Scouts and Scouters are encouraged to

More information

ENABLING OBJECTIVE AND TEACHING POINTS. BUSHCRAFT: TIME Two 30 minute periods. 6. METHOD/APPROACH: a. demonstration; and. b. performance.

ENABLING OBJECTIVE AND TEACHING POINTS. BUSHCRAFT: TIME Two 30 minute periods. 6. METHOD/APPROACH: a. demonstration; and. b. performance. CHAPTER 4: LESSON SPECIFICATIONS COURSE TITLE: RED STAR COURSE ENABLING OBJECTIVE AND TEACHING POINTS CTS NUMBER: A-CR-CCP-116/PC-001 TRAINING DETAILS BUSHCRAFT: 403.16 5. TIME Two 30 minute periods. 1.

More information

Objectives (1 of 3) List at least two types of materials and designs used in rope manufacture. Define and describe the following: Dynamic rope Static

Objectives (1 of 3) List at least two types of materials and designs used in rope manufacture. Define and describe the following: Dynamic rope Static Chapter 16 Rescue Objectives (1 of 3) List at least two types of materials and designs used in rope manufacture. Define and describe the following: Dynamic rope Static rope Webbing List at least five rules

More information

Rigging. Student Booklet

Rigging. Student Booklet Student Booklet Ministry of Education. December 2009. The material was developed for Continuing Education Committee for the building / construction industry and in cooperation with lecturer Ole Østergaard

More information

NOTES: Information Booklet 3. Basic Pioneering. Compiled For Cambridgeshire Scouts September2013

NOTES: Information Booklet 3. Basic Pioneering. Compiled For Cambridgeshire Scouts September2013 NOTES: Information Booklet 3 Basic Pioneering 12 Compiled For Cambridgeshire Scouts September2013 Basic Pioneering It is important that you read this before attempting any Pioneering Project. Pioneering

More information

04 Practical Seamanship. Captain

04 Practical Seamanship. Captain 04 Practical Seamanship Exhibit elements of basic seamanship RQ RQ Describe Characteristics, construction, advantages and disadvantages of various types of rope Describe the Factors that Affect the Strength

More information

Start by crossing the two sticks or dowels at perpendicular or 90 degree angles.

Start by crossing the two sticks or dowels at perpendicular or 90 degree angles. Square Lashing Used to fasten two spars or poles together. Start by crossing the two sticks or dowels at perpendicular or 90 degree angles. Make a Clove Hitch on the vertical stick or dowel near the point

More information

Rigging it Right. Presented by Ron Barwick Service Manager for Half Hitch Hosted by: Bob Fowler

Rigging it Right. Presented by Ron Barwick Service Manager for Half Hitch Hosted by: Bob Fowler Rigging it Right Presented by Ron Barwick Service Manager for Half Hitch ron@halfhitch.com Hosted by: Bob Fowler bob.fowler@marinemax.com (850) 708-1317 marinemax.com www.halfhitch.com 1 The Uni-Knot Strong,

More information

General Rescuer Task Book

General Rescuer Task Book General Rescuer Task Book Course Dates: Students Name: Lead Instructor: General Rescuer Course Course Completion At the end of the course, the Lead Instructor will fill out the information below to document

More information

Time: 3.0 hours Teaching and Learning Domain: Cognitive and Psychomotor

Time: 3.0 hours Teaching and Learning Domain: Cognitive and Psychomotor Construction of Rigging Systems Refresher Teaching and Learning Aids Projection Screen and PowerPoint System Whiteboard or easel pad and markers Rope Kits Time: 3.0 hours Teaching and Learning Domain:

More information

SECTION V. Terminology: Bight: Double Bight: Loop: Turn: Round Turn: Half Hitch: Girth Hitch: Running End: Standing End:

SECTION V. Terminology: Bight: Double Bight: Loop: Turn: Round Turn: Half Hitch: Girth Hitch: Running End: Standing End: SECTION V. Terminology: When using ropes, understanding basic terminology is important. The terms explained in this section are the most commonly used in military mountaineering. (a) Bight: A bight of

More information

Sea Scout Knots Knots Hitches Splices and Whippings

Sea Scout Knots Knots Hitches Splices and Whippings Sea Scout Knots Knots Hitches Splices and Whippings Knots www.artworkbygerry.com Bowline... 2 Bowline on the bight... 3 Clove hitch... 4 Double sheet bend... 5 Figure of eight... 6 Fireman s chair knot...

More information

SECTION 13 PO 421 PERFORM ROPEWORK. (2) Construction material appropriate to the task,

SECTION 13 PO 421 PERFORM ROPEWORK. (2) Construction material appropriate to the task, 1. : Perform Ropework 2. Conditions: a. Given: (1) Knife with lanyard, SECTION 13 PO 421 PERFORM ROPEWORK (2) Construction material appropriate to the task, (3) Supervision, (4) Assistance as required.

More information

Basic Rigging Knots. Clove hitch: primarily used to secure branches which are being rigged. To secure this hitch from rolling

Basic Rigging Knots. Clove hitch: primarily used to secure branches which are being rigged. To secure this hitch from rolling Clove hitch: primarily used to secure branches which are being rigged. To secure this hitch from rolling out under load during rigging, it is vital to secure the tail end of the rope around the standing

More information

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS PRESENTER'S GUIDE "RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS

More information

The importance of splicing especially for braids made with UHMWPE fibre

The importance of splicing especially for braids made with UHMWPE fibre The importance of splicing especially for braids made with UHMWPE fibre Nautilus has installed a high spec strength tester for testing ropes up to 14tonnes. There has been much knowledge gained as we can

More information

Troop 226. Knot Master Program

Troop 226. Knot Master Program Troop 226 Knot Master Program Knots are a skill taught at every level of scouting. The Knot Master program is designed to provide each scout an opportunity to learn essential knots. In addition to learning

More information

LOOP KNOTS: A loop knot, like a hitch, fastens a rope to another object. A loop knot may be tied in the hand and then placed over the object, while a

LOOP KNOTS: A loop knot, like a hitch, fastens a rope to another object. A loop knot may be tied in the hand and then placed over the object, while a LOOP KNOTS: A loop knot, like a hitch, fastens a rope to another object. A loop knot may be tied in the hand and then placed over the object, while a hitch is tied directly to the object. However, since

More information

An introduction to Rigging for Trail Work

An introduction to Rigging for Trail Work An introduction to Rigging for Trail Work Give me a lever long enough and a prop strong enough, I can single handed move the world. Archimedes The purpose of this seminar is to provide a hands-on introduction

More information

Tying Farm Knots. Working with Heifers

Tying Farm Knots. Working with Heifers Tying Farm Knots A rope is one of the most common of tools used to restrain animals. Unfortunately, most people never learn which knots are most efficient to use in given situations. Practice tying the

More information

FISH NET REPAIR. By Alfred Carlson

FISH NET REPAIR. By Alfred Carlson FISH NET REPAIR By Alfred Carlson 2 Contents 1. Contents 2 2. 3-Spot Repair (One Broken mesh) 3 3. V-Shaped Repair (Two Broken meshes ) 23 4. N-Shaped Repair (Three Broken meshes) 33 5. M-Shaped Repair

More information

Instructor Guide. Session Reference: 1. Topic: Ropes, Knots, and Rigging. Level of Instruction: Time Required: Three Hours

Instructor Guide. Session Reference: 1. Topic: Ropes, Knots, and Rigging. Level of Instruction: Time Required: Three Hours Rescue Refresher Instructor Guide Session Reference: 1 Topic: Ropes, Knots, and Rigging Level of Instruction: Time Required: Three Hours Materials: 25 foot length of rope for each student webbing, harnesses,

More information

Double Braid Class II Eye Splice for TS-II Turbo

Double Braid Class II Eye Splice for TS-II Turbo SAMSON SPLICING INSTRUCTIONS Double Braid Class II Eye Splice for TS-II Turbo 1 MEASURING AND MARKING The measurements are the same as those for the direct bury eye splice for Class II ropes. Measure 3

More information

SAMPLE PAGE. Section 2... Wire Rope

SAMPLE PAGE. Section 2... Wire Rope Section 2...................................................... Wire Rope Never use any kind of clip to directly connect two straight lengths of wire rope to form a continuous piece. Do not make up slings

More information

requirement 9 Polyester Nylon

requirement 9 Polyester Nylon Page 4, requirement 9: By yourself, build an A-trestle OR X-trestle OR H- trestle using square and diagonal lashings. Explain the application of the trestle you build. Demonstrate how to tie two spars

More information

Scout Meeting Schedule: Week 3 Theme: Pioneering A Date:

Scout Meeting Schedule: Week 3 Theme: Pioneering A Date: Scout Meeting Schedule: Week 3 Theme: Pioneering A Date: Time Activity Program Details Leader Responsible 15 mins. Gathering Activity Chain Gang 10 mins. Opening Ceremony Details can be found in the Scout

More information

Level Two Green Rope. Clove Hitch

Level Two Green Rope. Clove Hitch Level Two Green Rope Level Two consists of a combination of two knots (or hitches), all five lashings and the three basic splices. The lashings are essential for pioneering activities and to create camp

More information

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an By User Manual Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet and Traveler 11. Main Sail 12. Downhaul

More information

TRAINING BULLETIN ROPE 5 March 8, 2007 KNOTS AND HITCHES NOMENCLATURE

TRAINING BULLETIN ROPE 5 March 8, 2007 KNOTS AND HITCHES NOMENCLATURE TRAINING BULLETIN ROPE March 8, 007 NOMENCLATURE Hitch A temporary method of securing an object, fastened so that it can be readily undone, i.e., Half Hitch. Bend The tying of the ends of two ropes to

More information

LOW ANGLE ROPE RESCUE OPERATIONAL

LOW ANGLE ROPE RESCUE OPERATIONAL Chapter 8: Three Main Components of a Rope Rescue System Chapter 8: Three Main Components of a Rope Rescue System Scope: This chapter serves as an orientation to the three main components of a rope rescue

More information

KNOTS. Overhand Knot. Page 12 of 32

KNOTS. Overhand Knot. Page 12 of 32 Overhand Knot KNOTS The overhand knot is useful for tying cord around a pin to end a macramé project, holding beads in place, and tying your shoes! It also makes a nice variety knot in a macramé design.

More information

RESCUE TECHNICIAN KNOT GUIDE

RESCUE TECHNICIAN KNOT GUIDE RESCUE TECHNICIAN KNOT GUIDE RESCUE TECHNICIAN - BASIC September 20, 2014 8AM-5PM - Location T.B.A September 27, 2014 8AM-5PM - Location T.B.A October 11, 2014 8AM-5PM - Location T.B.A This Class is an

More information

Splicing Instructions. Standard Double Braid Eye Splice Type 1 Double Braid Ropes

Splicing Instructions. Standard Double Braid Eye Splice Type 1 Double Braid Ropes Splicing Instructions Standard Double Braid Eye Splice Type 1 Double Braid Ropes Introduction Double Braid Eye Splice This document describes the steps required to perform a Double Braid Eye Splice in

More information

Seamanship. A braided line comprises a core of braided or stranded threads covered with a sheath. The center or core of the line gives strength.

Seamanship. A braided line comprises a core of braided or stranded threads covered with a sheath. The center or core of the line gives strength. Seamanship 1. Describe the life boat ropes. On a life boat, we rarely use the word rope but rather lines to describe all of the ropes. Moreover, each line has a specific name, such as the painter, halyard

More information

Scout Meeting Schedule: Week 1 Theme: Pioneering A Date:

Scout Meeting Schedule: Week 1 Theme: Pioneering A Date: Scout Meeting Schedule: Week 1 Theme: Pioneering A Date: Time Activity Program Details Leader Responsible 15 mins. Gathering Activity Bowling for Bottles 10 mins. Opening Ceremony Details can be found

More information

Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder

Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder Square Diagonal Tripod Japanese Square Filipino Diagonal Round Shear Ladder Square Lashing - Step by Step Used to fasten two spars or poles together. Start by crossing the two sticks or dowels at perpendicular

More information

Splicing Instructions. Moran Tuck Splice

Splicing Instructions. Moran Tuck Splice Splicing Instructions Moran 5-4-3 Tuck Splice Introduction Moran 5-4-3 Tuck Splice This document describes the steps required to perform a Moran 5-4-3 Tuck Splice. The Moran 5-4-3 Tuck Splice is a Cortlandapproved

More information

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 3 EO M OBSERVE SITE POLICIES AND PROCEDURES PREPARATION

ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 3 EO M OBSERVE SITE POLICIES AND PROCEDURES PREPARATION ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL ONE INSTRUCTIONAL GUIDE SECTION 3 EO M190.03 OBSERVE SITE POLICIES AND PROCEDURES Total Time: 60 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

Scout It Out would like to extend its gratitude to all the sites where the following information had been gathered.

Scout It Out would like to extend its gratitude to all the sites where the following information had been gathered. Rope Work introduces the basic knots that all Scouts and Guides should know. Most of the knots featured here are very useful in Pioneering and should be learnt. This Section does not fully teach the exact

More information

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 5 EO C IDENTIFY TYPES OF CIVILIAN VESSELS PREPARATION

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 5 EO C IDENTIFY TYPES OF CIVILIAN VESSELS PREPARATION ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 5 EO C120.02 IDENTIFY TYPES OF CIVILIAN VESSELS Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS A complete list of resources needed

More information

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline Prerequisites: This course shall have no formal pre-requisite. The individual should have no history of a disabling medical condition, which

More information

Donaghys Winch Ropes. Handling & Installation Guide

Donaghys Winch Ropes. Handling & Installation Guide Donaghys Winch Ropes Handling & Installation Guide September 2015 Choosing the right rope for the job It is important to choose the right rope for the job. Donaghys specialise in custom designing ropes

More information

Topaz OMEGA Rigging Instructions

Topaz OMEGA Rigging Instructions Topaz OMEGA Rigging Instructions www.toppersailboats.com TOPAZ OMEGA RIGGING INSTRUCTIONS CONTENTS 02. Introduction 02. Manufacturers Details 03. Maintenance 04. Raising the Mast 05. Attaching the Boom

More information

Block & Tackle. Block & Tackle. Klein s line of block and tackle is engineered for high-strength requirements.

Block & Tackle. Block & Tackle. Klein s line of block and tackle is engineered for high-strength requirements. Block & Tackle Klein s line of block and tackle is engineered for high-strength requirements. 254 Block and Tackle These are NOT occupational protective devices. NOT for human support. Sheaves are strong,

More information

For Review Only No Copying No Saving No Lending No Posting Online

For Review Only No Copying No Saving No Lending No Posting Online The following copyrighted samples are provided as a service for your review only. Copying, saving, lending, posting online or any general use of these files other than for the purpose provided is unlawful

More information

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT HOW TO PREPARE FOR THE LEVEL A CRANESAFE ASSESSMENT Prepare for your assessment! Our website contains all the information you need for a successful assessment. Our goal is to find you competent on the

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck Page 1 of 7 Compiled by Approved by Chief Examiner Syllabus Committee:22 November 2011 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Ratings: Page 2 of 7 1. Contribute

More information

Beginners Fly-Tying Notes

Beginners Fly-Tying Notes Beginners Fly-Tying Notes SESSION 1 Tools Bobbin holder Threader (for dental floss!) Bodkin/ Dubbing needle (hat pins!) Vice 1 Check that: the jaws hold the sizes of hooks you want to tie on; and the stem

More information

ROYAL CANADIAN SEA CADETS PHASE FOUR INSTRUCTIONAL GUIDE SECTION 5 EO C DESCRIBE D-DAY AND THE BATTLE OF NORMANDY PREPARATION

ROYAL CANADIAN SEA CADETS PHASE FOUR INSTRUCTIONAL GUIDE SECTION 5 EO C DESCRIBE D-DAY AND THE BATTLE OF NORMANDY PREPARATION ROYAL CANADIAN SEA CADETS PHASE FOUR INSTRUCTIONAL GUIDE SECTION 5 EO C420.07 DESCRIBE D-DAY AND THE BATTLE OF NORMANDY Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery

More information

Knots. Some points on ropes:

Knots. Some points on ropes: Knots Knots have been created so that they may perform a certain job effectively. A good knot is easy to tie and just as easy to untie, does not slip under strain and can be relied upon. There are only

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

COMMON TRAINING PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 1 EO M PARTICIPATE IN A RECREATIONAL MARKSMANSHIP ACTIVITY PREPARATION

COMMON TRAINING PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 1 EO M PARTICIPATE IN A RECREATIONAL MARKSMANSHIP ACTIVITY PREPARATION COMMON TRAINING PROFICIENCY LEVEL FOUR INSTRUCTIONAL GUIDE SECTION 1 EO M406.01 PARTICIPATE IN A RECREATIONAL MARKSMANSHIP ACTIVITY Total Time: 90 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed

More information

Marlinespike Seamanship

Marlinespike Seamanship 20 Marlinespike Seamanship 157 Section 20 Marlinespike Seamanship Becket. An eye in the end of a block used for securing an end of a line; an eye in the end of a rope. Bend. To make fast a sail to a spar

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

Army Mountain Warfare School Ethan Allen Firing Range Jericho, VT Military Mountaineer Course Knot Guide

Army Mountain Warfare School Ethan Allen Firing Range Jericho, VT Military Mountaineer Course Knot Guide Army Mountain Warfare School Ethan Allen Firing Range Jericho, VT 05465-9796 Military Mountaineer Course Knot Guide 2 - Basic Knot Tying 071E9002 INTRODUCTION: There are many knots used in mountaineering.

More information

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment Orignal Issue Date : 28-10-10 Date of Revision: Page- - 1-1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment (Slings & Ropes) 2.0 Reference: 3.0 Associated

More information

Scout Meeting Schedule: Week 2 Theme: Pioneering A Date:

Scout Meeting Schedule: Week 2 Theme: Pioneering A Date: Scout Meeting Schedule: Week 2 Theme: Pioneering A Date: Time Activity Program Details Leader Responsible 15 mins. Gathering Activity Poison Circle 10 mins. Opening Ceremony Details can be found in the

More information

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA 1910.184 SAFE OPERATING PRACTICES -.Whenever any sling is used, the following practices shall be observed:

More information

===============================================================

=============================================================== TOPIC: TRAINING TECHNIQUES LEVEL OF INSTRUCTION: TIME REQUIRED: TWO HOURS INSTRUCTOR GUIDE MATERIALS: APPROPRIATE AUDIO-VISUAL MATERIALS REFERENCES: Fire and Emergency Services Instructor, 6 th ed., International

More information

8-20 Place edge protection to protect rope and webbing.

8-20 Place edge protection to protect rope and webbing. 8-20 Place edge protection to protect rope and webbing. NOTE: All personnel working near an edge must take fall protection precautions as required by the AHJ. Edge personnel must place the edge protection,

More information

Zip-Line Kit Instructions

Zip-Line Kit Instructions 1 Zip-Lines Ireland - Zip-Line Kit Instructions DC001A Zip-Line Kit Instructions Thank you for your purchase of the ZLI Zip-line kit! This product was engineered to provide safe fun for all ages when the

More information

CONTENTS ORIGINAL MANUAL Page General warning 3 Technical data 3. Description of equipment. Rigging arrangements 3. Installing the wire rope 5. Releas

CONTENTS ORIGINAL MANUAL Page General warning 3 Technical data 3. Description of equipment. Rigging arrangements 3. Installing the wire rope 5. Releas 0086086.03-0/95 operating and maintenance instructions equipment in accordance with CE directives tirfor lifting and pulling machines models TU : TU-8 TU-6 TU-3 T-500D : T-508D T-56D T-53D CONTENTS ORIGINAL

More information

Crane & Rigging Brain Teasers

Crane & Rigging Brain Teasers Crane & Rigging Brain Teasers Host: Mike Parnell President/CEO, ITI ASME B30 Vice Chair (Cranes & Rigging) ASME P30 Chair (Lift Planning) The views expressed in this presentation are that of ITI and are

More information

Chapter 9 Rigging and Vehicle Recovery ROPES. Table 9-1. Wire rope characteristics and safety factors

Chapter 9 Rigging and Vehicle Recovery ROPES. Table 9-1. Wire rope characteristics and safety factors Chapter 9 Rigging and Vehicle Recovery ROPES Tables 9-1 and 9-2 give characteristics, safety factors, and breaking strength for different diameters of wire, manila, and sisal ropes. Table 9-1. Wire rope

More information

KITSAP MOUNTAINEERS BASIC CLIMBING COURSE

KITSAP MOUNTAINEERS BASIC CLIMBING COURSE Basic Rock & Glacier Climbing Course Kitsap Mountaineers KITSAP MOUNTAINEERS BASIC CLIMBING COURSE Class #2 and Field Trip #2 Kitsap Basic Climbing Course Class 5 and Field Trips 6 & 7-1 BASIC CLIMBING

More information

The Forest School Training Co. OCN accredited training

The Forest School Training Co. OCN accredited training Useful Knots for Forest School The Overhand Knot 1. Cast an overhand loop. Take the working end and push it through the loop. The Figure of Eight Knot 1. Form a loop and pass the end under the standing

More information

ROPE. Average Tensile (lbs) Average. Tensile. (lbs)

ROPE. Average Tensile (lbs) Average. Tensile. (lbs) Rope Class ropes are made from any or all of the following fibers: olefin, polyester or nylon. Additional rope needed for splice length of crowns plus lengthof eye with thimble length of crowns plus cerc.

More information

Knots for Cavers Knots, Hitches, Bends, and Splices Step By Step Instructions For tying knots for Caving

Knots for Cavers Knots, Hitches, Bends, and Splices Step By Step Instructions For tying knots for Caving Knots for Cavers Knots, Hitches, Bends, and Splices Step By Step Instructions For tying knots for Caving Knot Requirements by Slide Edge Color Required Knots Additional Knots Credits The photography and

More information

A Basic Guide to Europe Dinghy Rigging

A Basic Guide to Europe Dinghy Rigging The Basics: A Basic Guide to Europe Dinghy Rigging Use the smallest blocks available for the line size. Most of the blocks on your boat will be micro blocks. Examine all of your rigging and ensure that

More information

Pioneering. It s More Than Just Knots and Rope

Pioneering. It s More Than Just Knots and Rope Pioneering It s More Than Just Knots and Rope Mark Montrose Retired Scoutmaster Troop 14, Santa Clara Venture Crew Advisor Crew 14, Santa Clara Assistant District Commissioner Pioneer District University

More information