Procedure for Filling 2 T Bruker Magnet with Nitrogen
|
|
- Derek Lloyd
- 5 years ago
- Views:
Transcription
1 Procedure for Filling 2 T Bruker Magnet with Nitrogen Note: Nitrogen fills require 2 people to be present. Transfer of N2 from Reservoir to Dewar 1) Get keys from Phil s desk and open door to courtyard. [Note that when crash bars on double doors (into corridor) are opened they become permanently unlocked and need to be relocked with a key after filling]. 2) Get protective goggles from Phil s desk in workshop. 3) Get gloves from on top of He bottle in corridor (far end of corridor). 4) Move dewar from corridor outside into courtyard. 5) Open vent valve (Fig 1) to reduce pressure in dewar to close to zero. 6) Open and remove the leybold clamp around the neck of the dewar (Fig 1). 7) Slowly remove the valve unit and fill apparatus from the dewar. Also remove the O ring. Place the valve unit along with leybold clamp and O ring on the corridor floor (Fig 2). 8) Get transfer tube from the hook in the corridor and place this in the open dewar neck. Attach the other end to the filling connector on the Reservoir (Fig 3). The leybold clamp and O ring should be on this connector when not in use. 9) Pressurize the Reservoir by closing the vent valve (Fig 3) and opening the pressurizing valve (Fig 3). Note that if the vent valve has been accidentally left closed then the Reservoir can be at high pressure (40 psi). In such cases open the vent valve to reduce the pressure in the Reservoir. 10) When the pressure is up to approx 5 psi (to 10 psi), open the filling valve on the Reservoir (Fig 3) and N2 should flow. Note that if it is raining hard then it is best to shield the top of the dewar to avoid water getting into dewar. 11) Transfer takes approx. 20 mins. Wait until N2 spills over top of dewar. 12) When dewar is full (Fig 5) quickly close off the fill valve (Fig 3). 13) Return Reservoir to default state (pressure valve closed, vent valve open), and remove the filling tube from the reservoir. 14) Disconnect the transfer tube from the Reservoir, leaving the O ring and leybold clamp on the transfer tube. 15) Put plastic cover over the connector on Reservoir fill outlet. Close doors to Reservoir. 16) Replace filling tube on hook in corridor
2 17) Replace O ring on to collar of dewar. 18) Slowly insert valve unit and fill apparatus into the dewar (will get some boil off, so go slowly). 19) Re-attach the leybold clamp. Note that it will be necessary to re-tighten the clamp a few times as the dewar heats slightly. Transfer of N2 from Dewar to Magnet 1) Get log book from workshop. 2) Go into the equipment room and plug in the He/N2 monitoring unit into the wall. This is left unplugged by default to avoid the possibility of being left in Run mode when on (and hence increasing boil off). 3) Press the Manual button (Fig 6) to get the system to start sampling. 4) Take the initial readings for the N2 and record the value in the log book. 5) Open the back doors of the magnet room from inside the magnet room and wheel the dewar into the room and to the far side of the magnet. 6) Re-tighten the leybold clamp on the dewar to prevent spilling when filling. 7) Clamp the fill tube (dangling from the magnet side) to the fill valve on the dewar using the O ring and leybold clamp that can be found in the drawer near the magnet. Note that the leybold clamp is magnetic, so be careful. 8) Go up steps to top of magnet and remove the leybold clamp around the red vent hole. Note that the leybold clamp is magnetic, so be careful. 9) Place the leybold clamp, the red cover plate, and the O ring on top of the magnet for safe keeping (taking care to place the rubber bung on the leybold clamp so that it does not move in the field). 10) Re-tighten leybold clamp on dewar again to prevent spilling when filling! 11) Move the helium bottle in the corridor to the chained area near the 2T magnet room (but still in the corridor!). Note that the helium bottle and the stand are magnetic and must not be brought into the magnet room itself! 12) Chain the helium bottle to the wall for safety. 13) Run out the rubber hosing (Fig 7) into the magnet room (avoiding kinks) and attach the other end to the dewar pressurizer valve fitting. 14) Open the feeding valve on the dewar (Fig 1). Also open the vent valve (Fig 1).
3 15) Open the main (black) valve of the helium bottle (Fig 7). Turn the gold pressure valve clockwise to increase the pressure until it reads approx 5-6 psi (lbf/in2). 16) Tighten the leybold clamps if the dewar starts dripping. 17) While waiting for the magnet to fill (approx 15 mins) can switch the N2 monitor to fast sampling (Fig 6). Note that the system needs to be in Run mode (Fig 6). [Note that the Manual button is a bit sticky and can stick in the on position, never completing a reading! In which case give the button a jiggle.] 18) When the N2 reading gets to approx lower 90%s best to go back into the magnet room and wait for the magnet to show signs of being full. This can be ascertained by seeing a (subtle) spitting at the top of the N2 gas plume. 19) Turn off the fill valve on the dewar when the magnet is full. 20) Close the main (black) valve of the helium bottle. 21) Close the vent valve on the dewar and pull the rubber tube off the fitting (expect a mild pop). 22) Once rubber tube is removed from the dewar, re-open the vent valve and leave this open. 23) Note: can be useful to open and close the fill valve at this point to allow any liquid N2 in the transfer tube to drain into the Dewar. 24) Unscrew the leybold clamp on the dewar and remove the fill tube. Note that N2 liquid will pour onto the floor when the filling tube is detached. Best to stand on the ladder to do this to avoid N2 on the feet! 25) Put waste bin below end of filling tube to protect the floor from drips. 26) Replace the O ring and red blanking plate onto the vent hole on top of the magnet. Also re-attach leybold clamp around the red blanking plate to hold in place. 27) Coil up the rubber tubing and place on helium bottle. Turn the gold pressure valve on the helium bottle fully anti clockwise and replace the He gas bottle to the other end of the corridor. Make sure it is chained to the wall. 28) Replace dewar in corridor, taking care to avoid blocking the emergency exit from the magnet room. 29) Go into equipment room and record the final reading of the N2 fill in the log book. 30) Switch the N2 monitor back to slow sampling (Fig 6) and switch the unit to hold (Fig 6). 31) Turn the monitor off at the wall and take out the plug to avoid the unit being accidentally switched on between fills.
4 32) Return to magnet room and give a final tighten to the leybold clamp over the vent hole on top of the magnet. 33) Close magnet room doors and return log book to workshop. 34) Return gloves to top of He bottle in corridor. 35) Remember to lock all doors and return chains to corridor. Other Notes 1) BOC deliver N2 every other Monday and fill the N2 reservoir in the courtyard area. The usual driver is Steven Marsh ( , manager Tony Herbert ). Approximately 1000 litres is transferred each time BOC come. They need someone to let them in the gates of the courtyard (Sharon Dash). 2) The helium bottles last approx 1-2 months. There should always be one spare bottle kept outside in the courtyard, plus the one currently in use in the corridor. Replacement bottles are ordered from BOC via the University. [Liaise with Neserin Fleet in Biochem about changing the accounts info to Cardiovascular Medicine]. Current order is: Size L cylinder of helium gas. Grade A. Collect empty bottles as necessary. BOC Industrial National Accounting Centre PO Box 12 Priestley Rd Worsley Manchester MRC customer account number is Note that explicit instructions must be given for the bottle to be delivered to MRC MRS Unit, John Radcliffe Hospital. Otherwise the bottles have a habit of being delivered to the Industrial Block. In the event of a dire problem (no helium for some reason) Colin Hoey in the Industrial Block will often be able to loan out a bottle (to do an emergency fill, for example). 3) N2 is normally filled every two weeks, by which point the reading is typically in the range 60-65%. If the reading ever drops below 40-50% then the magnet should be filled as soon as possible. 4) He is normally filled every 3-4 weeks, when the reading gets to approx %. The danger level for He is likely to be anywhere below 50%, so avoid the He level going below 50%.
5 Figure 1 Vent valve and connection for He bottle pressurizer Transfer from N2 reservoir to dewar, and also from dewar to magnet auto vent valve up to 2 psi burst valve (needs replacing if it blows) Leybold clamp
6 Figure 2 O ring Leybold clamp
7 Transfer pressure (ideally 5-10 psi when filling, 0 otherwise). Level to indicate reservoir level (near red mark when full) Figure 3 Vent valve (normally open, but closed for dewar fills Valve and connector for filling dewar Only used by BOC. Leave closed Pressurize valve (open when pressurizing)
8 Figure 4 Transfer tube When transferring: Vent closed Fill valve open BOC valve closed Pressurizer open
9 Figure 5 Turn off fill valve when dewar spills over
10 Figure 6 Manual button to force sampling Slow/fast sampling setting Run/hold button Mains outlet
11 Figure 7 Gas pressure (ideally about 6 psi (lbf/in2) when filling magnet) Bottle level meter Main bottle valve Rubber pressurizer Tube to dewar Pressure valve (clockwise to increase pressure, anti-clockwise to reduce pressure
256 Pneumatic Pressure Indicator
256 Pneumatic Pressure Indicator 51425699 Copyright 2002 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any
More information1. Cryogen Tanks. N2 Fill Tutorial for Vanderbilt Magnets. Contents: CSB NMR Facility
CSB NMR Facility NMR-Home N2 Fill Tutorial for Vanderbilt Magnets This page gives an overview of the cryogen filling procedures for our instruments at Vanderbilt. User Info Access General Information:
More informationProcedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1
Project: Novel Electron Bubble Particle Detector Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat Version 5.1 (Using side filling line) Hand Processed Changes HPC No. Date
More informationVacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No
Rev. ECO Description Checked Approval Date 01 32- Release M. Smith Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System Dwg. No. 32-06003.05 Revision 01 June 18, 2007 1 1. Introduction 1.1.
More informationSuperconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)
Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS) Sensitivity: 1x10 11 A m 2 Applied DC fields: 0 T to 5 T Applied AC fields: 0 G to 3 G (zero-to-peak), 0.01 Hz to 1000 Hz Temperatures
More informationEco Snow CO2 Clean System Operation
Eco Snow CO2 Clean System Operation This equipment is to be operated only by individuals that have been trained and qualified by the MNFC staff. Do NOT use or attempt to use this tool unless you are qualified
More informationIMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION
IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION This Fitting Guide is designed to assist in the Installation of your Reverse Osmosis System. Some of the parts that are supplied with each system may
More informationUNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY
Revision No.: 1 Page 1 of 6 I. PURPOSE This policy/procedure establishes the proper steps for set up, and operation of the BullEx I.T.S Xtreme training system. II. PERSONNEL AFFECTED Fire Safety staff
More informationChem Bio Liquid Nitrogen Facility
Chem Bio Liquid Nitrogen Facility Who: Where: When: What: How: Open to anyone working in a Western research lab that requires LN2 for their research. To become a registered user, you must attend a training
More informationPump out insert (condenser and still lines) overnight with turbo pump
Running the Dilution Fridge Before starting a run: Pump out insert (condenser and still lines) overnight with turbo pump Make sure LN and LHe traps are clean pump out with He4 rotary pump Start He3 rotary
More informationWorking correctly with gas
Working correctly with gas When working with a reactive gas in a cylinder, there is an inherent risk. Special care has to be taken to allow safe handling. This example is with HCl. 1) Fixing the gas bottle.
More informationOperating Manual ALU 7 - ALU 10 - ALU 20 - ALU 26 ALU 35 - ALU 60 - ALU 100
Operating Manual ALU 7 - ALU 10 - ALU 20 - ALU 26 ALU 35 - ALU 60 - ALU 100 KGW - ISOTHERM Gablonzer Str. 6 76185 Karlsruhe Germany Tel: 0049 / 721 95897-0 Fax: 0049 / 721 95897-77 Internet: www.kgw-isotherm.com
More informationSterisil Ac+ Installation & Operating Manual
Sterisil Ac+ Installation & Operating Manual 719 622 7200 Sterisil.com Arbor Dental Associates 2 Table of Contents Introduction 4 Sterisil Ac + Features 5 Installation Instructions 6 Maintenance 10 Troubleshooting
More informationALU-CD 12, ALU-CD 25, ALU-CD 35, ALU-CD
Operating Manual ALU-CD 12, ALU-CD 25, ALU-CD 35, ALU-CD 50 und ALU-CD 60 KGW - ISOTHERM Gablonzer Straße 6 76185 Karlsruhe Germany Tel: 0049 / 721 95897-0 Fax: 0049 / 721 95897-77 Internet: www.kgw-isotherm.com
More informationIn Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure
PPMS Service Note 1099-412 In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure Introduction: Loss of electricity to the PPMS EverCool II should not cause damage to
More informationCryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases.
CRYOGENICS SAFETY Introduction Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases. The gases which are most widely used in industry and research
More informationInoxair. Repair Manual. Content. Edition: 12/2010. Subject to technical changes for reasons of the continous development.
Inoxair Repair Manual Edition: 12/2010 Content 1) Serial number 2) Technical data 3) Functional principle 4) Problem analysis 5) Removal 6) Repairs 7) Circuit diagram and cable-connection-plan 8) Pneumatic
More informationBudget Range Operators Handbook
Budget Range Operators Handbook BAMBI AIR COMPRESSORS LTD 152 Thimble Mill Lane Heartlands Birmingham B7 5HT United Kingdom Tel: 0121 322 2299 Fax: 0121 322 2297 Email: sales@bambi-air.co.uk www.bambi-air.co.uk
More informationBOC: Living healthcare. Manual. LIV IQ BOC Integrated Valve with digital display portable delivery system for Medical Oxygen. BOC: Living healthcare
BOC: Living healthcare Manual LIV IQ BOC Integrated Valve with digital display portable delivery system for Medical Oxygen. BOC: Living healthcare 02 Manual LIV IQ Oxygen Manual LIV IQ Oxygen 03 Contents.
More informationTable of Contents Want full page pictures with most important parts labeled in the beginning.
1 Table of Contents Want full page pictures with most important parts labeled in the beginning. Precool Procedures (Perform before cooling down): 1. Check N2 and 4He gas tanks to be sure that there is
More informationHalsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!
Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP! PLEASE READ THE FOLLOWING INFORMATION. ITALLATION ITRUCTIO FOR THE 4410FR FTN. WITH 97243C SINGLE VALVE CONTROL ASSEMBLY ARE LOCATED
More informationSINORIX Valve Reconditioning
Document No. 129-097 SINORIX Valve Reconditioning Product Description These instructions explain how to recondition and fill 1-inch through 4-inch SINORIX valves. Product Numbers Verify that the appropriate
More informationHalsey Taylor Owners Manual STOP!
Halsey Taylor Owners Manual 4710 Freeze Resistant Floor Mounted Steel Fountain STOP! PLEASE READ THE FOLLOWING INFORMATION. ITALLATION ITRUCTIO FOR THE 4710FR FTN. WITH 97243C SINGLE VALVE CONTROL ASSEMBLY
More informationGlove Box Installation Manual
Glove Box Installation Manual 1998 by M. Braun Company File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice Glovebox Installation Your Glove box has been fully assembled,
More informationABRASIVE REGULATOR II
ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS Contact Information and Customer & Technical Service... 1 1 Introduction... 1 2 Abrasive Regulator... 1 Description:... 1 2.1 Regulator
More informationTentec. Instruction Document. Mini Air Driven Pump Unit Model: HTT.627X Series. Part Identifier
Tentec Page 1 w w w. t e n t e c. n e t Instruction Document Mini Air Driven Pump Unit Model: HTT.627X Series HTT.6271 Maximum Working Pressure = 1500bar (21750 psi) HTT.6272 Maximum Working Pressure =
More informationABRASIVE REGULATOR II
ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS 1 Introduction... 1 2 Abrasive Regulator... 2 2.1 Regulator Installation... 2 Location... 2 Attaching the Regulator to the Machine...
More informationLiquid Helium Bath Cryostat
Liquid Helium Bath Cryostat Operating Manual Model TK1865M CONTENTS First A Word of Warning Lifting and Handling the Cryostat Using Cryogens Introduction The liquid helium cryostat. Type TK1865M Serial
More informationVERTICAL AIR COMPRESSORS
VERTICAL AIR COMPRESSORS MODEL NO: VE11C150, VE15C150, VE18C150 PART NO: 2226005, 2226000, 2226015 OPERATION & MAINTENANCE INSTRUCTIONS LS0615 INTRODUCTION Thank you for purchasing this CLARKE Vertical
More informationUser Instruction Manual
User Instruction Manual 4500 psi Air Compressor Ver 2, 1.18 Contents Parts Included...3 Assembly Instructions...3-5 Operation Instructions...6-7 Oil Change Intervals...8 Air Filter Replacement...9 Setting
More informationEXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.
Chem 366-3 Page XI - 1 EXPERIMENT XI INFRARED SPECTRUM OF SO2 (S&G, 5th ed. Expt 36, 6th ed. Expt. 35) 1. Pre-Lab preparation. The description of this experiment has disappeared from the more recent editions
More informationOPERATING MANUAL LO-CROSS-FLOW CF M
VA FILTRATION USA 110 Dodd Court American Canyon, CA 94503 Tel : (707) 552 2616 Fax :(707) 552 3871 Web : www.vafiltration.com OPERATING MANUAL LO-CROSS-FLOW CF8-2-200M January, 2017 TECHNICAL SPECIFICATIONS
More information8-GALLON AIR-OPERATED OIL CHANGER
8-GALLON AIR-OPERATED OIL CHANGER OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result
More informationTraining. Testor Training Manual
Training Testor Training Manual Index Section 1 Introduction and Safety Warnings Section 2 Test Procedures Section 3 Test Hoses Section 4 Fault Location 1:1 1.1 Introduction The Dräger Testor test equipment
More informationWarnings: Notes: Revised: January 8,
OAI Model 204IR Mask Aligner Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus
More information! CAUTION! ! WARNING! General Information
Great Plains Mfg., Inc. Installation Instructions Used with: 2SF24, 24-Foot Two-Section Drill General Information Two-Section, Hydraulic Folding Marker 2SF30, 30-Foot Two-Section Drill 2SBM30, 30-Foot
More informationConcentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141
0 Operation Manual Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and
More informationAIR DRIVE ROLL FEED CARTON STAPLER MODEL: H-1031 MANUAL
AIR DRIVE ROLL FEED CARTON STAPLER MODEL: H-1031 MANUAL WARNING Before operating this stapler familiarize yourself with the safety warnings and instructions in this manual. Keep these instructions with
More informationModel 130M Pneumatic Controller
Instruction MI 017-450 May 1978 Model 130M Pneumatic Controller Installation and Operation Manual Control Unit Controller Model 130M Controller is a pneumatic, shelf-mounted instrument with a separate
More informationWelcome to the Specialized Medical Services Respiratory training webinar series!
Welcome to the Specialized Medical Services Respiratory training webinar series! SMS is your Long Term Care (LTC) facility single source for oxygen, medical equipment, respiratory care services and supplies
More informationPROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road
PROPORTIONING VALVE Model 150 INSTRUCTION MANUAL March 2017 IMS Company 10373 Stafford Road Telephone: (440) 543-1615 Fax: (440) 543-1069 Email: sales@imscompany.com 1 Introduction IMS Company reserves
More informationINSTALLATION INSTRUCTIONS
EDGEMERE CENTERSET LAVATORY FAUCET INSTALLATION INSTRUCTIONS 708.0 Thank you for selecting American Standard... the benchmark of fine quality for over 00 years. To ensure that your installation proceeds
More informationWARNING OLED & BASIC MENU QUICK START
Getting Started QUICK START WARNING The VANGUARD MARKER is not a toy. Careless or improper use, including failure to follow instructions and warnings within this Operator Manual and attached to the VANGUARD
More informationBRAZING EQUIPMENT PORTAPAK KIT
BRAZING EQUIPMENT PORTAPAK KIT Portapak Trolley Single Stage 2 Gauge Acetylene Regulator Single Stage 2 Gauge Oxygen Regulator Acetylene Flashback Arrestor Oxygen Flashback Arrestor 5 Meter Oxy / Acetylene
More informationMANUAL BE SERIES Test Benches
The CustomCrimp Manual BE Series Test Benches are designed with features that make proof and burst testing of hydraulic hose assemblies a quick and easy procedure. CUSTOMIZED AND SPECIAL DESIGN BENCHES
More informationG7S Hand Pump Owner s Manual
G7S Hand Pump Owner s Manual Copyright Air Venturi 2018 Version 4-18 Specifications 24.80 inches long closed 43.31 inches long extended 4500 psi/310 bar max pressure Features Integral manometer (pressure
More informationThe second stage cannot begin until the first stage is complete.
Addendum to Pneumatic Corker (August 12, 2002) Please read the Operating Instructions before using the pneumatic corker. The purpose of this addendum is three-fold. 1) Describe in more detail how the corker
More informationLNG Regulator Test Kit
OVERVIEW Chart provides a LNG Economizer/Regulator Test Kit to help save money and time by allowing a technician to more accurately and easily diagnose the operability of the pressure control regulator/economizer
More informationInstruction Manual Updated 7/26/2011 Ver. 2.2
4-Unit Model MB HTHP Filter Press #171-50-4: 115-Volt #171-51-4: 230-Volt Instruction Manual Updated 7/26/2011 Ver. 2.2 OFI Testing Equipment, Inc. 11302 Steeplecrest Dr. Houston, Texas 77065 U.S.A. Tele:
More informationTitle/Description: Fuel Cell Fill Procedure
Fuel Cell Procedure Document No.: Author: Kurt Stiffel Title/Description: Approved by: Revision: 1-00 Effective Date: 1.0 Reference Documents All released OOI documents in Alfresco 3161-20000 Fuel Cell
More informationACCUCRAFT UK LTD Unit 4, Long Meadow Industrial Estate, Pontrilas, Herefordshire. HR2 0UA Tel:
1 ACCUCRAFT UK LTD Unit 4, Long Meadow Industrial Estate, Pontrilas, Herefordshire. HR2 0UA Tel: 01981 241380 www.accucraft.uk.com SAFETY FIRST OPERATING INSTRUCTIONS FLYING SCOTSMAN All our locomotives
More informationMODEL 269DF-LCF-LCF/WS FILLING SYSTEM
MODEL 269DF-LCF-LCF/WS FILLING SYSTEM 29975 Parkway Roseville, Michigan 48066 (586) 778-0426 Fax (586) 778-0479 www.gordinier.com Email: pat@gordinier.com MODEL 269DF-LCF-LCF/WS TABLE OF CONTENTS Receiving
More informationInstallation Instructions
Installation Instructions COLONY SOFT 7.0 Single Control Lavatory Faucet with Speed Connect Drain Congratulations on purchasing your American Standard faucet with the Speed Connect drain, a feature found
More informationHANDBOOK. Squeeze Off Unit SOU 400. Please refer any queries to:
HANDBOOK Squeeze Off Unit SOU 400 Please refer any queries to: Hy Ram Engineering Co Ltd Pelham Street Mansfield Nottinghamshire NG18 2EY Telephone No: (01623) 422982 Please note all queries should state
More informationCOMPACT AIR COMPRESSOR MODEL NO OWNER S MANUAL
COMPACT AIR COMPRESSOR MODEL NO. 299-2642-0 OWNER S MANUAL IMPORTANT: If you have questions or problems, are missing parts or require technical service, before returning to your retailer, please call our
More information100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13
100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: 2244025 OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 INTRODUCTION Thank you for purchasing this product. Before attempting to use this product, please
More informationThe number of test stands can be adapted to the special requirements.
Model DPC Model DPC 01 Simultaneous testing of several cylinders and cartridges is possible. For repeated pressure testing of CO2 high-pressure and breathing air cylinders. The number of test stands can
More informationAir Ball! Evaluation copy
Air Ball! Computer 24 Do you ever wonder how the National Basketball Association (NBA) decides how much air should be in the basketballs used during a game? The NBA measures the pressure inside the ball
More informationInstructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems
Corporation Issued: 5/09 P/N: 600104 Rev. 2 Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems The Gas Addition Accessory permits the
More informationInstallation Instructions
Installation Instructions COLONY SOFT 7.0 Centerset Lavatory Faucet 7.0 with Speed Connect Drain Congratulations on purchasing your American Standard faucet with the Speed Connect drain, a features found
More informationORB-400 BUBBLE/HAZE MACHINE. Item ref: UK User Manual
ORB-400 BUBBLE/HAZE MACHINE Item ref: 160.462UK User Manual Caution: Please read this manual carefully before operating Damage caused by misuse is not covered by the warranty Introduction Thank you for
More informationPortable Hydrostatic Electric Test Pump. Procedure Manual. Dixon 800 High Street Chestertown, MD Fax: dixonvalve.
Portable Hydrostatic Electric Test Pump Procedure Manual Dixon 800 High Street Chestertown, MD 21620 800-355-1991 Fax: 800-283-4966 dixonvalve.com Dixon's Portable Electric Hydrostatic Test Pump (E.T.P.)
More informationVERTICAL AIR COMPRESSORS
VERTICAL AIR COMPRESSORS MODEL NO: VE15C150, VE18C150, VE25C150 PART NO: 2226010, 2226020, 2226025 OPERATION & MAINTENANCE INSTRUCTIONS LS0715 INTRODUCTION Thank you for purchasing this CLARKE Vertical
More informationOWNER S MANUAL. Page: 1 of 8
Air Needle Scaler OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious personal
More informationStandard Operating Procedure
Standard Operating Procedure Use of liquid nitrogen filling station Date: 02-12-13 SOP Title: Principal Investigator: Room and Building: Lab Phone Number: Section 1 Process Use of liquid nitrogen filling
More informationproduct manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels
12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability
More informationDCIF Training Guide Variable Temperature Bruker B400 (last update )
DCIF Training Guide Variable Temperature Bruker B400 (last update 20100421) As with all of the other DCIF tutorials, the conventions used in this guide are as follows: Boldface type indicates commands
More information24 Litre Air Compressor
Operator s Manual 24 Litre Air Compressor WARNING! Before using this appliance, read the Operator s manual and follow all its safety rules and instructions. SPECIFICATION Model Power ITEM DATA HWKAC2 1Kw/1.5HP&1.5Kw/2HP&1.8Kw/2.5HP
More information3:1 High Ratio Oil Pump W. Extn. Kit
3:1 High Ratio Oil Pump W. Extn. Kit OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result
More informationProduct Information News September 26, 2003
Product Information News September 26, 2003 LEVER HEIGHT INSPECTION FOR FIREHAWK MMR MSA is announcing a revision to the instructions for the Firehawk MMR Second Stage Regulator as they relate to the air
More informationV-24 OXYGEN LANCE VALVE
INSTRUCTIONS for F-4737-U May, 2009 V-24 OXYGEN LANCE VALVE w/ C -Size Inlet w/ B -Size Inlet V-24 Oxygen Lance with 1/8" Pipe Holder... 9728D65... 2218939 V-24 Oxygen Lance with 1/4" Pipe Holder... 9728A65...
More informationPRESSURE-TEMPERATURE RELATIONSHIP IN GASES
PRESSURE-TEMPERATURE RELATIONSHIP IN GASES LAB PS2.PALM INTRODUCTION Gases are made up of molecules that are in constant motion and exert pressure when they collide with the walls of their container. The
More informationThis is the Quick Start Guide for the Optibike Pioneer Allroad electric bicycle. The Guide provides for basic information required to ride the
This is the Quick Start Guide for the Optibike Pioneer Allroad electric bicycle. The Guide provides for basic information required to ride the Allroad. It is not intended to be an extensive manual. It
More informationUser s Guide. CO2 & O2 Controller for miniature incubators
CO2 O2 Control User s Guide CO2 & O2 Controller for miniature incubators Precise CO2 & O2 Control throughout the experiment Media ph control Compatible with any perfusion system Miniature incubators for
More informationStep By Step Instructions for VT Experiments on the Bruker 300 MHz Spectrometer
Step By Step Instructions for VT Experiments on the Bruker 300 MHz Spectrometer (1) Use the drop down menu to create a new experiment/dataset for acquiring the room temperature 1D spectrum. The name of
More informationLiquid Nitrogen Experiment Tips
Liquid Nitrogen Experiment Tips Dipping Fingers In - Use a clear plastic cup to make it easier to see - Place in only for maximum of 1 second - Hold in air with at least 50cm space underneath. If someone
More informationSteam Locomotive Operating Procedures SVLS Locomotive 1973 Steam Up
Steam Locomotive Operating Procedures SVLS Locomotive 1973 Steam Up These procedures have been developed to help both the novice and experienced engineer prepare the steam engine for service. While some
More informationPAGE (Rev. A - 06/17)
Owners Manual Models 4420BF1UDBFR* and 4420BF1LDBFR* Bi-Level Tubular Bottle Filler Fountain with Pet Fountain and Sanitary Freeze Resistant Triple Valve Control Assembly MODEL (LK)4420BF1UDBFR MODEL (LK)4420BF1LDBFR
More informationPneumatic Wet Sander. (4,500 rpm) Operation Instruction
Pneumatic Wet Sander (4,500 rpm) Operation Instruction ON / OFF Safety Lever Features ON / OFF 4 6 3 5 2 5 3 6 7 4 Safety Lever 2 8 Rubber Sleeve Ergonomic handle comforts the users hand, its excellent
More information3/8" KEYLESS REVERSIBLE AIR DRILL CT1086
3/8" KEYLESS REVERSIBLE AIR DRILL CT1086 Cannon Tools Limited ORIGINAL INSTRUCTIONS Address: 20 Station Road, Rowley Regis, West Midlands, B65 0JU.U.K. SAVE THESE INSTRUCTIONS AND PRECAUTIONS. READ ALL
More informationComposite Pistol-Type Air Needle Scaler OWNER S MANUAL
Composite Pistol-Type Air Needle Scaler OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may
More informationOperation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER
Operation Manual - PN 0017946001 A MENSOR MODEL 73 SHOP AIR BOOSTER Mensor Model 73 Shop Air Booster System (750 psi Version) April 23, 2012 Trademarks / Copyright Mensor is a registered trademark of Mensor
More informationCOMPRESSOR REPLACEMENT PROCEDURE (R-134A)
372 ROUTE 4 BARRINGTON, NH 03825 USA TEL (603) 868-5720 FAX (603) 868-1040 1-800-435-6708 COMPRESSOR REPLACEMENT PROCEDURE (R-134A) [ ] If possible operate the compressor with proper charge for 5 minutes
More informationParallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL!
Parallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL! This SOP describes the basic procedure for using the HEL Cat-24 parallel reactor,
More informationINSTRUCTION MANUAL. January 23, 2003, Revision 0
INSTRUCTION MANUAL Model 810A In-Vitro Test Apparatus for 310B Muscle Lever January 23, 2003, Revision 0 Copyright 2003 Aurora Scientific Inc. Aurora Scientific Inc. 360 Industrial Parkway S., Unit 4 Aurora,
More informationFreedom8 ShoeBox Compressor Manual
Freedom8 ShoeBox Compressor Manual Warning!! This product is not a toy! Use or misuse can cause severe injury or death! Use only with adult supervision. This unit is only to be used with tanks, hoses and
More information24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13
24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: 2244010 OPERATION & MAINTENANCE INSTRUCTIONS LS01/13 INTRODUCTION Thank you for purchasing this product. Before attempting to use this product, please
More information[USING THE VITROBOT April 9, Using the Vitrobot
Using the Vitrobot The Vitrobot Mk 3 (aka Mark III, Mark 3, etc.) can control both the local temperature and the local humidity during the process of plunge-freezing a grid for cryoem. It does require
More informationPaddle Bar Replacement
This procedure is to help facilitate the replacement of the 23 Paddle Bar Assembly on the ANKOM Dietary Fiber Analyzer. Note: The following items will be sent in a replacement package as part of the 23
More informationLinkam Scientific Instruments USER GUIDE DSC600. Temperature Controlled Stage
Linkam Scientific Instruments DSC600 Temperature Controlled Stage USER GUIDE Contents Before Setting Up Your Equipment... 3 Important Notice... 4 Warranty... 4 Technical Support... 4 Equipment Maintenance...
More informationBS ml Bottle Sampling Unit
BS500 500ml Bottle Sampling Unit User Guide www.mpfiltri.co.uk 200.307-EN Covers Model Numbers BS500 SAFETY WARNING Hydraulic systems contain dangerous fluids at high pressures and temperatures. Installation,
More informationCART FOR CENTURION 1500+
CART FOR CENTURION 1500+ Operation & Maintenance Manual www.ameriwater.com 800-535-5585 AmeriWater 3345 Stop 8 Rd. Dayton, OH 45414 98-0161 Rev A Contents 1. GENERAL INFORMATION... 1 1.1. Features...
More informationAir Intake Snorkel Kit
SSV KIT - Air Intake Snorkel Kit Part number (SKU) : 715003733 Product: Side-by-side Project no: 487802499 Instruction Sheet P/N: 487802499 Revision no: Revision date: Item covered: Air Intake Snorkel
More informationKJ4000 Operating Instructions & Parts Manual NSN
KJ4000 Operating Instructions & Parts Manual NSN 1025-01-473-7710 Mandus Group Ltd. KJ4000 Operators Manual Date: 3 Jan. 2002 TABLE OF CONTENTS General Safety Instructions...Page 1 Operator Instructions...Page
More informationPurge Star & Ring Purge Systems
March 2013 Operator s Manual Purge Star & Ring Purge Systems Additional instruction for Purge Star Single Hose, Purge Star Double (bypass) Hose and Ring Purge with bypass hose and gas dump valve feature.
More informationGW DRY PIPE VALVE INSTALLATION & OPERATION 100mm (4 ) 150mm (6 )
Read in conjunction with Dry Valve Set Schematic (section 7). 1. PRINCIPLE OF OPERATION. Primary functions of the Angus Type D dry alarm valve station: 1.1. To maintain a dry sprinkler pipework system
More informationMicroscopy Cryogenic WORKSTATION. Performance by Design
CRYO Microscopy Cryogenic WORKSTATION Optical cryostat for use in microscopy and spectroscopy Performance by Design RC102-CFM Microscopy Cryostat offers fast cooldown, high efficiency, excellent temperature
More informationRARS5000 AIR BODY SAW OWNER S OPERATING MANUAL
RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL DESCRIPTION 1. No mar 2. No mar tip 3. Housing grip 4. Trigger 5. Air inlet 6. Air inlet plug 7. Plastic board Important! It is essential that you read the
More information450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES
EXTREME SERIES PART NO. 45043 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using this product. SAVE THIS
More informationA32W PRO ROBOT. User Manual. paddlepalace.com P P
A32W PRO ROBOT paddlepalace.com P 1-800-547-5891 P 503-777-2266 Paddle Palace A32W Pro P Two throw wheels, for multiple spin options P Multiple Oscillation Options P Very durable, made with high quality
More information