NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES. David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT
|
|
- Christopher Garrison
- 5 years ago
- Views:
Transcription
1 NCDOT S EXPERIENCE USING HYDRAULIC SETTLEMENT GAUGES David L. Teague,P.E. NCDOT GEOTECHNICAL ENGINEERING UNIT
2 OUTLINE Introduction Benefits of Hydraulic Settlement Gauges (HSG) over traditional settlement plates Installation procedures Calibration for temperature Case Study MSE Wall in Wayne County, NC (Currently under construction) Results compared to traditional settlement plates (for completed project)
3 INTRODUCTION What are Hydraulic Settlement Gauges?
4 Traditional Settlement Plate
5 BENEFITS OF HSG Once installed, HSG are completely buried, therefore they are not subject to being damaged or destroyed during fill placement and compaction efforts. Traditional settlement plates may be subject to surveyor error. Readings can be taken anytime by in-house personnel. A surveyor is not required. Readings can be taken during construction as well as anytime after construction. Traditional settlement plates must be removed before paving.
6 BENEFITS OF HSG (continued) Possible to remove HSG and re-use on another project (Save $$$) Roughly the same cost as Traditional Settlement plates. Traditional = $700-$800 each HSG = $900-$1000 each
7 INSTALLATION PROCEDURES Dig trench from cell location to reservoir. Ten feet of initial head is ideal. Minimum 2-3 ft. Length of cables can be up to 300 ft. Helpful if contractor is available with excavator to dig trench. Trench needs to be 18 inches deep.
8
9
10 INSTALLATION PROCEDURES Dig hole for settlement cell. Hole should be approximately 2 ft. square and 18 inches deep. Attach settlement cell to plate by either bolting vertically or attaching horizontally. Hand tamp the bottom of the hole so it is flat. Do not want any wobbling of the plate once it is placed in hole Place plate with attached cell into hole
11
12
13
14 INSTALLATION PROCEDURES Lay tubes flat and straight with minimum hills and valleys. Some, but not a lot of slack in tubes.
15
16
17 INSTALLATION PROCEDURES Backfill trench and cover cell with 2-3 ft. of soil Coil excess tubing and bury it. Connect tubes to reservoir. Must insulate tubes coming from out of ground to readout box from temperature. Can use pipe insulators with slotted PVC Pipe. Add fluid to top of reservoir. If any air is in the system it will affect results.
18
19
20
21 TAKING READINGS Readings are taken using a Vibrating Wire (VW) Data Recorder. VW Data Recorder records Temperature and Frequency. Temperature is used in the formula to convert frequency to pressure, then converted to elevation.
22 TAKING READINGS Check Dessicant chamber for saturation Fill Reservoir until fluid is up to overflow hole. Wait 10 minutes (if fluid is added). This allows any air bubbles to come to surface. Read Temperature Take Readings of VW Data every 30 seconds for 5 minutes. Frequency should be stable. If reservoir has the potential to settle, survey readings are needed. It is best to position reservoir on a post or other stationary position that is not subject to movement.
23
24
25 EXAMPLE CALIBRATION RECORD OF SETTLEMENT CELL
26 CONVERTING FREQUENCY TO PRESSURE To convert frequency reading to pressure in PSI, use the following formula: P = (A x F^2) + (B x F) + C Where P = pressure in PSI F = Frequency in hertz A, B, and C are determined by manufacturer at time of calibration
27 CONVERTING FREQUENCY TO PRESSURE To correct readings for temperature, use the following formula: Pt = P + ((Tcal Tnow) x m) Where Pt = corrected pressure Tcal = Temperature at calibration Tnow = Current temperature of cell (VW Data recorder). Not ambient temperature. m = sensitivity from manufacturers calibration
28 AIR TEMPERATURE CORRECTION We have noticed that on hot days the sensors seem to read about ¼ inch too low and on cold days the sensors read about ¼ inch too high. This is not satisfactory for our purposes. Therefore we started using an air temperature correction which works like this:
29 AIR TEMPERATURE CORRECTION Corrected temperature = ((Tu x St) + (Ta x AT)) / Tu +TA) Where Tu = Length of tubing underground St = Temperature measured at sensor (from data recorder) Ta = Length of tubing above ground AT = Air temperature at time of reading
30 AIR TEMPERATURE CORRECTION The idea is we want to find the average temperature of the tube, which is the weighted average of the buried tube and the exposed tube. So if the tube is 150 ft. long and 5 ft. is exposed, the ground temperature is 15 C and the air temperature is 30 C the corrected Temperature would be: ((145 x 15) + (5 x 30)) / ( ) = 15.5 C
31 AIR TEMPERATURE CORRECTION The corrected temperature is then used in place of the sensor temperature when calculating settlement. So far, when using the air temperature correction, all the anomalies have disappeared.
32 CASE STUDY R-2554A Wayne County, NC Project consists of a 45 ft. high MSE Wall adjacent to a bridge. Subsurface conditions indicated that significant settlement would be possible. Traditional settlement plates were installed as part of the project contract. HSG were installed by NCDOT in-house forces as a pilot project to compare results.
33
34
35
36
37
38
39
40
41
42
43
44
45 PREDICTED SETTLEMENT UNDER WALL Maximum predicted settlement = 381 mm = 15 in.
46
47 Results from completed project Jacksonville Bypass, Onslow County, NC
48 Another benefit of HSG is that it is possible to retrieve the cells after settlement is complete. The cells can be reused on another project, saving money. Cells are placed inside outer PVC pipe. A cable is attached to the cell and run out to the end of the embankment or outside the wall footprint. When settlement is complete, the cell is pulled through the pipe and retrieved.
49
50
51
52
53 INSTALLATION COMPLETE
54 HSG Retrieval on Sunset Beach project
55 THE END Questions? Questions?
Vented VW Settlement Cell
Vented VW Settlement Cell 52612199 Copyright 2004 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any errors
More informationVW Liquid Settlement System VWLSS-200
DATASHEET VW Liquid Settlement System VWLSS-200 The Geosense VWLSS-200 Vibrating Wire Liquid Settlement System is used to monitor settlement or heave in soils and other structures such as embankments,
More informationPrecision Liquid Settlement Array Manual
Precision Liquid Settlement Array Manual All efforts have been made to ensure the accuracy and completeness of the information contained in this document. RST Instruments Ltd reserves the right to change
More informationSOIL SETTLEMENT GAGE. Model SSG. Roctest Limited, All rights reserved.
INSTRUCTION MANUAL SOIL SETTLEMENT GAGE Model Roctest Limited, 2005. All rights reserved. This product should be installed and operated only by qualified personnel. Its misuse is potentially dangerous.
More informationSOIL SETTLEMENT GAGE Model SSG. Roctest Limited, 2005, All rights reserved.
INSTRUCTION MANUAL SOIL SETTLEMENT GAGE Model SSG Roctest Limited, 2005, 2017. All rights reserved. This product should be installed and operated only by qualified personnel. Its misuse is potentially
More informationVibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual
Vibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual Man 188 1.1.0 06/08/2014 Chris Rasmussen Philip Day Chris Rasmussen Manual No. Revision Date Originator Checked Authorised for Issue User
More informationVented VW Pressure Transducer
Vented VW Pressure Transducer 52612499 Copyright 2008 DGSI. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any errors or omissions
More informationItem 404 Driving Piling
Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.
More informationInstruction Manual Model 4615
Instruction Manual Model 4615 Hydraulic Overflow Settlement System No part of this instruction manual may be reproduced, by any means, without the written consent of Geokon, Inc. The information contained
More informationSECTION PRESSURE TESTING OF PIPING
SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical
More informationSafetyBuletin. Se ingoutriggerstopreventaccidents
SafetyBuletin Se ingoutriggerstopreventaccidents Safety Bulletin This document is intended to supplement but not supersede the manufacturer s applicable insrtuctions. Copyright 2010 ACPA All rights reserved
More information_ pressure transducers. User Manual
_ pressure transducers User Manual summary introduction DescriPTION preliminary checks Installation taking measurements data management Troubleshooting maintenance Appendix 1 Page 4 Page 5 Page 6 Page
More informationIntegral type Differential pressure flowmeter VNT Series
Integral type Differential pressure flowmeter VNT Series OUTLINE VH series Wafer-Cone differential pressure flowmeter and high precision differential pressure transmitter are integrated into one flowmeter.
More informationStep 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED
Installation Guide Fiji Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED In planning for the installation of a new Viking pool, there are many important considerations that must be evaluated in order
More informationUSER S MANUAL. Model TES-SM-30V
USER S MANUAL Model TES-SM-30V SETTLEMENT MONITORING SYSTEM USING Vibrating wire Settlement Monitoring Sensors Doc. # WI 6002.94 Rev. 1 Printed 24/11/2009 1. Introduction The TRITECH Model TES-SM-30V settlement
More informationTA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions
3500032/2 IM-P350-02 CH Issue 2 TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.
More informationVibrating Wire Soil Extensometer. User Manual. Man /08/2016 P. Day Andy Small Chris Rasmussen
Vibrating Wire Soil Extensometer Man 065 3.2.0 04/08/2016 P. Day Andy Small Chris Rasmussen Manual No. Revision Date Originator Checked Authorised for Issue 1 Contents Section 1 : Introduction... 3 Section
More informationNEXT GENERATION FLEX FENCE
NEXT GENERATION FLEX FENCE Area To Be Fenced.. With Next Generation Flex Fence any post that is not in a straight line with another post must be braced. Layout your fence installation. Determine all end
More informationSSM0019 G. D Aerator SS6000 Liquid Settlement System Flushing Tool User s Manual
SSM0019 G D Aerator SS6000 Liquid Settlement System Flushing Tool Although all efforts have been made to ensure the accuracy and completeness of the information contained in this document, RST Instruments
More informationBTD52L Thermodynamic Steam Trap Installation and Maintenance Instructions
1810050/4 IM-P181-03 ST Issue 4 BTD52L Thermodynamic Steam Trap Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Commissioning 5 Operation
More informationSTEEL TRENCH SHIELDS DW MODELS
STEEL TRENCH SHIELDS DW MODELS 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Phone: 713.943.0750 Toll Free: 800.231.6662 Fax: 713. 943.8483 COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 2009 April 16,
More informationVACUUM TESTING PRECAST CONCRETE MANHOLES
1 OF 5 testing is a quick, safe and practical way to validate manhole system integrity. Manhole sections can be tested at the precast concrete plant prior to delivery or on site prior to backfilling. Here
More informationGROUND IMPROVEMENT USING RAPID IMPACT COMPACTION
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-, Paper No. 9 GROUND IMPROVEMENT USING RAPID IMPACT COMPACTION Henrik KRISTIANSEN 1, Michael DAVIES SUMMARY Geotechnical
More informationTripod Setup Guide (M-TPx)
Items needed: 1/2 inch wrench, mast level (M-MLA), medium size wire cutters, crescent wrench, all-purpose grease, tape measure, tie wraps, redi-mix cement (optional), shovel (optional), sledge hammer (for
More informationHOW TO DIG A TEST PIT
HOW TO DIG A TEST PIT An archaeological test pit is a small 1m by 1m trench dug in a series of layers, or spits, to a depth of approximately 1m. The archaeological materials collected from these layers
More informationFigure 4.1 Schematic of Virginia Tech Calibration Chamber and Accessory Components
Figure 4.1 Schematic of Virginia Tech Calibration Chamber and Accessory Components 128 Chamber Shell Sample Base Plate 29 mm Bolt Holes Chamber Base Plate a) Chamber Shell Unattached from Bottom Plate
More informationFlow Measurement. SITRANS F US Inline. Flowmeter SITRANS FUS880 (retrofit kit) 4/275. Overview
Siemens G 2010 Overview pplication Irrigation systems Irrigation distribution systems Pumping stations Canal laterals On-farm outlets Water well production rip and sprinkler irrigation Center pivot systems
More informationMODEL TES-GS-30V VIBRATING WIRE SETTLEMENT MEASUREMENT SYSTEM
USERS MANUAL MODEL TES-GS-30V VIBRATING WIRE SETTLEMENT MEASUREMENT SYSTEM Doc. # WI 6002.90 Rev. 01 Printed March, 2008 1 Introduction The TES-GS-30V settlement cell is designed for monitoring soil settlement
More informationIFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor
6150350/3 IM-P615-12 ST Issue 3 IFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
More informationInstallation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No
Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Guide Cables No Guide Cables 1 August 4, 2011 Assembly Instructions: (Shown with a 2 board, 12 ft kit) ITEM NO. PART NUMBER DESCRIPTION
More informationInstrumentation & Data Acquisition Systems
Instrumentation & Data Acquisition Systems Section 3 -Level Robert W. Harrison, PE Bob@TheHarrisonHouse.com Made in USA 1 Level Section Question Which level measuring technology is the best solution when
More informationLevel MEASUREMENT 1/2016
Level MEASUREMENT 1/2016 AGENDA 2 A. Introduction B. Float method C. Displacer method D. Hydrostatic pressure method E. Capacitance method G. Ultrasonic method H. Radar method I. Laser method J. Level
More informationPreferred Instruments Danbury, CT USA
Tank Level Sensor Model TG-EL-WF-xx Installation & Operation Instructions SDI-TG-EL-WF March 6, 2006 Preferred Instruments Danbury, CT USA www.preferredinstruments.com CONTENTS Installation Pg. 2 Calibration
More informationElectric and Natural Gas Safety Slide Show Presenter s Notes
Contractor Beware Electric and Natural Gas Safety Slide Show Presenter s Notes Slide 1 Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Today s training
More information-FRU FREEZE RESISTANT WATER VALVE COOLERS SYSTEM
I N S TA L L AT I O N / I MN SA TA I N TL EL NAT AIN OC N E / MI AN IS NT RE UN CA TN I CO E N SI N S T R U C T I O N S INSTALLATION INSTRUCTIONS FOR -FRU OPTION Important: Read all instructions and refer
More informationINTERFELS RADIAL AND TANGENTIAL TOTAL PRESSURE CELLS
INTERFELS RADIAL AND TANGENTIAL TOTAL PRESSURE CELLS USER S MANUAL 331.0000 CONTENTS 1. Stress Cell Design and Construction... 3 2. Specifications... 4 2.1 Radial Total Pressure Cell... 4 2.2 Tangential
More informationSPOOLER INSTRUCTIONS. STEP 12 If you are going to paint your posts, that should be done at this time.
STEP 4 Starting where you marked the end post location, move down your fence line 6 feet and make another mark. This mark is where your second upright post will be installed. Continuing down the fence
More informationTOTAL PRESSURE CELLS VWTPC-4000 I N S T R U C T I O N M A N U A L
TOTAL PRESSURE CELLS VWTPC-4000 I N S T R U C T I O N M A N U A L NOTES: 2 CONTENTS Page 1.0 INTRODUCTION 3 1.1 General Description 3 1.2 Theory of operation 3 2.0 CONFORMITY 5 3.0 MARKINGS 6 4.0 DELIVERY
More informationSPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs
SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs January 01, 2005 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Tel:
More informationDUAL-VORTEX SEPARATOR. Inspection and Maintenance Guide
DUAL-VORTEX SEPARATOR Inspection and Maintenance Guide Description The Dual-Vortex Separator (DVS) is a hydrodynamic stormwater treatment device used to remove pollutants from urban runoff. Impervious
More informationDry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.
Dry Hydrants What is a Dry Hydrant? A dry hydrant is a non-pressurized pipe system permanently installed in existing lakes, ponds and streams that provides a suction supply of water to a fire department
More informationPumping Systems for Landscaping Pumps, Controls and Accessories. Mark Snyder, PE
October 21, 2010 Pumping Systems for Landscaping Pumps, Controls and Accessories Mark Snyder, PE Pump Station Design Purpose of Pump Stations Pump stations are designed to boost water pressure from a lower
More informationPTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump
Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without
More informationStudent Manual. Lesson 4- Nuclear Density Testing. Version 1.0-3/09 4-1
Version 1.0-3/09 4-1 Version 1.0-3/09 4-2 Version 1.0-3/09 4-3 What is the Density we are measuring? Can the Density be more than 100% of Maximum Dry Density reported in the Proctor test? Version 1.0-3/09
More informationSpiratec ST14, ST16 and ST17 Sensor Chambers and sensors
0862050/1 IM-P086-18 MI Issue 1 Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors Installation and Maintenance Instructions 1. Safety Information 2. General product information 3. Installation 4.
More informationFT16 Ball Float Steam Trap Installation and Maintenance Instructions
1430050/1 IM-P143-04 ST Issue 1 FT16 Ball Float Steam Trap Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation ½" and ¾" shown 4 Commissioning
More informationW A S T E W A T E R T R E A T M E N T S Y S T E M S
W A S T E W A T E R T R E A T M E N T S Y S T E M S PROCEDURES FOR ASSEMBLY AND INSTALLATION A Division of Consolidated Trmt Systems, Inc. 1501 Commerce Center Drive Franklin, OH 45005 Tel: 937-746-2727
More informationBuried Cable Installation Practices
Buried Cable Installation Practices Install 04 (previously M P 1007 Issue 2) Issue #3 August 2016 BURIED CABLE INSTALLATION PRACTICES CONTENTS PAGE 1. General... 2 2. Precautions... 3 3. Pre-survey...
More informationTECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages
TECHNICAL BENEFITS OF CJS / RAISE HSP Technical Advantages The HSP is designed for low- to mid- volume applications at flow rates of 1 cubic meter to 30 c. m per day. The benefits are in the details. The
More information36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS
INLET PRESS TAP WTE-RODGERS 36E54-214 DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS
More informationACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION
Application Note Doc. G8108-001 Rev. A - 23-Jul-02 ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION For more information regarding Digiquartz products contact: Paroscientific,
More informationH-LEVEL _ H-LEVEL LIQUID LEVEL SYSTEM SETTLEMENT GAUGES
_ LIQUID LEVEL SYSTEM SETTLEMENT GAUGES LIQUID LEVEL SYSTEM The H-Level is an automatic system for long-term monitoring of differential settlements in buildings, tunnels, and other civil structures. The
More informationBARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S
ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE
More informationInstrumentation & Data Acquisition Systems
Instrumentation & Data Acquisition Systems Section 4 - Pressure Robert W. Harrison, PE Bob@TheHarrisonHouse.com Made in USA 1 Definition of Pressure Pressure is the amount of force applied perpendicular
More informationVW Piezometers, VWP-3000 Series
DATASHEET VW Piezometers, Pore pressure measurement in soils and rocks & fluid pressures in hydro-fracture and pump tests using the well-proven method of converting fluid pressures on a sensitive diaphragm
More informationSafe Excavation & Safety Watch Guidelines
Safe Excavation & Safety Watch Guidelines For your SAFETY Or call 1-800-940-3447 RELEASE OF NATURAL GAS In the event of any damage to a natural gas pipeline (regardless of whether it is steel, plastic
More informationAPPENDIX A 'F' MANITOBA HYDRO REQUIREMENTS
The City of Winnipeg Appendix A 'F' Bid Opportunity No. 602-2018 Addendum 1 Page 1 of 1 Template Version: C420180312 - RW APPENDIX A 'F' GEOTECHNICAL MANITOBA HYDRO REPORTS GAS REQUIREMENTS Safe
More informationAluminum Sheeting Guide (ASG)
Tabulated Data Aluminum Sheeting Guide (ASG) February 2016 Copyright, U.S.A.,Griswold Machine & Eng., 2016 594 Mendon Road, Union City, MI 49094 (800) 248 2054 Fax: (517) 741 7483 CAUTION EXCAVATION PROCEDURES
More informationRecommendations for Marking Power Facilities
Recommendations for Marking Power Facilities with the Use of 3M EMS Electronic Markers 1.0 Overview Revised June 21, 2005 Page 1of 12 The 3М TM electronic marker system is intended to make the job of precisely
More informationRecommendations for Marking Communication Facilities
Recommendations for Marking Communication Facilities with the Use of 3M EMS Electronic Markers Revised June 21, 2005 Page 1of 12 1.0 Overview The 3М TM electronic marker system is intended to make the
More informationSAFETY HANDBOOK. Working around. natural gas pipelines. works for your safety. Reprinted with permission from ATCO Gas.
SAFETY HANDBOOK Working around natural gas pipelines works for your safety Reprinted with permission from ATCO Gas. ENSTAR Natural Gas Company provides natural gas service through 3,580 miles of gas mains
More informationCP10 Sensor Installation and Maintenance Instructions
4030150/9 IM-P403-26 EMM Issue 9 CP10 Sensor Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Maintenance 5. Spare parts Copyright 2017
More informationATS430 turbidity sensor Retractable insertion assembly
A MEASUREMENT & ANALYTICS INSTRUCTION ATS430 turbidity sensor Retractable insertion assembly Measurement made easy 1 Introduction This publication details installation procedures for the retractable insertion
More informationPractice Test FOR GAS POSITIONS APTITUDE BATTERY
Practice Test FOR GAS POSITIONS APTITUDE BATTERY INTRODUCTION The purpose of this Practice Test is to help you prepare for the Gas Positions Aptitude Battery placement exercise. A sample of questions based
More informationEUROFLO CULVERT PIPE. Fittings / Pipes
EUROFLO CULVERT PIPE Fittings / Pipes F EUROFLO FITTINGS RUBBERS SIZE CODE COMMENT 160 OD 200 OD 250 OD 315 OD 400 OD 500 OD 630 OD 800 OD 1000 OD 1200 OD 1550 OD 1750 OD 1950 OD 520-160-RBR 520-200-RBR
More information"STEEL FRAMED" ALUMINUM PANEL SHIELDS
"STEEL FRAMED" ALUMINUM PANEL SHIELDS MANUFACTURE S TABULATED DATA 3330 S. Sam Houston Pkwy Houston, Texas 77047 (713)943-0750 USA Toll Free 1-800-231-6662 Fax (713)943-8483 Www.speedshore.com PRINTED
More informationRecommendations for Marking Gas Facilities Using 3M EMS Electronic Markers
Recommendations for Marking Gas Facilities Using 3M EMS Electronic Markers Ball Marker Near-Surface Marker A small marker which is well-suited for bore holes in concrete or asphalt for marking flush-mount
More informationTEK-SUB 4800B. Submersible Level Transmitter. Flow Level Temperature Pressure Valves Analyzers Accessories TekValSys LEVEL
Technology Solutions TEK-SUB 4800B Submersible Level Transmitter LEVEL Flow Level Temperature Pressure Valves Analyzers Accessories TekValSys Introduction The Tek-Sub 4800B Submersible Level Transmitter
More informationBollard Light Installation Guidelines
Bollard Light Installation Guidelines The following is provided as an overview and is not intended to be a comprehensive guide. All installations must be completed by a licensed contractor or electrician
More informationInstant Garage 20' x 12' 3" x 8' 3"
Instant Garage 20' x 12' 3" x 8' 3" Assembly Instructions Description Model # Instant Garage 20' x 12' 3" x 8' 3" - Grey CIG 1220 3503502 Recommended Tools OR THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED
More information36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS
INLET PRESS TAP WTE-RODGERS 36E96-314 DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL
More informationNext Generation Quartz Pressure Gauges
Next Generation Quartz Pressure Gauges Rick Puccio, Ph.D. Senior Scientist Quartzdyne Houston, TX March 2, 2016 Outline Quartz Pressure Gauge Introduction Gauge Size Reduction Long Term Pressure Drift
More informationADVANTAGES DESCRIPTION MECHANICAL FITTINGS AND DIMENSIONS
03304 Float Gauge: Level measurement Application: LNG tanks Level 03304 E 1 ADVANTAGES - High level accuracy - Local mechanical counter read out. - High reliability - Suitable for 12 and 8 still well.
More informationExcavations and Trenches
Purpose Excavation and trenching are among the most hazardous work activities undertaken by the TNRD. This document outlines general requirements and specific safe work procedures to ensure the health
More informationWIND AND SNOW FENCES
Fencing Order No. 307.230-1 Revised December 2015 WIND AND SNOW FENCES Whereas many fence designs are constructed for livestock and wildlife control or crop protection, these designs are to modify either
More informationPOOL AND HOT TUB/SPA REGULATIONS A BUILDING PERMIT IS REQUIRED BEFORE THE INSTALLATION OF A POOL.
CITY OF NEENAH Department of Community Development (Inspection Department) 211 Walnut Street Phone (920) 886-6130 website: www.ci.neenah.wi.us POOL AND HOT TUB/SPA REGULATIONS A BUILDING PERMIT IS REQUIRED
More informationCity of Crystal Lake Community Development Department
City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org ABOVE GROUND SWIMMING
More informationTOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall
TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall Contents 1) Introduction...2 2) Site Selection and Preparation...2 3) Tools List...3 4) Parts List...4 5) Tower
More informationNEW VERSAFLOW CORIOLIS
Steffen Baecker June 20, 2017 NEW VERSAFLOW CORIOLIS With Stable Two-phase Flow Measurement Honeywell Internal VersaFlow Flow Technologies Volume flow measurement Conductive fluids only - Water - Chemicals
More informationthen the work done is, if the force and the displacement are in opposite directions, then the work done is.
1. What is the formula for work? W= x 2. What are the 8 forms of energy? 3. Write the formula for the following: Kinetic Energy Potential Energy 4. If the force and the displacement are in the same direction,
More informationSITE TESTING STANDARDS FOR METHANE
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: 91.7104.1 Effective: 11-30-04 DOCUMENT NO. P/BC 2002-101 Revised: Previously Issued As: None SITE TESTING STANDARDS FOR METHANE This Infmation
More informationThis loop is filled with an antifreeze solution such
Solar Panel expansion Tank Sizing: Getting It right Part I The most common type of solar thermal system uses a closed piping loop between the collector array and storage tank heat exchanger. BY JOhN SIeGeNThAler
More informationTD45 Thermodynamic Steam Trap Installation and Maintenance Instructions
0685255/1 IM-P068-47 ST Issue 1 TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Commissioning 5 Operation
More informationAVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions
1234150/3 IM-P123-17 ST Issue 3 AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation 4.
More informationGuide for Evaluating Your Hose Assembly Supplier
Guide for Evaluating Your Hose Assembly Supplier Supplier Evaluation Checklist, and How to Clearly Define Application Requirements Safe, reliable hose assemblies require appropriate specification work
More informationPressure Measurement
Pressure Measurement Manometers Sensors, Transducers Ashish J. Modi Lecturer, Dept. of Mech.Engg., Shri S.V.M. inst. Of Technology, Bharuch Pressure Pressure is a force per unit area exerted by a fluid
More informationRecirculating Coolers
(Chillers) - Basic type Low Temp. - General Type Low Temp. - Intelligent type Selection Guide Recirculating Cooler Basic type General type (Low temp.) Intelligent type (Low temp.) Working Temp. Range (
More informationModels 106-RF / 206-RF Rate of Flow Control Valve
Rate of Valve KEY FEATURES Accurately limits low to a pre-set maximum Easily adjustable low limit Paddle-style oriice plate included Optional oriice plate housing 106-RF Globe Product Overview The 106-RF
More informationComments on Homework. Class 4 - Pressure. Atmospheric Pressure. Gauge vs. Absolute Pressure. 2. Gauge vs. Absolute Pressure. 1.
Class 4 - Pressure 1. Definitions 2. Gauge Pressure 3. Pressure and Height of Liquid Column (Head) 4. Pressure Measurement and Manometers Please don t forget the special problem for the next HW assignment
More informationTechnical Test Theory Crawler - Tractor/Dozer A34
1 What THREE things should be checked out before carrying out embankment work? 2 How can a qualification or card benefit a plant operator? 3 What is a possible effect on the undercarriage when reversing
More informationSINGER MODEL 106/206-RPS-L&H
DESCRIPTION: Model 106/206-RPS-L&H dissipates surges caused by power failure to pumps. The valve anticipates the surge by opening on low line pressure associated with sudden stopping of pumps. This assures
More informationPERMANENT POOLS. Location
Community Development Department 211 Walnut Street - PO Box 426 Neenah, WI 54957-0426 Phone: (920) 886-6130 Fax: (920) 886-6129 Web site: www.ci.neenah.wi.us PERMANENT POOLS A pool is any man-made structure,
More informationTotal s Golden rules
Total s Golden rules Golden rule No. 9: Excavation works Excavation works The many risks we regularly face in our activities include those related to excavation works. It s wrong to think that only people
More informationINSTALLATION AND OPERATING INSTRUCTIONS
INSTALLATION AND OPERATING INSTRUCTIONS For 3D Instruments Direct Drive Pressure Gauges 3D Instruments Inc., 15542 Chemical Lane, Huntington Beach, CA, 92649, U.S.A. Tel. (714) 894-5351, Fax. (714) 895-4309
More informationConstruction Dewatering
Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue
More information! CAUTION! ! WARNING! General Information
Great Plains Mfg., Inc. Installation Instructions Used with: 2SF24, 24-Foot Two-Section Drill General Information Two-Section, Hydraulic Folding Marker 2SF30, 30-Foot Two-Section Drill 2SBM30, 30-Foot
More informationTEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES
Test Procedure for TEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES TxDOT Designation: Tex-208-F Effective Date: February 2005 1. SCOPE 1.1 Use this test method to determine the Hveem stability value
More informationOP CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST
Page 1 of 5 WORK INSTRUCTIONS FOR ENGINEERS NHB Compiled by : LSS Checked by : GSS Approved by : OP-3-31. CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST Page 2 of 5 31.0 CHECKLIST ITEMS *(refer to respective
More informationT EK-COR 1100A Coriolis Mass Flowmeter
T EK-COR 1100A Coriolis Mass Flowmeter Instruction Manual Document Number: IM-1100A NOTICE Read this manual before working with the product. For personal and system safety, and for optimum product performance,
More information