1 Decommissioning Ageing Infrastructure: Abandoning or Re-Routing Hydrocarbon Pipelines Dave Vernon - Director of Isolation Services

2 Overview Abandonment and Decommissioning Pipeline Disconnection Pipeline Rerouting Pipeline Abandonment Riser Isolation Flow Line Plugging The 130 metre high Brent Delta topside heading for Hartlepool, UK Photo: Shell / Allseas STATS GROUP Slide: 2

3 Typical Mature Field Overview Decommissioned In Decommissioning Image: TAQA Bratani STATS GROUP Slide: 3

4 Hub Platform Configuration Several pipelines in the image are scheduled for disconnection in the near future Image: TAQA Bratani STATS GROUP Slide: 4

5 Why Double Block and Bleed Isolation Equipment? Pipeline Diver Safety Positive Pressure Diver Safety Negative Pressure Environmental Protection Reduced Diver Time Reduced Flushing and Purging Operations Downstream production unaffected (upstream too with pre-installed bypass) STATS GROUP Slide: 5

6 Equipment for Isolation and Abandonment Abandonment and Decommissioning Remote Tecno Plug Tethered Tecno Plug BISEP Pipeline Connector (Sleeve or Adaptor) Pipe End Plugs STATS GROUP Slide: 6

7 Secondary Seal Integrity Test: Leak-Off Test 1) Pressure locked in the annulus 2) Pressure behind (inboard) vented Secondary seal tested with full differential pressure in correct direction. STATS GROUP Slide: 7

8 Primary Seal Integrity Test: Build-Up Test 1) Pipeline pressure in front (outboard) 2) Annulus pressure vented and locked in Primary seal tested with full differential pressure in correct direction. STATS GROUP Slide: 8

9 Dual Redundancy Activation: Fail-Safe Self-energisation (Self-Locking) feature maintains a safe isolation while differential pressure (above the verified minimum pressure) exists across the tool. The isolation plug has two separate activation mechanisms Dual Redundant Activation. The isolation tool is activated and held in place by internal hydraulics AND energised and mechanically locked by the differential pressure. Both separate activation mechanisms need to be removed to unset the plug. NOTE: Permanent abandonment plugs include an additional mechanical lock which removes long term reliance on the hydraulics STATS GROUP Slide: 9

10 Passive Unset: Fail-Safe Passive Unset feature ensures the Tecno Plug is always recoverable upon job completion. Fail-safe in unlikely event of communication system issues. Passive Unset happens when tail pressure is equalised with the head pressure. This de-latches the locked in hydraulic pressure; open circuited to return. Equalising the pressure across the plug removes self energisation force. Once equalised the plug will then passively unset without any active control input. NOTES: Isolation cannot be unset until the breaking containment operation is completed and the pressure behind the plug is raised to pipeline isolated pressure. If the pressure is equalised, the plug will become unset unless it is actively commanded not to unset. The passive unset is done in a safe and controlled manner only when the pressure is equalised across the tool. STATS GROUP Slide: 10

11 Case Study: Pipeline Disconnect & Abandonment Abandonment and Decommissioning 8 Triple BISEP Pipeline Bypass STATS GROUP Slide: 11

12 Case Study: Pipeline Disconnect & Abandonment STATS GROUP Slide: 12

13 Case Study: Pipeline Disconnect & Abandonment Disconnect and Abandonment Final Pipeline Configuration STATS GROUP Slide: 13

14 Case Study: Subsea Platform Bypass STATS GROUP Slide: 14

15 Animation: Subsea Platform Bypass Animation 1 STATS GROUP Slide: 15

16 Thank You For Your Attention Questions? for more information visit STATS GROUP Slide: 16

17 Copyright & Disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in STATS (UK) Ltd and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer Although STATS Group believes that the Presentation and the references therein are based upon reasonable assumptions, it can give no assurance that the actual results will be as set out in the Presentation. STATS Group is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation or the data referenced therein, and neither STATS (UK) Ltd nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. STATS Group consists of many legally independent entities, constituting their own separate identities. STATS Group is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use STATS, we or us when we refer to STATS Group companies in general or where no useful purpose is served by identifying any particular STATS Group company. STATS GROUP Slide: 17

Trine Risøy, Bergen,

Trine Risøy, Bergen, part of Aker The Installation of Subsea Structures without Offshore Crane Vessel Trine Risøy, Bergen, 04.06.2008 2008 Aker Solutions AKER MARINE CONTRACTORS (AMC) 35 years experience worldwide: Subsea

More information

EMERGENCY PIPELINE REPAIR SYSTEMS DEVELOPED TO FACILITATE PIPELINE REPAIR OF UNPIGGABLE DEFECTS. By: Dale Millward, STATS Group, United Kingdom

EMERGENCY PIPELINE REPAIR SYSTEMS DEVELOPED TO FACILITATE PIPELINE REPAIR OF UNPIGGABLE DEFECTS. By: Dale Millward, STATS Group, United Kingdom EMERGENCY PIPELINE REPAIR SYSTEMS DEVELOPED TO FACILITATE PIPELINE REPAIR OF UNPIGGABLE DEFECTS By: Dale Millward, STATS Group, United Kingdom Introduction The term Double Block and Bleed is mostly used

More information

Emergency Pipeline Repair Isolation System

Emergency Pipeline Repair Isolation System Emergency Pipeline Repair Isolation System Isolation technology developed to facilitate pipeline repair of unpiggable defects Author: Dale Millward BEng (Hons) Director, EPRS & Subsea Services Introduction

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Success Paths: A Risk Informed Approach to Oil & Gas Well Control API Winter E&P Standards Conference, Austin January 18, 2017 Success Paths: A Risk Informed Approach to Oil & Gas Well Control Dr. Dan Fraser Director, Strategic Alliances for Global Energy Solutions,

More information

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime CASE STUDY CS15-02 >> Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime What s Inside:» Explore Double Block & Monitor» Increase Operational Safety» Achieve Double

More information

Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks. Alan Brodie Feb 2011 For more info visit

Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks. Alan Brodie Feb 2011 For more info visit Barrier Philosophy for Wells on Gas lift and Ways of Reducing HSE Risks Alan Brodie Feb 2011 For more info visit www.ptc.as Introduction Gas Lifted Well Integrity Management Incremental HSE risks Case

More information

TAM Single SeT inflatable

TAM Single SeT inflatable TAM Single SeT inflatable ReTRievAble PAckeRS Sets with pressure only Releases with straight pull or rotate Ideal for horizontal applications Sets in casing or open hole Runs on tubing, coiled tubing,

More information

SDS -Series 4C-D201/-D202 Supplemental Drying System User s Manual

SDS -Series 4C-D201/-D202 Supplemental Drying System User s Manual SDS -Series 4C-D201/-D202 Supplemental Drying System User s Manual 8 Executive Drive P.O. Box 2105 Toms River, NJ 08754 (732) 244-0010 (800) 337-3762 fax (732) 244-8140 www.permapure.com info@permapure.com

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk HP690A Intensifier Panel including the following versions: Model Intensification

More information

Design DSA Steam-Atomized Desuperheater

Design DSA Steam-Atomized Desuperheater Instruction Manual DSA Desuperheater Design DSA Steam-Atomized Desuperheater Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................

More information

SHELL FLAGS INSPECTION CASE STUDY

SHELL FLAGS INSPECTION CASE STUDY SHELL FLAGS INSPECTION CASE STUDY J. Nonemaker, Solution Engineer, ROSEN T. Steinvoorte, Business Development, ROSEN R. Subramanian, Pipelines & Subsea Technical Support Engineer, Shell U.K. Limited Introduction

More information

CATALOGUE // The Fort Vale Range of Equipment to suit Hydrogen Peroxide Tank Specification. Fort Vale Engineering Ltd. 2009

CATALOGUE // The Fort Vale Range of Equipment to suit Hydrogen Peroxide Tank Specification. Fort Vale Engineering Ltd. 2009 CATALOGUE // 20 19 18 16 17 The Fort Vale Range of Equipment to suit Hydrogen Peroxide Tank Specification 15 14 Fort Vale Engineering Ltd. 2009 THIS PAGE IS INTENTIONALLY BLANK HYDROGEN PEROXIDE EQUIPMENT

More information

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability Talisman energy COIN Virtual Meeting # 17 26 th January 2011 Darren Bewick Graeme Douglas Martin Forbes David McGuckien Matt Morrison Martin Mosley Talisman Energy UK Ltd (TLMUK), Aberdeen 1 Presentations

More information

Installation, Operation & Maintenance Manual

Installation, Operation & Maintenance Manual Original Instructions Installation, Operation & Maintenance Manual Sentry VREL Control Valve Pressure Conditioning S-SW-IOM-00277-15 1-17 Table of Contents Safety Information... 3 General Safety Precautions...

More information

FRAGMENTATION INSTRUCTION & OPERATION HANDBOOK

FRAGMENTATION INSTRUCTION & OPERATION HANDBOOK FRAGMENTATION INSTRUCTION & OPERATION HANDBOOK Doc. Jordair FRAGMENTATION-MANUAL WARNING! HIGH PRESSURE UNITS Under no circumstances should the fill stations be operated with the safety relief valves removed

More information

Weatherford Inverse Gas Lift System (IGLS)

Weatherford Inverse Gas Lift System (IGLS) 36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Weatherford Inverse Gas Lift System (IGLS) Jerry Sutton Senior Applications Engineer 2013 Gas-Lift Workshop Contents Why is IGLS needed? What

More information

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Sampler Model GSS-1 The information in this manual has been carefully checked for accuracy and is intended to be used as a guide to operations. Correct

More information

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve. Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.

More information

Installation Operation Maintenance

Installation Operation Maintenance 682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description

More information

Fisher DSA Steam-Atomized Desuperheater

Fisher DSA Steam-Atomized Desuperheater Instruction Manual DSA Desuperheater Fisher DSA Steam-Atomized Desuperheater Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 2 Operating Instructions...

More information

92831 TEL: (714) FAX:

92831 TEL: (714) FAX: Document N0. 1800-03 Copyright 2010 Terra Universal Inc. All rights reserved. Revised Sept. 2010 Terra Universal, Inc. TerraUniversal.com 800 S. Raymond Ave. Fullerton, CA 92831 TEL: (714) 578-6000 FAX:

More information

Global Gas Lift Optimization Using WellTracer Surveys

Global Gas Lift Optimization Using WellTracer Surveys 36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Global Gas Lift Optimization Using WellTracer Surveys Tony Hord, Mike Johnson ExxonMobil Production Company 2013 Gas-Lift Workshop 1 WellTracer

More information

Fisher DVI Desuperheater Venturi Inline

Fisher DVI Desuperheater Venturi Inline Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...

More information

abc INSTALLATION, OPERATING & MAINTENANCE MANUAL FOR HYDRAULIC EXTRACTOR

abc INSTALLATION, OPERATING & MAINTENANCE MANUAL FOR HYDRAULIC EXTRACTOR abc INSTALLATION, OPERATING & MAINTENANCE MANUAL FOR HYDRAULIC EXTRACTOR This Jiskoot Product is designed to provide outstanding service if correctly installed, used and maintained recognising the effects

More information

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Secondary Coolant System Start-Up Procedures June 2006 Produced by the Hill PHOENIX Learning Center DISCLAIMER This

More information

Weatherford Inverse Gas Lift System (IGLS)

Weatherford Inverse Gas Lift System (IGLS) Gas Well Deliquification Workshop Sheraton Hotel, February 17 20, 2013 Weatherford Inverse Gas Lift System (IGLS) Norman Strachan Product Manager (IGLS) Renaissance Systems Contents Why is IGLS needed?

More information

Subsea Tree Valve Actuator Permanent Reinstatement Systems. Dr Lev Roberts-Haritonov General Manager, Subsea Engineering

Subsea Tree Valve Actuator Permanent Reinstatement Systems. Dr Lev Roberts-Haritonov General Manager, Subsea Engineering Subsea Tree Valve Actuator Permanent Reinstatement Systems Dr Lev Roberts-Haritonov General Manager, Subsea Engineering Introduction Problem Overview Temporary Fix Neptune Permanent Tree Valve Actuator

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SMP 08 (RIC Standard: SC 00 52 00 08 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Issue 1 Revision

More information

Safe hydraulics for hydroforming presses. more finished product to be created from less raw material.

Safe hydraulics for hydroforming presses. more finished product to be created from less raw material. profile Drive & Control Safe hydraulics for hydroforming presses Safety Standard Guidelines for Hydraulic Presses In several western regions, safety standards exist that describe how to achieve safe control

More information

Troubleshooting Gas-lift Wells Using Dual Shot Acoustic Technique

Troubleshooting Gas-lift Wells Using Dual Shot Acoustic Technique 2018 Artificial Lift Strategies for Unconventional Wells Workshop Cox Convention Center, Oklahoma City, OK February 4 7, 2018 Troubleshooting Gas-lift Wells Using Dual Shot Acoustic Technique Shea Province

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

Veriforce TG CCT 661OP. Training Guide

Veriforce TG CCT 661OP. Training Guide Training Guide Directions: This training guide is to be used by a Veriforce Authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

INSTALLATION GUIDE Gas Rangetops

INSTALLATION GUIDE Gas Rangetops INSTALLATION GUIDE Gas Rangetops Contents Wolf Gas Rangetops........................... 3 Safety Instructions............................ 4 Gas Rangetop Specifications.................... 5 Gas Rangetop

More information

COSASCO 6000 PSI DOUBLE ISOLATION SERVICE VALVE MAINTENANCE

COSASCO 6000 PSI DOUBLE ISOLATION SERVICE VALVE MAINTENANCE COSASCO 6000 PSI DOUBLE ISOLATION SERVICE VALVE MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com Page: 2 of 28 Revision History

More information

RiskTopics. Lockout/Tagout October 2017

RiskTopics. Lockout/Tagout October 2017 RiskTopics Lockout/Tagout October 2017 This Risktopic is designed to outline guidelines for lockout/tagout and provide assistance in developing a management program to reduce the risk of injury from unintended

More information

RECOMMENDATION FOR INTERCHANGEABLE FLANGED DRILLING CHOKE DIMENSIONS

RECOMMENDATION FOR INTERCHANGEABLE FLANGED DRILLING CHOKE DIMENSIONS RECOMMENDATION FOR INTERCHANGEABLE FLANGED DRILLING CHOKE DIMENSIONS TECHNICAL REPORT TR0601 AWHEM publications may be used by anyone desiring to do so. Every effort has been made by the Association to

More information

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com Page: 2 of 26 Revision

More information

GE Oil & Gas. Mooney * Flowgrid * Slam Shut Regulator. Delivering accuracy, performance and protection

GE Oil & Gas. Mooney * Flowgrid * Slam Shut Regulator. Delivering accuracy, performance and protection GE Oil & Gas Mooney * Flowgrid * Slam Shut Regulator Delivering accuracy, performance and protection Industries Gas transmission Gas distribution Midstream gas Gas processing Applications Gas pipelines

More information

Covered Task 614OP Training Guide Purging Pipeline Facilities with Air or Inert Gas

Covered Task 614OP Training Guide Purging Pipeline Facilities with Air or Inert Gas Directions This training guide is to be used by a Subject matter expert (SME) authorized Evaluator/Trainer and Trainee during on-thejob training (OJT) or prior to an evaluation as a resource. (S) Indicates

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

HIPPS Development Project

HIPPS Development Project Hydraulic HIPPS HIPPS Development Project This presentation describes the Energy Equipment Corporation Hydraulic HIPPS control development project, and gives: Brief background information about Energy

More information

Installation, Operation & Maintenance Manual

Installation, Operation & Maintenance Manual Original Instructions Installation, Operation & Maintenance Manual Sentry Cobra FV Sampler Low Emission Samplers S-MS-IOM-00543-0 08-18 Table of Contents Safety Information... 3 General Safety Precautions...

More information

Case History. North Sea Platform Wellhead Isolation Tubing Hanger Body Seals Locking Device 20-3/4 x 13-3/8 Mandrel Neck Seal

Case History. North Sea Platform Wellhead Isolation Tubing Hanger Body Seals Locking Device 20-3/4 x 13-3/8 Mandrel Neck Seal Case History North Sea Platform Wellhead Isolation Tubing Hanger Body Seals Locking Device 20-3/4 x 13-3/8 Mandrel Neck Seal History / Introduction: Failed test issues as reported in 2001(SBMS-II, S Seal)

More information

256 Pneumatic Pressure Indicator

256 Pneumatic Pressure Indicator 256 Pneumatic Pressure Indicator 51425699 Copyright 2002 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any

More information

Isolation Lockout and Tagging

Isolation Lockout and Tagging PURPOSE To define the minimum system requirements for isolation of plant and equipment from hazardous substances, mechanical, electrical or other energy sources to protect all workers from personal injury

More information

What Geologists Need to Know about Drilling

What Geologists Need to Know about Drilling INTEGRITY RESPECT ACCOUNTABILITY SAFETY RESILIENCE SUCCESS What Geologists Need to Know about Drilling Wayne Pengelly 27 March 2018 newhopegroup.com.au Introduction Teamwork Only need one Crew to achieve

More information

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Model 106 DPI Micro-switch Installation and Operating Instructions Mid-West Instrument Model 106 DPI "Micro-switch" Installation and Operating Instructions BULLETIN NO. IM116DPImicro/09A Replaces --- INSPECTION Before installation carefully check the Model Number on each

More information

Lockout Tagout Policy

Lockout Tagout Policy Office of Environmental Health & Safety www.moreheadstate.edu/ehs 606-783-2584 Lockout Tagout Policy PURPOSE To establish procedures for the de-energization and isolation of energy sources or the lockout

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

LOCKOUT SYSTEM AND POLICIES

LOCKOUT SYSTEM AND POLICIES LOCKOUT SYSTEM AND POLICIES Lockout System Purpose Employees health and safety takes top priority. Isolating hazardous energy to prevent sudden and unexpected energisation of machines, equipment, and processes

More information

Manual. FRESH AERO OneOP Model PC (Portable Compressors) Tire Inflator. Where Imagination Meets Innovation

Manual. FRESH AERO OneOP Model PC (Portable Compressors) Tire Inflator. Where Imagination Meets Innovation FRESH AERO OneOP Model PC (Portable Compressors) Tire Inflator For inflating aircraft tires and all types of other vehicle tires and air operated devices Manual The Fresh Aero Group Where Imagination Meets

More information

MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING

MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING By: Magne Andreas Vik, StatoilHydro; Alf Åge Kristiansen, StatoilHydro Simon Sykes, FTL Seals Technology; Steve Hutcheson, Pipeline

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

PPC2+ BG0002. Operation and Maintenance Manual (Use with PPC2+ Operation and Maintenance Manual) 2001 DH Instruments, Inc.

PPC2+ BG0002. Operation and Maintenance Manual (Use with PPC2+ Operation and Maintenance Manual) 2001 DH Instruments, Inc. PPC2+ BG0002 Operation and Maintenance Manual (Use with PPC2+ Operation and Maintenance Manual) High pressure liquids and gases are potentially hazardous. Energy stored in these liquids and gases can be

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual TOP VALVE Pat. #5,857,486 & 5,944,050 Mid-Range Pressure 50 232 PSIG Back Pressure and Pressure Relief Valves Instruction Manual Please Note: This instruction manual provides detailed information and instructions

More information

Wet pipe low flow foam/water system

Wet pipe low flow foam/water system December 6, 2010 Foam 14a 1. The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with Viking supplied foam concentrates. This system consists of a standard

More information

Alkylphosphines. Storage and Handling Recommendations

Alkylphosphines. Storage and Handling Recommendations Alkylphosphines Storage and Handling Recommendations 2 The Phosphine Specialties Group has been producing phosphine and phosphine derivatives on a large scale for a number of years and the handling procedures

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

October 10, 2018 Annual Seminar New England Pipeline Safety Representatives Meredith, New Hampshire Randy Knepper Director of Safety, NHPUC

October 10, 2018 Annual Seminar New England Pipeline Safety Representatives Meredith, New Hampshire Randy Knepper Director of Safety, NHPUC SOFT OFFs Safety and Convenience Considerations October 10, 2018 Annual Seminar New England Pipeline Safety Representatives Meredith, New Hampshire Randy Knepper Director of Safety, NHPUC Some years ago,

More information

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel:

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel: PERMA PURE INSTRUCTION MANUAL FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model 3300 Version 4.06 Perma Pure LLC Tel: 732-244-0010 P.O. Box 2105, 8 Executive Drive Tel: 800-337-3762 (toll free US)

More information

HYDROGEN PEROXIDE Railcar Unloading by Self-Priming Pump Technical Data Sheet

HYDROGEN PEROXIDE Railcar Unloading by Self-Priming Pump Technical Data Sheet HYDROGEN PEROXIDE RAILCAR UNLOADING BY SELF-PRIMING PUMP INTRODUCTION All equipment used for storage and handling of hydrogen peroxide must be dedicated exclusively to hydrogen peroxide service and must

More information

URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports

URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports URC Voltage Sensor SEN-VOLT for use with MRX units containing sensor ports URC Voltage Sensor SEN-VOLT 2013 Universal Remote Control, Inc. The information in this Owner s Manual is copyright protected.

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main

SPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum

More information

API 682 Mechanical Seals. Swagelok Eastern Australia & New Zealand

API 682 Mechanical Seals. Swagelok Eastern Australia & New Zealand API 682 Mechanical Seals Swagelok Eastern Australia & New Zealand API 682 Mechanical Seals Overview Previous projects completed o Plan 53A o Plan 72 / 76 o Plan 74 API 682 Mechanical Seals Overview What

More information

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions PORTER Parker Hannifin Corporation Porter Instrument Division 245 Township Line Rd. P.O. Box 907 Hatfield, PA 19440-0907 USA (215) 723-4000 / fax (215) 723-5106 Compact Triple Cabinet Outlet Station Model

More information

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions Compact Triple Cabinet Outlet Station Model 6258-1 Installation and Operating Instructions The Porter Compact Triple Outlet Station (6258-1) provides a quick, safe, and reliable method of connection to

More information

Installation, Operation and Maintenance Manual. TSV Temperature Shut-off Valve SPD Rev. 6 10/07

Installation, Operation and Maintenance Manual. TSV Temperature Shut-off Valve SPD Rev. 6 10/07 Installation, Operation and Maintenance Manual TSV Temperature Shut-off Valve SPD 13.1.2 Rev. 6 10/07 SENTRY EQUIPMENT CORP PO Box 127 Oconomowoc, WI 53066 USA Phone: 262.567.7256 Fax: 262.567.4523 Email:

More information

12V Mini Air Compressor

12V Mini Air Compressor INSTRUCTIONS FOR 12V Mini Air Compressor Stock No.80999 Part No.DA12/250B IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY TO ENSURE THE SAFE AND EFFECTIVE USE OF THIS PRODUCT. GENERAL INFORMATION This

More information

Overview EUSDSG3.12. Install gas meters and regulators (2.5 to 16.0m3/hr)

Overview EUSDSG3.12. Install gas meters and regulators (2.5 to 16.0m3/hr) Overview This national occupational standard is for gas engineerswho are required to install and exchange meters and regulators (2.5 to 16.0m3/hr) on low pressure and medium pressure gas systems. This

More information

TAQA North Ltd. Well Blowout W4M June 8, 2009

TAQA North Ltd. Well Blowout W4M June 8, 2009 TAQA North Ltd. Well Blowout 10-10-28-29W4M June 8, 2009 ERCB Investigation Report January 11, 2010 Report prepared by Brian Temple (Incident Investigator), Rondine Cabot (Field Surveillance), Mark R.

More information

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE Rohrback Cosasco Systems, Inc. 11841 E. Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com

More information

UNIVERSAL TUBE HOLDER SYSTEM

UNIVERSAL TUBE HOLDER SYSTEM UNIVERSAL TUBE for Constant Low Flow & Constant-Pressure (Multi-Flow) Operation INSTRUCTION MANUAL 16333 Bay Vista Dr. Clearwater, Florida 33760 (800) 451-9444 (727) 530-3602 (727) 539-0550 [FAX] Revision

More information

TOP VALVE. Pat. #5,857,486 & 5,944,050. High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves. Instruction Manual

TOP VALVE. Pat. #5,857,486 & 5,944,050. High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves. Instruction Manual TOP VALVE Pat. #5,857,486 & 5,944,050 High Temperature: max. 300 F (149 C) Back Pressure And Pressure Relief Valves Instruction Manual PLEASE NOTE: This instruction manual provides information and instructions

More information

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Operations & Service Manual TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Do not attempt to select, install, use or maintain this product until you have read and fully understood this

More information

EMERGING AUTOMOTIVE, CRUDE OIL, AND CHEMICALS SUPPLY CHAINS IN THE US SOUTHEAST

EMERGING AUTOMOTIVE, CRUDE OIL, AND CHEMICALS SUPPLY CHAINS IN THE US SOUTHEAST SEPTEMBER 2015 EMERGING AUTOMOTIVE, CRUDE OIL, AND CHEMICALS SUPPLY CHAINS IN THE US SOUTHEAST Presentation to the Southeast Association of Rail Shippers 2015 Fall Conference, Orlando, Florida Christopher

More information

FPD175 Compact orifice carrier assembly

FPD175 Compact orifice carrier assembly ABB MEASUREMENT & ANALYTICS OPERATING INSTRUCTION FPD175 Compact orifice carrier assembly The smart solution for remote applications. Measurement made easy Installation, commissioning and operating / maintenance

More information

VLI Visible Level Interface Operation & Maintenance Manual

VLI Visible Level Interface Operation & Maintenance Manual VLI Visible Level Interface Operation & Maintenance Manual All rights reserved. Information in this document is subject to change without notice. No part of this document may be reproduced or transmitted

More information

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments) CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments) PURPOSE This program establishes the general and specific requirements for the control of

More information

repair & earn a free bike?

repair & earn a free bike? Want to learn to repair & earn a free bike? SIGN UP FOR A FUN, FREE, AFTER-SCHOOL CLASS! W HE N: 4-6 pm* Wed & Thurs * Except on these ACT days [9/20, 10/4, 10/18] when class is from 2:45-5 pm. W H ER

More information

Captain Wellhead & Tree

Captain Wellhead & Tree North Sea Platform 13-3/8 Casing Hanger Annulus Pack-off Product & Procedure Overview Ref: AB374RM 04-07-2007 The following is based on limited information available at the time of this evaluation History:

More information

Fisher Lever-Lock Handlever Actuators for POSI-SEAL A81 Rotary Valves

Fisher Lever-Lock Handlever Actuators for POSI-SEAL A81 Rotary Valves Instruction Manual D103319X012 Lever-Lock Handlever Actuator Fisher Lever-Lock Handlever Actuators for POSI-SEAL A81 Rotary Valves Contents Introduction................................. 1 Scope of Manual.........................

More information

The Practical Guide To Long Range Hunting Cartridges

The Practical Guide To Long Range Hunting Cartridges The Long Range Hunting Series The Practical Guide To Long Range Hunting Cartridges (2nd Edition) Nathan Foster Copyright Information Copyright 2017 - Nathan Foster, New Zealand - All rights reserved. All

More information

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES AIGA 016/04 Asia Industrial Gases Association 298 Tiong Bahru Road, #20-01 Central Plaza, Singapore 168730 Tel :

More information

GAS SUPPLY DESIGN GUIDE

GAS SUPPLY DESIGN GUIDE GAS SUPPLY DESIGN GUIDE Natural Gas, Propane Gas, or Dual Fuel Fired Modulating, Condensing Boilers BENCHMARK Series Gas-Fired Boilers For models: BMK750 to BMK6000 Last Update: 06/20/2014 PR1 06/20/14

More information

Gas Lift Valve Testing

Gas Lift Valve Testing 36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Gas Lift Valve Testing Angel Wileman, Research Engineer Southwest Research Institute, Fluid Dynamics Feb. 4 8, 2013 2013 Gas-Lift Workshop 1

More information

Venting Atmospheric and Low-pressure Storage Tanks API STANDARD 2000 SEVENTH EDITION, MARCH 2014

Venting Atmospheric and Low-pressure Storage Tanks API STANDARD 2000 SEVENTH EDITION, MARCH 2014 Venting Atmospheric and Low-pressure Storage Tanks API STANDARD 2000 SEVENTH EDITION, MARCH 2014 Special Notes API publications necessarily address problems of a general nature. With respect to particular

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Field Development & Construction

Field Development & Construction Field Development & Construction Michael Cowie Technical Director Ecosse Subsea Systems Ltd Ambient Lifting: A Real Alternative to Heavy Lift Vessels 4 th February 2016, AECC, Michael Cowie Presentation

More information

QUESTIONS AND ANSWERS ON AUDIT PARTNER ROTATION REQUIREMENTS IN MALAYSIA

QUESTIONS AND ANSWERS ON AUDIT PARTNER ROTATION REQUIREMENTS IN MALAYSIA QUESTIONS AND ANSWERS ON AUDIT PARTNER ROTATION REQUIREMENTS IN MALAYSIA Audit partner rotation requirements will change for periods beginning on or after 15 December 2018. The changes will affect Key

More information

Commissioning of Subsea Hydraulic Systems

Commissioning of Subsea Hydraulic Systems Commissioning of Subsea Hydraulic Systems DISCLAIMER This Discussion Paper does not purport to contain all of the information that may be required to evaluate the Business and any intending investor and

More information

A record Quarter and Year for the Group

A record Quarter and Year for the Group 14 January 2019 2018 and FY18 Trading Update Steve Ingham Kelvin Stagg Chief Executive Officer Chief Financial Officer A record Quarter and Year for the Group LSE: PAGE.L Website: http://www.page.com/investors

More information

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0) Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW Tel +44 (0)1254 615100 www.allspeeds.co.uk SOFT LINE CUTTER SL55 PRODUCT CODE No. 980504 INSTRUCTIONS FOR INSTALLATION,

More information

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012 Installation Guide English September 2012 299H Series Introduction This Installation Guide provides instructions for installation, startup, and adjustment of 299H Series regulators. To receive a copy of

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The platform has a Separation System which consists of a Test Separator (MBD-100). The gas, oil and water discharges to the Departing Bulk Oil Pipeline (KAH-1200). Rev: 1 Date: 7/31/12

More information

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 Revision History Record www.cosasco.com Page: 2 of

More information

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

M03 WUNDATRADE. Heat Pump Manifold. Before you start:  Check the contents. Optional. ...a division of WUNDA GROUP PLC Before you start: Check the manifold box contents against the list below. Check the contents Flow gauges 1. Bar assembly with manual return valves 2. 2 x Auto air vent & drain hose attachments Optional

More information

Continuous Injection of Hydrate Inhibitor in Gas Lift Gas to Mitigate Downtime Due to Downhole Annular Plugging

Continuous Injection of Hydrate Inhibitor in Gas Lift Gas to Mitigate Downtime Due to Downhole Annular Plugging 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 Continuous Injection of Hydrate Inhibitor in Gas Lift Gas to Mitigate Downtime Due to Downhole Annular Plugging John R. Cliver and

More information