1 SOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, PA 18411, USA Technical Conference Paper Telephone: Fax: Cavern Integrity and performance management at Geomethane underground storage Mehdi KARIMI-JAFARI and Arnaud REVEILLERE, GEOSTOCK, France Charles FRASSY, STORENGY, France SMRI Fall 2014 Technical Conference September 2014 Groningen, The Netherlands
2 Solution Mining Research Institute Fall 2014 Technical Conference Groningen, The Netherlands, September 2014 Cavern integrity and performance management at Geomethane underground storage Abstract Mehdi KARIMI-JAFARI and Arnaud REVEILLERE, GEOSTOCK, France Charles FRASSY, STORENGY, France Located in Manosque, France, Geomethane gas caverns are used for seasonal and peak gas storage since the early nineties. These caverns have been monitored by a comprehensive survey program including gas inventory follow-up, sonar survey, well pressure and temperature logging, cavern bottom sounding, micro-seismic monitoring and subsidence survey. The gas inventory follow-up method applied on Geomethane caverns consists in thermodynamic simulation of gas operations together with downhole measurements such as cavern sonar and pressure/temperature logging. Many advantages can be taken of this follow-up method: A more accurate continuous assessment of stored gas volume, without requiring a permanent downhole measurement tool. Prediction of cavern capacity and performance Coupling thermodynamical behavior of cavern with rock mechanical modeling to assess the cavern stability Optimization of storage performance In this paper the Geomethane caverns monitoring and surveys are presented. Thermodynamic simulation of gas operations is introduced and some results are discussed. Key words: Geomethane natural gas storage, Cavern follow-up, Monitoring program, Gas operation, Inventory verification, Thermodynamic simulation 1. Introduction Geomethane GIE, a company equally owned by Geosud (subsidiary of Total, Geostock and Ineos) and Storengy (GDF Suez), was created in 1989 for underground storage of natural gas in Manosque, France. Storengy sells storage services to third parties and operates the site. Geostock delivers the technical and administrative support services. As presented in some SMRI papers (Colin and de Laguerie, 1990; Colin and You, 1990; de Laguerie and Durup, 1994), Geomethane gas storage has a total working gas capacity of nearly 300 Mnm3 and comprises: 7 salt caverns solution mined between 900 and 1500 m below ground, operating since the early 90s. The pressure range at the casing shoe is 60 to 190 bar. surface facilities including the collection site at Gontard and compression, treatment and metering facilities at Gaude. 1
3 The site continues expending: 2 new gas storage caverns are currently being solution mined and the extension of the existing surface facilities is planned. The location of the caverns is illustrated in Figure 1. Géométhane. Figure 1: Location of the Geomethane caverns. GA and GB leaching is expected to be finished by 2016, other caverns are in gas operation since the early 90s. Located in a protected area of the Luberon Regional Park, the facilities received special attention regarding environmental protection, in close cooperation with the Park and local authorities. As any other industrial activity, gas storage in salt caverns comprises risks that should be managed. The risk management process aids decision making by taking account of uncertainty and the possibility of future events or circumstances (intended or unintended) and their effects on agreed objectives. The International Standard ISO (ISO, 2009) proposes a framework dedicated to the risk management. It consists of the following successive steps: setting the context, assessing the sitespecific risks (risk identification, analysis and evaluation), and implementing treatment options when the risk level is assessed as unacceptable. Throughout this logical system, a monitoring and review is conducted, as presented in Figure 2. Monitoring should enable early detection and a characterization of the potential deviations from the expected behavior. 2
4 Figure 2- Risk management general concept, from ISO (ISO, 2009) From this figure, also note that similarly to constant monitoring, the ISO risk management also considers constant communication during all stages. In this perspective, monitoring and third party verifications demonstrate the transparency of the site operation among stakeholders. Geomethane caverns are followed by a comprehensive monitoring and survey program in order to manage environmental and safety (stability of salt caverns and their integrity) as well as financial (inventory verification) risks, to provide requested or mandatory information to competent authorities and to ensure optimized gas operation. The monitoring (defined in this paper as continuous data gathering and analysis) and surveys (defined as periodic operations) can be grouped in three objectives: Cavern stability follow-up, which includes seismic monitoring, subsidence survey, cavern bottom sounding and sonar survey Well and completion integrity follow-up, which includes corrosion monitoring and annular tubing pressure monitoring Inventory follow-up including bottom Pressure / temperature logging, cavern thermodynamic modeling from wellhead measurement and sonar survey. The performance assessment (sustainable gas deliverability over time) and optimization of gas operations at Geomethane are annually updated for gas marketing purposes using thermodynamic follow-up results. The monitoring techniques implemented for the follow-up of Geomethane caverns are presented in section 2. The inventory verification methods are reviewed in section 3. The implementation and results of Geomethane inventory follow-up are presented in section Geomethane caverns follow-up 2.1. Stability follow-up Micro-seismic monitoring As discussed in Renoux et al. (2013), micro-seismicity is a good indicator of rock physical and mechanical change. Setting up a permanent array of seismic sensors at shallow depth provides useful 3
5 data to detect underground cavern instabilities as well as external events associated to structural activities. The micro-seismic network at Manosque has been set up for monitoring both Geosel liquid storage site and Geomethane gas caverns. It was developed more than twenty years ago and includes 7 three-axis geophones cemented in shallow boreholes at about 45 m depth. The Manosque network allows detecting on-site events (mainly identified as local instability related to rock spalling at caverns wall during solution mining process and storage operations) as well as off-site seismic activities. The utility of the micro-seismic monitoring to predict a possible cavern collapse was experimentally studied by INERIS in the north of France. A high resolution micro-seismic network installed in a brine field site (at north east of France) recorded some precursory signs before the cavern collapse and highlighted the major role of overlying layers on the cavern stability (Cao et al, 2010) Subsidence survey If any significant cavern closure happens due to the salt creep or mechanical instability, remarkable surface subsidence or ground deformation can be observed at ground level. Thus measuring the surface subsidence is a good indicator of caverns geometry evolution with time. At Manosque a benchmark network consisting of more than one hundred points spread over Geosel and Geomethane sites has been set up to measure vertical ground movement since Subsidence surveys at Manosque are carried out every 5 years measuring the elevation of all benchmark points. The surface subsidence is hence calculated as the difference of two subsequent campaign measurements. The surface subsidence at Manosque has been reported as small as the measurement uncertainty and no significant down ward tendency in surface level all over the area has been observed since the nineties. This result is consistent with the fact that the creep closure rate of Geomethane caverns is extremely limited Sonar Survey One sonar measurement is run every ten years in each Geomethane cavern. The periodic sonar survey aims at checking caverns contour evolution. The possible instability events at cavern wall and the rate of cavern creep closure are deduced from the comparison of successive sonars. A sonar survey in a gas cavern is always completed together with a downhole pressure/temperature measurement to assess the total gas inventory in the cavern as well as the physical cavern volume. Geomethane caverns show a very small volume loss rate about % per year. Different reasons are at the origin of such small volume loss: Caverns have mostly operated in the upper part of the designed pressure range (operated between 120 and 190 bar at cavern mid-depth), Rock Salt at Manosque has a small to medium creep ability (Vouille s index 1 is around 1%), The salt formation has a relatively high percentage of insolubles (20 %) Cavern bottom sounding This survey is run in each wellbore every 3 years on the occasion of subsurface safety valve replacement. The cavern bottom sounding measures any change in the sump level depth. Two mechanisms can be considered to be at the origin of any rise of the sump level in a gas cavern: upward displacement of the cavern bottom due to the salt creep rock slabs falling to the cavern bottom. To identify the actual cause of sump level depth variations, if any, further investigations are necessary. 1 The Vouille s index is used for a comparison of the creep potential of different salt formations. It represents the axial creep strain after one year for a 10 MPa deviatoric stress. 4
6 For Geomethane caverns, no significant change in the sump level depth has been observed Well Integrity follow-up Gas completions of Geomethane wells have been equipped with a production tubing and a packer sealing off the annular space between the last cemented casing and the inner production tubing. This well architecture provides a double protective shield against gas migration. The well integrity can be jeopardized only if both the casing and the packer are affected. Thus, the common practice to check and survey the well integrity consists in controlling the casing corrosion and lack of tightness of the packer (permanent control of the annular pressure) Corrosion monitoring Well casings could be subject to external corrosion (in contact with rock formations or ground water). In general, the lack of good cementation is known as the most common cause of the external corrosion. Different tools and methods have been developed to detect any internal or external corrosion of the casing such as ultrasonic logging, visual inspection etc. A preventive and cost effective method is cathodic protection system which can be installed to protect casings from the external corrosion only. Geomethane wells are protected by an impressed current system. It consists in coupling the well to the negative pole of a direct current source, while the positive pole is coupled to an anode bed. Anodes are generally installed in vertical holes at a given distance from wells. The electric potential and current are measured at wellheads on a periodic basis to ensure the protection Annular pressure monitoring The annular pressure at wellhead is recoded on a daily basis to survey the packer tightness. A pressure build-up in the annular space is an indicator of gas migration through the packer. One of the Geomethane wells has been identified with a loose packer from the beginning of gas operations. This situation is perfectly under control and the well has been subjected to many tests and surveys. To limit the packer leakage, it has been decided to keep limited the pressure difference between the annular and tubing. This restriction implies a dynamic management of annular pressure during gas operations Gas inventory follow-up The first estimate of the gas inventory in a cavern is obtained by metering the quantity of gas injected in and withdrawn from the cavern. Gas metering of Geomethane storage is checked by thermodynamic follow-up that enables to detect and correct possible deviation of the gas inventory. The thermodynamic analysis of caverns is continuously updated using the surface and downhole data on the gas pressure and temperature. A brief review of inventory verification methods is discussed in section 3. The Geomethane follow-up method is described in more detail in section Surface measurements The following continuous surface measurements are used for inventory verification: The flow metering of the gas injected in or withdrawn from each cavern The wellhead pressure measurement, which gives a reliable estimation of the cavern pressure in both static or dynamic conditions 5
7 Wellhead temperature measurement, which provides an input data during injections and enables to verify the cavern temperature during withdrawals Gas composition, which is then used to derive the cavity gas properties (particularly gas compressibility factor Z) Pressure/temperature logging Downhole pressure/temperature measurements are performed in two ways: Temperature survey method: Periodic temporary logging of pressure and temperature from the wellhead down to the cavern bottom every 3 years per cavern Temperature monitoring method: Permanent downhole tool continuously recording pressure and temperature at a specific depth (casing shoe depth or cavern mid-depth) over a period of time (e.g. one year) Temperature survey method provides a one-time measurement of temperature and pressure in the well and cavern, whereas the second method enables to record the downhole temperature and pressure evolution during gas operations over a period of time. Besides its use for inventory check, pressure/temperature log also indicates the gas/brine interface depth. The gas/brine interface aims at determining the gas free volume evolution in the cavern. Normally the interface depth falls down with time as the injected gas is much drier than the withdrawn gas. However, any cavern closure or rock falling, hiding this effect, can lead to the interface rise Thermodynamic analysis Thermodynamic analysis of the cavern data aims at checking the main uncertainties such as the cavern physical volume (during the calibration of the model) and the gas inventory throughout the operation of the site. Verification of gas inventory in underground storage is one of the most important economic issues. It is understood by the concern about contractual commitments on gas deliverability as well as the storage gas tightness. That is why the inventory must be periodically or even continuously rechecked. Using the above-mentioned surface measurements, temperature logs and sonar surveys as inputs, the thermodynamic simulation of a gas cavern is a constant follow-up work that enables to: Check and eventually adjust the cavern gas inventory, Provide valuable information for the operating purposes by predicting the withdrawn gas temperature (pipeline limits or hydrate formation limits), Predict the cavern temperature evolution for performance assessment (including rock mechanical aspects) 3. Review of inventory follow-up techniques The gas inventory can be either directly measured (book inventory based on flowmeters) or deduced from the Equation of State applicable to the gas in the cavern Book inventory deduced from surface metering The cavern inventory at a time is equal to the algebraic sum of injection/withdrawal quantities from the beginning of gas operations: Equation (1) The uncertainty associated with this method is strictly increasing over time and can reach unacceptable levels even if each individual metered error may be small (less than 2%): 6
8 Equation (2) 3.2. Equation of state methods The other alternative is to deduce the gas inventory in the cavern from the following gas equation of state, which as reasonably assumed to be verified in the cavern at any time: Equation (3) Where I, the inventory in normal cubic meter P, cavern pressure in bar V, cavern free volume in cubic meter Z, the compressibility factor T, absolute temperature in the cavern in Kelvin P 0, atmospheric pressure at normal condition (=1.013 bar) T 0, absolute temperature at normal condition (= K) One can distinguish three applicable methods, depending on whether the parameters on the righthand side of the equation are known with reasonable accuracy or to be estimated: Volumetric method, if all parameters including cavern volume are known Depletion method, where a differential version of equation (3) is used in order to estimate the cavern volume as well as the cavern inventory Thermodynamic method, where the downhole temperature is estimated using a thermodynamic model of the gas in the cavern coupled with a model of heat exchange with the surrounding rocks since the start of the leaching. We note that contrarily to the book metering method, the equation of state methods don t rely on a sum over time and Consequently, the associated uncertainty is not increasing over time Volumetric method This method relies on measuring all the Equation 3 right-hand side parameters. Even if using accurate downhole measurements, the error on the inventory will be at least in the same order as the cavern volume error, which is usually estimated at 5% from sonar surveys. The method can also be improved by discretizing the computation on the vertical axis, as proposed by Skaug et al. (2010). This enables to consider the volume as function of depth and to use the gas properties at this depth temperature and pressure. This does not raise major practical complications for the measurement since the log can easily measure temperature and pressure from the bottom to the top of the cavern Depletion method If the cavern physical volume is not accurately known, measuring downhole parameters before (subscript 1) and after (subscript 2) a withdrawal, one can calculate the cavern free volume and initial inventory as follows: Equation (4) 7
9 Where, is the metered withdrawn gas. The uncertainty associated with this method is not only depending on the metering error, but also highly influenced by the relative quantity of withdrawn gas. The larger the quantity of withdrawn gas, the smaller is the error on inventory (Tek, 1993; Nelson & Van Sambeek, 2003) Thermodynamic simulation method As mentioned, the drawback of these two previous methods is that they require cavern temperature measurements, either a one-time measurement (P, T log) or a costly downhole gage. The thermodynamic model of the gas in the cavern and in the well and the heat transfer with the surrounding rocks enables to calculate the cavern temperature based on the surface measurements, history of injections and withdrawals, and thermal properties of the system. 4. Gas inventory follow-up of Geomethane caverns The gas inventory of Geomethane caverns is evaluated on a daily basis by thermodynamic simulation method based on the wellhead pressure and temperature, calculating the cavern pressure/temperature during gas operations. Thermodynamic simulations of Geomethane caverns are carried out using SCTS software (Nieland, 2004) Model calibration The thermodynamic model of the cavern must be calibrated before being used for the prediction of cavern pressure/temperature during gas operations. The overall idea of that calibration is that the gas equation of state (3) in the cavern should be verified at any time. The calibration aims at setting all the parameters that are used for deducing the temperature in the cavern, and other parameters of the gas equation of state to calculate the inventory. Once these parameters are precisely adjusted, the only remaining parameter that should eventually be adjusted by pressure history matching is the cavern inventory. The model calibration relies on four main parameters: Cavern free volume Initial rock temperature at cavern mid-depth Cavern temperature at the end of first gas filling Cavern heat exchange ratio (cavern volume to area ratio) Cavern free volume The cavern free volume is calibrated against the cavern pressure difference prior to and after a significant gas withdrawal or injection. This value must be consistent with the sonar survey measurement. The difference between sonar volume and thermodynamically calibrated volume is generally less than 5%. The confidence level on the calibrated volume value can be higher than the sonar measurement if several calibrations have been performed upon large withdrawal/injection phases. The dewatered cavern volume at the end of first gas filling of the cavern gives an additional convenient benchmark value of the cavern free volume. 8
10 Geomethane caverns volumes have been thermodynamically calibrated and have been compared to sonar measurements. For six caverns, the difference between measured and calculated volume was below 5% (ranging from 1% to 4%). The 7 th cavern showed a large difference between the calculation and the sonar measurement (close to 11%) as presented below: Cavern Sonar volume (m3) Thermodynamically Calibrated volume (m3) Debrined cavern volume (m3) EJ As shown in Figure 3, the adjusted volume greatly improves the fit, and the obtained cavern volume is closer to the debrining volume. The large discrepancy between sonar and calibrated volume may be explained by the very irregular shape of the cavern. Figure 3- Cavern volume calibration from wellhead pressure Initial rock temperature The initial rock temperature is measured by a temperature log. The gas in the wellbore is in thermal equilibrium with surrounding rock and indicates the rock temperature. On contrary, the gas in the cavern is not necessarily in equilibrium with rock formation. The thermal gradient observed in the well within the salt formation can be extrapolated further down in order to estimate the rock temperature at the cavern mid-depth (cf. Figure 4). 9
11 Figure 4- Pressure/temperature log Temperature after 1st gas fill Cavern temperature at the end of first gas filling constitutes an initial reference point in the thermal history of the cavern. This temperature is mainly influenced by the cavern leaching conditions that have cooled down the rock below its initial temperature. A temperature log must be run at the end of first gas filling to provide data for this calibration. The main parameters influencing the cavern initial temperature (at the end of gas filling) are the following: Leaching water temperature Leaching duration Stand-by period between the end of leaching and gas first filling Duration of first gas fill Varying only one of the above parameters (mainly leaching duration) could result in an accurate fitting of the initial cavern temperature. 10
12 Cavern heat exchange ratio Cavern heat exchange ratio is a coefficient which enables to adjust the heat flow rate between the gas and surrounding rock. In SCTS software, this parameter is adjustable by the cavern volume to area ratio (V/A). This parameter has a strong influence on the cavern temperature evolution during gas operation. It is therefore calibrated against all cavern temperature measurements during gas operations (see Figure 5). Figure 5- Cavern temperature adjusted against downhole measurements An initial value of V/A can be calculated from sonar data. Actually the cavern area measured by sonar has a large uncertainty because of the cavern wall irregularities. In general, the contact surface between the gas and rock salt is much larger than the cavern surface area derived from sonar and the calibrated V/A value are smaller than the sonar based V/A. The calibrated V/A ratios of Geomethane caverns are within the range of 4 to 8 m History matching When there is a good accordance between downhole temperature measurements and modeling predictions (discrepancy less than 2 C), the model calibration can be considered to be achieved. As shown in Figure 6, the cavern pressure and temperature calculated at the cavern mid-depth are in good accordance with continuous downhole measurements. 11
13 Figure 6- Comparison of simulations and downhole measurements The cavern gas inventory can be re-assessed by matching the quantity of gas injected or withdrawn against the observed wellhead pressure during gas operations. As shown in Figure 7 for a typical Geomethane cavern, the metered gas injections / withdrawals (without any correction) did not match with the observed wellhead pressure. Therefore, Injections and withdrawals have been adjusted to fit the calculated wellhead pressure with the measured one (see Figure 8). These adjustments hence result in a continuous calibration of the inventory throughout the gas operations. Figure 7- Wellhead pressure calculated using injections / withdrawals as metered (without adjustment) 12
14 Figure 8- Wellhead pressure calculated using adjusted injections / withdrawals If the metered inventory is smaller than the thermodynamically calibrated one (negative gap) and this difference is growing with time, the likely explanation could be a higher cavern closure rate than what expected and used into the simulations. A non-symmetrical metering error (underestimating withdrawals and overestimating injections) during operations can also be suspected. If the metered inventory is larger than the calculated inventory (positive gap) and the difference is increasing with time, this drift cannot be explained by a growing cavern volume. This result can be related to different causes and needs to be deeply investigated: gas loss (underground or aboveground leak), non-symmetrical metering error (overestimating withdrawals and underestimating injections). The implementation of this follow-up in Geomethane storage since 2010 and the analysis of all survey data have made it possible to identify a growing positive gap between the metered and calculated gas inventory over a long period of time (since the beginning of gas operations) as shown in Figure 9. 13
15 Figure 9 Difference between metered and adjusted gas inventory Modeling works and investigations highlighted that some anomalies in the surface facilities are at the origin of this drift. A loose valve separating the storage from the gas network has been suspected to be the main cause of the gas leakage into the network for many years. After replacing the loose valve and strengthening surface facility follow-up, the inventory drift has remained broadly stable. 5. Conclusions Geomethane caverns are monitored by a comprehensive follow-up program that aims at the early detection of any potential deviation from the expected behavior. This monitoring program follows the good industry practices and provides the required information to the competent administration. It is coherent with the risk management international standard proposed by the ISO It constitutes key elements to the management of safety and environmental risks (cavern stability and tightness) and financial risk (gas inventory verification). It also participates at the transparency of the information among the stakeholders. The techniques applied in this follow-up and the objectives they serve are summarized in the following table: 14
16 Technique and frequency Objective: Cavern stability and closure Well integrity Inventory assessment Micro-seismic monitoring Subsidence survey Cavern bottom depth sounding Continuous 5 years 3 years local or global instability Cavern creep closure rock spalling or cavern closure Cathodic protection continuous Casing string Annulus pressure monitoring Continuous Tubing string and packer tightness Sonar survey 10 years Rock spalling and cavern closure Wellhead pressure monitoring Continuous Minimum and Maximum allowable pressure Volumetric method Thermodynamic simulation Downhole temperature measurement 3 years Depletion method Gas metering Continuous Book inventory The thermodynamic simulation involves uncertainty in its input parameters (gas pressure, temperature, injected/withdrawn quantity, composition etc.) and in model predictions. Due to these uncertainties, the absolute accuracy of calculated inventory, at best, cannot be less than 3-4%. The main purpose of the inventory follow-up is to control the relative error growing and to identify operational anomalies or gas leak, if any. This monitoring program has been successfully applied to Geomethane, a mostly seasonal gas storage site. The need for cavern monitoring and survey increases with the frequency and the amplitude of gas cycling. Large volume, high rate and frequent withdrawals result in more significant thermo-mechanical loading on rock salt and require more accurate prediction of storage capacity and performance. The need for gas inventory verification is higher due to measurement uncertainties and increasing errors of gas metering, and this follow-up program is deemed even more necessary in that context. 15
17 Acknowledgements The authors wish to thank Geomethane for authorizing this publication. References Colin P. and de Laguerie P. (1990), Conversion from hydrocarbons to natural gas storage at Manosque. Proc. SMRI Fall Meeting. Colin P. and You Th. (1990), Salt Geomechanics seen through 20 years experience at the Manosque facility. Proc. SMRI Fall Meeting. de Laguerie P. and Durup G. (1994), Natural gas storage facility at Manosque, France. Proc. SMRI Fall Meeting, Hannover, Germany. ISO 31000:2009 (2009), Risk management principles and Guidelines on Implementation. ISSN Renoux P., Fortier E. and Maisons Ch. (2013), Microseismicity induced within Hydrocarbon storage in salt caverns, Manosque, France. Proc. SMRI Fall Meeting, Avignon, France. Cao N.T., Klein E., Contrucci I., Daupley X. and Bigarre P. (2010), Large-scale salt cavern collapse: Multi-parameter monitoring from precursor signs to general failure. Proc. ISRM-EUROCK, Lausanne, Switzerland. Skaug N., Ratigan J., Thompson M. (2010), Natural Gas cavern inventory assessment: A New Approach. Proc. SMRI Spring Meeting, Grand Junction, Colorado, USA. Tek M. R. (1993) Inventory verification in salt cavity storage. Proc. SMRI Spring Meeting, Syracuse, New York, USA. Nelson P. E. and Van Sambeek L. L. (2003), State of the art review and New techniques for Mechanical Integrity tests of (gas-filled) natural gas storage caverns. SMRI research project report Nieland, J., D. (2004), Salt Cavern Thermal Simulator version 2.0 User s Manual. RESPEC Topical Report RSI-1760, March
SOLUTION MINING RESEARCH INSTITUTE
SOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, PA 18411, USA Technical Conference Paper Telephone: +1 570-585-8092 Fax: +1 505-585-8091 www.solutionmining.org MULTI CYCLE GAS
More informationSOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, PA 18411, USA
SOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, PA 18411, USA Technical Conference Paper Telephone: +1 570-585-8092 Fax: +1 505-585-8091 www.solutionmining.org Sounds good? Determination
More informationDecommissioning and Abandonment Procedure of LPG Caverns at Carresse (France)
SOLUTION MINING RESEARCH INSTITUTE Fall Conference Berlin 3-6 October 2004 Decommissioning and Abandonment Procedure of LPG Caverns at Carresse (France) de Laguérie Patrick (1), Héas Jean-Yves (2), Fourmaintraux
More informationNext Generation Quartz Pressure Gauges
Next Generation Quartz Pressure Gauges Rick Puccio, Ph.D. Senior Scientist Quartzdyne Houston, TX March 2, 2016 Outline Quartz Pressure Gauge Introduction Gauge Size Reduction Long Term Pressure Drift
More informationCOGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES
COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES DOCUMENT CONTROL: Created Date: May 06, 2013 Last Updated Date: September 15, 2015 Last Updated By: Stuart Ellsworth
More informationComparative temperature measurements in an experimental borehole heat exchanger. Vincent Badoux 1, Rita Kobler 2
European Geothermal Congress 2016 Strasbourg, France, 19-24 Sept 2016 Comparative temperature measurements in an experimental borehole heat exchanger Vincent Badoux 1, Rita Kobler 2 1 GEOTEST AG, Bernstrasse
More informationDrilling Efficiency Utilizing Coriolis Flow Technology
Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities
More informationCourses of Instruction: Controlling and Monitoring of Pipelines
Courses of Instruction: Controlling and Monitoring of Pipelines Date December 2010 Dr. Peter Eschenbacher Partner Angergraben 4 85250 Altomünster Germany Tel. +49-(0)8254 / 99 69 57 Fax +49-(0)8254 / 99
More informationA Depletion Compensated Wet Bath Simulator For Calibrating Evidential Breath Alcohol Analyzers
A Depletion Compensated Wet Bath Simulator For Calibrating Evidential Breath Alcohol Analyzers Slemeyer, A. University of Applied Sciences of Giessen, Dept. of Electrical Engineering 1 Wiesenstr. 14, D-35390
More informationNew power in production logging
New power in production logging Locating the zones where fluids enter the wellbore in a producing or injecting well is an important aspect of production logging. It is relatively straightforward to establish
More informationA PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS
A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS Authors: J. Daniel Arthur, P.E., SPEC, Tom Tomastik, Senior Geologist, Kris Anderson,
More informationHard or Soft Shut-in : Which is the Best Approach?
HARD - SOFT shut-in? Hard or Soft Shut-in : Which is the Best Approach? March '93 INTRODUCTION There is now reasonable acceptance through-out the industry for the use of a hard shut-in procedure following
More informationCHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells
CHDT Cased Hole Dynamics Tester testing and sampling in cased wells Applications Evaluation of old wells for bypassed hydrocarbons Development of critical economic data for well evaluation Reduced-risk
More informationW I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS
PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient
More informationAnnulus Communications Eliminated using Pressure- Activated Sealant
SOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, Pennsylvania, USA Technical Conference Paper Telephone: 570-585-8092 Fax: 570-585-8091 www.solutionmining.org smri@solutionmining.org
More informationImpact of imperfect sealing on the flow measurement of natural gas by orifice plates
Impact of imperfect sealing on the flow measurement of natural gas by orifice plates Rubens Silva Telles 1, Kazuto Kawakita 2 1 IPT Instituto de Pesquisas Tecnológicas, São Paulo, Brazil, rtelles@ipt.br
More informationAn Innovative Solution for Water Bottling Using PET
An Innovative Solution for Water Bottling Using PET A. Castellano, P. Foti, A. Fraddosio, S. Marzano, M.D. Piccioni, D. Scardigno* DICAR Politecnico di Bari, Italy *Via Orabona 4, 70125 Bari, Italy, scardigno@imedado.poliba.it
More informationSOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, PA 18411, USA
SOLUTION MINING RESEARCH INSTITUTE 105 Apple Valley Circle Clarks Summit, PA 18411, USA Technical Conference Paper Telephone: +1 570-585-8092 Fax: +1 505-585-8091 www.solutionmining.org Set-up of a broken-casings
More informationASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES
ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction
More informationCORESTA RECOMMENDED METHOD N 6
CORESTA RECOMMENDED METHOD N 6 DETERMINATION OF VENTILATION DEFINITIONS AND MEASUREMENT PRINCIPLES (2015 Revision September 2016) 1. SCOPE This CORESTA Recommended Method specifies a method for the determination
More informationFinite Element Analysis of an Aluminium Bike Frame
Finite Element Analysis of an Aluminium Bike Frame Word Count: 1484 1 1. Introduction Each new bike model must pass a series of structural tests before being released for public retail. The purpose of
More informationAPPENDIX A1 - Drilling and completion work programme
APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme
More informationLong-term behavior of salt caverns
ARMA 14-7032 Long-term behavior of salt caverns Bérest, P. LMS, Ecole Polytechnique, Palaiseau, France Brouard, B. Brouard Consulting, Paris, France Copyright 2014 ARMA, American Rock Mechanics Association
More informationCHARACTERISTICS OF LEAK DETECTION BASED ON DIFERENTIAL PRESSURE MEASUREMENT
CHARACTERISTICS OF LEAK DETECTION BASED ON DIFERENTIAL PRESSURE MEASUREMENT Harus L.G..*, Maolin CAI**, Kenji KAWASHIMA** and Toshiharu KAGAWA** * Graduate student of Mechano-Micro Engineering Dept., Tokyo
More information1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?
PLEASE NOTE THAT ALL USES OF THE WORD OPERATOR IN THIS DOCUMENT REFER TO THE ACT 13 DEFINITION OF WELL OPERATOR AND THUS, REFERENCE THE PERMIT HOLDER (PERMITEE) FOR THE WELL. ANY ENFORCEMENT ACTIONS UNDER
More informationEngineering: Measurement Technology Pressure/Level (SCQF level 6)
National Unit Specification: general information CODE F5KT 12 SUMMARY This Unit can be delivered as part of a National Qualification Group Award but can also be taken as a free-standing Unit. This Unit
More informationEnbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT
Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project Appendix A to Updated Pipeline Engineering Assessment PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT Table of Contents 1.
More informationMicro Motion 3098 Gas Specific Gravity Meter
Product Data Sheet PS-001188, Rev. B April 2009 Micro Motion 3098 Gas Specific Gravity Meter Micro Motion density and concentration meters are built to tackle the most demanding process and fiscal applications.
More informationConstruction Dewatering
Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue
More informationGEOTHERMAL WELL COMPLETION TESTS
GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately
More informationACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING
ACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING Blair Chalpin Charles A. Matthews Mechanical Design Engineer Product Support Manager Scanivalve Corp Scanivalve Corp Liberty Lake, WA
More informationChapter Pipette service & maintenance. Pipette specifications according to ISO Repair in the lab or return for service?
Pipette specifications according to ISO 8655 Chapter 5 5.1 The ISO 8655 standard gives the accuracy and precision limits as both absolute and relative values. Specifications will depend on the technique
More informationAalborg Universitet. Published in: Proceedings of Offshore Wind 2007 Conference & Exhibition. Publication date: 2007
Aalborg Universitet Design Loads on Platforms on Offshore wind Turbine Foundations with Respect to Vertical Wave Run-up Damsgaard, Mathilde L.; Gravesen, Helge; Andersen, Thomas Lykke Published in: Proceedings
More informationOIL AND GAS INDUSTRY
This case study discusses the sizing of a coalescer filter and demonstrates its fouling life cycle analysis using a Flownex model which implements two new pressure loss components: - A rated pressure loss
More informationFAQs about Directive 017
FAQs about Directive 017 General What measurement points are covered in this directive? The requirements in this directive cover all measurement points required by the Oil and Gas Conservation Regulations
More informationTIGHTNESS. Glass sealing Thanks to our glass-sealing technology, ODU products can meet the most demanding tightness requirements.
TIGHTNESS Glass sealing Thanks to our glass-sealing technology, ODU products can meet the most demanding tightness requirements. ODU has the necessary expertise for developing and manufacturing connectors
More informationNumerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the Vortex Generators
Second International Symposium on Marine Propulsors smp 11, Hamburg, Germany, June 2011 Numerical and Experimental Investigation of the Possibility of Forming the Wake Flow of Large Ships by Using the
More informationSPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main
SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum
More informationHardware Triaxial and Consolidation Testing Systems Pressure Measurement and Control
25 GDS Helpsheet Hardware Triaxial and Consolidation Testing Systems Pressure Measurement and Control World Leaders in Computer Controlled Testing Systems for Geotechnical Engineers and Geologists 1. Digital
More information3.6 Magnetic surveys. Sampling Time variations Gradiometers Processing. Sampling
3.6 Magnetic surveys Sampling Time variations Gradiometers Processing Sampling Magnetic surveys can be taken along profiles or, more often, on a grid. The data for a grid is usually taken with fairly frequent
More informationGerald D. Anderson. Education Technical Specialist
Gerald D. Anderson Education Technical Specialist The factors which influence selection of equipment for a liquid level control loop interact significantly. Analyses of these factors and their interactions
More informationProceedings of Meetings on Acoustics
Proceedings of Meetings on Acoustics Volume 9, 2010 http://acousticalsociety.org/ 159th Meeting Acoustical Society of America/NOISE-CON 2010 Baltimore, Maryland 19-23 April 2010 Session 1pBB: Biomedical
More informationA New Piston Gauge to Improve the Definition of High Gas Pressure and to Facilitate the Gas to Oil Transition in a Pressure Calibration Chain
A New iston Gauge to Improve the Definition of High Gas ressure and to Facilitate the Gas to Oil Transition in a ressure Calibration Chain ierre Delajoud, Martin Girard DH Instruments, Inc. 4765 East Beautiful
More informationDiagnostics for Liquid Meters Do they only tell us what we already know? Terry Cousins - CEESI
Diagnostics for Liquid Meters Do they only tell us what we already know? Terry Cousins - CEESI DIAGNOSTICS FOR LIQUID METERS-DO THEY ONLY TELL US WHAT WE ALREADY KNOW? T. Cousins CEESI CMSI INTRODUCTION
More informationFluid-Structure Interaction Analysis of a Flow Control Device
Abaqus Technology Brief Fluid-Structure Interaction Analysis of a Control Device TB-06-FSI-2 Revised: April 2007. Summary The Vernay VernaFlo flow controls are custom-designed fluid flow management devices
More information29th Monitoring Research Review: Ground-Based Nuclear Explosion Monitoring Technologies
IMPROVED CALIBRATION AND OPERATION OF A STABLE-GAS QUANTIFICATION MANIFOLD AS PART OF A RADIOXENON COLLECTION SYSTEM ABSTRACT Richard M. Williams, James C. Hayes, and Randy R. Kirkham Pacific Northwest
More informationCoriolis Mass Flow Meter
Coriolis Mass Flow Meter TMFW Series Mini Type Coriolis Mass Flow Meter Xi an Tosilon Automation Co., Ltd No.299, Daqing Rd, Lianhu District, Xi'an Shaanxi, China Tel: +86-29-8823 8550 info@tosilon.com;
More informationHYDROGEN - METHANE MIXTURES : DISPERSION AND STRATIFICATION STUDIES
HYDROGEN - METHANE MIXTURES : DISPERSION AND STRATIFICATION STUDIES A. Marangon, M.N. Carcassi Department of Mechanical, Nuclear and Production Engineering, University of Pisa, Via Largo Lucio Lazzarino,
More informationCalculation of Trail Usage from Counter Data
1. Introduction 1 Calculation of Trail Usage from Counter Data 1/17/17 Stephen Martin, Ph.D. Automatic counters are used on trails to measure how many people are using the trail. A fundamental question
More informationDisposal/Injection Well Pressure Test Report (H-5)
RAILROAD COMMISSION OF TEXAS Disposal/Injection Well Pressure Test Report (H-5) Lauryn McFarland Engineering Technician Summary When Mechanical Integrity Test (MIT) is required How to file MIT How to perform
More informationFinding leaks in Main Cryogenic Heat Exchangers without shutdown
Finding leaks in Main Cryogenic Heat Exchangers without shutdown Liquefaction is the most fundamental step in the LNG production process. To achieve this there are several process solutions available,
More informationChapter 7. SCIIB Pressure Sensor Performance Evaluations: Experiments, Results and Discussions
: Experiments, Results and Discussions This chapter will summarize the experiments and results associated with the development of the single-mode fiber-based SCIIB pressure sensor system. We will start
More informationHASTAC High stability Altimeter SysTem for Air data Computers
HASTAC High stability Altimeter SysTem for Air data Computers André Larsen R&D Director Memscap Sensor Solution SIXTH FRAMEWORK PROGRAMME PRIORITY 4 Aeronautics and Space EC contract no. AST4-CT-2005-012334
More informationResults of mathematical modelling the kinetics of gaseous exchange through small channels in micro dischargers
Journal of Physics: Conference Series PAPER OPEN ACCESS Results of mathematical modelling the kinetics of gaseous exchange through small channels in micro dischargers Related content - The versatile use
More informationMACH ONE MASS FLOW CONTROLLER. MACH ONE SERIES flow control. MASS FLOW CONTROLLERS at the speed of sound.
MACH ONE MASS FLOW CONTROLLER MACH ONE SERIES flow control MASS FLOW CONTROLLERS at the speed of sound. MACH ONE SERIES MASS FLOW CONTROLLER FLOW CONTROL AT THE SPEED OF SOUND The Mach One revolutionary
More informationBalmoral Offshore Engineering
Balmoral Offshore Engineering Buoyancy, insulation and elastomer products Balmoral Casing Guard Annular pressure build-up mitigation system Connect with us: www.balmoraloffshore.com TM Balmoral Casing Guard
More informationMicro Channel Recuperator for a Reverse Brayton Cycle Cryocooler
Micro Channel Recuperator for a Reverse Brayton Cycle Cryocooler C. Becnel, J. Lagrone, and K. Kelly Mezzo Technologies Baton Rouge, LA USA 70806 ABSTRACT The Missile Defense Agency has supported a research
More informationP-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints
Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS
More informationA Reliable and Tracer Gas Independent Leak Detector for Food Packages
19 th World Conference on Non-Destructive Testing 2016 A Reliable and Tracer Gas Independent Leak Detector for Food Packages Silvio DECKER 1 1 INFICON GmbH, Köln, Germany Contact e-mail: Silvio.Decker@inficon.com-
More informationSituated 250km from Muscat in
CYAN MAGENTA YELLOW BLACK GRAVITY GAINS A novel method of determining gas saturation has proved successful in Oman s Natih Field where conventional methods were giving anomalous results in difficult conditions.
More informationFIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:
By Phil Smith, Project Manager and Chen-Hsiang Su, PE, Senior Consultant, Lincolnshire, IL, JENSEN HUGHES A hydraulic model is a computer program configured to simulate flows for a hydraulic system. The
More informationThis test shall be carried out on all vehicles equipped with open type traction batteries.
5.4. Determination of hydrogen emissions page 1 RESS-6-15 5.4.1. This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4.2. The test shall be conducted following
More informationValidation of Custody Transfer Metering Skid at Site After Laboratory Proving
flotek.g 2017- Innovative Solutions in Flow Measurement and Control - Oil, Water and Gas August 28-30, 2017, FCRI, Palakkad, Kerala, India Validation of Custody Transfer Metering Skid at Site After Laboratory
More informationSafety Systems Based on ND Pressure Monitoring
ECNDT 2006 - oster 65 Safety Systems Based on ND ressure Monitoring Davor ZVIZDIC; Lovorka GRGEC BERMANEC, FSB-LM, Zagreb, Croatia Abstract. This paper investigates the scope of ND pressure monitoring
More informationOrganisation Internationale de Métrologie Légale
Organisation Internationale de Métrologie Légale OIML INTERNATIONAL RECOMMENDATION Pressure balances Manomètres à piston OIML R 110 Edition 1994 (E) CONTENTS Foreword... 3 1 Scope... 4 2 Terminology...
More informationAcid Gas Progress Report Requirements
Acid Gas Progress Report Requirements Operation of an acid gas disposal well requires the permit holder to submit a Progress Report to the Commission twice a year, filed within 60 days after the end of
More informationApplication Note AN-107
SPEC Sensor TM Characterization & Calibration Considerations Scope This document is provided to describe the considerations needed to characterize, calibrate, verify and validate the measurement performance
More informationthe annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).
Bulletin 2011-35 December 20, 2011 Surface Casing Vent Requirements for Wells This bulletin clarifies Section 6.100(4) of the Oil and Gas Conservation Regulations (OGCR) and provide additional surface
More informationPROCESS MONITORING AND CONTROL
Chemical Engineering Process Design PROCESS MONITORING AND CONTROL Keith Marchildon David Mody Monitoring means Measurement 1. There is no Control without Monitoring 2. Monitoring should not be done without
More informationCalculating Total Uncertainty of Temperature Calibration with a Dry Block. Calibration White Paper. Beamex.
Beamex Calibration White Paper info@beamex.com Calculating Total Uncertainty of Temperature Calibration with a Dry Block World-class calibration solutions Calculating Total Uncertainty of Temperature Calibration
More informationFull Classification acc. to IEC for SoDAR AQ510 Wind Finder. Vincent Camier, Managing Director, Ammonit Measurement GmbH
Full Classification acc. to IEC 61400-12-1 for SoDAR AQ510 Wind Finder Vincent Camier, Managing Director, Ammonit Measurement GmbH Ammonit Company Profile German company, based in Berlin +25 years of know-how
More informationCONTROL VALVE TESTING
The optimal functioning of the Control valve not only exists of sufficient body & seat tightness, but more important, the total "performance" of the valve and its controls! For an accurate and reliable
More informationESTIMATION OF THE DESIGN WIND SPEED BASED ON
The Seventh Asia-Pacific Conference on Wind Engineering, November 8-12, 2009, Taipei, Taiwan ESTIMATION OF THE DESIGN WIND SPEED BASED ON UNCERTAIN PARAMETERS OF THE WIND CLIMATE Michael Kasperski 1 1
More informationENVIRONMENTAL AND POLLUTANTS GAS ANALYZERS
XIX IMEKO World Congress Fundamental and Applied Metrology September 6, 9, Lisbon, Portugal ENVIRONMENTAL AND POLLUTANTS GAS ANALYZERS Ana Madeira, Florbela A. Dias and Eduarda Filipe 3 Instituto Português
More informationNotice for Pressure Special Equipment Manufacture Licensing
AQSIQ Notice No.151 (2012) Notice for Pressure Special Equipment Manufacture Licensing To further enhance the implementation of the manufacture licensing system to imported pressure special equipment,
More informationA review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility
A review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility mass balance and compliance 1. What, When and Why? 2. Flare
More informationThe model of thermal response of Liquefied Petroleum Gas Tanks subjected to accidental heat input
Economic Commission for Europe Inland Transport Committee Working Party on the Transport of Dangerous Goods Joint Meeting of the RID Committee of Experts and the Working Party on the Transport of Dangerous
More informationSignificant Change to Dairy Heat Treatment Equipment and Systems
Significant to Dairy Heat Treatment September 2008 Page 1 Significant to Dairy Heat Treatment Equipment and Systems September 2008 1 Background Requirements for the assessment of dairy heat treatment equipment
More information2007 Gas-Lift Workshop
2007 Gas-Lift Workshop Field Application of Automation and Control Equipment by Cleon Dunham Oilfield Automation Consulting 2/11/2007 2007 Gas-Lift Workshop 1 Gas-Lift Automation & Control Equipment Outline
More informationMODELING&SIMULATION EXTRAPOLATED INTERNAL ARC TEST RESULTS: A COUPLED FLUID-STRUCTURAL TRANSIENT METHODOLOGY
MODELING&SIMULATION EXTRAPOLATED INTERNAL ARC TEST RESULTS: A COUPLED FLUID-STRUCTURAL TRANSIENT METHODOLOGY Jérôme DOUCHIN Schneider Electric France Jerome.douchin@schneider-electric.com Ezequiel Salas
More informationMechanical Integrity Testing Using the Fibre OpticTemperature Sensing Technique
SOLUTION MINING RESEARCH INSTITUTE 1219 Bittersweet Drive Richmond, Texas 77469-6544, USA Technical Conference Paper Telephone and Fax: 281-232-8766 www.solutionmining.org smri@solutionmining.org Mechanical
More informationNon-intrusive Natural Gas Flow Measurement
Non-intrusive Natural Gas Flow Measurement Upstream Midstream Downstream - Gas at the Separator Outlet - Wellhead Gas Flow Measurement - Gas Injection n & Lift - Gas Treatmentent on - Compressor r Stations
More informationTransient Analyses In Relief Systems
Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances
More informationImprove Process Reliability
Convenient Conductivity Calibration to Meet Pharmacopeia Regulations Pharmacopeias require that conductivity measurement systems be periodically calibrated to ensure their precision. The range of accessories
More informationAPI MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks
API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of
More informationDevelopment of Prediction Models for Spent Nuclear Fuel Storage Cask Monitoring Hyong Chol Kim, Sam Hee Han, Dong Jae Park
Transactions of the Korean Nuclear Society Autumn Meeting Yeosu, Korea, October 25-26, 2018 Development of Prediction Models for Spent Nuclear Fuel Storage Cask Monitoring Hyong Chol Kim, Sam Hee Han,
More informationWELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS
WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS CONSULTATION AND ENGAGEMENT DRAFT MAY 17, 2016 If you would like this information in
More informationCoal Bed Methane (CBM) Permeability Testing
Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April 28-29, 2011 ExxonMobil Exploration / Well Testing Team CBM Flow Characteristics Flow mechanism Gas desorbs when pressure drops below
More informationAlong-string pressure, temperature measurements hold revolutionary promise for downhole management
Along-string pressure, temperature measurements hold revolutionary promise for downhole management IT S WIDELY KNOWN that the majority of stuck pipe incidents occur while pulling out of hole. If we can
More informationThe Study of Bubbly Gas-Water Flow Using
The Study of Bubbly Gas-Water Flow Using Displacement Current Phase Tomography Chris Zuccarelli 1, Benjamin Straiton 1, Joshua Sines 1, Qussai Marashdeh 1 1 Tech4Imaging, 1910 Crown Park Court, Columbus,
More informationWade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2. University of Southern Queensland Toowoomba 4350 AUSTRALIA
A Comparison of Methods for Mapping Golf Greens Wade Reynolds 1 Frank Young 1,2 Peter Gibbings 1,2 1 Faculty of Engineering and Surveying 2 Australian Centre for Sustainable Catchments University of Southern
More informationGuidance on room integrity testing and its interpretation
Guidance Note Guidance on room integrity testing and its interpretation Guidance on room integrity testing and its interpretation 1. SCOPE... 6 2. INTRODUCTION AND BACKGROUND... 6 2.1. DEVELOPMENT OF INTEGRITY
More informationPerformance Overview calibration Laboratory EP Instruments Messtechnik und Kalibrierung GmbH
Performance Overview calibration Laboratory EP Instruments Messtechnik und Kalibrierung GmbH 1 D-K-15143-01-00 Services around the measurement technology in Germanys most accurate DAkkS laboratory*. Whether
More informationZIN Technologies PHi Engineering Support. PHi-RPT CFD Analysis of Large Bubble Mixing. June 26, 2006
ZIN Technologies PHi Engineering Support PHi-RPT-0002 CFD Analysis of Large Bubble Mixing Proprietary ZIN Technologies, Inc. For nearly five decades, ZIN Technologies has provided integrated products and
More informationWhy Do Not Disturb Is a Safety Message for Well Integrity
Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,
More informationOpen Research Online The Open University s repository of research publications and other research outputs
Open Research Online The Open University s repository of research publications and other research outputs Developing an intelligent table tennis umpiring system Conference or Workshop Item How to cite:
More informationRon Gibson, Senior Engineer Gary McCargar, Senior Engineer ONEOK Partners
New Developments to Improve Natural Gas Custody Transfer Applications with Coriolis Meters Including Application of Multi-Point Piecewise Linear Interpolation (PWL) Marc Buttler, Midstream O&G Marketing
More informationMetering Code Gas TSO, measurement by connected party Effective from to the present
Please note that although Gasunie Transport Services B.V. translated the Dutch network codes with utmost care, Gasunie Transport Services B.V. would like to point out that only the decisions of the Dutch
More informationSTRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO)
National Institute for Nuclear Physics and High Energy Physics Kruislaan 409 1098 SJ Amsterdam The Netherlands NIKHEF Reference no.: MT-VELO 04-1 EDMS no: 432626 OF THE VACUUM VESSEL FOR THE LHCb VERTEX
More informationNitrogen subtraction on reported CO 2 emission using ultrasonic flare gas meter
Nitrogen subtraction on reported CO 2 emission using ultrasonic flare gas meter Kjell-Eivind Frøysa, Christian Michelsen Research AS, Bergen, Norway Henning Ekerhovd, StatoilHydro ASA, Kollsnes, Norway
More information