1 Technology Burst Test, Finite Element Analysis and Structural Integrity of Pipeline System By Nasir Shafiq, Mokhtar Che Ismail, Chanyalew Taye, Saravanan K and M F Nuruddin Abstract Pipelines are one of the major means of transporting hydrocarbons (oil and/or natural) from one point to the other point, which may be routed within onshore or offshore locations. There is a great risk to occur many defects during the service life these pipelines. Corrosion (internal and/or external) is one of the common defects observed in many instants. With the passage of time the corrosion that occurs either at a localized point or onto a large area cause the metal loss hence the strength or in other words load bearing capacity of the pipeline is reduced. In order to continuously operate the pipeline for suiting the earlier assumptions taken at the time of first design, it requires strengthening for returning to the original capacity. The type of strengthening technique and procedure required to estimate the percentage capacity lost using appropriate experimental procedure. Full-scale pipe burst test is most commonly used for this reason. A systematic study has been conducted for remaining capacity analysis of API 5L X52 pipeline operated and managed in the South China Sea. The objective of the study was to investigate the fracture behaviour of corroded pipe extracted from in-service pipeline using full scale burst test and to correlate the experimental results with the finite element analysis. INTRODUCTION Pipeline is exposed to both internal and external corrosion. Internally, pipeline carrying hydrocarbon fluid is known to be susceptible to CO 2 corrosion. Externally, harsh marine environment becomes a threat if the preventive corrosion measures fail. The CO 2 corrosion is not only influenced by the presence of the corrosive species in the fluid such as H 2 S and organic acid but also enhanced by operational parameters such as temperature, ph, flow rate, water cut and others. The presence of Sulfate reducing bacteria (SRB) poses the pipe to another aggressive corrosion; microbial induced corrosion (MIC) 1. As part of the corrosion management, inspection and monitoring relies on intelligent pig (IP) data obtained from the scheduled pigging exercise to provide feedback on the integrity of the pipeline. The IP metal loss data provided a means for engineers to conduct fitness for service assessment based on the available codes such as DNV etc. Since the FFS assessment depends on the accuracy of the IP data, it is of upmost importance to have high confidence level of the IP data. Overestimation of metal loss by IP means premature retirement of the pipe. Furthermore, the codes used also contain inherent conservativeness which also affects the assessment. Thus, there is a need to establish the understanding of the accuracy of the IP data and also the degree of the conservativeness of the codes used. Recommendation based on burst test investigation of naturally corroded pipeline is considered to be an appropriate technique for improving the conservativeness of current assessment procedures. The main objective of this project is the failure analysis of PMO PL24 corroded pipeline. Burst test of pipe removed from service containing natural corrosion defects and simulated defects were conducted. Furthermore, nonlinear finite element analyses of these defects were conducted 2. A 10 diameter pipeline of 6.9 km length carrying wet 38 JUL-SEPT 2010 Visit our websites at /
2 and semi processed crude oil from platform-a platform-b is operating in South-China Sea. It was commissioned in 1982 with a design life of 20 years. Maximum Allowable Operating Pressure (MAOP) was 40.0 bars, which was derated pressure from 93 bars based on the Fitness-for- Service (FFS) Assessment performed by the operator in The pipeline had been operated at an average Operation Pressure (OP) of 28.0 bars by the time when the operator/consultant referred to the University Technology PETRONAS. An inline inspection using Magnetic Flux Leakage (MFL) tool was performed in November 2006, it reported 10,804 metal loss defects; where 10,803 internal defects concentrated at 700 metres from platform-a. There was only one external defect reported at the riser of the Platform- A. Based on the fitness for service, FFS done using DNV-RP- F101Part A; 17 defects were reported with allowable corroded pipe pressure (P corr ) lower than the maximum allowable operating pressure MAOP and at the location of 8 defects, the P corr was determined as zero. Furthermore, there were 10 groups of interacting defects having P corr = 0. All the identified defects were located within 100 to 350 metres section from platform-a. Accordingly, it was recommended to replace critical section from log distance 93 to 850 metres due to single and interacting defects having P corr = 0 bar and containing highest density of defects (88%). Universiti Teknologi PETRONAS (UTP) is commissioned to perform failure analysis on this retired section of the pipeline. For the study purpose, about 100 meter of the retired pipe section was delivered to UTP. Objectives and Scope The main objective of this study was to establish the relationship between the maximum allowable pressure, MAOP due to corrosion defect reported by the IP and the burst pressure based for stress analysis of the pipe containing natural and artificial corrosion defects and through the nonlinear finite element analysis of known defect profiles. The sub-objectives include: Obtain the cross-sectional profile of the corroded pipelines Verify the reliability of IP tally by the UT-Scan results Experimental investigation of the burst pressure for the corroded pipelines Evaluation of defect assessment methods, by comparison of burst test results with predicted results for pipeline with corrosion defects, Comparison and verification of burst pressure with finite element simulation. Develop a model to predict the burst pressure of pipelines with longitudinal defect under internal pressure Methodology The study was conducted according to the following framework. Visual Inspection: Conduct visual inspection and take photographic records of visible defects, Perform UT-Scan and record the profile of the identified sections FFS Calculation: FFS calculations for 10 critical sections identified by IP inspection by ASME B31G, modified ASME B31G and DNV codes Material Test: Cut tensile test specimens from the pipeline and prepare the surface according to the standard (ASTM E 8M 04). Conduct tensile test and record the necessary data to be used for burst strength prediction Burst Test: To identify critical sections for performing the burst test based on UT-Scan Cut the test samples and clean the surface weld the end cup, fix the strain gauges, attach pressure transducer gauge, and attach water inlet perform burst tests and record the data Finite Element Simulation Non-linear FE analysis was performed using ANSYS software for simulating the experimental results obtained by the burst test. Burst Pressure (P f ) Predictions Based On IP Data A summary of the critical metal loss sorted in order of their absolute distance from the launch is shown in Table- 1, these sections were reported for ERF value greater than 1. Upon the decision made by the operator, the 450 m of critically corroded section was replaced with the new section by contractor from17 to 24 of Aug For these identified features, burst pressure predictions were made by using ASME B31G, modified ASME B31G, DNV-RP-F101Part A and FEM. The summary of the results are given in the Figure-1 and 2. The following values were used for the calculations. Pipe size: D=273.05mm, t= 11.1mm D= 274mm, t=12.8mm Yield strength: SMYS, (actual, engineering) = 358 MPa Tensile strength: σ UTS (actual, engineering) = 455 MPa Sample Calculation (D= mm, t = 11.1mm): Let us consider defect designated by Feature Nr8204 to demonstrate the failure pressure prediction by using the above mentioned methods. The defect geometries for this feature are: d/t = 0.41 (41%) and L m = 250 mm. JUL-SEPT
3 Table-1: Summary of inspection sheets with the metal loss features sorted in order of their absolute distance from the launch ASME B31G First let us calculate A and P Therefore, according to modified ASME B31G, the burst (failure) pressure of the pipe due to defect identified as Nr8204 is 251 bar. For A is greater than 4.0: DNV-RP-F101 burst capacity First let us calculate factor Q, Therefore, according to ASME B31G, the burst (failure) pressure of the pipe due to defect identified as Nr8204 is bar. Therefore, the failure pressure (P f ) is calculated using: Modified ASME B31G First let us calculate the Folias factor, M Therefore, according to DNV RP-F101 the burst capacity of the pipe due to defect identified as Nr8204 is bar. 40 JUL-SEPT 2010 Visit our websites at /
4 Sample Calculation (D= 274 mm, t = 12.8 mm) : Let us consider the same defect as identified by previous sample calculation. DNV-RP-F101 burst capacity First let us calculate factor Q, ASME B31G First let us calculate A and P Therefore, the failure pressure (P f ) is calculated using: For A is less than 4.0: Therefore, according to DNV RP-F101 the burst capacity of the pipe due to defect identified as Nr8204 is bar. Therefore, according to ASME B31G, the burst (failure) pressure of the pipe due to defect identified as Nr8204 is bar. Modified ASME B31G First let us calculate the Folias factor, M Therefore, according to modified ASME B31G, the burst (failure) pressure of the pipe due to defect identified as Nr8204 is bar. MAOP (P corr ) Predictions Based On IP Data The maximum allowable operating pressure or the allowable corroded pipe pressure can be estimated based on operator s factor of safety. In the case of ASME B31G codes and the FE calculation, MAOP can be calculated by considering an appropriate design factor (F). We may use JUL-SEPT
5 the acceptance equation of DNV-RP-F101Part A for direct calculation of P corr. The allowable corroded pipe pressure of a single metal loss defect subject to internal pressure loading is given by the following acceptance equation. The partial safety factor for MFL under normal safety class can be taken as, γ m = For 80% confidence level the standard deviation can be taken as, StD[d/t] = 0.08, therefore, γ d = 1.28 and ε d = 1.0 can be taken. Let us assume safety factor, (F = 0.5) to recalculate the acceptable operation pressure for ASME codes and FE simulations. Burst Test Results As per the critical section identified by UT P-scan, five burst test samples were prepared from section A and section B. One of these test samples (T2) is with general corrosion distributed over the internal surface and four of which were with artificial longitudinal corrosion defect. The defects were smooth and machined on the external surface of the pipe. The simulated corrosion defects were machined on at the external surface. The summary of the tests are shown in Table-3. The defects had a smooth surface and all edges were made with a small radius. The surfaces were also grinded slightly to get smoother surface for ease of thickness measurements and attachment of strain gauges. At each end of the test specimens a spherical end caps were welded to the pipe. The inlet for internal pressure and mounting of the pressure transducer were at the end flanges. Water was pumped into the pipes until burst. The water pump used had a capacity of 1000 bar. All tests were performed at room temperature of about 30 o C. Table 2: MAOP (P corr ) predictions 42 JUL-SEPT 2010 Visit our websites at /
6 Table-3: Description of test samples * Sample failed during machining of for 85% simulated defect. Burst tests were successfully conducted for test sample T001 to T004, but test sample T005 failed during machining of simulated defect due to imbedded pinhole defect on the corroded pipeline internal wall. The corresponding numerical simulation results were also calculated. FE simulations were used for simulated defects and analytical calculation was made for test sample T002. This test sample (T002) was with general corrosion defect evenly distributed over the internal surface of the pipeline. Therefore, in order to make analytical calculations, we may assume uniform wall thickness reduction due to the general corrosion. According to the P-Scan measurement in this section the average wall thickness of this test sample is mm, only about 5% wall loss. We may use the maximum hoop stress theory to predict the burst pressure of this section. The maximum hoop stress theory suggests the maximum allowable pressure for hollow pressure vessel (cylinder) as follows. Therefore, the failure pressure predicted is about 368 bars, which is within 4.4% deviation of the experimental burst pressure. Similarly, as shown in Table-3, the errors for FE simulations for T001 and T003 were 3% and 3.2%, respectively. CONCLUSIONS Based on the visual inspection, corrosion is found to be minimal and concentrated in the bottom half of the pipeline between 3 to 9 o clock positions. There was no severe localized and deep corrosion of any form. Rusting and sea water infiltration under the newly wrapped rubber laminations was observed. Therefore, proper lamination should be done after inspection or maintenance activities. Among the three codes used, DNV gave less conservative burst strength predictions. The burst test at the most severely corroded section of the pipeline, as it is represented by test sample T002, was 385 bars. This pressure is much higher than the design pressure of the pipeline. Therefore, it can be concluded that the level of corrosion in this pipeline is not significant to challenge the integrity. FE simulation results estimated the burst capacity of the pipe within reasonable accuracy less than 5%. PP References 1. O.H. Bjornoy and M.D. Marley. Assessment of Corroded Pipelines: Past, Present and Future, Proceedings of tile Eleventh (2001) International Offshore and Polar Engineering Conference Stavanger, Norway, June Duan Qingquan, Zhang Hong, Yan Feng, Deng Changyi. Hydrostatic burst test 0F X80 grade steel pipe, Journal of Loss Prevention in the Process Industries, (2009) pp: PetroMin Pipeliner would like to show appreciation to Prof Nasir Shafiq and his faculty in Universiti Tecknologi PETRONAS, for this detailed article which was presented at our Hydrocarbon Asia s Engineering and Operations Convention, July 2010, in Kuala Lumpur, Malaysia. JUL-SEPT
Kiefner & Associates, Inc.
Kiefner & Associates, Inc. KAPA FAQs What does KAPA stand for? KAPA is an acronym for Kiefner & Associates Pipe Assessment. What does KAPA do? KAPA calculates an estimated failure pressure of a pipe affected
More informationFitness for Service Assessment of Ageing Pressure Vessel Experiencing External Corrosion: A Case Study
The International Journal Of Engineering And Science (IJES) Volume 6 Issue 2 Pages PP 12-16 2017 ISSN (e): 2319 1813 ISSN (p): 2319 1805 Fitness for Service Assessment of Ageing Pressure Vessel Experiencing
More informationStress Analysis of The West -East gas pipeline with Defects Under Thermal Load
Stress Analysis of The West -East gas pipeline with Defects Under Thermal Load Abstract Xu Lei School of Petroleum Engineering, Yangtze University, Wuhan 430000, China 13071247220@163.com Natural gas is
More informationINTERNAL AXIAL CORROSION IN OFFSHORE PIPELINES: INSPECTION AND ASSESSMENT. By: Dr. Christoph Jäger, Abdullahi Atto, NDT Global, Germany
INTERNAL AXIAL CORROSION IN OFFSHORE PIPELINES: INSPECTION AND ASSESSMENT By: Dr. Christoph Jäger, Abdullahi Atto, NDT Global, Germany Abstract Internal long axial corrosion is the most common corrosion
More informationASPIRE for Integrity Management Support for Upstream Assets. Payam Jamshidi, TWI Ltd Sebastian Hartmann, Innospection Ltd
ASPIRE for Integrity Management Support for Upstream Assets Payam Jamshidi, TWI Ltd Sebastian Hartmann, Innospection Ltd OVERVIEW - Discussion of corroded pipe assessment procedures under combined loading
More informationPressures MAOP MOP OP
MAOP Pressures MAOP MOP OP MAOP "Maximum Allowable Operating Pressure" means the maximum pressure at which a pipeline or segment of a pipeline may be operated under this part. 192.3 MOP "Maximum Actual
More informationAnomaly Evaluation, Response, and Repair Summit. Presentation by INGAA June 3, 2008
Anomaly Evaluation, Response, and Repair Summit Presentation by INGAA June 3, 2008 Context of Today s Meeting Basis for Anomaly evaluation and response has become an issue on: Enforcement Integrity Management
More informationThe Use of ILI In Dent Assessments
The Use of ILI In Dent Assessments Prepared for: 2014 CRUG Conference Date: 11 September 2014 Prepared by: Rhett Dotson, PE Contributions from Dr. Chris Alexander and Markus Ginten Contents Current Dent
More informationMETHODOLOGY FOR ASSESSING THE EFFECTS OF PLAIN DENTS, WRINKLE BENDS, AND MECHANICAL DAMAGE ON PIPELINE INTEGRITY
NACE International Corrosion 007 Conference & Expo March 11-15, 007, Nashville, Tennessee NACE007-07139 METHODOLOGY FOR ASSESSING THE EFFECTS OF PLAIN DENTS, WRINKLE BENDS, AND MECHANICAL DAMAGE ON PIPELINE
More informationProceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011
Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the ASME 2011 30th International
More informationSTANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)
STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply
More informationTightening Evaluation of New 400A Size Metal Gasket
Proceedings of the 8th International Conference on Innovation & Management 307 Tightening Evaluation of New 400A Size Metal Gasket Moch. Agus Choiron 1, Shigeyuki Haruyama 2, Ken Kaminishi 3 1 Doctoral
More informationCONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT
ASSET INTEGRITY INTELLIGENCE CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT JAMES R. WIDRIG, Manager Advanced Engineering at Quest Integrity Group VOLUME 23, ISSUE 6 NOVEMBER DECEMBER
More informationSHELL FLAGS INSPECTION CASE STUDY
SHELL FLAGS INSPECTION CASE STUDY J. Nonemaker, Solution Engineer, ROSEN T. Steinvoorte, Business Development, ROSEN R. Subramanian, Pipelines & Subsea Technical Support Engineer, Shell U.K. Limited Introduction
More informationReliable subsea gas transport; the history and contribution of DNV-OS-F101
OIL & GAS Reliable subsea gas transport; the history and contribution of DNV-OS-F101 GL-ST-F101 Pipeline Safety Philosophy Leif Collberg, Vice President, DNV GL 1 SAFER, SMARTER, GREENER Safety Philosophy,
More informationInvestigation of Stresses in Ring Stiffened Circular Cylinder
International Journal of Engineering and Technical Research (IJETR) ISSN: 2321-869, Volume-2, Issue-9, September 214 Investigation of Stresses in Ring Stiffened Circular Cylinder Neetesh N. Thakre, Dr.
More informationDesign and Optimization of Weld Neck Flange for Pressure Vessel
V th International Symposium on Fusion of Science & Technology, New Delhi, India, January 18-22, 2016 ID: 2016-ISFT-430 Design and Optimization of Weld Neck Flange for Pressure Vessel Vinod Kumar 1, Vivek
More informationFEA ANALYSIS OF PRESSURE VESSEL WITHDIFFERENT TYPE OF END CONNECTIONS
FEA ANALYSIS OF PRESSURE VESSEL WITHDIFFERENT TYPE OF END CONNECTIONS Deval Nitin Bhinde 1 and Rajanarsimha S. 2 1 MTech CAD-CAM & Robotics, 2 Facculty, Department of Mechanical Engineering K.J. Somaiya
More informationI. CHEM. E. SYMPOSIUM SERIES NO. 85
FIRE SURVIVAL OF PROCESS VESSELS CONTAINING GAS J. Nylund * The present work is a theoretical evaluation of the ability of process vessels to survive hydrocarbon fires when the vessels are designed and
More informationP-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints
Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS
More informationDesign and Analysis of Pressure Safety Release Valve by using Finite Element Analysis
Design and Analysis of Pressure Safety Release Valve by using Finite Element Analysis Mr.V.D.Rathod* 1, Prof.G.A.Kadam* 2, Mr.V. G. Patil* 3 * 1 M.E. Design (Pursuing), SKN Sinhgad Institute of Technology&
More informationPlastic non-symmetric bifurcation buckling of circular cylinders under uniform external hydrostatic pressure
icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) Plastic non-symmetric bifurcation buckling of circular
More informationUKOPA Dent Management Strategy
UKOPA Dent Management Strategy 1 Background Pipelines are thin shell structures which are susceptible to geometric distortions and dents during handling, construction, and operation. These dents and distortions,
More informationThe Use of Ultrasonic Inspections at Elevated Temperature
18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa The Use of Ultrasonic Inspections at Elevated Temperature Alex McLAY, Jan VERKOOIJEN, TÜV Rheinland Sonovation 4906AZ
More informationINSPECTION OF MULTI-DIAMETER PIPELINES OPERATING AT LOW PRESSURE. Stefan Vages > ROSEN Group
INSPECTION OF MULTI-DIAMETER PIPELINES OPERATING AT LOW PRESSURE Stefan Vages > ROSEN Group PIPELINE TECHNOLOGY JOURNAL 7 ABSTRACT Particularly in the 1940s and 1950s, gas pipeline systems were not necessarily
More informationUSING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS
USING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS by Dennis C. Johnston and Carolyn E. Kolovich Kiefner & Associates, Inc. P.O. Box
More informationASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES
ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction
More informationA FINITE ELEMENT PROCEDURE TO MODEL THE EFFECT OF HYDROSTATIC TESTING ON SUBSEQUENT FATIGUE CRACK GROWTH
Proceedings of the International Pipeline Conference & Exposition IPC216 September 26-3, 216, Calgary, Alberta, Canada IPC216-64563 A FINITE ELEMENT PROCEDURE TO MODEL THE EFFECT OF HYDROSTATIC TESTING
More information2.1 Introduction to pressure vessels
2.1 Introduction to pressure vessels Pressure vessels in the form of cylinders and tanks are used for storing variety of liquids and gasses at different temperatures and pressures. Some of the substances
More informationSTRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO)
National Institute for Nuclear Physics and High Energy Physics Kruislaan 409 1098 SJ Amsterdam The Netherlands NIKHEF Reference no.: MT-VELO 04-1 EDMS no: 432626 OF THE VACUUM VESSEL FOR THE LHCb VERTEX
More informationEngineering Practice on Ice Propeller Strength Assessment Based on IACS Polar Ice Rule URI3
10th International Symposium on Practical Design of Ships and Other Floating Structures Houston, Texas, United States of America 2007 American Bureau of Shipping Engineering Practice on Ice Propeller Strength
More informationNASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD
NSS/HP-1740.1 This Standard was CANCELLED on Jul 30 2002 22 FEBRUARY 1974 NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD OFFICE OF SAFETY AND RELIABILITY AND QUALITY ASSURANCE NATIONAL AERONAUTICS AND
More informationFinite Element Analysis of an Aluminium Bike Frame
Finite Element Analysis of an Aluminium Bike Frame Word Count: 1484 1 1. Introduction Each new bike model must pass a series of structural tests before being released for public retail. The purpose of
More informationCopyright by Turbomachinery Laboratory, Texas A&M University
Proceedings of the 2 nd Middle East Turbomachinery Symposium 17 20 March, 2013, Doha, Qatar Effectiveness of Windage Features on High Speed Couplings Steven Pennington Global Engineering Manager John Crane
More informationIJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 06, 2016 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 06, 2016 ISSN (online): 2321-0613 Design Optimization and Fabrication of a Low Pressure Vessel Bhagatsinh Verma 1 Ankur
More informationDesign and optimization of a low pressure vessel
Abstract Research Journal of Engineering Sciences ISSN 2278 9472 Design and optimization of a low pressure vessel Available online at: www.isca.in, www.isca.me Received 8 th April 2017, revised 11 th July
More informationAnalysis of Shear Lag in Steel Angle Connectors
University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2013 Analysis of Shear Lag in Steel Angle Connectors Benjamin Sawyer
More informationSTRESS ANALYSIS OF BELL CRANK LEVER
STRESS ANALYSIS OF BELL CRANK LEVER Mr. M. M. Dange 1, Prof. S. R. Zaveri 2 1 Department of Mechanical Engineering, R.C.E.R.T., R.T.M.N.U, Chandrapur, (India) 2 Department of Mechanical Engineering, R.C.E.R.T.,
More informationAvailable online at ScienceDirect. Procedia Engineering 84 (2014 )
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 84 (014 ) 97 93 014 ISSST, 014 International Symposium on Safety Science and Technology Research of emergency venting time in
More informationSubpart E. Pressure Testing
Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.
More informationSimulation Research of a type of Pressure Vessel under Complex Loading Part 1 Component Load of the Numerical Analysis
Simulation Research of a type of Pressure Vessel under Complex Loading Part 1 Component Load of the Numerical Analysis Yufu Zhang 1,2 1. College of Materials Science and Engineering, ; 2. Gansu Lanpec
More informationWire ropes condition monitoring: conception and embodiment
NDT2015, Hyderabad November 26-28, 2015 More info about this article: http://www.ndt.net/?id=21134 Wire ropes condition monitoring: conception and embodiment Alexander Mironenko INTRON PLUS LTD., Moscow,
More informationEvaluating Damage to Onshore and Offshore Pipelines Using Data Acquired Using In-line Inspection Efforts
Evaluating Damage to Onshore and Offshore Pipelines Using Data Acquired Using In-line Inspection Efforts Dr. Chris Alexander Stress Engineering Services, Inc. chris.alexander@stress.com EXECUTIVE SUMMARY
More informationLiquefied gas cargo tanks and process pressure vessels
.1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant
More informationLIMIT STATE DESIGN BASED ON EXPERIMENTAL METHODS FOR HIGH PRESSURE SUBSEA PIPELINE DESIGN
Proceedings of Conference ASME International Offshore Pipeline Forum October 28-29, 2009, Houston, Texas USA LIMIT STATE ESIGN BASE ON EXPERIMENTAL METHOS FOR HIGH PRESSURE SUBSEA PIPELINE ESIGN Chris
More informationExperimental Method to Analyse Limit Load in Pressure Vessel
International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) Dilip M. Patel 1, Dr. Bimlesh Kumar 2 1 Mechanical Department D.N.Patel COE, Shahada 2 Mechanical Department COE, Faizpur Abstract:
More information2003 WJTA American Waterjet Conference August 17-19, 2003 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT?
23 WJTA American Waterjet Conference August 17-19, 23 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT? D. Wright, J. Wolgamott, G. Zink StoneAge, Inc. Durango, Colorado, U.S.A. ABSTRACT At present
More informationHigh-Energy Ship Collision with Jacket Legs
High-Energy Ship Collision with Jacket Legs Jørgen Amdahl Department of Marine Structures, NTNU, Trondheim, Norway Atle Johansen MARINTEK, Trondheim, Norway ABSTRACT Risk analysis of planned jacket installations
More informationThe model of thermal response of Liquefied Petroleum Gas Tanks subjected to accidental heat input
Economic Commission for Europe Inland Transport Committee Working Party on the Transport of Dangerous Goods Joint Meeting of the RID Committee of Experts and the Working Party on the Transport of Dangerous
More informationTHE MISSING LINK - INSPECTING THE FINAL CRITICAL SECTION OF A LARGE CRUDE TRANSMISSION AND EXPORT SYSTEM
THE MISSING LINK - INSPECTING THE FINAL CRITICAL SECTION OF A LARGE CRUDE TRANSMISSION AND EXPORT SYSTEM By: Basil Hostage and Dr. Rainer Schmidt, 3P Services, Germany Summary This paper contains a focussed
More informationOther Si min/max. Cr min/max. 0.4/ / / / Bal.
178.46 Specification 3AL seamless aluminum cylinders. (a) Size and service pressure. A DOT 3AL cylinder is a seamless aluminum cylinder with a imum water capacity of 1000 pounds and minimum service pressure
More informationCorrosion problems in seawater pump caissons. Practical solutions.
Corrosion problems in seawater pump caissons. Practical solutions. Svenn Magne Wigen FORCE Technology Norway AS Hornebergveien 7 7038 Trondheim, Norway Harald Osvoll FORCE Technology Norway AS Hornebergveien
More informationNATURAL GAS MAINTENANCE. Part 192 Subpart "M"
NATURAL GAS MAINTENANCE Part 192 Subpart "M" CONTACT INFORMATION Pamela West Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Main: (405) 686-2310
More informationDesign of a Hyperbaric Chamber for Pressure Testing
MATEC Web of Conferences 13, 03004 (2014) DOI: 10.1051/ matecconf/ 201413 03004 C Owned by the authors, published by EDP Sciences, 2014 Design of a Hyperbaric Chamber for Pressure Testing Shahmir Fikhri
More informationMAY JUNE Mechanical p. 4 Integrity Assessment of NGL Pressure Vessel Mary p. 13 Kay O Connor Safety Symposium
MAY JUNE 2009 Vol 15 Issue 3 Mechanical p. 4 Integrity Assessment of NGL Pressure Vessel 2009 Mary p. 13 Kay O Connor Safety Symposium API RP 581 p. 14 RBI Technology - Worked Example Part 3 of 3 2nd Annual
More informationDrilling Efficiency Utilizing Coriolis Flow Technology
Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities
More informationElastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse
Abstract Elastic-Plastic Finite Element Analysis for Zhongwei--guiyang Natural Gas Pipeline Endangered by Collapse Gengxin Wu,Peng Zhang,Zhixiang Li,Zunhai Ke,Guizhi Li,Anmin Jiang 2 School of Civil Engineering
More informationLearn more at
Full scale model tests of a steel catenary riser C. Bridge 1, H. Howells 1, N. Toy 2, G. Parke 2, R. Woods 2 1 2H Offshore Engineering Ltd, Woking, Surrey, UK 2 School of Engineering, University of Surrey,
More informationRIGID RISERS FOR TANKER FPSOs
RIGID RISERS FOR TANKER FPSOs Stephen A. Hatton 2H Offshore Engineering Ltd. SUMMARY Recent development work on the subject of dynamic rigid (steel pipe) risers demonstrates that their scope of application
More informationGuided Wave Testing (GWT)
Guided Wave Testing (GWT) Use of guided wave testing for the detection and monitoring of corrosion under insulation Peter Philipp Independent GWT consultant Level 3 GUL Level 3 PCN GWT BINDT-ICorr. - 12/05/2013
More informationNON-DESTRUCTIVE INSPECTION OF STEEL WIRE ROPES
The International Journal of TRANSPORT & LOGISTICS Medzinárodný časopis DOPRAVA A LOGISTIKA ISSN 1451-107X NON-DESTRUCTIVE INSPECTION OF STEEL WIRE ROPES Ivan Shpakov 1, Alexander Mironenko 2 1 INTRON
More informationFlow transients in multiphase pipelines
Flow transients in multiphase pipelines David Wiszniewski School of Mechanical Engineering, University of Western Australia Prof. Ole Jørgen Nydal Multiphase Flow Laboratory, Norwegian University of Science
More informationBottom End-Closure Design Optimization of DOT-39 Non-Refillable Refrigerant Cylinders
Y. Kisioglu a) Department of Mechanical Education, Kocaeli University, Izmit, Kocaeli, 41100, Turkey J. R. Brevick Industrial and Systems Engineering, The Ohio State University, Columbus, Ohio G. L. Kinzel
More informationA New Test Setup for Testing Polyethylene Tubes under Constant and Cyclic Internal Pressures
A New Test Setup for Testing Polyethylene Tubes under Constant and Cyclic Internal Pressures S. Vahidi, E. Schruba, Y. Sun, M. McCarthy, and Y. G. Hsuan Drexel University, Philadelphia, PA, USA Abstract
More informationSPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main
SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum
More informationEnbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT
Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project Appendix A to Updated Pipeline Engineering Assessment PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT Table of Contents 1.
More informationMicro Channel Recuperator for a Reverse Brayton Cycle Cryocooler
Micro Channel Recuperator for a Reverse Brayton Cycle Cryocooler C. Becnel, J. Lagrone, and K. Kelly Mezzo Technologies Baton Rouge, LA USA 70806 ABSTRACT The Missile Defense Agency has supported a research
More informationTHE PRESSURE SIGNAL CALIBRATION TECHNOLOGY OF THE COMPREHENSIVE TEST
THE PRESSURE SIGNAL CALIBRATION TECHNOLOGY OF THE COMPREHENSIVE TEST SYSTEM Yixiong Xu Mechatronic Engineering, Shanghai University of Engineering Science, Shanghai, China ABSTRACT The pressure signal
More informationDetermination of Burst Pressure of Spherical Shell
International Journal for Ignited Minds (IJIMIINDS) Determination of Burst Pressure of Spherical Shell Balaji J a & Shivappa H A b a PG Student, Dept. of Mechanical Engineering,Dr. Ambedkar Institute of
More informationDetermination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside
Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Migyeong Kim a, Gyusung Kim a, *, Jongjin Jung a and Wooseung Sim a a Advanced Technology Institute,
More informationBRINGING A NEW DIMENSION TO PIPELINE PIGGING. By: David Aitken, Aubin Group, UK
BRINGING A NEW DIMENSION TO PIPELINE PIGGING By: David Aitken, Aubin Group, UK The importance of keeping pipework clear of restrictions and debris to allow maximum flow conditions cannot be emphasised
More informationAIS data analysis for vessel behavior during strong currents and during encounters in the Botlek area in the Port of Rotterdam
International Workshop on Next Generation Nautical Traffic Models 2013, Delft, The Netherlands AIS data analysis for vessel behavior during strong currents and during encounters in the Botlek area in the
More informationStudy on Stress Analysis of Araldite HY-951 and CY-230 Bell Crank Lever using Photoelasticity and FEM
Study on Stress Analysis of Araldite HY-951 and CY-230 Bell Crank Lever using Photoelasticity and FEM Prasanth Kumar Mallipudi L.Dinesh Anil Neerukonda Institute of Technology and Sciences, Sangivalasa,
More informationThe Application Of Computer Modeling To Improve The Integrity Of Ballast Tanks
Paper No. 4255 The Application Of Computer Modeling To Improve The Integrity Of Ballast Tanks Robert Adey, Guy Bishop, John Baynham, CM BEASY Ltd Ashurst Lodge Southampton, SO40 7AA, UK ABSTRACT Generally
More informationDesign and Analysis of Reactor Dish Vessel
IJIRST International Journal for Innovative Research in Science & Technology Volume 3 Issue 11 April 2017 ISSN (online): 2349-6010 Design and Analysis of Reactor Dish Vessel Aniket D. Patil PG Student
More informationResidual Stresses in Railway Axles
Residual Stresses in Railway Axles ŘEHA BOHUSLAV 1,a,*, VÁCLAVÍK JAROSLAV 2,b NÁVRAT TOMÁŠ 3,c and DAVID HALABUK 3,d 1 GHH-BONATRANS GROUP a.s., Revoluční 1234, 735 94 Bohumín, Czech Republic 2 Výzkumný
More informationRules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)
Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on
More informationHIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS
Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Amer A. Al-Dhafiri Rotating Equipment Engineer Nabeel M. Al-Odan
More informationWith a team of highly qualified divers Vision offers a wide range of services including;
Commercial Diving Services With a team of highly qualified divers Vision offers a wide range of services including; Civils Diving Services Inspections, Construction and maintenance on bridges, piles, quay
More informationCourses of Instruction: Controlling and Monitoring of Pipelines
Courses of Instruction: Controlling and Monitoring of Pipelines Date December 2010 Dr. Peter Eschenbacher Partner Angergraben 4 85250 Altomünster Germany Tel. +49-(0)8254 / 99 69 57 Fax +49-(0)8254 / 99
More informationModeling of thin strip profile during cold rolling on roll crossing and shifting mill
University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 2013 Modeling of thin strip profile during cold
More informationDESIGN AND ANALYSIS OF PRESSURE VESSEL
DESIGN AND ANALYSIS OF PRESSURE VESSEL Vrushali Dilip Solapurkar 1 Assistant Professor, Mechanical Engineering Department, Vadodara Institute of Engineering, Gujarat, India ABSTRACT This technical paper
More informationPNEUMATIC STOPPERS OPERATING MANUAL. Type F G H - FOG
OPERATING MANUAL PNEUMATIC STOPPERS Type F G H - FOG This document is property of SO.CA.P. s.r.l. LISSONE - ITALY - ANY DUPLICATION IS FORBIDDEN Rev 07 del 01/11/2016 info@socapsrl.com - www.socapsrl.com
More informationHOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources
HOW TO NOT MEASURE GAS - ORIFICE Dee Hummel Targa Resources Introduction Measuring natural gas is both a science and an art. Guidelines and industry practices explain how to accurately measure natural
More informationRisk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline
IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline To cite this article: B Sasikirono et al 2017 IOP Conf.
More informationAnalysis of Pressure Safety Relief Valve using Finite Element Analysis
Analysis of Pressure Safety Relief Valve using Finite Element Analysis 1 Mr. M. V. Awati, 2 Prof. S. G. Jadhav, 3 Vinay G. Patil 1 P.G.Student, 2 Proffessor, 3 Consultant 1 Mechanical Department, Veermata
More informationDesign and Finite Element Analysis of Fabricated Panama chock with 225T capacity
LOWER HULL TOP DEC K EL. 3 1 ' - 2 " AB L [ 9 5 0 0 ] ( E) AIR DUC T ( INB D) ( E) B HD 1 4 m m `AH' ( E) PL. 1 2 m m `AH' ( E) L 1 5 0 x9 0 x1 2 m m `AH' - DO- - DO- SMIT BRACKET PANAMA CHOCK International
More informationIrrigation &Hydraulics Department lb / ft to kg/lit.
CAIRO UNIVERSITY FLUID MECHANICS Faculty of Engineering nd Year CIVIL ENG. Irrigation &Hydraulics Department 010-011 1. FLUID PROPERTIES 1. Identify the dimensions and units for the following engineering
More informationTSC developed the practical use of magnetostrictive method for strain measurement and it is embodied in the StressProbe instrument.
TSC StressProbe StressProbe Background OVERVIEW OF TECHNIQUE Magnetisation of ferromagnetic materials such as iron and mild steel have an interaction with elastic strain called magnetostriction, that is,
More informationThe Relationship between the Depth Embedded Pipe Pile and the Force of Clamping Jaw
IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS The Relationship between the Depth Embedded Pipe Pile and the Force of Clamping Jaw To cite this article: Yu Wentai et al 018
More informationPaper 2.2. Operation of Ultrasonic Flow Meters at Conditions Different Than Their Calibration
Paper 2.2 Operation of Ultrasonic Flow Meters at Conditions Different Than Their Calibration Mr William Freund, Daniel Measurement and Control Mr Klaus Zanker, Daniel Measurement and Control Mr Dale Goodson,
More informationVessels subject to External Pressure
Basic principles of compressive force Vessels subject to External Pressure Before After The result of just air pressure! Presented by: Ray Delaforce Basic principles of compressive force Consider For a
More informationDESIGN OPTIMIZATION OF WORK ROLL CHOCK AND BACKUP ROLL CHOCK IN COLD ROLLING MILL
DESIGN OPTIMIZATION OF WORK ROLL CHOCK AND BACKUP ROLL CHOCK IN COLD ROLLING MILL Tukesh Sahu 1, Prof. G.R.Kesheory 2 1M.Tech Scholar, Department of Mechanical Engineering, VITS Indore, MP, India 2Assistant
More informationStructural Design and Analysis of the New Mobile Refuge Chamber
Key Engineering Materials Online: 2013-09-10 ISSN: 1662-9795, Vol. 584, pp 175-178 doi:10.4028/www.scientific.net/kem.584.175 2014 Trans Tech Publications, Switzerland Structural Design and Analysis of
More informationSTRESS ANALYSIS OF PRESSURE VESSEL WITH DIFFERENT END CONNECTIONS
ISSN 2321-6441 STRESS ANALYSIS OF PRESSURE VESSEL WITH DIFFERENT END CONNECTIONS 1 APSARA C. GEDAM, 2 Dr. D. V. BHOPE 1 PG Student, M.Tech (CAD/CAM) R.C.E.R.T., Chandrapur (MH) 2 Professor, Department
More informationBEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C.
BEFORE THE UNITED STATES DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION WASHINGTON, D.C. Pipeline Safety: Meeting of Gas Pipeline Safety Advisory Committee Docket Nos.
More informationASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel
1.0 Introduction ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel Katherine Wilson 28 May 2007 To minimize the hazards associated with vacuum and pressure
More informationABS TECHNICAL PAPERS 2005
OTC 17535 Structural Reliability Applications in Risk-Based Inspection Plans and Their Sensitivities to Different Environmental Conditions A. P. Ku and R. E. Spong, Energo Engineering; C. Serratella, ABS
More informationValve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime
CASE STUDY CS15-02 >> Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime What s Inside:» Explore Double Block & Monitor» Increase Operational Safety» Achieve Double
More informationDesign of Pressure vessel for the Hydrocarbon release from the Vent Header Lines
Design of Pressure vessel for the Hydrocarbon release from the Vent Header Lines Bhargav Mangesh Joshi 1 1Student, Department of mechanical engineering, Modern college of engineering, Pune-5 ---------------------------------------------------------------------***---------------------------------------------------------------------
More information